Transportation Technical Committee Chair · PDF fileMark Land from Snyder & Associates...
Transcript of Transportation Technical Committee Chair · PDF fileMark Land from Snyder & Associates...
Boone County • Dallas County • Jasper County • Madison County • Marion County
Polk County • Story County • Warren County • Adel • Boone • Huxley • Indianola
Knoxville • Nevada • Newton • Pella • Perry • Story City • Winterset
The CIRTPA receives federal funding and may not discriminate against anyone on the basis of race, color, or national origin, according to Title VI of the Civil Rights Act of 1964. For more information or to obtain a Title VI Complaint form, call 515-334-0075.
Denny Buyert, City of Pella Transportation Policy Committee Chair
Todd Hagan, Madison County Transportation Technical Committee Chair
420 Watson Powell Jr. Parkway, Suite 200 Des Moines, Iowa 50309
Phone: 515.334.0075 www.cirtpa.org
1. Call To Order
2. VOTE: Approval of Agenda
3. VOTE: Approval of Meeting Minutes .......................................................................................................... Page 2 • Approve the March 9, 2017, meeting minutes.
4. PUBLIC INPUT: Federal Fiscal Year 2017-2020 Transportation Improvement Program RevisionRequest….………………………………………………………………………………………………………………………………….……………Page 5
• Opportunity for the public to comment on proposed revisions to the Federal Fiscal Year 2017-2020Transportation Improvement Program.
5. DISCUSSION: Opportunity for Regional Transportation Issues to be Discussed ....................................... Page 6• Opportunity for communities or individuals to present regional transportation issues for discussion.
6. REPORT and VOTE (TPC ONLY): Des Moines Area Metropolitan Planning Organization Invoice to CIRTPA forthe 3rd Quarter of Fiscal Year 2017 ............................................................................................................ Page 7
• Report on the MPO’s invoice to CIRTPA for the 3rd Quarter of Fiscal Year 2017; consider approval.7. REPORT and VOTE: CIRTPA Fiscal Year 2018 Unified Planning Work Program…………………..............….....Page 9
• Report on the Fiscal Year 2018 Unified Planning Work Program; consider approval.8. REPORT and VOTE: Draft FFY 2018-2021 Transportation Improvement Program…………………..…..…......Page 10
• Report on draft FFY 2018-2020 TIP; consider approval.9. REPORT and OPTIONAL VOTE: Federal Fiscal Year 2017-2020 Transportation Improvement Program
Revision Requests……………...….……………..……………………………………………..…..……………………………….………..Page 11 • Report on the requests to amend projects in the FFY 2017-2020 TIP; consider approval.
10. REPORT: Best Practice Series: Complete Streets for Small Towns and Rural Communities ................... Page 15• Report on new tool for complete streets in small towns and rural settings.
11. REPORT: Draft Bridge Report ................................................................................................................... Page 16• Discussion regarding the draft trail bridge report.
12. REPORT: dTIMS Pavement Condition Forecasting and Licensing………………………………………………………...Page 17• Report on the development of pavement condition forecasting reports.
13. Other Non-Action Items of Interest to the Committee
14. Next Meeting Date
• Approval of the next meeting date for 9:30 a.m., Thursday July 20, 2017, Burnham Meeting Room.
15. Adjournment
Boone County • Dallas County • Jasper County • Madison County • Marion County
Polk County • Story County • Warren County • Adel • Boone • Huxley • Indianola
Knoxville • Nevada • Newton • Pella • Perry • Story City • Winterset
May 2017 Item No. 3
ISSUE: Approval of Meeting Minutes
VOTE: Review and approve the minutes of the March 9, 2017, Joint Committee meeting.
BACKGROUND:
Included, immediately following are the minutes of the March 9, 2017, CIRTPA Joint Committee meeting.
RECOMMENDATION:
Approve the minutes of the March 9, 2017, CIRTPA Technical Committee only and Joint Committee meeting.
STAFF CONTACTS:
Andrew Collings, [email protected]; (515) 334-0075.
2
MEETING MINUTES
CENTRAL IOWA REGIONAL TRANSPORTATION PLANNING ALLIANCE (CIRTPA)
TRANSPORTATION POLICY COMMITTEE (TPC)
AND
TRANSPORTATION TECHNICAL COMMITTEE (TTC)
JOINT MEETING
MARCH 9, 2017
CIRTPA TTC Members Present:
Todd Hagan | Madison County
Tyler Christian | Marion County
Bret VandeLune | Polk County
Tyler Sparks | Story County
Dean Yordi | Warren County
Anthony Brown | City of Adel
Wayne Schwartz | City of Boone
John Haldeman | City of Huxley
Dennis Webb | City of Knoxville
Larry Stevens | City of Nevada
Keith Laube | City of Newton
Josh Wuebker | City of Perry
CIRTPA TTC Members Absent:
Scott Kruse | Boone County
Alan Miller | Dallas County
Russell Stutt | Jasper County
Chuck Burgin | City of Indianola
Wayne Peterson | Mitchellville
Denny Buyert | City of Pella
Mark Jackson | Story City
Mark Nitchals| City of Winterset
Julia Castillo | HIRTA
CIRTPA TPC Members Present:
Brad Golightly | Dallas County
Dennis Carpenter | Jasper County
Todd Hagan | Madison County
Steve McCombs | Marion County
Bret VandeLune | Polk County
Tyler Sparks | Story County
Dean Yordi | Warren County
Anthony Brown | City of Adel
Wayne Schwartz | City of Boone
John Haldeman | City of Huxley
Aaron Adams | City of Knoxville
Larry Stevens | City of Nevada
Keith Laube | City of Newton
Josh Wuebker | City of Perry
CIRTPA TPC Members Absent:
Ryan Waller | City of Indianola
Jon Woods | City of Mitchellville
Denny Buyert | City of Pella
Mark Jackson | Story City
Mark Nitchals | City of Winterset
Julia Castillo | HIRTA
Others Present:
Mike Clayton | Iowa DOT
Carl Saxon | DART
Arlinda McKeen | SPPG
John Rouse | Boone County
Staff Present:
Todd Ashby | Executive Director
Dylan Mullenix | Assistant Director
Andrew Collings | Transportation Planner
Zach Young | Principal Planner
Tracey Deckard | Office Manager
1. Call to Order
CIRTPA TPC Vice Chair Brad Golightly called the CIRTPA TPC and the CIRTPA TTC March 9,
2017, Joint Committee Meeting to order at 9:34 a.m., in the CIRTPA Office, 420 Watson Powell,
Jr. Parkway, Des Moines, Iowa. A quorum was present.
2. Approval of the Agenda
MOTION: A motion was made and seconded to approve the joint CIRTPA TPC March 9, 2017,
meeting agenda.
MOTION CARRIED UNANIMOUSLY
3. Approval of Meeting Minutes
MOTION: A motion was made and seconded to approve March 9, 2017, meeting minutes as
amended.
3
MOTION CARRIED UNANIMOUSLY
4. Formation of Watershed Management Authorities
Mark Land from Snyder & Associates presented regarding the Beaver Creek and Middle
River WMA.
Report only.
5. MPO Strategic Plan
Arlinda McKeen from SPPG presented information regarding the MPO Strategic Plan.
Report only.
6. Public Input on TIP Revisions
None.
7. CIRTPA Fiscal Year 2018 Unified Planning Work Program
Staff presented. Discussion ensued.
MOTION: A motion was made and seconded to approve the CIRTPA Fiscal Year 2018 Unified
Planning Work Program as amended regarding Marion County.
MOTION CARRIED UNANIMOUSLY
8. Federal Fiscal Year 2017-2020 Transportation Improvement Program Amendment Requests
Staff presented. Discussion ensued.
MOTION: A motion was made and seconded to approve the proposed amendments to the FFY
2017-2020 TIP made by Jasper County and HIRTA.
MOTION CARRIED UNANIMOUSLY
9. Federal Fiscal Year 2018-2021 Transportation Improvement Program Development
Staff presented. Report only.
10. Other Non-Action Items of Interest to the Committee
Wayne Schwartz requested that future agendas indicate if each voting item is a Policy
and/or TTC voting item.
Mike Clayton from the IDOT advised of a Public Input meeting regarding LRTP.
11. Next Meeting Date
Next Joint CIRTPA Meeting will be held on Thursday, May 18, 2017.
12. Adjournment
Meeting adjourned at 9:55 a.m.
4
Boone County • Dallas County • Jasper County • Madison County • Marion County
Polk County • Story County • Warren County • Adel • Boone • Huxley • Indianola
Knoxville • Nevada • Newton • Pella • Perry • Story City • Winterset
May 2017 Item No. 4
ISSUE: Public Input on TIP Revisions
PUBLIC INPUT: Opportunity for public comment on proposed revisions to the Federal Fiscal Years 2017-2020 Transportation Improvement Program.
BACKGROUND:
The CIRTPA’s Public Participation Plan provides an opportunity for the public to comment on Transportation Improvement Program (TIP) revisions at CIRTPA Policy Committee meetings. This item is to allow for public comment on proposed TIP revisions (agenda item 9).
RECOMMENDATION:
None. Public comment only.
STAFF CONTACT:
Andrew Collings, [email protected]; (515) 334-0075.
5
Boone County • Dallas County • Jasper County • Madison County • Marion County
Polk County • Story County • Warren County • Adel • Boone • Huxley • Indianola
Knoxville • Nevada • Newton • Pella • Perry • Story City • Winterset
May 2017 Item No. 5
ISSUE: Opportunity for Regional Transportation Issues to be Discussed
DISCUSSION: Opportunity for communities or individuals to present regional transportation issues for discussion.
BACKGROUND:
The CIRTPA sets aside time each month for individuals and non-CIRTPA communities within the CIRTPA planning area to come in and discuss regional transportation issues.
RECOMMENDATION:
None. Public discussion only.
STAFF CONTACT:
Andrew Collings, [email protected]; (515) 334-0075.
6
Boone County • Dallas County • Jasper County • Madison County • Marion County
Polk County • Story County • Warren County • Adel • Boone • Huxley • Indianola
Knoxville • Nevada • Newton • Pella • Perry • Story City • Winterset
May 2017 Item No. 6
ISSUE: Des Moines Area Metropolitan Planning Organization Invoice to CIRTPA for the 3rd Quarter of Fiscal Year 2017
REPORT AND VOTE (TPC ONLY): Brief report and approval of the Des Moines Area Metropolitan Planning Organization (MPO) Invoice to CIRTPA for the 3rd Quarter of Fiscal Year 2017.
BACKGROUND:
The MPO bills the CIRTPA for work conducted on the CIRTPA’s behalf on a quarterly basis. The MPO’s 3rd Quarter Fiscal Year 2017 Invoice covers work conducted for the period beginning January 1, 2017 through March 31, 2017. If approved, the CIRTPA staff will proceed with reimbursing the MPO.
Included, immediately following is a copy of the MPO 3rd Quarter Fiscal Year 2017 Invoice.
RECOMMENDATION:
Approve payment to the Des Moines Area Metropolitan Planning Organization for the 3rd Quarter of Fiscal year 2017 billing period, January 1, 2017 through March 31, 2017.
STAFF CONTACTS:
Zach Young, [email protected]; (515) 334-0075.
7
Des Moines Area MPO INVOICE TO CIRTPA 3RD QUARTER FY 2017From:1/1/2017 To: 3/31/2017
WORK ACTIVITIES
Code Description Time Cost
8.1 CIRTPA ‐ Program Administration 128.00 $10,240.00
8.2 CIRTPA ‐ Funding 12.00 $960.00
8.3 CIRTPA ‐ Long‐Range Transportation Plan 1.00 $80.00
8.4 CIRTPA ‐ Public Participation Plan 0.00 $0.008.5 CIRTPA ‐ Planning Support 80.00 $6,400.00
STAFF HOURS/COST SUBTOTAL 221.00 $17,680
Assigned Name Fee Time Cost
TA Todd Ashby $80.00 10.00 $800.00
GO Gunnar Olson $80.00 0.00 $0.00
TJD Tracey Deckard $80.00 36.00 $2,880.00
DM Dylan Mullenix $80.00 7.00 $560.00
ZY Zach Young $80.00 89.00 $7,120.00
TD Teva Dawson $80.00 0.00 $0.00
MC Marcus Coenen $80.00 0.00 $0.00
MA Mike Armstrong $80.00 0.00 $0.00
AC Andrew Collings $80.00 56.00 $4,480.00
AR Allison Riley $80.00 23.00 $1,840.00
INT Intern $80.00 0.00 $0.00221.00 $17,680
DIRECT COSTS
$0.00DIRECT COSTS SUBTOTAL $0.00
STAFF HOURS/COST SUBTOTAL $17,680
DIRECT COSTS SUBTOTAL $0.00
17,680$ Des Moines Area MPO INVOICE AMOUNT
8
Boone County • Dallas County • Jasper County • Madison County • Marion County
Polk County • Story County • Warren County • Adel • Boone • Huxley • Indianola
Knoxville • Nevada • Newton • Pella • Perry • Story City • Winterset
May 2017 Item No. 7
ISSUE: CIRTPA Fiscal Year 2018 Unified Planning Work Program
REPORT AND VOTE: Consider approval of the Fiscal Year 2018 Unified Planning Work Program.
BACKGROUND:
The CIRTPA staff developed the draft Fiscal Year 2018 Unified Planning Work Program (FY 2018 UPWP), which documents all transportation planning activities the CIRTPA will perform using federal funds from July 1, 2017 through June 30, 2018. The Iowa Department of Transportation (DOT) requires that the UPWP describe the CIRTPA’s proposed planning activities – including task objectives, previous work, project descriptions, and work products – as well as the budget and funding sources to carry out the planning activities. The Iowa DOT requires the CIRTPA to submit a final UPWP by June 1, 2017.
CIRTPA approved the draft UPWP at their March 9, 2017 meeting, and staff forwarded the draft UPWP to the Iowa DOT and the FHWA. The DOT provided staff with comments. Staff addressed the comments and updated the UPWP document accordingly.
A copy of the Fiscal Year 2018 Unified Planning Work Program will be made available before the May meeting.
RECOMMENDATION:
Approve the Fiscal Year 2018 Unified Planning Work Program and forward on the Iowa DOT for final approval.
STAFF CONTACTS:
Zach Young, [email protected]; (515) 334-0075.
9
Boone County • Dallas County • Jasper County • Madison County • Marion County
Polk County • Story County • Warren County • Adel • Boone • Huxley • Indianola
Knoxville • Nevada • Newton • Pella • Perry • Story City • Winterset
May 2017 Item No. 8
ISSUE: Draft FFY 2018-2021 Transportation Improvement Program
REPORT AND VOTE: Consider approval of the Federal Fiscal Year 2018-2021 Transportation Improvement Program.
BACKGROUND:
The CIRTPA staff is annually required to develop a four-year Transportation Improvement Program (TIP) by updating the current TIP for the CIRTPA. The purpose of the TIP is to list all projects in the CIRTPA Planning Area for which are using Federal funding and scheduled to begin within a designated period of the four federal fiscal years.
The CIRTPA staff requested that CIRTPA member governments and participating agencies review and report any project changes, new projects, or “roll-over” projects programmed in Federal Fiscal Year (FFY) 2017, 2018, 2019, 2020, and/or 2021. Staff generated a project list for the FFY 2018-2021 TIP using responses from each member government.
Staff will submit the FFY 2018-2021 TIP draft to the Iowa Department of Transportation (DOT) and Federal Highway Administration for review and comment on June 15, 2017. Staff will incorporate comments received into the final draft. The final FFY 2017-2020 TIP is due to the Iowa DOT by July 21, 2017.
The CIRTPA staff will schedule a public input meeting for the FFY 2018-2021 TIP draft at 5:00 p.m. on Tuesday June 20, 2017 at the CIRTPA office, in order to provide an opportunity for the public to comment.
The draft FFY 2018-2021 TIP will be made available to committees before the May meeting.
Staff requests that CIRTPA member governments review both lists and provide comments/updates by May 30, 2017.
RECOMMENDATION:
Approve the draft FFY 2017-2020 TIP.
STAFF CONTACT:
Andrew Collings, [email protected]; (515) 334-0075.
10
Boone County • Dallas County • Jasper County • Madison County • Marion County
Polk County • Story County • Warren County • Adel • Boone • Huxley • Indianola
Knoxville • Nevada • Newton • Pella • Perry • Story City • Winterset
May 2017 Item No. 9
ISSUE: Federal Fiscal Year 2017-2020 Transportation Improvement Program Amendment Requests
REPORT AND OPTIONAL VOTE: Consider approval of the request to the Federal Fiscal Years 2017-2020 Transportation Improvement Program.
BACKGROUND:
The Iowa DOT and the City of Perry have requested the following revisions to the Federal Fiscal Year 2017-2020 Transportation Improvement Program (FFY 2017-2020 TIP):
Sponsor: Iowa DOT Project: On IA14, from 1.6 mi W of IA224 to 2.2 mi N of Laurel Federal Aid Amount: $28,000 Federal Aid Type: HSIP Total Cost: $32,000 TIP Projects Modifications: None necessary from CIRTPA, will be handled at the state level Change: Add project to FFY 2017 of the TIP
Sponsor: City of Perry Project: in the city of Perry, Willis Avenue Bridge over Frog Creek (Bridge #503845) Federal Aid Amount: $440,000 Federal Aid Type: STBG-HBP Total Cost: $550,000 TIP Projects Modifications: See corresponding change to Madison County’s Cottonwood bridge project (below), TPMS #29319 Change: Add project to FFY 2017 of the TIP
Sponsor: Madison County Project: On COTTONWOOD AVE, Over N BR NORTH RIVER, at SE S5 T77 R29 Federal Aid Amount: $960,000 Federal Aid Type: STBG-HBP Total Cost: $1,200,000 TIP Projects Modifications: Removing this project from TIP to accommodate the Willis Avenue Bridge project (above), TPMS# 32232 Change: Remove project from the TIP
Included, immediately following, are maps of the proposed TIP amendments.
11
Boone County • Dallas County • Jasper County • Madison County • Marion County
Polk County • Story County • Warren County • Adel • Boone • Huxley • Indianola
Knoxville • Nevada • Newton • Pella • Perry • Story City • Winterset
RECOMMENDATION:
Approve proposed amendments to the FFY 2017-2020 TIP.
STAFF CONTACT:
Andrew Collings, [email protected]; (515) 334-0075.
12
Iowa TPMS project map 2:28 PM 5-12-2017
Sponsor Perry
Identity BRM-5970(615)--8N-25 TPMS# 32232 TIP# --
Location In the city of Perry, Willis Avenue Bridgeover Frog Creek (Bridge # 503845)
Characteristics Minor Arterial / /
Type of Work Bridge Replacement
Vicinity Map
Project Site
13
Iowa TPMS project map 2:28 PM 5-12-2017
Sponsor Madison CRD
Identity BROS-C061(104)--8J-61 TPMS# 29319 TIP# 70315 NBIS# 235110
Location On COTTONWOOD AVE, Over N BRNORTH RIVER, at SE S5 T77 R29
Characteristics / 0.03 MI / 35 - 35
Type of Work Bridge Replacement
Vicinity Map
Project Site
14
Boone County • Dallas County • Jasper County • Madison County • Marion County
Polk County • Story County • Warren County • Adel • Boone • Huxley • Indianola
Knoxville • Nevada • Newton • Pella • Perry • Story City • Winterset
May 2017 Item No. 10
ISSUE: Best Practice Series: Complete Streets for Small Towns Rural Communities
REPORT: Presentation on new tool for complete streets in small towns and rural settings.
BACKGROUND:
The MPO continues the Best Practices Series with a presentation on a new FHWA tool called Small Town and Rural Multimodal Networks. This is a practitioner’s guide to implementing complete streets and multimodal networks in small towns and rural settings based on national guidelines and research. The guide covers mixed traffic facilities, visually separated facilities, physically separated facilities, key network opportunities, and planning and project development strategies.
The guide also includes specific case studies from small communities and outlines extensive considerations for how different infrastructure can be implemented within the context of small towns and rural areas.
RECOMMENDATION:
None. Report and discussion only.
STAFF CONTACT:
Mike Armstrong, [email protected] (515) 334-0075
15
Boone County • Dallas County • Jasper County • Madison County • Marion County
Polk County • Story County • Warren County • Adel • Boone • Huxley • Indianola
Knoxville • Nevada • Newton • Pella • Perry • Story City • Winterset
May 2017 Item No. 11
ISSUE: Draft Bridge Condition Report
REPORT: Discussion regarding the draft report on bridge conditions in the MPO planning area.
BACKGROUND:
MPO staff has developed a report outlining the condition of bridges in the MPO planning area. The report is a follow up to regional performance measures set forth in Mobilizing Tomorrow. Staff used 2016 data from the Iowa DOT to identify locations of deficient bridges in the region, as well as the amount of deck area considered to be in both good and poor condition. The report also outlines bridge quality for each member government. The report ends with an Environmental Justice (EJ) review comparing bridge conditions in EJ areas versus non-EJ areas.
The draft Bridge Condition Report is available on the CIRTPA website (click to access).
RECOMMENDATION:
None. Report and discussion only.
STAFF CONTACT:
Marcus Coenen, [email protected] (515) 334-0075
16
Boone County • Dallas County • Jasper County • Madison County • Marion County
Polk County • Story County • Warren County • Adel • Boone • Huxley • Indianola
Knoxville • Nevada • Newton • Pella • Perry • Story City • Winterset
May 2017 Item No. 12
ISSUE: dTIMS Pavement Condition Forecasting and Licensing
REPORT: Discussion regarding the development of pavement condition forecasting reports.
BACKGROUND:
MPO staff has developed an example report using the dTIMS software that prioritizes road improvement projects for the next ten years. Staff utilized road condition and road maintenance data from the Iowa DOT to build the report. The report reviews each road segment within the City of Perry and determines the schedule of projects that provides the greatest benefit-to-cost ratio.
The report highlights the ability of the dTIMS program to forecast and plan for roadway capital improvements projects. For a member community to be able to use the software they need to purchase a license of $1,000. CIRTPA can purchase each community a license for 80% of the cost, with each community being responsible for the other 20%, or about $200.
The pavement forecasting and projects selection report will be made available to committees before the May meeting
RECOMMENDATION:
None. Report and discussion only.
STAFF CONTACT:
Andrew Collings, [email protected] (515) 334-0075