Transregional Capacity Building Programme for Audit of Public Debt Management Meeting of Working...
-
Upload
clara-barton -
Category
Documents
-
view
214 -
download
0
Transcript of Transregional Capacity Building Programme for Audit of Public Debt Management Meeting of Working...
Transregional Capacity Building Programme for Audit of Public Debt Management
Meeting of Working Group on Public Debt
14-15 June 2010
Mexico City
Presentation PlanThe IDI’s Capacity Building Programmes
The IDI – WGPD Capacity Building Programme on Public Debt Management Audit (PDMA)
Completed Activities
Ongoing Activities
Plans for 2011
What worked well
Challenges and support required
Capacity building of an SAI is the development of its institutional framework, people, processes and products in a sustainable manner
enabling SAIs to deliver their mandate more effectively
The IDI’s Capacity Building Programmes
Professional Staff Development
Organizational Systems
Development
Institutional Development
Audit Impact
Table Report
Carry out Audit
Competent Staff
Audit Methodology
Committed Resources
Mandate
Effective Audit Function in an SAI
Transregional Programme on Public Debt Management Audit (PDMA) 2008-2011
Objective :To enhance both professional staff development and organisational
capacity of target SAIs in public debt management audit
1. Web based course in PDMA
2. 31 SAI Audit teams trained
3. Completed PDM Audit
4. PDMA guidance
1. Institutionalisation of PDMA
2. Acceptance of audit recommendations
3. Enhancement of the PDM
Output Outcome
Status of Participating SAIs 29 of 31 SAIs
7 of 8 French-speaking SAIs (AFROSAI F)
22 of 23 English-speaking SAIs (AFROSAI E, ASOSAI, EUROSAI, PASAI)
78 participants: 33 female + 45 male
Resource Persons
English-speaking GroupsMr. Jose Oyola – US GAO
Mrs. Roula Katergi – DMFAS/UNCTAD
French -speaking GroupsMrs. Teresa Nunes – SAI Portugal
Mr. Gabor Piski – DMFAS/UNCTAD
Regional SMEMrs. Regina Chilupula – SAI Zambia
Commonwealth SecretariatMr. Walton Gilpin
UNITAR
World BankMr. Tomas I. Magnusson
STATUS of ACTIVITIES
Completed ActivitiesDeployment of PDMA e-Course in English & French (#4) 5 October to 27 November 2009
10 sessions + case studies
Main Mentors from INTOSAI WGPD• English-speaking Group : Mr. Jose Oyola• French-speaking Group : Mr. Teresa Nunes
Support by DMFAS• English-speaking Group: Mrs. Roula Katergi• French-speaking Group: Mr. Gabor Piski
UNITAR platform
Outputs ( 2 of 4 Programme Output)• e-Course Modules available in two languages• 29 SAI audit teams trained
E-course evaluation
Importance of PDM and A
PDM Concept
Audit
Planning PA
CaseStudies
Online Development of Audit Plan (#5)Objective: to develop draft audit plan (audit design matrix and calendar)
Output: Draft Audit Plan on selected audit topics
29 SAIs in December 2009 – February 2010
Face-to-face Audit Planning Meetings (#6)Objective: peer and SMEs review on draft audit plan
Output: Agreed Audit Plan on selected audit topics
29 SAIs - one-week meeting (Senegal, Kenya, & Indonesia – March)
1st Draft Public Debt Management Audit Guidelines
Completed Activities
Selected Audit Topics
Financial, Regularity and Performance Audit
Audit Topics:Legal Framework and Organisational Arrangement
Debt Strategy
Debt Management Office
Management of External Loans
Management of Loan Guarantees
Management of Government Debt Securities
Management of Debt Securities in Domestic Market
Borrowing Activities
Debt Servicing Activities
Public Debt Information Systems
Debt Reporting and Monitoring Process
On going Projects
Objective: to conduct a pilot audit based on the approved audit plan from data collection until draft audit report
Output: draft audit reports ready to be reviewed by peers and SMEs in the audit review meeting
Approved Audit Design Matrix and Calendar • All completed
• 30 April 2010: AFROSAI-F
• 15 May 2010 : English-speaking SAIs
Audit completion: • 14 SAIs completed before December 2010
• 15 SAIs completed after December 2010
Pilot Audits (#7a)
Audit Supports (#7b)
On going Projects
Online Supportshttp://groups.yahoo.com/group/The_IDI_TPDMA_Group/
http://fr.groups.yahoo.com/group/idiverificationdettepublique/
20 Onsite Supports
OECD country list
Last resort: need basis and only if audit team is stuck
A team of 2 experts: WGPD and DMFAS
Development of Audit Guideline
On going Projects
Objective: to develop PDMA Guidelines – methodology and detailed audit procedures of all audit topics
ResourcesWGPD Guidelines, E-learning course and Audit Design Matrix
SMEs and Selected Audit Teams/Participants
Status1st Draft and feedback on format and structure by SMEs (Dec 2010)
2nd Draft will be available before Audit Review Meeting for participants’ feedback (March 2011)
3rd Draft will be circulated to key stakeholders
Finalisation - mid 2011 (Wrap-up Meeting)
Development of Audit Guideline
On going Projects
StructureIntroduction
Public Debt Concepts
Audit of Public Debt Management Concepts
One chapter for each audit topic covering components of the audit design matrix
One chapter on performance audit of public debt management
3 audit review meetings in March 2011 (#8)Review of draft audit findings and discussion on draft audit procedures
Feedback on the 2nd draft audit guideline and SAI plan for adoption of audit guideline
Wrap up Meeting (#9)Lessons Learned
Monitoring on approval and publishing of audit report
Finalisation of audit guideline
Plan for 2011
Partnership with WGPD for SMEs for the programme
Partnership with DMFAS for experts on debt management
Partnership with UNITAR for e-learning and online audit plan development
Partnership with World Bank, Commonwealth Secretariat, and Regional SME
What worked well
Availability of resource persons to conduct on-site visit
Diverse maturity levels – PDM and Audit
Challenge & support required
Muchas Gracias!
Thank you for your attention!www.idi.no
Online Course EvaluationCourse Information – overall is sufficient
Content and Pedagogical Approach 44% fully, 54% to large extent and 2 % partially achieve overall objectives
PDM structure of each country and more depth on certain topics
References, glossary and external links are very useful
Interaction during the course (discussion board)41% extremely useful, 56% very useful, and 2% useful
32% almost everyday, 56% twice a week, 10% a few times and 1-7 hrs/week
User-friendliness and functionality of e-course portalExcellent 71% and very good 29%
Online Course Evaluation
Contribution of course mentors (moderation, clarity and responsiveness)
63% excellent and 37% very good
Technical support and informationExcellent 54%, very good 44% and good 2%
Challenge: 7% no support from superior, 41% easily incorporate course in work hrs and 2% difficult
English-Speaking SAIs
French-Speaking SAIs