Transcript of Translift´s Presentation 2014
• Our Sales History.
15474258
11105
7884
23520
25841
30793
41280
-5000
0
5000
10000
15000
20000
25000
30000
35000
40000
45000
20
06
20
07
20
08
20
09
20
10
20
11
20
12
20
13
Revenues & Projection ( MR$ )
Revenues &
Projection ( MR$ )
Linear (Revenues &
Projection ( MR$ ))
• People Evolution.
7 14
43 5264
87110
130
0
20
40
60
80
100
120
1402
00
6
20
07
20
08
20
09
20
10
20
11
20
12
20
13
N° of People
N° of People
Area N° People
Administrative & Purchase 10
Sales 10
Mechanical Engineering 18
Electrical Engineering / Controls 24
Project & Site Management 6
Manufacturing ( Machinning ) 10
Manufacturing Planning ( PCP ) 4
Internal / External Assembly 48
130
� Capacity = 2800 – hours /month ( internal )
2 PRINTERS A4
12 WORSTATIONS
2 PLOTTERS
1 NOTEBOOK 2 WORKSTATION ( ARENA )
Flow Simulation
1 SERVIDOR - 2010 1 PRINTER A3
2 WORKSTATION ( COSMOS )
Finite Elements
• Mechanical Engineering – Brazil
Organization Organization Organization Organization
Marriage Systems
Overheads ( EOM )
Water Test Systems
Conveyors and Storage
SKID Systems
Power & Free Systems
Trans - Elevators
AGVs Systems
Roller Tables / Lifting Tables / Shuttle Tables
• Our Business Areas
Dispensing Cells
Handling Cells
Production Systems
Gluing Cells
Palletizing Cells
Urethane Cells
ReferencesReferencesReferencesReferences
Marriage Systems
Overheads ( EOM )
Water Test Systems
Conveyors and Storage
SKID Systems
Power & Free Systems
Trans - Elevators
AGVs Systems
Roller Tables / Lifting Tables / Shuttle Tables
• Our Business Areas
• Conveyors Examples:
Belt Conveyors Skid Systems Overhead (EOM)
Marriage Systems Elevators Shuttle Systems
•• Conveyors Examples:
Lift Tables
Chain Conveyors
Pallet ConveyorsWater Test
Power & Free Drag Conveyor
Electrical Project
Software Development
Robotics
Controls
Panel Assemblies
Process Controls
Instrumentation
Coordination
Planning
• Controls
� Coordination, Planning and Project
� Work Coordination
� Control of Materials
� Monitoring of all phases of
the project through to final delivery
• Controls
� Engineering:
� Concept Definition
� Proposals Development, Costs
Analysis, Materials and Resources
• Controls
� Robotics
� Development of Robotic Applications� Application Development Support (Robcad, Offline)� Experts in robot programming
• Controls
� Panel Assemblies and Installation
Fixtures
Installation
Panel Assemblies
Panel Assemblies
Panel Assemblies Panel Assemblies
Fixtures
Installation
• Controls
� Systems and Cells Automation
Robotic
Applications
Robotic
Applications
Robotic
Applications
• Controls
Dispensing Cells
Handling Cells
Production Systems
Gluing Cells
Palletizing Cells
Urethane Cells
• Production Systems
Manipulação
Palletizing Systems
Palletizing Systems
Handling
Handling Systems
Handling Systems
• Production Systems
Aplicação de Cola
Urethane ApplicationClear & Primer + Urethane
Urethane Application
• Production Systems
� Seat Conveyor – Ford SBC
MR-1 LI-2
MR-3
STP-14
STP-13MGR-4/MGR9
STP-12
STP-11
PALLETS
MR-8
MR-5
LO-6
MR-7
LEGENDA
MR – MESA DE ROLO
LI – ELEVADOR DE CARGA
MGR – MESA DE GIRO
LO – ELEVADOR DE DESCARGA
STP – STOPPER
SENTIDO CARREGADO
SENTIDO DE RETORNO VAZIO