Tram Project Board · Project management St.all Costs 41 51 378 31 ,299 (1) ... • All 27 trams...
Transcript of Tram Project Board · Project management St.all Costs 41 51 378 31 ,299 (1) ... • All 27 trams...
Agenda
• Mediation - Vic
• Project Director's Report - Steven
• Preparing for Operations - Alastair
• Build the Brand - Mandy
Tra,'ns
2
2
TIE00086026 0002
Deliver a Tram Safely Tra,'ns HS&E ACCIDENTS and INCIDENTS SUMMARY
Total TotlJ Hours >! Mo(or t>(ury NM,lk\aal• S.rvlc• EHV RT" MOP #'R Sf'R dav Qlndillon °"""'"" 1'9rlod 23,761 0 0 0 9 1 1 0 0 0.00 4,21 -13 period rolling 1,102 • .:11 0 1 9 133 11 12 5 16 009 •.oo
Ill C.00 ....
O !,O
RIOOOR Acc:idtnt1 A=! Jl-!I"(.~~ '";VI..
:a.-;«
.... S..'lk:t Sutkt1
SSffl 12-:)"'!• ., "'9 ..... . :a.-..:
CoCPScor·, Vr.-,) A•*''-' ~
~ .. -..: Slltty Tour, , ., .•.• .,\S .:,.,. ,., PM lnlp(tClions
~----.....,.:; (1. .:..:· flf't:.
• There were no reportable accidents during the period. The roll ing 13 Period AFR is at 0.09. CoCP compliance was recorded at 100% during Period 01.
• Progress on closing out the Stage 3 RSA report findings are being tracked by the Board SHE Committee. A planned meeting to discuss w ith BSC on 27 /04/11 was postponed.
• A joint inspection was carr ied out on Princes St reet . This highlighted that the repairs being carried out by BSC are not in line with the road rail interface. This issue has been escalated to BSC and tie Directors. An outcome of this exercise is awaited and a report w ill follow.
• Further results received from BSC for contaminated land. Meeting arranged 21/04/2011 to discuss the matter further.
3
3
TIE00086026 0003
Deliver a Safe Tram Metrics Inspection Overview
Data Checked
Section Acllvlty
!S.SX · Y • I:~• e.1og1 (1) N • No •vto.nc• •.A~$ (01 NA • NCI bpplJt;._IM (•I P • P~,r O'll;clri8'nc:• 11, l>f«• IO S
Overview of review of BSC design submissions
10011
805'
605'
"°" 205'
<»< Pll • 1
No.t Ytt Su0rn.lttrdby8$C • 8SG Submluk,n Ovcrd:u~ • ~e R~winPrci,t H
• ReJ.ttt ·C
At:v1ew not ftc,Q1,1irtd
• t.oOt:jtc-:ion·A
Tra,'ns
• 1 metrics inspection carried out during Period 1 - Depot Access Bridge review of updated ITP's including Structural Concrete, Bridge Bearings, Eart hworks and Waterproofing.
• Audits - 2 audits carried out in the period. BSC have st ill not provided a response to the Haymarket Audit carried out on the 14th Jan 2011.
Independent Competent Person RFI and RFO status - 5 open RFl's (2 on hold); 1 open RFO and 1 open ANC.
4
TIE00086026 0004
T:adi,nrgSh Progress - Period 01 •• I
What % complete
Tram vehicles 89%
Utilities 97%
Infrastructure construction - 40% Off Street
Tram project ancillary works 100%
Tram project overall as a "'76% Financial Metric against authorised funding
• 0.1% progress achieved in the period
5
TIE00086026 0005
Risk - Top 12 Risks Period 01 MID
""' ProtJri,r,~ddov •ithd !p.,Jtt(l<YICf ............... ,...,~ d mwPl"<"<lde ctn,np L-.IN.
...-,f,lhoo-Vllpfq,'~
f-o,d'o~W"!J'•~«.ff'oC,t ~<1~1,9'«1,.,..,,,.,"1$1"~,bt, ... ttn a,r~«rto~clfftttr« 1160 tt111-"'11*.w«6'0-tfq.1'1v&ued CE.Cftfoti:h~nn,egi,iongforrhPon, tie, .. ~F"o,thfloft'\CIOllll~l'I 'SBtll lif'l20
...uU~ovt <9-~1'.W'>tol~~rt• ,dvlllu,t(l..,....b
' ·.:YfflfU~~•-d6.11,,,,.(l)M F"t-dt119'1,tl'ld~··
U'l'~,Ot ibllklont4Mtetl !~f th.."tC:w..-1nc,tp._,~w:ak"'tlllif0t 11Wt1:Uprx.nQll«1~;11'1CJ
m ~('Mlfl«ttbt~vo1 ~n,$XC.. wl1~111rple!•w•,t«f. .r,c,~" Ct~I H#): lO ,c09toll!'lr.eo'lf0f"I l1W1Wn1•~~w,,ll'+~f,..,.. w,a;,1Mtol1r.ta,
I.IC' M:t;"'"""""r.r~d.ti!v:Jhc~ .... .,,;.s
~tldfiPJW'CfCg!'lffllf'if"'"O'lv..-i,o.,.
343 l..~t.C..fa, ... t'toObCJlf'l~IW~~ 1tiu,•td o,.;:•t>,,am(Oj~ duf lO ,a .. H1'> 2> t>nlf'!~l1M~ec«'}$d~ dflll>{rilJSr~~I01.S
co,n~~~vu!cg
o.c.,~(.IOt"':df-:loMofr.<oK.t
,.,. r111-,.o1'*~'"~'PIO"'~~ u.;tlJltf!'~f!IW&ffl'tr1tf•'4ffl9SC 1.t<l ol f'"Ol'Ul~....(A ~and , ... , HW\ ?) th!4ndf!SC ~sto,n,r;hk .ncfN·.-d(-0,~
Tra,'ns
6
6
TIE00086026 0006
Risk - Top 12 Risks Period 01 1101 I.Wt'lll~~~M~ui:ml!1...-lf,o,
ootMU~t th"t~~tle&C
(IOl'l'Jln« otl!lr'ir..9;a-,ii,tnt
.. ot8SC1"'tff~~,.Kl'Jfo,1.0I,;,, hPOJffl.
PrClgflll'l'lMfl'cidW..tnl\t~M. r, ..,.,~.n t \Cl"ll•ln tft ,~wt.·«t
Mt.,ors..llf!lottal'ffy....:t,"o,,~......,c:,! DNo;~o...,o l.loQl)d-J11 to
OM..r:•..-
921 U-tr,.h:;)dM~o.r,ogow;tnJaJon ~ l (lnd,.-..ng11odilre,,,,-ou1oco..-~I HS(~g.•1on.-id1""'°'l ~ f!~;,ddtn d,.r,ng<'O'll! ir~or,1 '11*tode 11•11h u,i:Mclt.-s
Ledo(A~frcm.tie Mw.t!ow ffl N~rd£'T'NWC9<fotof ,o.-,,un,"'
Tra,'ns
--7
7
TIE00086026 0007
Finance - Cost of Work Done Tra,'ns Actual Period 1 Project to Date
Cost of Work Done - £k 2011/12 Period 1 2011/12 Notes
BB+S 321 134,888 (1)
Advanced Payments 0 (14,356) r
CAF 110 47,900 (2)
sos 81 33,072
Phase lb payment to BSC 0 3,200 r
Utilities/ Other Infrastructure (91) 97,394 (4) r
Project Costs & Other/Land 1, 114 110,935 (5)
Sub-Total ) 1,535 413,033
• Spend in Period 1 fl.Sm - low activity as forecast. - BB+S major cost recognised against maintenance/mob Spare Parts (£268k) - Project/ Other costs reduced to £1.lm in Period 1 (£1.8m P13). • Actual cash spent to end Period 1 - £394.4m - Payment of £27.0m (+VAT) made to the lnfraco on 3rd and 4th May re lating to MOV4
8
8
TIE00086026 0008
Finance - Project Costs Breakdown Tra,'ns Last Period Spend· Year To Date Project to Date -Cost of Work Done - fk Period 13 2010/111 Period 12011/12 Pe riod 1 2011/12 Notes
Project manage ment St.all Costs 41 51
378 31 ,299 (1)
TSS 17 38 10,841
legal Costs (DLA &D&W) 9, 0 6,350
Central Overheads 381 22 5,153
DRPCosts ~=! 218 6,049 (2')
IT & Software Costs I fitout 51 3,352
Citypoint • ren t,rates,s/c 1321 22 2,916 (3)
TEL 10 14 2,547
Comms/ Stakeholder 19 18 2,904
DPOF 43 32 2,767
CEC Sta ff Recharge 52 ' 39 2,316
Archaeology ol 25 528
Recruitment Fees
:1 1 470
Tra vel & Subsistence I Conference 2 356
Other OI 0 131
Total 'Prolect Costs' 1,0211 859 n ,978 Othe,/Land (65) / 2551 32,957 (4)
Total Project Costs/ Other & Land 1.,~1 1,1141 110,935
• Significant reduction in underlying project costs run-rate from £1.8m (P13) to £1.lm (Pl) - DRP and mediation costs spike in P13 (£958k) now levelling out (£218k) - PM staff costs reduced in-line with forecast. Anticipate run-rate to fa ll to £350k in P2 &P3
9
TIE00086026 0009
Funding Position Funding Summary- Pl- 2011/12 Risk/ FundinRSummarv
Original QRA Risk
Further Funding Approved (TPB)
Uncommitted Budgets 'on hold'
Additional .. u m perTEI/CEC MOU(to £546m) Total Risk/ uncommitted funding
Drawn Down
Risk drawn down to end Pe nod 13
Risk remaining start Period 1 • 2010/11 Risk drawn dow n i n Period 1
Risk remaining start Period 1 • 2011/12 PM Staff Costs/ DRP (approved p13 to be processed)
Risk remaininR end Period 1- 2011/12
Forecast Spend over Funding allowance•
Further PM Staf f Costs (forecast) • to end P3
DPOF costs (forecast) to end P3
Unbudgeted items forecast**
• forecast exdudes impact of MOV4 (11g payments)
Tra,'ns ft actual · fk forecast - £k forecast - £k
(P1 - 201 1/121 (P2 - 201 1/12l (P3-2011112l
30,336 32,983 12,690
1,000 77,009
-71,706 5,304
I -649 4,755 0
-2,476 2,279
I -~I -350 -32, ·32
-3821 -382
• £2.3m of uncommitted risk allowance remaining as at the end of Period 1- 2011/12 • PM staff costs and DPOF costs forecast in P2 and P3 stil l to be drawn down ~£400k per period • Does not take account of Hg payments made on 3rd and 4th of May
10
TIE00086026 0010
Change register update Total Notices by BSC Deleted/withdrawn/superseded/Not issued TOTAL
Estimates Submitted Estimates Submitted (Notified to BSC as Incomplete) Estimates Outstanding
tie Change Orders issued
ESTIMATES SUBMITTED BUT NOT AGREED
Outstanding BSC Actions Outstanding tie Actions Disputed as Change
Value of agreed changes Original submission
868 (172)
696
465 (NIA)
233
228
235
139 48 48
£24.227m (52%) £46.563m
Tra,'ns
Change Statistics (at 05105111) Analysis of Estimates Of the 465 Estimates received: 267 <£50k 168 <£10k Smallest Estimate £60
11
11
TIE00086026 0011
Trams Progress Tra,'ns
• Al l 27 trams now completed or in production;
• Tram 27 in finishing area;
• 26th tram just finished factory acceptance test;
• pt and 3rd to 25th trams completed and stored ready for
delivery, entitled to take title to all or selected number
• ITN submission being prepared for potentia l tram lease
opportunity.
12
12
TIE00086026 0012
Operational Readiness Report Tra,'ns • Construction works at the depot continue apace;
• Main Workshop and store rooms nearing completion
with final plant being installed;
• The Siemens control room equipment is being installed;
• External track works are being progressed;
• Work progressing with the Mini Test Track;
• Testing staff preparations being made;
13
13
TIE00086026 0013
Key operations dates Tra,'ns • Depot workshop trackwork - Completed
• Depot substation fitout - Completed
• Limited HV power in workshop
• Building and workshop completed May 2011 except for the tramwash
• Building occupation scheduled for July
• Recruitment of testing staff for training July 2011
• Tram dynamic testing to start in December 2011
17