![Page 1: Transmission & Substations Area Research Priorities · 2016-09-18 · Transmission & Substations Area Research Priorities . 2 ... Transmission line Surge Arrester Failure Investigation-](https://reader031.fdocuments.us/reader031/viewer/2022022018/5b874b417f8b9af12d8ec259/html5/thumbnails/1.jpg)
© 2015 Electric Power Research Institute, Inc. All rights reserved.
Dr. Andrew Phillips
Transmission &
Substations Area
Research Priorities
![Page 2: Transmission & Substations Area Research Priorities · 2016-09-18 · Transmission & Substations Area Research Priorities . 2 ... Transmission line Surge Arrester Failure Investigation-](https://reader031.fdocuments.us/reader031/viewer/2022022018/5b874b417f8b9af12d8ec259/html5/thumbnails/2.jpg)
2© 2015 Electric Power Research Institute, Inc. All rights reserved.
In the Event of an Emergency
In the event of an emergencyREMAIN IN PLACE unless there is animmediate danger. Listen to audiblemessages for further instructions. Incase of evacuation, proceed tonearest stairwell and exit on groundlevel. Gathering Location: DiplomatLanding directly across from hotel.Hotel is fully equipped with anautomated Fire System, whichinclude sprinkler and smoke evac.
To call the emergency line: Pick upany guest phone or house phone anddial 28888 to be connected to the 24hour security dispatch emergencyline, or dial 911
Security, Engineering and the Fire Department are automatically notified and will respond to the main fire control panel and to the location of the alarm. Update messages will be played via the Public Address (PA) System.
In the hotel, the alarm will sound two floors above and two floors below the location of the alarm. The Convention Center is a full alert alarm.
The Fire Department, Paramedics and Police have a normal response time of 5-10 minutes. The nearest hospital is 3 miles from the hotel.
![Page 3: Transmission & Substations Area Research Priorities · 2016-09-18 · Transmission & Substations Area Research Priorities . 2 ... Transmission line Surge Arrester Failure Investigation-](https://reader031.fdocuments.us/reader031/viewer/2022022018/5b874b417f8b9af12d8ec259/html5/thumbnails/3.jpg)
3© 2015 Electric Power Research Institute, Inc. All rights reserved.
Emergency Services Contacts
Safety & Security Management
Contacts:
Frank Becker 954-602-8801
Director of Safety & Security
Omar Tigoudar 954-602-8802
Safety & Security Manager
Emergency & Medical Services Information:
Memorial Regional Hospital 954-987-2000
& Joe DiMaggio Children’s Hospital
3501 Johnson Street
Hollywood, Florida 33021
Aventura Hospital 305-682-7000
20900 Biscayne Blvd
Aventura, Florida 33180
Premiere Total Healthcare 954-456-0250
One Stop Medical Center
1250 East Hallandale Beach Blvd, 2nd Floor
Hallandale, Florida 33009
Fast Care 786-923-4000
Urgent Care Clinic
20601 East Dixie Hwy. Suite 340
Aventura, Florida 33180
AM/PM DOC 888-AM-PM-DOC
House Call Doctor
24 Hour a Day Emergency Medical Service
![Page 4: Transmission & Substations Area Research Priorities · 2016-09-18 · Transmission & Substations Area Research Priorities . 2 ... Transmission line Surge Arrester Failure Investigation-](https://reader031.fdocuments.us/reader031/viewer/2022022018/5b874b417f8b9af12d8ec259/html5/thumbnails/4.jpg)
4© 2015 Electric Power Research Institute, Inc. All rights reserved.
https://crowd.cc/s/j0wQ
App Download URL:
Or use the URL to access on your desktop or laptop
https://crowd.cc/pdufall2016advisory
![Page 5: Transmission & Substations Area Research Priorities · 2016-09-18 · Transmission & Substations Area Research Priorities . 2 ... Transmission line Surge Arrester Failure Investigation-](https://reader031.fdocuments.us/reader031/viewer/2022022018/5b874b417f8b9af12d8ec259/html5/thumbnails/5.jpg)
5© 2015 Electric Power Research Institute, Inc. All rights reserved.
Transmission and Substations Programs
P35 Overhead Transmission
• Asset Management -Decision
Bases
• Reference Books
• Design
• Lightning and Grounding
• Increased Power Flow
• Live Working
P37 Substations
• Asset Management Decision
Bases
• Reference Books
• Fleet Management
• Physical Security
P36 Underground• Asset Management Decision
Bases
• Reference Books
• Design and Construction
• Pipe Type Cables
• Extruded Cable
P162 HVDC
• New Applications of HVDC
• Electrical Effects
• Planning
![Page 6: Transmission & Substations Area Research Priorities · 2016-09-18 · Transmission & Substations Area Research Priorities . 2 ... Transmission line Surge Arrester Failure Investigation-](https://reader031.fdocuments.us/reader031/viewer/2022022018/5b874b417f8b9af12d8ec259/html5/thumbnails/6.jpg)
6© 2015 Electric Power Research Institute, Inc. All rights reserved.
Focus: Increase Advisors Ability to Collaborate
Understand Past Influence Plan Know the Output
Understand the Value
Your Organization The Industry
Be Familiar with the Process
![Page 7: Transmission & Substations Area Research Priorities · 2016-09-18 · Transmission & Substations Area Research Priorities . 2 ... Transmission line Surge Arrester Failure Investigation-](https://reader031.fdocuments.us/reader031/viewer/2022022018/5b874b417f8b9af12d8ec259/html5/thumbnails/7.jpg)
7© 2015 Electric Power Research Institute, Inc. All rights reserved.
In Your Packet
Last Year’s
Results
What the
Plan is
What we will
Deliver this Year
Understand Past Influence Plan Know the Output
![Page 8: Transmission & Substations Area Research Priorities · 2016-09-18 · Transmission & Substations Area Research Priorities . 2 ... Transmission line Surge Arrester Failure Investigation-](https://reader031.fdocuments.us/reader031/viewer/2022022018/5b874b417f8b9af12d8ec259/html5/thumbnails/8.jpg)
8© 2015 Electric Power Research Institute, Inc. All rights reserved.
In Your Packet
IDB Info
Your Utility vs. Industry
What ARP your
Utility joined
Who You Task Force Reps Are
& What They Attended
Understand the Value Your Organization
![Page 9: Transmission & Substations Area Research Priorities · 2016-09-18 · Transmission & Substations Area Research Priorities . 2 ... Transmission line Surge Arrester Failure Investigation-](https://reader031.fdocuments.us/reader031/viewer/2022022018/5b874b417f8b9af12d8ec259/html5/thumbnails/9.jpg)
9© 2015 Electric Power Research Institute, Inc. All rights reserved.
Background:
Surge arrester failure on transmission line
Cause was unknown – need to determine reason for failure
EPRI Response:
Detailed tear down inspection to determine failure mode
Value:
Knowledge on failure mode
– Determined potential issues related to population
performance
– Improved design specifications
Enhancement of EPRI research benefitting the industry
Transmission line Surge Arrester Failure Investigation-Value Received - Michael Fourman (Georgia Transmission)
Understand the Value The Industry
![Page 10: Transmission & Substations Area Research Priorities · 2016-09-18 · Transmission & Substations Area Research Priorities . 2 ... Transmission line Surge Arrester Failure Investigation-](https://reader031.fdocuments.us/reader031/viewer/2022022018/5b874b417f8b9af12d8ec259/html5/thumbnails/10.jpg)
10© 2015 Electric Power Research Institute, Inc. All rights reserved.
Prog. Mar-15 Oct-15 Feb-16 Sept-16
P35
P36
P37
P162
Value Slides Presented in 2015 & 2016
Understand the Value The Industry
![Page 11: Transmission & Substations Area Research Priorities · 2016-09-18 · Transmission & Substations Area Research Priorities . 2 ... Transmission line Surge Arrester Failure Investigation-](https://reader031.fdocuments.us/reader031/viewer/2022022018/5b874b417f8b9af12d8ec259/html5/thumbnails/11.jpg)
11© 2015 Electric Power Research Institute, Inc. All rights reserved.
Prog. Mar-15 Oct-15 Feb-16 Sept-16
P35
P36
P37
P162
Value Slides Presented in 2015 & 2016
Understand the Value The Industry
![Page 12: Transmission & Substations Area Research Priorities · 2016-09-18 · Transmission & Substations Area Research Priorities . 2 ... Transmission line Surge Arrester Failure Investigation-](https://reader031.fdocuments.us/reader031/viewer/2022022018/5b874b417f8b9af12d8ec259/html5/thumbnails/12.jpg)
12© 2015 Electric Power Research Institute, Inc. All rights reserved.
Value Determination Application
ARP Tasks From
Action Plans
Rating by
Assigned Task
Force Advisors
On-line Value
Determination
Application
Stakeholder Review:
- Utility Decision Makers
- Task Force Reps
- EPRI
Understand the Value Your Organization The Industry
![Page 13: Transmission & Substations Area Research Priorities · 2016-09-18 · Transmission & Substations Area Research Priorities . 2 ... Transmission line Surge Arrester Failure Investigation-](https://reader031.fdocuments.us/reader031/viewer/2022022018/5b874b417f8b9af12d8ec259/html5/thumbnails/13.jpg)
13© 2015 Electric Power Research Institute, Inc. All rights reserved.
In Your Packet –
Quick Reference
Guide
Be Familiar with the Process
![Page 14: Transmission & Substations Area Research Priorities · 2016-09-18 · Transmission & Substations Area Research Priorities . 2 ... Transmission line Surge Arrester Failure Investigation-](https://reader031.fdocuments.us/reader031/viewer/2022022018/5b874b417f8b9af12d8ec259/html5/thumbnails/14.jpg)
14© 2015 Electric Power Research Institute, Inc. All rights reserved.
Be Familiar with the Process
Value Tool
![Page 15: Transmission & Substations Area Research Priorities · 2016-09-18 · Transmission & Substations Area Research Priorities . 2 ... Transmission line Surge Arrester Failure Investigation-](https://reader031.fdocuments.us/reader031/viewer/2022022018/5b874b417f8b9af12d8ec259/html5/thumbnails/15.jpg)
15© 2015 Electric Power Research Institute, Inc. All rights reserved.
Upcoming Task Force Meetings
EPRI Campus
Charlotte, North Carolina
Task Force Week: January 30 – February 3, 2017
Overhead Transmission Program 35
• Inspection, Assessment and Asset
Management TF
• Lightning, Grounding and Insulation
Coordination
• Line Design
• Live Working
• Insulators
• Increased Transmission Capacity
Underground Transmission Program 36
• UG Taskforce
Substation Program 37
• Transformer Life Management
• Substations Equipment Asset Management
• Circuit Breakers & SF6
• Other Substation Equipment, Ratings and
Grounding
• Switching Safety and Reliability
• Protection and Control
High Voltage DC Program 162
• HVDC Taskforce
![Page 16: Transmission & Substations Area Research Priorities · 2016-09-18 · Transmission & Substations Area Research Priorities . 2 ... Transmission line Surge Arrester Failure Investigation-](https://reader031.fdocuments.us/reader031/viewer/2022022018/5b874b417f8b9af12d8ec259/html5/thumbnails/16.jpg)
16© 2015 Electric Power Research Institute, Inc. All rights reserved.
Improved Opportunity for Guidance of R&D Effort
Guide RoadmapIdentify New Areas
for Research
![Page 17: Transmission & Substations Area Research Priorities · 2016-09-18 · Transmission & Substations Area Research Priorities . 2 ... Transmission line Surge Arrester Failure Investigation-](https://reader031.fdocuments.us/reader031/viewer/2022022018/5b874b417f8b9af12d8ec259/html5/thumbnails/17.jpg)
17© 2015 Electric Power Research Institute, Inc. All rights reserved.
Send Text to: 22333
EPRIT
Participate in Interactive
Polls and Brainstorming
![Page 18: Transmission & Substations Area Research Priorities · 2016-09-18 · Transmission & Substations Area Research Priorities . 2 ... Transmission line Surge Arrester Failure Investigation-](https://reader031.fdocuments.us/reader031/viewer/2022022018/5b874b417f8b9af12d8ec259/html5/thumbnails/18.jpg)
18© 2015 Electric Power Research Institute, Inc. All rights reserved.
Where does Häagen Dazs Ice-cream Originate from
Frankfurt, Germany
Copenhagen, Denmark
Zurich, Switzerland
Brooklyn, NY
Stockholm, Sweden
![Page 19: Transmission & Substations Area Research Priorities · 2016-09-18 · Transmission & Substations Area Research Priorities . 2 ... Transmission line Surge Arrester Failure Investigation-](https://reader031.fdocuments.us/reader031/viewer/2022022018/5b874b417f8b9af12d8ec259/html5/thumbnails/19.jpg)
19© 2015 Electric Power Research Institute, Inc. All rights reserved.
What Assets do you have Responsibility for?
Overhead Lines only
Overhead & Underground Lines
Overhead, Underground Lines & Substations
Underground only
Underground Lines & Substations
Substations Only
![Page 20: Transmission & Substations Area Research Priorities · 2016-09-18 · Transmission & Substations Area Research Priorities . 2 ... Transmission line Surge Arrester Failure Investigation-](https://reader031.fdocuments.us/reader031/viewer/2022022018/5b874b417f8b9af12d8ec259/html5/thumbnails/20.jpg)
20© 2015 Electric Power Research Institute, Inc. All rights reserved.
What Area do you Work in?
Engineering
Standards
Maintenance
Asset Management
Equipment Subject Matter Expert Group
![Page 21: Transmission & Substations Area Research Priorities · 2016-09-18 · Transmission & Substations Area Research Priorities . 2 ... Transmission line Surge Arrester Failure Investigation-](https://reader031.fdocuments.us/reader031/viewer/2022022018/5b874b417f8b9af12d8ec259/html5/thumbnails/21.jpg)
21© 2015 Electric Power Research Institute, Inc. All rights reserved.
![Page 22: Transmission & Substations Area Research Priorities · 2016-09-18 · Transmission & Substations Area Research Priorities . 2 ... Transmission line Surge Arrester Failure Investigation-](https://reader031.fdocuments.us/reader031/viewer/2022022018/5b874b417f8b9af12d8ec259/html5/thumbnails/22.jpg)
22© 2015 Electric Power Research Institute, Inc. All rights reserved.
Which is the Most Important Future State for T&S?
New Components and Materials
Advanced Design & Construction
Enhanced Inspection & Assessment
Improved Monitoring & Automation
More Resilient Assets
Advanced Asset Management Analytics
![Page 23: Transmission & Substations Area Research Priorities · 2016-09-18 · Transmission & Substations Area Research Priorities . 2 ... Transmission line Surge Arrester Failure Investigation-](https://reader031.fdocuments.us/reader031/viewer/2022022018/5b874b417f8b9af12d8ec259/html5/thumbnails/23.jpg)
23© 2015 Electric Power Research Institute, Inc. All rights reserved.
Which is the Least Important Future State for T&S?
New Components and Materials
Advanced Design & Construction
Enhanced Inspection & Assessment
Improved Monitoring & Automation
More Resilient Assets
Advanced Asset Management Analytics
![Page 24: Transmission & Substations Area Research Priorities · 2016-09-18 · Transmission & Substations Area Research Priorities . 2 ... Transmission line Surge Arrester Failure Investigation-](https://reader031.fdocuments.us/reader031/viewer/2022022018/5b874b417f8b9af12d8ec259/html5/thumbnails/24.jpg)
24© 2015 Electric Power Research Institute, Inc. All rights reserved.
Is there a Future State we should Add?
![Page 25: Transmission & Substations Area Research Priorities · 2016-09-18 · Transmission & Substations Area Research Priorities . 2 ... Transmission line Surge Arrester Failure Investigation-](https://reader031.fdocuments.us/reader031/viewer/2022022018/5b874b417f8b9af12d8ec259/html5/thumbnails/25.jpg)
25© 2015 Electric Power Research Institute, Inc. All rights reserved.
Is there a Future State we Should Delete?
New Components and Materials
Advanced Design & Construction
Enhanced Inspection & Assessment
Improved Monitoring & Automation
More Resilient Assets
Advanced Asset Management Analytics
![Page 26: Transmission & Substations Area Research Priorities · 2016-09-18 · Transmission & Substations Area Research Priorities . 2 ... Transmission line Surge Arrester Failure Investigation-](https://reader031.fdocuments.us/reader031/viewer/2022022018/5b874b417f8b9af12d8ec259/html5/thumbnails/26.jpg)
26© 2015 Electric Power Research Institute, Inc. All rights reserved.
Is there a Future State we Should Edit?
New Components and Materials
Advanced Design & Construction
Enhanced Inspection & Assessment
Improved Monitoring & Automation
More Resilient Assets
Advanced Asset Management Analytics
![Page 27: Transmission & Substations Area Research Priorities · 2016-09-18 · Transmission & Substations Area Research Priorities . 2 ... Transmission line Surge Arrester Failure Investigation-](https://reader031.fdocuments.us/reader031/viewer/2022022018/5b874b417f8b9af12d8ec259/html5/thumbnails/27.jpg)
27© 2015 Electric Power Research Institute, Inc. All rights reserved.
Action Plans
Program Presentations will be Polling you for:
What is their most important
Future State?
What is the most critical
Asset Type?
What is the most important Issue?
What Issues should be added:
– Annual Research Portfolio (ARP)
– Technology Innovation (TI)
![Page 28: Transmission & Substations Area Research Priorities · 2016-09-18 · Transmission & Substations Area Research Priorities . 2 ... Transmission line Surge Arrester Failure Investigation-](https://reader031.fdocuments.us/reader031/viewer/2022022018/5b874b417f8b9af12d8ec259/html5/thumbnails/28.jpg)
28© 2015 Electric Power Research Institute, Inc. All rights reserved.
Is there a Cross-Cutting Effort that should added to T&S?
![Page 29: Transmission & Substations Area Research Priorities · 2016-09-18 · Transmission & Substations Area Research Priorities . 2 ... Transmission line Surge Arrester Failure Investigation-](https://reader031.fdocuments.us/reader031/viewer/2022022018/5b874b417f8b9af12d8ec259/html5/thumbnails/29.jpg)
29© 2015 Electric Power Research Institute, Inc. All rights reserved.
Is there a Cross-Cutting Technology Innovation (TI) Effort
added to T&S?
![Page 30: Transmission & Substations Area Research Priorities · 2016-09-18 · Transmission & Substations Area Research Priorities . 2 ... Transmission line Surge Arrester Failure Investigation-](https://reader031.fdocuments.us/reader031/viewer/2022022018/5b874b417f8b9af12d8ec259/html5/thumbnails/30.jpg)
30© 2015 Electric Power Research Institute, Inc. All rights reserved.
Mark Your Calendar
Upcoming EPRI PDU Advisory Meetings in 2017
Program Meetings: February 13-15, 2017
Council Meetings: February 15-16, 2017
Hyatt Regency-Huntington Beach
21500 Pacific Coast Highway
Huntington Beach, Ca 92648
www.huntingtonbeach.hyatt.com
Group Rate: $239
Program Meetings: September 11-13, 2017
Council Meetings: September 13-14, 2017
Hyatt Regency Denver
650 Fifteenth Street
Denver, CO 80202
Hyatt Regency Denver
Group Rate: $225
![Page 31: Transmission & Substations Area Research Priorities · 2016-09-18 · Transmission & Substations Area Research Priorities . 2 ... Transmission line Surge Arrester Failure Investigation-](https://reader031.fdocuments.us/reader031/viewer/2022022018/5b874b417f8b9af12d8ec259/html5/thumbnails/31.jpg)
31© 2015 Electric Power Research Institute, Inc. All rights reserved.
EPRI European PDU Advisors Meeting
May 17 & 18, 2017
London, England
Open to EPRI Members and Invited Utility Guests
Please join us for the first annual EPRI PDU Advisors meeting
with breakout sessions in:
Transmission & Substation
Grid Operations and Planning
Distribution
Energy Utilization
Information and Communication Technology
Cyber Security
SAVE-THE-DATE
![Page 32: Transmission & Substations Area Research Priorities · 2016-09-18 · Transmission & Substations Area Research Priorities . 2 ... Transmission line Surge Arrester Failure Investigation-](https://reader031.fdocuments.us/reader031/viewer/2022022018/5b874b417f8b9af12d8ec259/html5/thumbnails/32.jpg)
32© 2015 Electric Power Research Institute, Inc. All rights reserved.
Mark Your Calendar
Upcoming EPRI PDU Advisory Meetings in 2017
Program Meetings: February 13-15, 2017
Council Meetings: February 15-16, 2017
Hyatt Regency-Huntington Beach
21500 Pacific Coast Highway
Huntington Beach, Ca 92648
www.huntingtonbeach.hyatt.com
Group Rate: $239
Program Meetings: September 11-13, 2017
Council Meetings: September 13-14, 2017
Hyatt Regency Denver
650 Fifteenth Street
Denver, CO 80202
Hyatt Regency Denver
Group Rate: $225