Existing Transportation Infrastructure & Olympic Clusters
2
HTPR MAP
SANTA CRUZ LINE
DESCRIPTION
SUBWAY-RAILWAY
CONNECTIONS
RAILWAY-BRT
SUBWAY
RAILWAY
SUBWAY-BRT
Deodoro
Barra
Maracanã
Copacabana
Transportation Projects – BRTs (Bus Rapid Transit)
3
HTPR MAP
BRT TRANSOESTE
▪ Project Management: City Hall
▪ Funding: City Hall
▪ Value: USD 484 M
▪ End: dec/2012
▪ Concession: Existing operator
▪ Extension: approximately 55 km
▪ Demand: 135K users daily
▪ Hub: BRT´s Transcarioca and Transolympic
▪ OBS: Exclusive connecting Barra da Tijuca to Santa Cruz
BRT TRANSOESTE
Transportation Projects – BRTs (Bus Rapid Transit)
4
HTPR MAP
BRT TRANSOESTE
BRT TRANSCARIOCA
▪ Project Management: City Hall
▪ Funding: City Hall / Federal
▪ Value: USD 930 M
▪ Public Tender: dec/2010
▪ Extension: approximately 39 km
▪ Demand: 380K users daily
▪ Hub: subway and train systems
▪ OBS: exclusive BRT lane connecting Barra da Tijuca to the Tom Jobim Intl. Airp.
Transportation Projects – BRTs (Bus Rapid Transit)
5
HTPR MAP
BRT TRANSOESTE
BRT TRANSOLYMPIC
▪ Project Management: PPP
▪ Funding: PPP
▪ Value: USD 1.3 Bi
▪ Extension: approximately 20km
▪ Demand: 130K users daily
▪ Capacity: approximately 30 thousand cars daily
▪ OBS: Expressway with exclusive BRT lane connecting Barra da Tijuca to Deodoro
Transportation Projects – BRTs (Bus Rapid Transit)
6
HTPR MAP
BRT TRANSOESTE
BRT AV. BRASIL
▪ Project Management: State
▪ Value: USD 720 M
▪ Capacity: 47K users at peak time
▪ Extension: approximately 21km
▪ Hub: 3 terminals (Via Dutra, Washington Luiz and Downtown Rio)
▪ Project in development
Transportation Projects – BRTs (Bus Rapid Transit)
7
HTPR MAP
BRT TRANSOESTE
METRO LINE 4
▪ Project Management: State
▪ Funding: State
▪ Value: USD 2.8 Bi
▪ Concession: Existing operator
▪ Hub: South Zone (Ipanema) –Barra da Tijuca
Transportation Projects
8
HTPR MAP
SANTA CRUZ LINE
BRT TRANSOESTE
DESCRIPTION
SUBWAY-RAILWAY
CONNECTIONS
RAILWAY-BRT
BRT
SUBWAY
RAILWAY
SUBWAY-BRT
PROJECTS
EXISTING
US$ 8,4 bi investments in new transportation projects and enhancement of the existing infrastructure
Transportation Projects
9
DESCRIPTION
SUBWAY-RAILWAY
CONNECTIONS
RAILWAY-BRT
BRT
SUBWAY
RAILWAY
SUBWAY-BRT
PROJECTS
EXISTING
US$ 8,4 bi investments in new transportation projects and enhancement of the existing infrastructure
HTPR MAP
SANTA CRUZ LINE
BRT TRANSOESTE
Deodoro
Barra
Maracanã
Copacabana
Investments (USD Bi)
BRTs 3,4
Other 5,0
Total 8,4
Extension (Km) 135
Demand (K users daily) 1045