Immortus evx solar car modified for slideshare upload_Chassis slide
Training Slide - Car -Ncr - Copy
-
Upload
sds-mani-s -
Category
Documents
-
view
9 -
download
3
description
Transcript of Training Slide - Car -Ncr - Copy
NCR / CAR
NCR / CARQMS TERMS - TRAININGNON CONFORMANCE REPORTNC: NON CONFORMANCE
NOT MEETING THE SPECIFIED CODE OR PROCEDURE REQUIREMENT. (RAISED ON PRODUCT OR SERVICE)
NCR: NON CONFORMANCE REPORTCORRECTIVE ACTION REQUESTCAR:
CORRECTIVE ACTION REQUEST (RAISED FOR SYTEM DEFIENCY)
CORRECTIONCORRECTION:
ACTION TO ELIMINATE THE DETECTED NON CONFIRMITY SUCH AS REWORK, REGRADE, REJECTION, RETURN, SCRAP ETC. (IN OTHER WORDS ADDRESSING THE SYMPTOMS)
CORRECTIVE ACTIONCORRECTIVE ACTION:
ACTION TO PREVENT THE RE-OCCURANCE OF THE DETECTED NON CONFIRMITY.(ACTION TAKEN AFTER THE OCCURANCE)
PREVENTIVE ACTIONPREVENTIVE ACTION:
ACTION TO ELIMINATE THE CAUSE OF POTENTIAL NON CONFIRMITY.(ACTION TAKEN BEFORE OCCURANCE)
NATURE OF NON COMPLIANCEEXAMPLE
NATURE OF NON COMPLIANCE
REACHED OFFICE LATEROOT CAUSEROOT CAUSE
WHY-LATEWHY-ALTERNATE ROUTEWHY-TRAFIC IN REGULAR ROADWHY-POLICE BLOCK THE ROADWHY-SULTAN QABOOS ARRIVING TO MUSCAT TODAY
CORRECTIONCORRECTIONSTAY LATE IN THE OFFICE AND COMPLETE ALL THE WORK PLANNED FOR THE DAY
CORRECTIVE ACTIONCORRECTIVE ACTIONSTART EARLY TO OFFICE IN ALTERNATE ROUTE AND REACH OFFICE ON TIME
PREVENTIVE ACTIONPREVENTIVE ACTIONWHEN EVER THERE IS FORIGN OFFICIAL VISIT GIVE CIRCULAR TO ALL EMPLOYEES PREVIOUS DAY ITSELF TO KNOW IN ADVANCE TO PLAN TRAVEL ACTIVITYKEEP ALL THE APPOINTMENT IN THE SECOND HALF OF THE DAY
Common Statistical Techniques
Pareto charts Run charts Control charts Mean and standard deviation Experimental design (DOE) Graphical methods (fishbone diagrams, histograms, scatter plots, spreadsheets, etc.)