Transmission Tariff and Market Design Rulemaking Alice Fernandez, Mark Hegerle, Kevin Kelly, Dave...
-
Upload
laura-fowler -
Category
Documents
-
view
216 -
download
0
Transcript of Transmission Tariff and Market Design Rulemaking Alice Fernandez, Mark Hegerle, Kevin Kelly, Dave...
![Page 1: Transmission Tariff and Market Design Rulemaking Alice Fernandez, Mark Hegerle, Kevin Kelly, Dave Mead, Ed Murrell, Joe Power, and Dave Withnell.](https://reader036.fdocuments.us/reader036/viewer/2022072115/56649cdc5503460f949a7aa6/html5/thumbnails/1.jpg)
Transmission Tariff and Market Design Rulemaking
Alice Fernandez, Mark Alice Fernandez, Mark Hegerle, Kevin Kelly, Dave Hegerle, Kevin Kelly, Dave
Mead, Mead,
Ed Murrell, Joe Power, Ed Murrell, Joe Power,
and Dave Withnelland Dave Withnell
![Page 2: Transmission Tariff and Market Design Rulemaking Alice Fernandez, Mark Hegerle, Kevin Kelly, Dave Mead, Ed Murrell, Joe Power, and Dave Withnell.](https://reader036.fdocuments.us/reader036/viewer/2022072115/56649cdc5503460f949a7aa6/html5/thumbnails/2.jpg)
Reasons for Standard Market Design Rulemaking
Objective is a seamless national Objective is a seamless national electricity marketplaceelectricity marketplace
Need to look at power markets Need to look at power markets together with transmission together with transmission marketsmarkets
Greater standardization is needed Greater standardization is needed
![Page 3: Transmission Tariff and Market Design Rulemaking Alice Fernandez, Mark Hegerle, Kevin Kelly, Dave Mead, Ed Murrell, Joe Power, and Dave Withnell.](https://reader036.fdocuments.us/reader036/viewer/2022072115/56649cdc5503460f949a7aa6/html5/thumbnails/3.jpg)
Plan for NOPR
Build off of RTO Week discussions and Build off of RTO Week discussions and work of the Electronic Scheduling work of the Electronic Scheduling CollaborativeCollaborative
Make key policy decisions on the Make key policy decisions on the elements of standard market designelements of standard market design
Use industry collaborative process to Use industry collaborative process to develop detailed standardsdevelop detailed standards
![Page 4: Transmission Tariff and Market Design Rulemaking Alice Fernandez, Mark Hegerle, Kevin Kelly, Dave Mead, Ed Murrell, Joe Power, and Dave Withnell.](https://reader036.fdocuments.us/reader036/viewer/2022072115/56649cdc5503460f949a7aa6/html5/thumbnails/4.jpg)
Elements of the NOPR
Changes required in the Changes required in the pro forma pro forma tarifftariff
Energy marketsEnergy markets Market for transmission servicesMarket for transmission services Operating reservesOperating reserves Ensuring adequate generation capacityEnsuring adequate generation capacity Market MonitoringMarket Monitoring Market MitigationMarket Mitigation
![Page 5: Transmission Tariff and Market Design Rulemaking Alice Fernandez, Mark Hegerle, Kevin Kelly, Dave Mead, Ed Murrell, Joe Power, and Dave Withnell.](https://reader036.fdocuments.us/reader036/viewer/2022072115/56649cdc5503460f949a7aa6/html5/thumbnails/5.jpg)
Timeline for the Rule
Issue staff paper – Dec 2001Issue staff paper – Dec 2001
Industry workshops – Jan/Feb 2002Industry workshops – Jan/Feb 2002
Issue NOPR -- March 2002Issue NOPR -- March 2002
Industry workshops– April/May 2002Industry workshops– April/May 2002
Comments – May 2002Comments – May 2002
Rule – July 2002Rule – July 2002
![Page 6: Transmission Tariff and Market Design Rulemaking Alice Fernandez, Mark Hegerle, Kevin Kelly, Dave Mead, Ed Murrell, Joe Power, and Dave Withnell.](https://reader036.fdocuments.us/reader036/viewer/2022072115/56649cdc5503460f949a7aa6/html5/thumbnails/6.jpg)
Pre-NOPR Outreach
Multi-day workshop in mid-January Multi-day workshop in mid-January
Conference with state Conference with state commissioners in early Februarycommissioners in early February
Individual meetings with industry Individual meetings with industry segments segments
![Page 7: Transmission Tariff and Market Design Rulemaking Alice Fernandez, Mark Hegerle, Kevin Kelly, Dave Mead, Ed Murrell, Joe Power, and Dave Withnell.](https://reader036.fdocuments.us/reader036/viewer/2022072115/56649cdc5503460f949a7aa6/html5/thumbnails/7.jpg)
Conclusion
Getting the right market design is Getting the right market design is criticalcritical
Need input from all stakeholder Need input from all stakeholder interests to do that interests to do that