Transmission & Resource Planning Bob Smith & Peter Krzykos February 15, 2008

Transcript of Transmission & Resource Planning · 2008. 8. 25. · APS Transmission Paths Palo Verde Area –...

Page 1: Transmission & Resource Planning · 2008. 8. 25. · APS Transmission Paths Palo Verde Area – Phoenix/Yuma Overall APS TTC (includes Yuma direction outlet): 3071MW Existing long-term

Transmission & Resource Planning

Bob Smith &

Peter KrzykosFebruary 15, 2008

Page 2: Transmission & Resource Planning · 2008. 8. 25. · APS Transmission Paths Palo Verde Area – Phoenix/Yuma Overall APS TTC (includes Yuma direction outlet): 3071MW Existing long-term

APS Transmission

AgendaArizona Transmission SystemAPS lines/ownershipPath DescriptionsAPS 10 Year Plan ProjectsOther Arizona and Regional ProjectsRenewable Energy Task Force

Page 3: Transmission & Resource Planning · 2008. 8. 25. · APS Transmission Paths Palo Verde Area – Phoenix/Yuma Overall APS TTC (includes Yuma direction outlet): 3071MW Existing long-term
Page 4: Transmission & Resource Planning · 2008. 8. 25. · APS Transmission Paths Palo Verde Area – Phoenix/Yuma Overall APS TTC (includes Yuma direction outlet): 3071MW Existing long-term

Palo Verde East PathOwners: SRP, APS, PNM, & EPETTC= 7510 MW

Hassayampa-North Gila 500kVOwners: SDG&E, APS, IIDTTC = 1525MW

Page 5: Transmission & Resource Planning · 2008. 8. 25. · APS Transmission Paths Palo Verde Area – Phoenix/Yuma Overall APS TTC (includes Yuma direction outlet): 3071MW Existing long-term

APS Transmission PathsPalo Verde Area – Phoenix/Yuma

Overall APS TTC (includes Yuma direction outlet): 3071MWExisting long-term resources that use path

Palo VerdeRedhawkTolling PPAsMarket purchases

Amount available after long-term resource commitments: 628MW in 2008Future path utilization (as seen by APS)

Existing commitmentsLong-term & short-term market purchasesRenewables

Page 6: Transmission & Resource Planning · 2008. 8. 25. · APS Transmission Paths Palo Verde Area – Phoenix/Yuma Overall APS TTC (includes Yuma direction outlet): 3071MW Existing long-term

Mead-Phoenix 500kVOwners: APS, SRP, WAPA, LADWP, & Other CA EntitiesTTC = 1300MW

Page 7: Transmission & Resource Planning · 2008. 8. 25. · APS Transmission Paths Palo Verde Area – Phoenix/Yuma Overall APS TTC (includes Yuma direction outlet): 3071MW Existing long-term

APS Transmission PathsMead – Phoenix

Overall APS TTC: 236MWExisting long-term resources that use path: Market purchasesAmount available after long-term resource commitments: 11MW in 2008Future path utilization (as seen by APS)

Market purchasesRenewables

Page 8: Transmission & Resource Planning · 2008. 8. 25. · APS Transmission Paths Palo Verde Area – Phoenix/Yuma Overall APS TTC (includes Yuma direction outlet): 3071MW Existing long-term

Navajo South PathOwners: SRP, APS, TEP, USBRTTC= 2264 MW

Page 9: Transmission & Resource Planning · 2008. 8. 25. · APS Transmission Paths Palo Verde Area – Phoenix/Yuma Overall APS TTC (includes Yuma direction outlet): 3071MW Existing long-term

APS Transmission PathsNavajo – Phoenix

Overall APS TTC: 559MWExisting long-term resources that use path: Navajo GenerationAmount available after long-term resource commitments: 244MW in 2008Future path utilization (as seen by APS)

Navajo GenerationRenewablesMarket purchases

Page 10: Transmission & Resource Planning · 2008. 8. 25. · APS Transmission Paths Palo Verde Area – Phoenix/Yuma Overall APS TTC (includes Yuma direction outlet): 3071MW Existing long-term

FC/Cholla to PhoenixOwners: APSTTC= 1925 MW

Page 11: Transmission & Resource Planning · 2008. 8. 25. · APS Transmission Paths Palo Verde Area – Phoenix/Yuma Overall APS TTC (includes Yuma direction outlet): 3071MW Existing long-term

APS Transmission PathsFour Corners/Cholla – Phoenix

Overall APS TTC: 1925MWExisting long-term resources that use path

Four Corners, Cholla, & Saguaro GenerationPacifiCorp Diversity ExchangeWind & Biomass PPAsMarket purchases

Amount available after long-term commitments: 0MW in 2008Future path utilization (as seen by APS):

Existing commitmentsRenewables

Page 12: Transmission & Resource Planning · 2008. 8. 25. · APS Transmission Paths Palo Verde Area – Phoenix/Yuma Overall APS TTC (includes Yuma direction outlet): 3071MW Existing long-term
Page 13: Transmission & Resource Planning · 2008. 8. 25. · APS Transmission Paths Palo Verde Area – Phoenix/Yuma Overall APS TTC (includes Yuma direction outlet): 3071MW Existing long-term

10 Year Plan Projects (APS Capacity)Palo Verde to Sun Valley 500kV Line

Increases amount of resources that can be utilized at Palo Verde and taken to APS Phoenix load – 400MW in 2010 (estimated capacity)

Sun Valley to TS9 500kV LineIncreases amount of resources that can be utilized at Palo Verde and taken to APS Phoenix load – 400MW in 2012 (estimated capacity)

Palo Verde to North Gila 500kV LineIncreases amount of resources that can be utilized at Palo Verde area –160MW in 2012 (160MW in 2012 and 500MW long term - estimated capacity)

Navajo to Westwing UpgradeIncreases by 207MW in 2010

Mead to Westwing UpgradeIncreases by 113MW in 2009

Page 14: Transmission & Resource Planning · 2008. 8. 25. · APS Transmission Paths Palo Verde Area – Phoenix/Yuma Overall APS TTC (includes Yuma direction outlet): 3071MW Existing long-term

Resources & Transmission Paths

Resource Planning assumptions in Transmission Planning

Transmission Uses

Scheduling Capability

Page 15: Transmission & Resource Planning · 2008. 8. 25. · APS Transmission Paths Palo Verde Area – Phoenix/Yuma Overall APS TTC (includes Yuma direction outlet): 3071MW Existing long-term
Page 16: Transmission & Resource Planning · 2008. 8. 25. · APS Transmission Paths Palo Verde Area – Phoenix/Yuma Overall APS TTC (includes Yuma direction outlet): 3071MW Existing long-term

Other Transmission Projects

ArizonaSoutheast ValleyCoronado upgradeNavajo Transmission ProjectDevers - Palo Verde #2

RegionalTransWest ExpressSunZia & High Plains ExpressGateway ProjectsNorthern Lights

Page 17: Transmission & Resource Planning · 2008. 8. 25. · APS Transmission Paths Palo Verde Area – Phoenix/Yuma Overall APS TTC (includes Yuma direction outlet): 3071MW Existing long-term

Regional EHV Projects

SD

Mexico

NV

ID

UT

NM

CO

WY

MT

CA

British Columbia

AZ

Canada

Alberta

OR

WA

NE

Pacific

Ocean

El PasoTucson

Laramie

Round

Celilo

Portland

Colstrip

Jim

Reno

Peace River

Phoenix

Malin

Mountain

San Francisco

Los Angeles

River

Denver

Salt Lake City

Corners

Bridger

Borah

Palo Verde

Four

Albuquerque

Seattle

Midpoint

PlaceMarket

SD

Mexico

NV

ID

UT

NM

CO

WY

MT

CA

British Columbia

AZ

Canada

Alberta

OR

WA

NE

SD

Mexico

NV

ID

UT

NM

CO

WY

MT

CA

British Columbia

AZ

Canada

Alberta

OR

WA

NE

Pacific

Ocean

El PasoTucson

Laramie

Round

Celilo

Portland

Colstrip

Reno

Peace River

San Diego Phoenix

Malin

Mountain

San Francisco

Los Angeles

River

Denver

Salt Lake City

Corners

Bridger

Borah

Palo Verde

Four

Albuquerque

Seattle

Midpoint

PlaceMarket

H

Jim

•TransWest Express•Northern Lights•Frontier Line•SunZia/High Plains•PAC GatewayDave

Johnson

Page 18: Transmission & Resource Planning · 2008. 8. 25. · APS Transmission Paths Palo Verde Area – Phoenix/Yuma Overall APS TTC (includes Yuma direction outlet): 3071MW Existing long-term

Columbia GridColumbia Grid

WestConnectWestConnect

CAISOCAISO

NTTGNTTG

Western Market Development Status

Page 19: Transmission & Resource Planning · 2008. 8. 25. · APS Transmission Paths Palo Verde Area – Phoenix/Yuma Overall APS TTC (includes Yuma direction outlet): 3071MW Existing long-term

Renewable Energy Task Force

Original BTA requirement Accomplished through open forum - SWATDevelopment of Resource ZonesTransmission SolutionsNext Steps – Regional Assessment

Page 20: Transmission & Resource Planning · 2008. 8. 25. · APS Transmission Paths Palo Verde Area – Phoenix/Yuma Overall APS TTC (includes Yuma direction outlet): 3071MW Existing long-term

BTA Response - ResourcesA renewable resource map displaying areas where resources development could occur was developed with input from three specific areas

The Arizona Renewable Energy Assessment recently prepared for APS, SRP and TEP by Black and Veatch (2007)The queue for renewable resource in Arizona requesting potential interconnection (as of October 15th 2007)Stakeholder/developer input on prospective development opportunities.

The renewable resource map was developed during workshop meetings on Oct 8th and Nov 16th 2007

Page 21: Transmission & Resource Planning · 2008. 8. 25. · APS Transmission Paths Palo Verde Area – Phoenix/Yuma Overall APS TTC (includes Yuma direction outlet): 3071MW Existing long-term

Proposed Renewable Resource Proposed Renewable Resource ProjectionProjection

Page 22: Transmission & Resource Planning · 2008. 8. 25. · APS Transmission Paths Palo Verde Area – Phoenix/Yuma Overall APS TTC (includes Yuma direction outlet): 3071MW Existing long-term

BTA Response – Transmission System

The map was developed by the utilities and stakeholders during both meetings and included in the map are:

existing transmission linesAPS, SRP and TEP 10 year plansother WECC Projects in Phase II processpotential transmission lines

Next steps

Page 23: Transmission & Resource Planning · 2008. 8. 25. · APS Transmission Paths Palo Verde Area – Phoenix/Yuma Overall APS TTC (includes Yuma direction outlet): 3071MW Existing long-term

Master Transmission Map Master Transmission Map