TRANSPARES
INTRODUCTION
-
7/25/2019 Transpares Ltd Profile
2/29
About us:TransparesTransparesTransparesTranspares LimitedLimitedLimitedLimited, a renowned name in the field of Transformer
cooling system engaged in manufacturing and supply of Pressed Steel
Transformer Radiators in different sizes for distribution & powertransformers. Transpares was established in 1995 with a view to be the
best in field and has come a long way becoming supplier to major
trans ormer manu acturer in omestic mar et as we as nternationa
market.
Transpares Limited is situated in well developed industrial area
in the vicinity of Ahmadabad having all the infrastructure facilities. The
factory is spread over a land area of nearly 10, 000 sq. mtr and a built up
area of 3550 sq. mtr with manufacturing capacity of 3000 tons per annum.
-
7/25/2019 Transpares Ltd Profile
3/29
Pressed Steel Radiators
F Type Flange Type W Type Weld able Type
Swan Neck Type Off - Set Type
-
7/25/2019 Transpares Ltd Profile
4/29
Construction of Pressed Steel Radiator
Radiator Panel:- CRCA Grade D Sheets as perIS : 513:1990 used in radiatorpanel from well renownedsuppliers like :
Essar Steels Indian Steel Corporation JSW Steel Ltd. Etc.,
Header Pipe:- Header pipes supplied in bothERW as well as in two halvesin outer diameter 90mm and114mm as per customer
requirement
Paints: being procured frominternational brands like:
Hempel Ltd, Akzonobel Coatings Pvt Ltd Jotun India Private Limited
-
7/25/2019 Transpares Ltd Profile
5/29
Forming MIG &
FlangeWelding
PressureTesting
Manufacturing Process Chart
SpotWelding
SeamWelding
EdgeCutting
Assembly ofRadiator
Oil flushing& Inside
Varnishing
ShotBlasting
Painting
Dispatch
-
7/25/2019 Transpares Ltd Profile
6/29
Manufacturing Process Control
Manufacturing Process is Control by ISO norms.Plant-wide use of ISO 9001:2008 approachAll radiators should manufacture under IEEMAstandard.
Type tests can be carried out at customer defined
frequencies
Routine Tests carried out for each product
100% leak test at standard specified operating pressure
Control on ancillary process such as Forming, Spot & Seam
Welding, MIG Welding, Assembly , Painting and Packing.
-
7/25/2019 Transpares Ltd Profile
7/29
Forming Forming is done on advanced CNC roll forming machine according
to the lengths as per customer requirements. At this stage requiredquantity of cooling channels are created which provide the
transformer oil circulation inside the radiators.
-
7/25/2019 Transpares Ltd Profile
8/29
Spot & Seam Welding : Radiator slices are welded together by using multiple spot welding
at the determined points where the oil grooves are contracted toeach other. Edges are welded to each other by using seam welding
machine and prepared complete panels for Assembly.
-
7/25/2019 Transpares Ltd Profile
9/29
Edge Cutting:
-
7/25/2019 Transpares Ltd Profile
10/29
Assembly:
-
7/25/2019 Transpares Ltd Profile
11/29
MIG & Flange Welding
-
7/25/2019 Transpares Ltd Profile
12/29
Grinding:
-
7/25/2019 Transpares Ltd Profile
13/29
Testing facilities
All product are validated at Transpares , state-of-the-art, in-housetesting facilities
100 % Leak profness test : As per standard practice radiator tested
underwater at 2 kg/cm sq. air pressure for the period of 30 minutes.
-
7/25/2019 Transpares Ltd Profile
14/29
Oil flushing & Internal Coating : Radiator internal surface is protected by
flushing of Transformer oil and varnishing.
-
7/25/2019 Transpares Ltd Profile
15/29
Painting: Flood painting a unique painting process has beenadopted to achieve free flow (sag less) finished surface
with uniform paint DFT throughout the surface of
radiators. Total Dry Film Thickness provided is inbetween 80 to 250 as per customers specification.Separate paint booths are being used for Primer,n erme a e na coa .
-
7/25/2019 Transpares Ltd Profile
16/29
Packing: Packing being the most effective area of concern,
Transpares makes radiators are packed with sturdywooden blocks, properly nailed & tightened with steel
straps. Domestic radiators are packed either in woodenpallets or in crates as per customers requirement
Proper care is taken with all safety measures for Export
bubble sheet covering
-
7/25/2019 Transpares Ltd Profile
17/29
Inspection & Quality Control : Radiators are inspected and controlled stage wise toachieve good quality of the product. Continualimprovement action is taken against customer
comments.
-
7/25/2019 Transpares Ltd Profile
18/29
Nitrogen Gas Filling at positive pressure beingdone in radiators on customer demand
-
7/25/2019 Transpares Ltd Profile
19/29
Center Cooling DISSIPATED PER SECTION FOR OIL EXCESS TEMPERATURE OF Weight Oil Per
distance surface per section
L1 per 35C 40C 45C 50C 55C 60C section in
in mmsection
m2 ONAN ONAF ONAN ONAF ONAN ONAF ONAN ONAF ONAN ONAF ONAN ONAF kg Litres
800 0.513 141 241 162 284 184 329 206 379 232 423 259 487 5.17 2.26900 0.575 154 263 177 310 201 360 226 416 255 465 283 533 5.77 2.461000 0.640 171 292 196 343 222 397 250 460 281 512 312 587 6.37 2.66
1100 0.703 184 315 212 371 238 426 270 497 304 554 338 625 6.97 2.86
1200 0.767 195 333 227 397 256 458 288 530 326 594 361 668 7.57 3.061300 0.831 208 356 241 416 272 487 306 563 347 632 385 712 8.17 3.26
1400 0.894 221 378 256 442 290 519 324 596 368 670 407 753 8.77 3.46
1500 0.958 233 398 266 459 302 540 338 622 383 698 425 786 9.37 3.661600 1.024 245 419 285 492 322 576 360 662 407 741 449 830 9.97 3.86
1700 1.085 256 438 296 511 335 599 374 688 422 769 467 878 10.57 4.06
1800 1.150 267 457 311 536 349 625 391 719 441 803 487 916 11.17 4.261900 1.212 279 477 324 559 363 650 407 749 459 836 507 954 11.77 4.46
2000 1.278 291 498 335 578 378 676 422 776 476 867 525 987 12.37 4.66
HEAT DISSIPATION DATA FOR 4 FLUTE DESIGN TRANSFORMER RADIATORS
3 0 0 mm W I D E3 0 0 mm W I D E3 0 0 mm W I D E3 0 0 mm W I D EINDICATIVE
VALUES
. . .2200 1.404 310 530 359 619 405 725 449 824 509 927 561 1050 13.57 5.06
2300 1.466 321 549 368 635 416 745 467 857 525 956 577 1079 14.17 5.262400 1.530 333 569 382 659 430 770 482 885 541 985 596 1115 14.77 5.46
2500 1.596 343 587 394 680 444 795 498 914 556 1012 610 1141 15.37 5.662600 1.659 353 604 404 697 458 811 513 942 572 1044 628 1175 15.97 5.86
2700 1.723 362 619 415 716 468 829 522 953 586 1070 644 1205 16.57 6.06
2800 1.788 373 638 430 742 485 859 541 988 602 1099 665 1244 17.17 6.262900 1.844 382 653 437 754 494 875 553 1004 613 1125 682 1276 17.77 6.46
3000 1.918 393 672 450 779 506 901 567 1030 630 1157 698 1306 18.37 6.66
CORRECTION FACTOR
Vertical distance in mm between 0 100 200 300 400 500 600 800 1000
core center line and radiator center line.
Correction Factor K1 0.8 0.85 0.89 0.925 0.95 0.975 1.0 1.05 1.1
Horizontal distance between radiators : 350 375 400 425 450 500 550
Correction Factor 0.75 0.82 0.87 0.9 0.93 0.97 1
Number of sections per radiator : 3 4-5 6-8 9-11 12-14 15-17 18-20 21-24
Correction Factor K3 1.1 1.06 1.02 1 0.99 0.98 0.97 0.96
-
7/25/2019 Transpares Ltd Profile
20/29
Center Cooling DISSIPATED PER SECTION FOR OIL EXCESS TEMPERATURE OF Weight Oil Per
distance surface per section
L1 per 35C 40C 45C 50C 55C 60C section in
Mm section m2 ONAN ONAF ONAN ONAF ONAN ONAF ONAN ONAF ONAN ONAF ONAN ONAF kg Liters
800 0.96 259 437 308 521 361 611 415 701 478 808 520 879 8.55 2.82
900 1.08 288 486 328 554 378 639 426 720 500 845 532 900 9.55 3.12
1000 1.20 316 533 364 615 411 695 462 781 522 883 548 927 10.55 3.42
1100 1.32 342 577 391 661 444 751 498 842 561 949 626 1058 11.55 3.70
1200 1.45 364 614 422 713 477 807 537 908 606 1025 673 1138 12.55 3.99
1300 1.56 391 660 452 764 511 864 572 967 646 1092 719 1216 13.55 4.28
1400 1.68 414 699 479 810 540 913 608 1028 684 1156 760 1285 14.55 4.55
1500 1.80 434 733 507 857 570 964 621 1049 723 1222 801 1354 15.55 4.83
1600 1.93 459 775 532 899 600 1014 673 1137 759 1283 840 1420 16.55 5.11
1700 2.05 479 809 557 941 628 1062 706 1193 792 1339 880 1488 17.55 5.40
1800 2.16 502 847 582 984 656 1109 734 1240 829 1402 915 1547 18.55 5.68
HEAT DISSIPATION DATA FOR 24 FLUTE DESIGN TRANSFORMER RADIATORS
5555 2222 0000 mmmmmmmm WWWW IIII DDDD EEEE INDICATIVE VALUES
. . .
2000 2.41 545 920 631 1066 709 1199 795 1344 896 1515 987 1669 20.55 6.26
2100 2.53 563 950 654 1105 736 1244 825 1394 921 1557 1024 1731 21.55 6.54
2200 2.64 582 982 678 1146 762 1288 851 1438 959 1621 1057 1787 22.55 6.82
2300 2.77 603 1018 702 1186 786 1329 881 1489 991 1675 1091 1844 23.55 7.10
2400 2.90 628 1060 724 1224 814 1376 907 1533 1017 1719 1127 1905 24.55 7.39
2500 3.01 645 1089 744 1257 837 1415 936 1582 1046 1768 1156 1954 25.55 7.67
2600 3.13 666 1124 764 1291 816 1380 963 1627 1069 1807 1190 2012 26.55 7.95
2700 3.25 682 1151 786 1328 886 1498 990 1673 1105 1868 1223 2067 27.55 8.25
2800 3.38 704 1188 807 1364 911 1540 1021 1725 1135 1919 1256 2123 28.55 8.53
2900 3.49 721 1217 829 1401 933 1577 1044 1764 1163 1966 1286 2174 29.55 8.81
3000 3.62 744 1256 851 1438 988 1670 1082 1829 1193 2017 1355 2290 30.55 9.09
CORRECTIONCORRECTIONCORRECTIONCORRECTION FACTORFACTORFACTORFACTOR
Vertical distance in mm between 0 100 200 300 400 500 600 800 1000
Core center line and radiator center line.
Correction Factor K1 0.80 0.850 0.890 0.925 0.950 0.975 1.00 1.05 1.10
Horizontal distance between radiators : 575 600 625 650 675 700
Correction Factor 0.888 0.916 0.953 0.977 0.989 1.00
No. of sections per radiator : 3 4-5 6-8 9-11 12-14 15-17 18-20 21-24 25-28
Correction Factor K3 1.11 1.06 1.02 1.0 0.95 0.90 0.84 0.82 0.80
-
7/25/2019 Transpares Ltd Profile
21/29
5S at TRANSPARES
Radiator Process line
Packing AreaStore Area
Safety
-
7/25/2019 Transpares Ltd Profile
22/29
CERTIFICATION
TransparesTransparesTransparesTranspares LimitedLimitedLimitedLimited has been
certified ISO 9001:2008 by BVQI
for Manufacturing & Servicing of
Pressed Steel Radiators for
Power & Distribution
Transformers.
-
7/25/2019 Transpares Ltd Profile
23/29
ERDA TEST CERTIFICATE
Our product is ERDA certifies under the Specification of CI No:17.2.2.1 of IEEMA : 9-1990
We also doing Routine test at our premises and follow the IEEMAspecification
-
7/25/2019 Transpares Ltd Profile
24/29
Various Approvals
Transparesmake radiators are approved byNTPC up to size of center distance 3200 mmin 520 mm width.
Power Grid has approved TransparesmakeRadiators for up to 100 MVA / 220 kV voltageClass
-
7/25/2019 Transpares Ltd Profile
25/29
Transpares Performance Review
-
7/25/2019 Transpares Ltd Profile
26/29
Transpares Performance Review
-
7/25/2019 Transpares Ltd Profile
27/29
Transformers & Rectifiers (I) Ltd.
Bharat Heavy Electricals Ltd. - Jhansi
Vijai Electricals Ltd. Haridwar
OUR ESTEEMED CUSTOMER:
Andrew Yule & Company Ltd. Chennai
IMP Powers Ltd, - Mumbai.
KRYFS Power Components Ltd.
Sudhir Transformers Ltd.
-
7/25/2019 Transpares Ltd Profile
28/29
Serving to Major Electricity Board:
Maharashtra State Electricity Board. (MSETCL)
Gujarat Electricity Board. (GETCO)
Jharkhand State Electricity Board. (J.S.E.B.)
Tamilnadu Transmission Corporation Ltd. (TANTRANSCO.)
Power grid Corporation of India Ltd.(PGCIL)
National Thermal Power Corporation. (NTPC)
Karnataka Power Transmission Corporation Ltd.( K.P.T.C.L.).
Rajasthan Rajya Vidyut Prasaran Nigam limited.(R.R.V.P.N.L.)Uttarpradesh Power Transmission Corporation Limited. (U.P.P.T.C.L)
West Bengal State Electricity Transmission Corporation Limited.
(W.B.S.E:T.C.L.)
Haryana Vidyut Prasaran Nigam Limited. (H.V.P.N.L.)
Andhra Pradesh Power Transmission Corporation Limited.
(AP.TRANS.Co.)
Telangana Eletricity Board .
-
7/25/2019 Transpares Ltd Profile
29/29
TRANSPARES LIMITEDTRANSPARES LIMITEDTRANSPARES LIMITEDTRANSPARES LIMITEDREGISTERED OFFICE & PLANT14 -15, Ashwamegh Industrial Estate, Sarkhej Bavla Highway, Village:Changodar, Tal: Sanand, Dist: Ahmedabad-382 210, Gujarat.Telephone No: 02717-250633, +91-9687659990 Mo: +91-9687659980Email: [email protected]: [email protected]