TREASURE ISLAND - SFGOV Ferry & Bus...TREASURE ISLAND Arts Commission CDR Meeting APR 18, 2016 PHASE...

23
FERRY SHELTER & BUS SHELTERS PHASE 3 - CD TREASURE ISLAND Arts Commission Civic Design Review APRIL 18, 2016

Transcript of TREASURE ISLAND - SFGOV Ferry & Bus...TREASURE ISLAND Arts Commission CDR Meeting APR 18, 2016 PHASE...

Page 1: TREASURE ISLAND - SFGOV Ferry & Bus...TREASURE ISLAND Arts Commission CDR Meeting APR 18, 2016 PHASE 2 SUMMARY 1 PHASE 2 COMMENTS/INFORMAL SESSION FOLLOW UP 1. Lighten up the concrete

FERRY SHELTER & BUS SHELTERS PHASE 3 - CDTREASURE ISLAND

Arts Commission Civic Design ReviewAPRIL 18, 2016

Page 2: TREASURE ISLAND - SFGOV Ferry & Bus...TREASURE ISLAND Arts Commission CDR Meeting APR 18, 2016 PHASE 2 SUMMARY 1 PHASE 2 COMMENTS/INFORMAL SESSION FOLLOW UP 1. Lighten up the concrete

1APR 18, 2016TREASURE ISLAND Arts Commission CDR Meeting PHASE 2 SUMMARY

PHASE 2 COMMENTS/INFORMAL SESSION FOLLOW UP

1. Lighten up the concrete base of the Ferry Shelter a. Let the wall be a wall. b. Seating should be independent or floating off of wall.2. Develop roof details on Ferry and Bus/Shuttle Shelters to create minimal roof edge profile3. Make Bus/Shuttle Shelters more unique, distinctive - do not relate them directly to Ferry Shelter4. Relocate back-flow preventer away from the entrance to the Pier from the Ferry Shelter

Page 3: TREASURE ISLAND - SFGOV Ferry & Bus...TREASURE ISLAND Arts Commission CDR Meeting APR 18, 2016 PHASE 2 SUMMARY 1 PHASE 2 COMMENTS/INFORMAL SESSION FOLLOW UP 1. Lighten up the concrete

2APR 18, 2016TREASURE ISLAND Arts Commission CDR Meeting

FERRY SHELTER &BUS SHELTERS

LOCATION MAP

Page 4: TREASURE ISLAND - SFGOV Ferry & Bus...TREASURE ISLAND Arts Commission CDR Meeting APR 18, 2016 PHASE 2 SUMMARY 1 PHASE 2 COMMENTS/INFORMAL SESSION FOLLOW UP 1. Lighten up the concrete

3APR 18, 2016TREASURE ISLAND Arts Commission CDR Meeting CONTEXT MAP

1. FERRY SHELTER2. SHUTTLE LOADING3. BUS LOADING4. PROMENADE5. CITY VIEW ESPLANADE6. SEATING CUBES7. WATERFRONT LOUNGE8. RAIN GARDEN9. RESTROOM10. HISTORIC BUILDING 1

1

2 4 44

77

10

766 8

8

8

5 5

3

5

9

Page 5: TREASURE ISLAND - SFGOV Ferry & Bus...TREASURE ISLAND Arts Commission CDR Meeting APR 18, 2016 PHASE 2 SUMMARY 1 PHASE 2 COMMENTS/INFORMAL SESSION FOLLOW UP 1. Lighten up the concrete

4APR 18, 2016TREASURE ISLAND Arts Commission CDR Meeting VIEW FROM WATER

Page 6: TREASURE ISLAND - SFGOV Ferry & Bus...TREASURE ISLAND Arts Commission CDR Meeting APR 18, 2016 PHASE 2 SUMMARY 1 PHASE 2 COMMENTS/INFORMAL SESSION FOLLOW UP 1. Lighten up the concrete

5APR 18, 2016TREASURE ISLAND Arts Commission CDR Meeting FERRY SHELTER PLAN

Page 7: TREASURE ISLAND - SFGOV Ferry & Bus...TREASURE ISLAND Arts Commission CDR Meeting APR 18, 2016 PHASE 2 SUMMARY 1 PHASE 2 COMMENTS/INFORMAL SESSION FOLLOW UP 1. Lighten up the concrete

6APR 18, 2016TREASURE ISLAND Arts Commission CDR Meeting FERRY SHELTER: WINDSCREEN BASE - PHASE 2

Page 8: TREASURE ISLAND - SFGOV Ferry & Bus...TREASURE ISLAND Arts Commission CDR Meeting APR 18, 2016 PHASE 2 SUMMARY 1 PHASE 2 COMMENTS/INFORMAL SESSION FOLLOW UP 1. Lighten up the concrete

7APR 18, 2016TREASURE ISLAND Arts Commission CDR Meeting FERRY SHELTER: WINDSCREEN BASE - PHASE 2

Page 9: TREASURE ISLAND - SFGOV Ferry & Bus...TREASURE ISLAND Arts Commission CDR Meeting APR 18, 2016 PHASE 2 SUMMARY 1 PHASE 2 COMMENTS/INFORMAL SESSION FOLLOW UP 1. Lighten up the concrete

8APR 18, 2016TREASURE ISLAND Arts Commission CDR Meeting FERRY SHELTER: WINDSCREEN BASE - CURRENT

Page 10: TREASURE ISLAND - SFGOV Ferry & Bus...TREASURE ISLAND Arts Commission CDR Meeting APR 18, 2016 PHASE 2 SUMMARY 1 PHASE 2 COMMENTS/INFORMAL SESSION FOLLOW UP 1. Lighten up the concrete

9APR 18, 2016TREASURE ISLAND Arts Commission CDR Meeting

T.O. WINDSCREEN13' - 0"

T.O. CONC. WALL1' - 6"

REFERENCE ELEV.0"

CBA

T.O. ROOF22' - 0"

PAVING FS VARIES (SWPD)

MEDIA CENTER

FRAMELESS GLASSWINDSCREEN, TYP

LUMINAIRE, SLTD

SIGNAGE, DIMENSIONALCHARACTERS

PRECAST CONCRETELOW WALL

FERRY SHELTER: ELEVATION W/ CURRENT WINDSCREEN BASE

Page 11: TREASURE ISLAND - SFGOV Ferry & Bus...TREASURE ISLAND Arts Commission CDR Meeting APR 18, 2016 PHASE 2 SUMMARY 1 PHASE 2 COMMENTS/INFORMAL SESSION FOLLOW UP 1. Lighten up the concrete

10APR 18, 2016TREASURE ISLAND Arts Commission CDR Meeting

SS ANGLE SUPPORTS FOR PRECAST PANELS, 12" O.C.

Z-CLIP

REMOVABLE PRECAST PANEL

7 1/2" 7 1/2" 3 1/2"

FERRY SHELTER FRAMELESS WINDSCREEN

WEEP & DRAINAGE CHANNEL TO FRENCHDRAIN, SWPD. 1 PER LITE.

CONT. SILICONE WITH BACKER, TYP.

CITY VIEW ESPLANADE /WATERFRONT PLAZA

FERRY SHELTERINTERIOR

FIXED PRECAST CONCRETE LOWWALL. SEE LOW WALL DETAILS

A10.00 FOR PROFILE

CONDUIT

CONTINUOUS SHOE TOSTL0'-6 1/4"3

1/2"

3 1/2"

GRADE VARIES. SEEGENERAL NOTES

CONTINUOUS TRENCHFOR CONDUIT & JBOX SLOPE 1/4" / 12"

EXPANSION JOINT @ PAVERS (NIC). SWPD

TYP1/2"

REFERENCE ELEVATIONCIVIL SITE ELEVATION 113.75 = 0

8 1/

4"

T.O. CONC. WALL1'-6"

1/2"

1'-6

"

6 1/

4"

1'-7 1/2"

1" 2 1/2"

1'-1

3/8

"

SLOPE 1/4" / 12"

WINDSCREEN SHOE, SEE SHOE DETAILSA9.12

OUTLET, WHERE OCCURS. SEE ELEVATIONS

SS ANGLE SUPPORTS FOR PRECASTPANELS, EMBED @ 12" O.C.

FERRY SHELTER: WINDSCREEN BASE DETAIL - CURRENT

Page 12: TREASURE ISLAND - SFGOV Ferry & Bus...TREASURE ISLAND Arts Commission CDR Meeting APR 18, 2016 PHASE 2 SUMMARY 1 PHASE 2 COMMENTS/INFORMAL SESSION FOLLOW UP 1. Lighten up the concrete

11APR 18, 2016TREASURE ISLAND Arts Commission CDR Meeting FERRY SHELTER: CEILING PATTERN - PHASE 2

Page 13: TREASURE ISLAND - SFGOV Ferry & Bus...TREASURE ISLAND Arts Commission CDR Meeting APR 18, 2016 PHASE 2 SUMMARY 1 PHASE 2 COMMENTS/INFORMAL SESSION FOLLOW UP 1. Lighten up the concrete

12APR 18, 2016TREASURE ISLAND Arts Commission CDR Meeting FERRY SHELTER: CEILING PATTERN - CURRENT

Page 14: TREASURE ISLAND - SFGOV Ferry & Bus...TREASURE ISLAND Arts Commission CDR Meeting APR 18, 2016 PHASE 2 SUMMARY 1 PHASE 2 COMMENTS/INFORMAL SESSION FOLLOW UP 1. Lighten up the concrete

13APR 18, 2016TREASURE ISLAND Arts Commission CDR Meeting

Variegated 10’-0” Planks

FERRY SHELTER: CEILING PATTERN RENDERED - CURRENT

Page 15: TREASURE ISLAND - SFGOV Ferry & Bus...TREASURE ISLAND Arts Commission CDR Meeting APR 18, 2016 PHASE 2 SUMMARY 1 PHASE 2 COMMENTS/INFORMAL SESSION FOLLOW UP 1. Lighten up the concrete

14APR 18, 2016TREASURE ISLAND Arts Commission CDR Meeting FERRY SHELTER: CEILING PATTERN RCP - CURRENT

C

B

A

8765432114'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 18'-0" 14'-0"

14'-0

"16

'-0"

16'-0

"14

'-0"

SL. U

P

SL. U

P

SL. UP

SL. UP

EQEQ

EQEQ

LINE OF LOW WALL ANDMEDIA CENTER BELOW, TYP.

EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ

TYP.

TYP.

FX1

FX1

FX1

FX1

FX1

FX1

FX1

FX1

FX1

FX1

FX1

FX1

FX1

FX1

FX1

FX1

FX1

FX1

FX1

FX1

FX1

FX1

FX1

18' - 0"

OPEN TO SKYLIGHTABOVE, TYP

TYP

18' - 11" TYP

WOOD DECK CEILING

FOLDED ALUMINUMPARAPET CAP ANDFASCIA EDGE

SKYLIGHTSURROUND

MOTION SENSORS,SED

Page 16: TREASURE ISLAND - SFGOV Ferry & Bus...TREASURE ISLAND Arts Commission CDR Meeting APR 18, 2016 PHASE 2 SUMMARY 1 PHASE 2 COMMENTS/INFORMAL SESSION FOLLOW UP 1. Lighten up the concrete

15APR 18, 2016TREASURE ISLAND Arts Commission CDR Meeting FERRY SHELTER: CEILING SECTION

1

8

RAFTER BEYOND

STEEL COL (SSD)

METAL DECK

GYPSUM SHEATHING

WATERPROOFING

STANDING SEAM MTL ROOFING

B.O. GLAZING

IPE WOOD CEILING

COAT W/ GALVANIZED REPAIR PAINT, TYP

WATERPROOFING

2'-10 5/8" CLEAR

1'-10 1/4"

T.O. ROOF22' - 0"

B.O. CEILING18' - 0"

4'-0

"

2 1/2" MTL STUD

7/8" HAT CHANNEL

SKYLIGHT SURROUNDW/ WELDED STUDS

14'-0" 4'-6"

1'-11 3/4" 1'-11 3/4"

A1000 UNISTRUT SUSPENSION SYSTEM@ 3'-0" X 3'-0" OC, MAX, SEISMIC

LATERAL BRACING @ 6'-0" OC, TYP

Page 17: TREASURE ISLAND - SFGOV Ferry & Bus...TREASURE ISLAND Arts Commission CDR Meeting APR 18, 2016 PHASE 2 SUMMARY 1 PHASE 2 COMMENTS/INFORMAL SESSION FOLLOW UP 1. Lighten up the concrete

16APR 18, 2016TREASURE ISLAND Arts Commission CDR Meeting FERRY SHELTER: MEDIA CENTER ELEVATION

Page 18: TREASURE ISLAND - SFGOV Ferry & Bus...TREASURE ISLAND Arts Commission CDR Meeting APR 18, 2016 PHASE 2 SUMMARY 1 PHASE 2 COMMENTS/INFORMAL SESSION FOLLOW UP 1. Lighten up the concrete

17APR 18, 2016TREASURE ISLAND Arts Commission CDR Meeting FERRY SHELTER: MEDIA CENTER ELEVATIONS

Page 19: TREASURE ISLAND - SFGOV Ferry & Bus...TREASURE ISLAND Arts Commission CDR Meeting APR 18, 2016 PHASE 2 SUMMARY 1 PHASE 2 COMMENTS/INFORMAL SESSION FOLLOW UP 1. Lighten up the concrete

18APR 18, 2016TREASURE ISLAND Arts Commission CDR Meeting ARCHITECTURAL MATERIAL PALETTE

PRECAST CONCRETE(WINDSCREEN LOW WALL)

LAMINATED GLASS (FERRY SHELTER WINDSCREEN, MEDIA CENTERS, BUS/SHUTTLE SHELTERS)

CONCRETE PAVERS(FINISH PAVERS, BY OTHERS)

IPE WOOD - PRE-WEATHERED WITH AGING STAIN (CEILING, BUS/SHUTTLE SHELTERS)

METAL - PEARL MOUSE GREY - RAL 7048 (FASCIA, SKYLIGHT SURROUND, COLUMNS, ROOF, BUS/SHUTTLE SHELTERS)

BRUSHED STAINLESS STEEL, GRADE 316(HARDWARE, MISCELLANEOUS FIXTURES)

Page 20: TREASURE ISLAND - SFGOV Ferry & Bus...TREASURE ISLAND Arts Commission CDR Meeting APR 18, 2016 PHASE 2 SUMMARY 1 PHASE 2 COMMENTS/INFORMAL SESSION FOLLOW UP 1. Lighten up the concrete

19APR 18, 2016TREASURE ISLAND Arts Commission CDR Meeting BUS/SHUTTLE SHELTER - CURRENT

Page 21: TREASURE ISLAND - SFGOV Ferry & Bus...TREASURE ISLAND Arts Commission CDR Meeting APR 18, 2016 PHASE 2 SUMMARY 1 PHASE 2 COMMENTS/INFORMAL SESSION FOLLOW UP 1. Lighten up the concrete

20APR 18, 2016TREASURE ISLAND Arts Commission CDR Meeting BUS/SHUTTLE SHELTER - CURRENT

Page 22: TREASURE ISLAND - SFGOV Ferry & Bus...TREASURE ISLAND Arts Commission CDR Meeting APR 18, 2016 PHASE 2 SUMMARY 1 PHASE 2 COMMENTS/INFORMAL SESSION FOLLOW UP 1. Lighten up the concrete

21APR 18, 2016TREASURE ISLAND Arts Commission CDR Meeting BUS/SHUTTLE SHELTER ELEVATION - CURRENT

B3 B2 B1

OPEN

PAVING NIC, SWPD

10"

FOLDED ALUMINUM DARPET CAPAND FASCIA EDGE

FOLDED ALUMINUM PANEL

TYPE B GLAZING: LAMINATED GLASS

Page 23: TREASURE ISLAND - SFGOV Ferry & Bus...TREASURE ISLAND Arts Commission CDR Meeting APR 18, 2016 PHASE 2 SUMMARY 1 PHASE 2 COMMENTS/INFORMAL SESSION FOLLOW UP 1. Lighten up the concrete

22APR 18, 2016TREASURE ISLAND Arts Commission CDR Meeting

BA6’-0”

9’-6”

25 - TREASURE ISLAND

MAP/INFORMATION

18”

1x2 IPE WOOD SLAT BENCH W/ PRE-AGING STAIN

BRUSHED STAINLESS STEEL GLAZING & BENCH SUPPORTS

7” CIRCULAR STEEL COLUMNS

1/2” STRUCTURAL TEMPERED GLASS

1/8” ALUMINUM FOLDED PANEL AWNING

STAINLESS STEEL DISPLAY CASE

SECTION @ BUS SHELTER (SCALE: 3/4”)MATERIALS PALETTE

1/8” ALUMINUM PLATE, KYNAR FINISH 7048 (PEARL MOUSE GREY).

BRUSHED STAINLESS STEEL GRADE 316.

CONCRETE (BY OTHERS)

IPE W/ PRE-AGING STAIN

BUS/SHUTTLE SHELTERS - CURRENT