TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman, Ph.D. Makassar, February 17 to 21, 2014

Transcript of TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia...

Page 1: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

TRANSIENT STABILITY STUDIES(POWERTRS)

Indonesia Clean Energy Development (ICED) project

Indonesia Wind Sector Impact Assessment

Presented by:Dr. Balaraman, Ph.D.

Makassar, February 17 to 21, 2014

Page 2: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

Voltage stability

Rotor angle stabilityStudy period: 0-10

sec

Mid-term/long-term stabilityStudy period: seconds to

several minutes(slow dynamics)

Small signal stability

Non-oscillatory Insufficient synchronizing torque

OscillatoryUnstable control

action

Transient stabilityLarge disturbance(First swing)

Stability

Page 3: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

f, v, loading acceptable, load met,n-1 or n-2 contingency acceptable

f, v, loading acceptable

load met n-1 or n-2 contingency

not satisfied

f, v, loading not acceptable,

load not met

Normal

Alert Restorative

Cascaded system

syste

m In Extremis Emergency

Power System Operating States

Page 4: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

Pool control centre

System control centre

To other systemTo other system To other system

Transmission system Power plant

DS DS DS G G G

DS: Distribution SystemG : Generator

Control Hierarchy

Page 5: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

f Ptie Pgtotal

ScheduleSystem generation control

Load frequency control witheconomic allocation

Other generating unitsand associated controls

Generating units control

Prime mover & control

Excitation system &control

Generator

f/N orPg

Vt

If

Pm f/N

Transmission ControlsReactive power, Voltage control,HVDC transmission and others

Pg

f Ptie Pg.total

Power System Subsystem & Controls

Page 6: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

Power System Stability

• Ability of a power system to remain in synchronism

• Classification of transients : Electromagnetic and Electromechanical

Stability classification • Transient stability : Transmission line faults, sudden load

change, loss of generation, line switching etc.• Dynamic stability : Slow or gradual variations. Machine,

governor - Turbine, Exciter modelling in detail.• Steady state stability : Changes in operating condition. Simple

model of generator.

Page 7: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

Transient Stability: First swing and Multiple Swings

Stable Unstable

Stable Unstable

t Sec. t Sec.

t sec.t Sec.

m2

m2

m1 m1

0 0

00

Page 8: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

Assumptions :

• Synchronous speed current and voltage are considered.

• DC off set currents, harmonics are neglected.• Symmetrical components approach.• Generated voltage is independent of machine speed.• Circuit parameters are constant at nominal system

frequency. (Frequency variation of parameter neglected).

Page 9: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

Stable Unstable

Stable

Unstable

Steady State Stability

Page 10: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

Jd

d tT T T N mm

a m e*2

2

• J : Moment of inertia of rotor masses (kg-mt2 )• m : Angular displacement of rotor w.r.t. a stationary

axis (mechanical radians)• t : Time (seconds)• Tm : Mechanical or Shaft Torque ( N-m )

• Te : Net electrical torque (N-m )

• Ta : Net accelerating torque (N-m)

•  • For generator, Tm and Te are +ve.

Mechanical Equation

Page 11: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

Reference Axis Stationary

m

Reference axis at sm

sm

sm

Rotor axis at rotor speed

m sm mt m : Angular displacement of the rotor in mechanical radians.

Page 12: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

d

dt

d

dt

d

dt

d

dt

Jd

dtT T N m

d

dtAngular velocity in radians per

Jd

dtP P watts

Md

dtP P Approx

msm

m

m m

mm e

mm

mm

m e

mm e

2

2

2

2

2

2

2

2

2

2

sec.

( )

Where M : Inertia constant = at synchronous speed in Joules-sec per mechanical radian.

Page 13: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

Constant is defined as the ratio of stored Kinetic Energy in Mega Joules at synchronous speed and machine rating in MVA

 

emm

sm

emm

sm

smsm

PPdt

dHS

wattsPPdt

dM

radianmechanicalperMJSH

M

MVAMJS

M

S

JH

2

2

2

2

2

2

2

/2

1

2

1

Page 14: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

ems

emm

sm

emm

sm

PPdt

dH

puPPdt

dH

S

PP

dt

dH

2

2

2

2

2

2

2

2

2

Page 15: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

2

2

2

2

deg

180

2

1

21 ,

2

2 ,

m e

m e

m e ss

m e

s

s

s

H dP P pu SwingEquation

f dt

If inelectrical d rees

H dP P pu

f dt

H d dP P

dt dt

Let P P pu

H dpu t

dt H

If t H

Page 16: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

Pm

Pe = 1 pu

• At t = 0, breaker is opened.• Initially Pe = 1 pu on machine rating Pm = 1pu and

kept unchanged.• In 2H seconds, the speed doubles.

Page 17: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

HStored KE

Machine Rating

H Machine Rrating H systemMVA

H HMachine rating

System MVA

mech system

system mech

Inertia constant (H) is in the range 2 - 9 for various types of machines. Hence H-constant is usually defined for machine.

Page 18: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

machineS

NWR

H

Wattslbft

lbftNWR

KE

feetingyrationofRadiusR

poundsinpartrotationalofWeightW

ftlbWR

InertiaofMoment

622

22

22

10550746

602

2.3221

746sec/550

60

2

2.322

1

:

:2.32

Relation between H constant and Moment of Inertia is given by:

Page 19: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

Example :

Smach = 1333 MVA, WR2 = 5820000 lb – ft2, N= 1800

RPM

= 3.2677575 pu (MJ/ MVA)

On 100 MVA base : H = 1333 / 100 = 43.56 (MJ / MVA)

13336018002

2.325820000

21

10550746

26

H

Page 20: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

G1 ,H1

Pe1Pm1

G2 ,H2

Pm2Pe2

H

f

d

dtP Pm e

12

12 1 1

2222

22

em PPdt

d

f

H

H H

f

d

dtP P P Pm m e e

1 22

2 1 2 1 2

Page 21: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

PePtd

d

f

Hm

2

2

HStored energy at rated speed in MWs

MVA rating

H = H1 + H2

Pm = Pm1 + Pm2

Pe = Pe1 + Pe2

G1 and G2 are called coherent machines.

Inertia Constant

Page 22: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

ratingMVA

RPMJ

ratingMVA

JH

RPMradianmechanicalinspeedRated

mkgininertiaofMomentJ

MWsJ

wattsJ

energyKineticenergyStored

om

om

om

om

29

62

2

62

2

1048.5

102

1

60

2sec/:

:

102

1

2

1

MKS system

Page 23: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

22

22

356.12.32

)(

mkgWR

J

ftlbgyrationofradiusofsquarepartrotatingofWeightWR

British units

Given

Page 24: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

JWR

kg mt

HJ RPM

MVA ratingMWs MVA

Stored energy

H MVA rating MWs

Mechanical starting time

H onds

22

62

32 21356 27547 77168

548 10

2

.. .

.( )

/

sec

MVA rating : 555WR2 : 654158 lb-ft2

Example

Page 25: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

Non coherent machines

H

f

d

dtPm Pe1

21

2 1 1

d

dt

f

HP Pm e

21

21

1 1

H

f

d

dtP Pm e

22

22 2 2

d

dt

f

HP Pm e

22

22

2 2

Unit Type H Constant

Hydro Unit 2 to 4

Thermal unit

2 pole – 3600 RPM 2.5 to 6

4 pole – 1800 RPM 4 to 10

Typical Values

Page 26: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

d

dt

f

HP P

f

HP P

f

d

dt

H P P P P H

H H

H H

H H f

d

dt

H

H HP P

H

H HP P

H H

H H f

d

dt

H P H P

H H

H P H P

H H

H

m e m e

m e m e

m e m e

m m e e

2

2 1 21

1 12

2 2

21 2

2

2 1 1 2 2 1

1 2

1 2

1 2

21 2

22

1 21 1

1

1 22 2

1 2

1 2

21 2

22 1 1 2

1 2

2 1 1 2

1 2

1

1

1

f

d

dtP P

Where

HH H

H HP

H P H P

H H

PH P H P

H H

m e

mm m

ee e

2122 12 12

1 2

1 212

2 1 1 2

1 2

122 1 1 2

1 2

,

Relative swing (with reference to one machine) is more important, rather than absolute swing.

Page 27: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

Relative Plot (i-)Absolute Plot

1

o

2

3

4

3

20

1

T in sec. T in sec.

Swing curves

Relative swing (with reference to one machine) is more important, rather than absolute swing.

Page 28: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

I

E’ = Vt + (0 + jxd’) I

E’

Vt

jxd’ I

Ref.Vt

I

E’

jxd’+

-

Classical model : (Type 1) Constant voltage behind transient reactance

Page 29: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

E1 : Magnitude of voltage at bus1E2 : Magnitude of voltage at bus2 : 1 - 2

Xs : Reactance

PE E

Xs

1 2 sin

jXs

E2 2E1 1

Power angle equation

Page 30: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

Machine Parameters Synchronous : Steady state, sustained.Transient : Slowly decaying Sub-transient : Rapidly decayingE=?

X=?

X X X X X

T T

T T

d q q q d

d do

qo qo

' " "

' "

' "

0

Page 31: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

Typical values

Parameter Hydro (pu) Thermal (pu)

xd 0.6 - 1.5 1.0 - 2.3

xq 0.4 - 1.0 1.0 - 2.3

xd’ 0.2 - 0.5 0.15 - 0.4

xq’ ------- 0.3 - 1.0

xd” 0.15 - 0.35 0.12 -0.25

xq” 0.2 - 0.45 0.12 -0.25

Td0’ 1.5 - 9.0 s 3.0 -10.0 s

Tq0’ ------- 0.5 - 2.0 s

Td0” 0.01 - 0.05 s 0.02 - 0.05 s

Tq0” 0.01 - 0.09 s 0.02 - 0.05 s

Ra 0.002 - 0.02 0.0015 - 0.005

Page 32: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

Stability

Stable

At s ; Pm = Pe ; net accelerating torque = 0.

Let Pe decrease slightly.

      

increase (acceleration) comes back to original position.Stable region . Hence s is stable operating point.

 

veisPPdt

d

f

Hem

2

2

P

Pmmmm

O

Pe=Pmax sin

u

900 s 1800

Page 33: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

Unstable

At u; Pm = Pe ; Net accelerating torque = 0 ,

Let Pe decrease slightly.

increases, (acceleration)

Pe further decreases.

Chain reaction never comes back to normal value

Hence u is unstable operating point.

veisPPdt

d

f

Hem

2

2

Page 34: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

System

Infinite bus

• Generator connected to infinite bus.

• High inertia. H compared to other machines in the system.

• Frequency is constant.

• Low impedance. Xd’ is very small.

• E’ is constant and Vt is fixed.

• Infinite fault level symbol.

Page 35: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

200 MW1.05 pu V

250 MVA250 MVA Slack bus

1 pu - V

Example :

H = 3.2 , Z = 10% on own rating , Xd1 = 25% , tap = 1, Ra

= 0.0 and neglect R.

• Establish the initial condition.

• Perform the transient stability without disturbance.

• Open the transformer as outage & do the study.

• How long the breaker can be kept open before closing,

without losing synchronism.

Page 36: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

Load Load11 kVSwitchedCapacitor

132/110 kV

Load Modeling

Page 37: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

fo

Po

frequency

Power

·       Vary the tap.

·       Switch on the capacitor.

·       Determine the response (charge) in

load.

·       Compute the parameters.•   P = P0 (CP + CI . V + CZ . V

2) ( 1+Kf . f)

·       P varies with time, voltage and

frequency.

·       P0 varies with time - can be constant at a

given time of a day.

·       CP, CI, CZ & Kf are constants.

·       V & f are known at any time instant.

·       P is known from measurements.

·       Solve the non linear problem over a set of

measurements.

Page 38: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

• Let the load be 10,000 MW. i.e. P0 = 10,000

• Let for 1 Hz change in frequency, let the load change be 700 MW.

• What it implies :– Initial load 10,000 MW.– Loss of generation 700 MW– Increase in load 700 MW – Frequency 49 Hz.

5.3

501100

7

:100,;

%7000,10

700

7001

700)(

)(700

pf

pf

pfoo

pfo

C

baseMVAonthenfrequencyinchangeunitpertheisfpuinisPIf

C

numberpowerCffP

loadindecreaseCfP

Page 39: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

Load model parameters

Measurement based approach Input: Connected load Measurement: P,V, f over a period Out put: Parameters

Component based approach Industrial Commercial residential Agricultural

Load model Parameters

Page 40: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

Loads

Page 41: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

Transducer

Regulator Exciter Generator

Limiter + relay

PSS

Excitation System Components

Ref.

ControllerRegulator

Poweramplifier(Exciter)

Plant

Feedback elements

Block Schematic

EtEfdVtrVer

Vref

Page 42: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

Reactive Power Control

•Synchronous generators•Overhead lines / Under ground cables•Transformers•Loads•Compensating devices

Page 43: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

Control devices

• Sources /Sinks --- Shunt capacitor, Shunt inductor (Reactor), Synchronous condenser, and SVC.

• Line reactance compensation --- Series capacitor• Transformer -----OLTC, boosters

Page 44: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

AGC

Speedchanger

SpeedGovernor

Valve/gate

ElectricalSystem

Energy Supplysteam or water

TurbineGenerator

Speed

Tie line Power

Frequencies

Speed governor systems:

Page 45: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

1/R 1

1

T

Tws

ws

1

T Kms D

speed

TurbineDroop(Goveror) Generator+

-

SpeedRef.

Types of Control:

• Primary Control : Governor action• Secondary Control : AGC, load frequency control (For

selected generators)

Under Frequency operation :

· Vibratory stress on the long low pressure turbine blades· Degradation in the performance of plant auxiliaries say,

induction motor

Page 46: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

Limitations

• Only maximum spinning reserve can be achieved• Turbine pickup delay• Boiler slow dynamics• Speed governor delay

Page 47: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

Trip signal 49.50.4 Hz/s

48

10% load rejection

15% load rejection

50% load rejection

30% load rejection

1 Hz/s

4 Hz/s

2 Hz/s

Other measures :* Fast valving* Steam by-passing

Load shedding

Page 48: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

Modules in a program• Data reading• Initialization

– Steady state load flow– Control block parameter AVR, Gov., Machine, Motor, PSS, HVDC, SVC.

• Disturbance model• Control block modeling• Machine modeling• Load flow solution• Protective relay modeling• Special functions

– Cyclic load– Arc furnace– Re-closure

• Results Output– Report– Graph

Page 49: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

Time in seconds

AVR & PSS

Constant Efd

AVR with no PSS

65432

90

60

30

1

Typical swing curve :

Page 50: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

0.01

0.090

0.025

5 4 3 2 1

180

120

60

Time in Sec.

Rotor angle degrees

Integration step size : Typical value : 0.01 seconds, Range : 0.005 to 0.02 seconds

Typical swing curve :

Page 51: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

1

1 1sT k

sT1

21

s=f(Efd)

sk

sT3

41

1

2 3k sT

PSS

+-

+

Vref

+

- EfdVT

AVR : Type 1

Page 52: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

Efd1

1 1sT k

sT1

21

sk

sT sT3

4 51 1

Vs

+-

+

Vref

SE

1

2 3k sT+

-VT

VRmax

VRmin-

AVR : Type 2

Page 53: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

VT 1

1001. s

k sT sT

sT sT1 2 3

4 5

1 1

1 1

( )

+

- +

Vref VRmax

VRmin

Efdmax

Efdmin

1

1 1sT

AVR TYPE – 5

Page 54: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

ref

+

1/T31/S

+PrefP5

Pmax

C min

P-up

P-dn

1+sT2

0 k1(1+sT1)

-

+

- Pmin

C max

Steam Turbine Governing System

K1: 0.05 Pmax: 1.0

T1: 0.1 Pmin: 0.0

T2: 0.03 Pup: 0.1

T3: 0.4 Pdn: -1.0

Page 55: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

P

1/(1+sT1 ) 1/(1+sT2)

k1+k2 k3+k4

(1/1+sT3) (1/1+sT4)

k5+k6 k7+k8

Ps

  

Turbine Model

Page 56: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

+

1

11sT-

+

-

1

2T Pmin

Pmax

Ps

ksT

sT13

31.

k2

Transient Droop Compensator

Permanent Droop Compensator

ref

+

+

CminP-dn

Cmax

1

s

P-up

 

Hydro Governor

Page 57: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

Hydro Turbine

Ps1-sT1

1+0.5sT1

DM

T1 (T) : 1.0

Page 58: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

Transient Stability Enhancement

Philosophy• Minimize the disturbance influence by

minimizing the fault severity and duration.• Increase the restoring synchronizing forces.• Reduce accelerating torque.

Page 59: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

Transient Stability Enhancement

Methods :

1. High speed fault clearing.

2. Reduction of transmission system reactance.

3. Regulated shunt compensation.

4. Dynamic Braking.

5. Reactor switching.

6. Independent pole operation of circuit breaker.

7. Single pole switching

8. Fast valving.

9. Generator tripping.

10. Controlled system separation and load shedding.

11. High speed excitation systems.

12. HVDC transmission link control.

Page 60: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

Major references used in the development of Transient Stability Studies Module

1. Dommel, N. Sato “Fast Transient Stability Solutions”, IEEE Transactions on Power Apparatus and Systems, 1972, PP 1643 - 1650.

2. W. Dommel, “Digital computer solution of electromagnetic transients in single and multiphase networks”, IEEE Transactions on Power Apparatus and Systems, April 1969, Vol. PAS-88, PP 388 - 399.

3. IEEE Committee Report, “Dynamic Models for Steam and Hydro Turbines in Power System Studies”, IEEE PES Winter Meeting, New York, Jan./Feb. 1973. (Paper T 73 089-0).

4. IEEE Committee Report, “Proposed Excitation System Definitions for Synchronous Machines”, IEEE Transactions on Power Apparatus and

Systems, Vol. PAS-88, No. 8, August 1969.

5. IEEE Committee Report, “Computer representation of excitation systems”, IEEE Transactions Power on Apparatus and Systems, June 1968, Vol. PAS-87, PP 1460 - 1464.

Page 61: TRANSIENT STABILITY STUDIES (POWERTRS) Indonesia Clean Energy Development (ICED) project Indonesia Wind Sector Impact Assessment Presented by: Dr. Balaraman,

For further information please contact:

Office Address of ICED-USAID (Indonesia Clean Energy Development – United States Agency for International Development)

•ICED-USAID Jakarta Office: Tifa Building, 5th Floor, Jl. Kuningan Barat No. 26 Jakarta 12710; Phone/Facsimile: +62 21 52964445/ 52964446

•ICED-USAID Medan Office: Jl. Tengku Daud No. 7A Medan 20152; Phone/Facsimile: +62 61 4519675/ 4519058

Contact Person:Pramod Jain, Ph.D.

President, Innovative Wind Energy, [email protected]

+1-904-923-6489, http://i-windenergy.com Dr.K.Balaraman Ph.D

CGM, [email protected]

61