Transmission Integrity Management Lessons Learned
June 6, 2018
![Page 2: Transmission Integrity Management - UTC · Transmission Integrity Management . Lessons Learned . June 6, 2018 . trcsolutions.com 2 Agenda • (Revisit) Technical approach • Successes](https://reader036.fdocuments.us/reader036/viewer/2022081614/5fd15ed655b003011a628180/html5/thumbnails/2.jpg)
trcsolutions.com2
Agenda
• (Revisit) Technical approach • Successes• Opportunities• Discussion
![Page 3: Transmission Integrity Management - UTC · Transmission Integrity Management . Lessons Learned . June 6, 2018 . trcsolutions.com 2 Agenda • (Revisit) Technical approach • Successes](https://reader036.fdocuments.us/reader036/viewer/2022081614/5fd15ed655b003011a628180/html5/thumbnails/3.jpg)
trcsolutions.com3
Integrity Management – Technical Approach
![Page 4: Transmission Integrity Management - UTC · Transmission Integrity Management . Lessons Learned . June 6, 2018 . trcsolutions.com 2 Agenda • (Revisit) Technical approach • Successes](https://reader036.fdocuments.us/reader036/viewer/2022081614/5fd15ed655b003011a628180/html5/thumbnails/4.jpg)
trcsolutions.com4
Technical Approach
• Concept of High Consequence Areas• Risk Management • Process driven life cycle
![Page 5: Transmission Integrity Management - UTC · Transmission Integrity Management . Lessons Learned . June 6, 2018 . trcsolutions.com 2 Agenda • (Revisit) Technical approach • Successes](https://reader036.fdocuments.us/reader036/viewer/2022081614/5fd15ed655b003011a628180/html5/thumbnails/5.jpg)
trcsolutions.com5
High Consequence Areas Hazardous Liquids
• 49 CFR 195.450, Definitions, HCAs:– A commercially navigable waterway, which means a waterway where a substantial
likelihood of commercial navigation exists; – A high population area, which means an urbanized area, as defined and delineated
by the Census Bureau, that contains 50,000 or more people and has a population density of at least 1,000 people per square mile;
– An other populated area, which means a place, as defined and delineated by the Census Bureau, that contains a concentrated population, such as an incorporated or unincorporated city, town, village, or other designated residential or commercial area;
– An unusually sensitive area, as defined in §195.6 – A USA means a drinking wateror ecological resource area that is unusually sensitive to environmental damage from a hazardous liquid pipeline release.
![Page 6: Transmission Integrity Management - UTC · Transmission Integrity Management . Lessons Learned . June 6, 2018 . trcsolutions.com 2 Agenda • (Revisit) Technical approach • Successes](https://reader036.fdocuments.us/reader036/viewer/2022081614/5fd15ed655b003011a628180/html5/thumbnails/6.jpg)
trcsolutions.com6
High Consequence Areas
Hazardous Liquids
![Page 7: Transmission Integrity Management - UTC · Transmission Integrity Management . Lessons Learned . June 6, 2018 . trcsolutions.com 2 Agenda • (Revisit) Technical approach • Successes](https://reader036.fdocuments.us/reader036/viewer/2022081614/5fd15ed655b003011a628180/html5/thumbnails/7.jpg)
trcsolutions.com7
High Consequence Areas
Natural Gas
![Page 8: Transmission Integrity Management - UTC · Transmission Integrity Management . Lessons Learned . June 6, 2018 . trcsolutions.com 2 Agenda • (Revisit) Technical approach • Successes](https://reader036.fdocuments.us/reader036/viewer/2022081614/5fd15ed655b003011a628180/html5/thumbnails/8.jpg)
trcsolutions.com8
Risk Management
• Integrate data• Conduct Risk Analysis
• Risk = Likelihood (Probability) of Failure x Consequence of Failure
![Page 9: Transmission Integrity Management - UTC · Transmission Integrity Management . Lessons Learned . June 6, 2018 . trcsolutions.com 2 Agenda • (Revisit) Technical approach • Successes](https://reader036.fdocuments.us/reader036/viewer/2022081614/5fd15ed655b003011a628180/html5/thumbnails/9.jpg)
trcsolutions.com9
High Consequence Areas
Risk
• Manage risk of assets • Assessments/Rehabilitation • P&MMs
![Page 10: Transmission Integrity Management - UTC · Transmission Integrity Management . Lessons Learned . June 6, 2018 . trcsolutions.com 2 Agenda • (Revisit) Technical approach • Successes](https://reader036.fdocuments.us/reader036/viewer/2022081614/5fd15ed655b003011a628180/html5/thumbnails/10.jpg)
trcsolutions.com10
Written Programs Robust process drives successful Integrity Management Programs
HCA
Data Integration/
Risk Assessment
Assessment/Rehabilitation
P&MM
Program Evaluation
• Who has responsibility• Resources needed• Frequency & triggers• How the task is done• Communication of
outputs • Documentation• Links to other program
elements
![Page 11: Transmission Integrity Management - UTC · Transmission Integrity Management . Lessons Learned . June 6, 2018 . trcsolutions.com 2 Agenda • (Revisit) Technical approach • Successes](https://reader036.fdocuments.us/reader036/viewer/2022081614/5fd15ed655b003011a628180/html5/thumbnails/11.jpg)
trcsolutions.com11
Integrity Management – Successes
![Page 12: Transmission Integrity Management - UTC · Transmission Integrity Management . Lessons Learned . June 6, 2018 . trcsolutions.com 2 Agenda • (Revisit) Technical approach • Successes](https://reader036.fdocuments.us/reader036/viewer/2022081614/5fd15ed655b003011a628180/html5/thumbnails/12.jpg)
trcsolutions.com12
Successes
• Evolution of: • Data integration and mapping capabilities • Inline inspection technologies and programs
• Operators use of flexibility allowed by the Rule(s) to manage system integrity• Variability in written IM programs • Scaled and varying approaches to IM strategies
• Anomalies repaired
![Page 13: Transmission Integrity Management - UTC · Transmission Integrity Management . Lessons Learned . June 6, 2018 . trcsolutions.com 2 Agenda • (Revisit) Technical approach • Successes](https://reader036.fdocuments.us/reader036/viewer/2022081614/5fd15ed655b003011a628180/html5/thumbnails/13.jpg)
trcsolutions.com13
Integrity Management – Where can we be better and what have we learned?
![Page 14: Transmission Integrity Management - UTC · Transmission Integrity Management . Lessons Learned . June 6, 2018 . trcsolutions.com 2 Agenda • (Revisit) Technical approach • Successes](https://reader036.fdocuments.us/reader036/viewer/2022081614/5fd15ed655b003011a628180/html5/thumbnails/14.jpg)
trcsolutions.com14
• Not all HCA studies are created equal • Focus on collection data, not technology • Need to advance Risk Assessments • Build in time to study the why… • Program Evaluation
Opportunities
![Page 15: Transmission Integrity Management - UTC · Transmission Integrity Management . Lessons Learned . June 6, 2018 . trcsolutions.com 2 Agenda • (Revisit) Technical approach • Successes](https://reader036.fdocuments.us/reader036/viewer/2022081614/5fd15ed655b003011a628180/html5/thumbnails/15.jpg)
trcsolutions.com15
• Leak detection and shutdown times• Overly optimistic vs. realistic
• Application of buffers • Needs technical justifications
• Operator identified (non-NPMS) HCAs• Population areas• ECO areas
HCA Studies – Hazardous Liquids
![Page 16: Transmission Integrity Management - UTC · Transmission Integrity Management . Lessons Learned . June 6, 2018 . trcsolutions.com 2 Agenda • (Revisit) Technical approach • Successes](https://reader036.fdocuments.us/reader036/viewer/2022081614/5fd15ed655b003011a628180/html5/thumbnails/16.jpg)
trcsolutions.com16
HCA Studies – Hazardous Liquids
• (1.01) The operator shall correctly identify and maintain up-to-date locations and boundaries of HCAs using NPMS and other information sources as appropriate for all states/regions in which it operates.
§195.452 (f) FAQs: 3.7, 3.8, 13.1
![Page 17: Transmission Integrity Management - UTC · Transmission Integrity Management . Lessons Learned . June 6, 2018 . trcsolutions.com 2 Agenda • (Revisit) Technical approach • Successes](https://reader036.fdocuments.us/reader036/viewer/2022081614/5fd15ed655b003011a628180/html5/thumbnails/17.jpg)
trcsolutions.com17
• Quality Control • Structures! • Year over year comparisons
HCA Studies – Natural Gas
![Page 18: Transmission Integrity Management - UTC · Transmission Integrity Management . Lessons Learned . June 6, 2018 . trcsolutions.com 2 Agenda • (Revisit) Technical approach • Successes](https://reader036.fdocuments.us/reader036/viewer/2022081614/5fd15ed655b003011a628180/html5/thumbnails/18.jpg)
trcsolutions.com18
Data Collection
• Technology doesn’t fix missing or incorrect data
• Find out what you don’t know!
![Page 19: Transmission Integrity Management - UTC · Transmission Integrity Management . Lessons Learned . June 6, 2018 . trcsolutions.com 2 Agenda • (Revisit) Technical approach • Successes](https://reader036.fdocuments.us/reader036/viewer/2022081614/5fd15ed655b003011a628180/html5/thumbnails/19.jpg)
trcsolutions.com19
![Page 20: Transmission Integrity Management - UTC · Transmission Integrity Management . Lessons Learned . June 6, 2018 . trcsolutions.com 2 Agenda • (Revisit) Technical approach • Successes](https://reader036.fdocuments.us/reader036/viewer/2022081614/5fd15ed655b003011a628180/html5/thumbnails/20.jpg)
trcsolutions.com20
• Standard SME/Indexing models • Difficulty identifying actionable risk results • Qualitative (probabilistic) • Risk Modeling Work Group
Risk Assessment
![Page 21: Transmission Integrity Management - UTC · Transmission Integrity Management . Lessons Learned . June 6, 2018 . trcsolutions.com 2 Agenda • (Revisit) Technical approach • Successes](https://reader036.fdocuments.us/reader036/viewer/2022081614/5fd15ed655b003011a628180/html5/thumbnails/21.jpg)
trcsolutions.com21
Risk Assessment
• (5.06.01) Risk results should point to areas posing the highest risks to HCAs. Operator risk analysis results should not only be the output of an automated algorithm, but should involve participation and review by knowledgeable operator field and headquarters personnel. In turn, operator conclusions regarding the highest risk locations should be verified by inspectors in light of common sense, inspector experience and knowledge, and available operating history. One important output of operator risk analysis processes is the prioritization of segments for activities such as integrity assessments.
§195.452 (e),(f),(g),(i)(2)
![Page 22: Transmission Integrity Management - UTC · Transmission Integrity Management . Lessons Learned . June 6, 2018 . trcsolutions.com 2 Agenda • (Revisit) Technical approach • Successes](https://reader036.fdocuments.us/reader036/viewer/2022081614/5fd15ed655b003011a628180/html5/thumbnails/22.jpg)
trcsolutions.com22
• Ask ourselves why at various IM element checkpoints • Why is this HCA off the list? • Why is risk… high/low? • Why are we having these anomalies?
Why?
![Page 23: Transmission Integrity Management - UTC · Transmission Integrity Management . Lessons Learned . June 6, 2018 . trcsolutions.com 2 Agenda • (Revisit) Technical approach • Successes](https://reader036.fdocuments.us/reader036/viewer/2022081614/5fd15ed655b003011a628180/html5/thumbnails/23.jpg)
trcsolutions.com23
Program Evaluation
• Is the program being implemented as written?
• Is the program effective in improving asset integrity?
![Page 24: Transmission Integrity Management - UTC · Transmission Integrity Management . Lessons Learned . June 6, 2018 . trcsolutions.com 2 Agenda • (Revisit) Technical approach • Successes](https://reader036.fdocuments.us/reader036/viewer/2022081614/5fd15ed655b003011a628180/html5/thumbnails/24.jpg)
trcsolutions.com24
Program Evaluation
• Self evaluation is critical in any safety program
• Operators must identify goals and objectives
• Operators must identify metrics to measure to those goals and objectives
• Operators must measure program progress
![Page 25: Transmission Integrity Management - UTC · Transmission Integrity Management . Lessons Learned . June 6, 2018 . trcsolutions.com 2 Agenda • (Revisit) Technical approach • Successes](https://reader036.fdocuments.us/reader036/viewer/2022081614/5fd15ed655b003011a628180/html5/thumbnails/25.jpg)
trcsolutions.com25
Program Evaluation
• Written Program Reviews • Have a 3rd party/colleague review your written program
![Page 26: Transmission Integrity Management - UTC · Transmission Integrity Management . Lessons Learned . June 6, 2018 . trcsolutions.com 2 Agenda • (Revisit) Technical approach • Successes](https://reader036.fdocuments.us/reader036/viewer/2022081614/5fd15ed655b003011a628180/html5/thumbnails/26.jpg)
trcsolutions.com26
Program Evaluation
PHMSA Advisory Bulletin: Docket No. PHMSA-2014-0086
PHMSA Guidance Document
Guidance on the elements and characteristics of a mature program evaluation process that uses meaningful metrics.
Guidance for Strengthening Pipeline Safety through Rigorous Program Evaluation and Meaningful Metrics
![Page 27: Transmission Integrity Management - UTC · Transmission Integrity Management . Lessons Learned . June 6, 2018 . trcsolutions.com 2 Agenda • (Revisit) Technical approach • Successes](https://reader036.fdocuments.us/reader036/viewer/2022081614/5fd15ed655b003011a628180/html5/thumbnails/27.jpg)
trcsolutions.com27
• Not all HCA studies are created equal • Focus on collection data, not technology • Need to advance Risk Assessments • Build in time to study the why… • Program Evaluation
Lessons Learned
![Page 28: Transmission Integrity Management - UTC · Transmission Integrity Management . Lessons Learned . June 6, 2018 . trcsolutions.com 2 Agenda • (Revisit) Technical approach • Successes](https://reader036.fdocuments.us/reader036/viewer/2022081614/5fd15ed655b003011a628180/html5/thumbnails/28.jpg)
trcsolutions.com28