Statewide Integrated Transportation Reliability Program Southern Nevada Stakeholders Meeting March 5, 2009

Transcript of Transportation Reliability Program...Mar 05, 2009  · Los Angeles Adaptive Traffic Control System...

Page 1: Transportation Reliability Program...Mar 05, 2009  · Los Angeles Adaptive Traffic Control System North Central Texas Council of Governments Thoroughfare Assessment Traffic Signal

Statewide IntegratedTransportation Reliability Program

Southern Nevada Stakeholders MeetingMarch 5, 2009

Page 2: Transportation Reliability Program...Mar 05, 2009  · Los Angeles Adaptive Traffic Control System North Central Texas Council of Governments Thoroughfare Assessment Traffic Signal

Agenda

ITRP Status

Best Practices

Gap Analysis Process

Next Steps

Page 3: Transportation Reliability Program...Mar 05, 2009  · Los Angeles Adaptive Traffic Control System North Central Texas Council of Governments Thoroughfare Assessment Traffic Signal

ITRP Development Process –Phase I

Page 4: Transportation Reliability Program...Mar 05, 2009  · Los Angeles Adaptive Traffic Control System North Central Texas Council of Governments Thoroughfare Assessment Traffic Signal

ITRP Development Process –Phase II

Page 5: Transportation Reliability Program...Mar 05, 2009  · Los Angeles Adaptive Traffic Control System North Central Texas Council of Governments Thoroughfare Assessment Traffic Signal

ReliabilityFocusRegions

1. Las VegasMetropolitan Area

2. Reno/Sparks/Carson City/Tahoe

3. I-80 Corridor

4. Rural Corridors

5. Statewide

Page 6: Transportation Reliability Program...Mar 05, 2009  · Los Angeles Adaptive Traffic Control System North Central Texas Council of Governments Thoroughfare Assessment Traffic Signal

Reliability Issues and Impacts

Las Vegas Metropolitan Area– Recurring congestion

• Unique peak travel periods

• Capacity

– Infrastructure deployment

– Incident management – TIM Coalition

– Land use planning and future expansion

– Regional systems and coordination withlocal systems

– Access management

– Traveler information

– Transit/Multimodal

– FUNDING

Page 7: Transportation Reliability Program...Mar 05, 2009  · Los Angeles Adaptive Traffic Control System North Central Texas Council of Governments Thoroughfare Assessment Traffic Signal

Goals/Priorities for Program

Funding – for implementing operationsand strategiesTraveler information – need a ‘push’system to get information to publicInformation sharing among agencies –data collected in region could bebeneficial to multiple agenciesLimited arterial capacity – cannotsupport freeway traffic, accessmanagement, arterial detour routesIncident management and responsecoordination – coordinate with localagencies for arterial impacts fromfreeway incidents

Page 8: Transportation Reliability Program...Mar 05, 2009  · Los Angeles Adaptive Traffic Control System North Central Texas Council of Governments Thoroughfare Assessment Traffic Signal

Overview of Best PracticesReference Guide

Best practices and innovativeapproaches by category

Federal programs and initiatives forcongestion management

Other processes and strategies –performance measures, land useplanning, emerging trends

5 case studies

Page 9: Transportation Reliability Program...Mar 05, 2009  · Los Angeles Adaptive Traffic Control System North Central Texas Council of Governments Thoroughfare Assessment Traffic Signal

Areas for Potential Best PracticesLand use/access management planningwith a congestion management focusExpanding TIM focus to include arterialsMode shift to alleviate recurringcongestionInnovative funding approaches – howfunds are utilized/distributed to allow fornear-term operational enhancementsLocalized/regional traveler informationapproaches

Page 10: Transportation Reliability Program...Mar 05, 2009  · Los Angeles Adaptive Traffic Control System North Central Texas Council of Governments Thoroughfare Assessment Traffic Signal

Case StudiesWashington State DOT and theGeorgia DOT –Incident management,traveler information, maximize capacitythrough HOT lanes and corridormanagement, statewide traveler infoMaryland CHART – Performancemonitoring, documenting cost/benefitAZTech™ in Phoenix, Arizona – Regionaltraveler information, institutionalframework for operationsMetropolitan TransportationCommission (MTC) in the San FranciscoBay Area – urban multimodal travelerinformation, integrated corridors

Page 11: Transportation Reliability Program...Mar 05, 2009  · Los Angeles Adaptive Traffic Control System North Central Texas Council of Governments Thoroughfare Assessment Traffic Signal

How to Use Reference Guide

Strategies Featured Best Practices and ApproachesSection 2 – Maximizing CapacityReducing Bottlenecks Los Angeles Operation Bottleneck Relief Program

Minnesota DOT Bottleneck Reduction ProgramHigh-Occupancy Toll (HOT) Lanesand Reversible Lanes

Minnesota MnPass Express Lanes Congestion PricingFlorida DOT Miami-Dade I-95 Express LanesTucson Arterial Reversible LanesPhoenix Arterial Reversible LanesDallas Freeway Reversible Zipper Lanes

Traffic Control Devices (TrafficSignal Timing and Ramp Metering)

Los Angeles Adaptive Traffic Control SystemNorth Central Texas Council of Governments Thoroughfare

Assessment Traffic Signal Timing ProgramMaricopa Association of Governments Traffic Signal Optimization

Funding ProgramTwin Cities Ramp Metering Evaluation Program

Organized into sections:• Maximizing capacity• Demand management• Traffic incident management• Work zone management• Road weather management• Traveler information

Not all sections will apply to all regions – usethe sections that your region can apply

Page 12: Transportation Reliability Program...Mar 05, 2009  · Los Angeles Adaptive Traffic Control System North Central Texas Council of Governments Thoroughfare Assessment Traffic Signal

Gap Analysis Process

GAP = a system, functional, or policydeficiency that is impacting theability of NDOT to continue toimprove the reliability of travel inNevada

Goal for gap analysis process = toshift ITRP discussions and planningefforts from the core causes ofcongestion and unreliability to thesix gap analysis categories

Page 13: Transportation Reliability Program...Mar 05, 2009  · Los Angeles Adaptive Traffic Control System North Central Texas Council of Governments Thoroughfare Assessment Traffic Signal

Gap Categories

Capacity Improvements and TravelDemand Management

Traffic Incident Management

Work Zone Management

Traveler Information

Planning and Policy

Operations and Management

Page 14: Transportation Reliability Program...Mar 05, 2009  · Los Angeles Adaptive Traffic Control System North Central Texas Council of Governments Thoroughfare Assessment Traffic Signal

Gap Analysis Category ID by Region

ITRPRegions

Gap Analysis Category

CapacityImprovements

and TDM

TrafficIncident

Mgmt

Work ZoneMgmt

TravelerInformation

Planning andPolicy

Operationsand Mgmt

Las VegasMetro

Reno/Sparks/ Carson

City/ LakeTahoe

I-80 Corridor

RuralHighwayCorridors

Statewide

Page 15: Transportation Reliability Program...Mar 05, 2009  · Los Angeles Adaptive Traffic Control System North Central Texas Council of Governments Thoroughfare Assessment Traffic Signal

Strategy Types

Technical – equipment, technology,systems

Institutional – agency/organizationculture, staff capacity, ability ofagencies to partner

Policy – formal policy atorganizational, regional, or state level

Process – programs, actions, oractivities to deliver a specific serviceor reach a specific goal

Page 16: Transportation Reliability Program...Mar 05, 2009  · Los Angeles Adaptive Traffic Control System North Central Texas Council of Governments Thoroughfare Assessment Traffic Signal

Strategy Types (continued)

Agency Operations – Internaloperational procedures ofrequirements, management andmaintenance responsibilities

Funding – Existing and future fundingsources, activities, priorities

To most effectively address the gapsand the many influences on each gapbased on the way Nevada currentoperates

Page 17: Transportation Reliability Program...Mar 05, 2009  · Los Angeles Adaptive Traffic Control System North Central Texas Council of Governments Thoroughfare Assessment Traffic Signal

Example Gap for Las Vegas Region

Gap Specific Deficiencies

Strategy Type

Tech

nica

l

Inst

itutio

nal

Polic

y

Proc

ess

Agen

cy O

pera

tions

Fund

ing

Lack of arterial,freeway andintersection/interchangecapacity toprocess trafficvolumes duringpeak periods

Lack of right-of-way in developed areas constrains the abilityto expand existing facilities and develop new facilities andtransit options.

X

Lack of funding to support construction of new roadways orwidening existing facilities. X

Local agencies do not have a formal process in place as partof their capital improvement programs to identify capacityconstrained areas, develop mitigation strategies andprioritize potential improvement projects.

X X X

Requirements for right-of-way dedication have not beenconsistently applied by local agencies to new development. X X X

Page 18: Transportation Reliability Program...Mar 05, 2009  · Los Angeles Adaptive Traffic Control System North Central Texas Council of Governments Thoroughfare Assessment Traffic Signal

Example Gap for Las Vegas Region

Gap Specific Deficiencies

Strategy Type

Tech

nica

l

Inst

itutio

nal

Polic

y

Proc

ess

Agen

cy O

pera

tions

Fund

ing

Lack of arterial,freeway andintersection/interchangecapacity toprocess trafficvolumes duringpeak periods

A disconnect exists between local agencies and withinagency planning and engineering departments.Infrastructure projects do not typically look beyond theimmediate project area to incorporate other traffic demandmanagement measures or evaluate long-range landplanning.

X X X

Impacts of development are felt beyond jurisdictionalboundaries. A regional approach to traffic impact analysis isneeded.

X X X

No funding mechanism exists for agencies to effectivelyidentify and address near-term or immediate operationalimprovements

X

Page 19: Transportation Reliability Program...Mar 05, 2009  · Los Angeles Adaptive Traffic Control System North Central Texas Council of Governments Thoroughfare Assessment Traffic Signal

Example Gap for Las Vegas Region

Gap Specific Deficiencies

Strategy Type

Tech

nica

l

Inst

itutio

nal

Polic

y

Proc

ess

Agen

cy O

pera

tions

Fund

ing

Accessmanagementpolicies do notexist or are notapplied uniformlyin the region

There are no uniform guidelines that can be utilized on alocal level. The current NDOT access management policy isdirected towards high-speed state facilities and does notaddress volume and throughput needs of today’s urbancorridors.

X X

There is no requirement to review access management fornew developments at the regional level. Inconsistent accessmanagement requirements at agency boundaries createconflicts along corridors.

X X

There are no regional or local impact fees in place to driveaccess management planning and compliance. X

Page 20: Transportation Reliability Program...Mar 05, 2009  · Los Angeles Adaptive Traffic Control System North Central Texas Council of Governments Thoroughfare Assessment Traffic Signal

Trends in Gaps

Across all regions:Sharing incident and weatherinformation that affects traffic withmultiple agenciesLack of detour routesNeed to get more information outto travelersStatewide systems not sufficient toprovide detailed information toagenciesFUNDING

Page 21: Transportation Reliability Program...Mar 05, 2009  · Los Angeles Adaptive Traffic Control System North Central Texas Council of Governments Thoroughfare Assessment Traffic Signal

Effort and Impact on Reliability

Low Effort

High Impact

IMPA

CT M

EASU

RE

EFFORT MEASURE

Low Effort

Low Impact

High Effort

High Impact

High Effort

Low Impact

Strategy 1• Does not requirenew staff

• Does not affect manyreliability issues

Strategy 2• Needs training

and new staff• Addresses manyneeds

Page 22: Transportation Reliability Program...Mar 05, 2009  · Los Angeles Adaptive Traffic Control System North Central Texas Council of Governments Thoroughfare Assessment Traffic Signal

Next Steps

Stakeholder review of:– Tech Memo #3 Best Practices

Reference Guide– Tech Memo #4 Gap Analysis

Next phase in the ITRP process(Phase II):– Develop detailed strategies to

address gaps– Develop implementation plan to

guide the deployment of thestrategies

– Develop performance measures

Page 23: Transportation Reliability Program...Mar 05, 2009  · Los Angeles Adaptive Traffic Control System North Central Texas Council of Governments Thoroughfare Assessment Traffic Signal

Contact Information

John Domina – Nevada DOT [email protected]

Pierre Pretorius – [email protected]

Lisa Burgess – [email protected]

Page 24: Transportation Reliability Program...Mar 05, 2009  · Los Angeles Adaptive Traffic Control System North Central Texas Council of Governments Thoroughfare Assessment Traffic Signal

ITRP Focus Areas