TRANS ADRIATIC PIPELINE Joint Venture Punj Lloyd - Sicim · 52 years of experience . SICIM is a...
Transcript of TRANS ADRIATIC PIPELINE Joint Venture Punj Lloyd - Sicim · 52 years of experience . SICIM is a...
TRANS ADRIATIC PIPELINE
Supplier networking event
Joint Venture Punj Lloyd - Sicim
February 2010
Oil & Gas, Petrochemicals, and Infrastructure Solutions
Punj Lloyd General Information
Incorporated : 1988
FY 14 Revenues : US $ 1.8 billion
Order backlog : US$ 4.1 Billion
Manpower : 15000
Equipment : $500 Million
EPC Services
February 2010
Oil & Gas, Petrochemicals, and Infrastructure Solutions
Technical Support
Turnaround
Services
O&G Upstream Onshore & Offshore Pipelines
Tanks & Terminals Offshore
Field Development
O&G Downstream Refineries
Chemicals & Petrochemicals Polymers
Power Thermal Nuclear
Renewable Solar
Bio-fuels Water Treatment
Utilities Water Treatment
Sewage Treatment Reservoirs & Centralized Utilities
Buildings Hospitality & Leisure
Commercial Institutional & Residential Complexes
Healthcare Townships & Industrial Parks
Infrastructure Subway & Metro Systems
Airports Highways & Expressways
Bridges Flyovers & Interchanges, Tunnels
& Caverns Seaports & Terminals
O & M
February 2010
Oil & Gas, Petrochemicals, and Infrastructure Solutions
EPC Services
Sicim General information HEAD OFFICE
=> BUSSETO (PARMA) - ITALY
DATE OF ESTABLISHMENT
=> 22nd January 1962
MANPOWER
=> 4,348
TURNOVER 2014
=> 400 MLN EURO
SICIM’S Global Footprint
=> 25 Branches/Subsidiaries
WORLDWIDE EPC SOLUTIONS FOR OIL & GAS SINCE 1962
52 years of experience SICIM is a Construction Company established in 1962 and offering all types of services related to the installation of pipelines and relevant ancillary facilities for the transmission and distribution of oil and gas on international basis. Our past, including the installation of over than 8’000 km of pipelines and 25’000 tons of steel in facilities world-wide, is a guarantee of success.
Range of services ⇒ Project Management ⇒ Engineering and Procurement for EPC works
(approx. 200.000 hrs/year) ⇒ Pipelines and Flowlines for oil, gas, petroleum
and other industry’s products, water, etc., including rehabilitations of existing pipelines
⇒ Oil/gas plants & facilities
WORLDWIDE EPC SOLUTIONS FOR OIL & GAS SINCE 1962
WORLDWIDE EPC SOLUTIONS FOR OIL & GAS SINCE 1962
TRANS ADRIATIC PIPELINE Potential activities that might be subcontracted
Pipe transportation;
Catering services;
Permitting and authorizations;
Specialised geo-technical studies and reports;
Erosion and Slope Protection (Temporary and Permanent);
Demining;
Overhead power lines;
Supervisory Control & Data Acquisition (SCADA);
Revegetation/biorestoration.
TRANS ADRIATIC PIPELINE Contact Details
Punj Lloyd Group
Mr Sandeep Maurya – GM, Business Development
E-mail: [email protected]
Mr Shilajit Dutta – GM, Estimation
E-mail: [email protected]
SICIM S.p.A.
Mr Alberto BARBIERI – Commercial Manager
E-mail: [email protected]
Mr Paolo ZONI – Bid Coordinator
E-mail: [email protected]