Transcript of Training NBE 400V AC System R0
-
7/28/2019 Training NBE 400V AC System R0
1/39
NEWBONGESCAPE
400VAC
Switchgear
(3.6)
Oct.2012
TRAININGMANUAL
Vol.III:BALANCEofPLANT
-
7/28/2019 Training NBE 400V AC System R0
2/39
NewBongEscape
BalanceofPlant
400VACSwitchgearContents
1.General Introduction2.Major TechnicalData3.Design
4.Outline DrawingandInstallation5.Operation
6.Inspection andMaintenance
-
7/28/2019 Training NBE 400V AC System R0
3/39
NewBongEscape
BalanceofPlant
400VACSwitchgear
Notes:
Whileoperatingelectricaldevicestherearesomepartsundercurrent.Onlystaffwho
hasreceivedrelevanttrainingandwhichisfamiliarwiththesafelydefinitionof
electricaldevicescanexecutesuchworkasinstallation,trying,maintainsand
modification
.
-
7/28/2019 Training NBE 400V AC System R0
4/39
NewBongEscape
BalanceofPlant
400VACSwitchgear
1. General Introduction
-
7/28/2019 Training NBE 400V AC System R0
5/39
NewBongEscape
BalanceofPlant
400VACSwitchgearGeneral
Introduction
The400VACstationsupplysystemshallbeprovidedwith400VACdistributionboardssuppliedfrom4
(four)setsof11kVgeneratorswitchgearthrough2(two)setsof
11000/400Vdrytypeauxiliary
transformerseach
of
1600kVA
as
per
the
load
calculation
of
the
plant.
The
system
shall
also
be
supplied
fromonesetofdieselgeneratorofsufficientcapacityincaseofblackoutandblackstart.
Thesystemshallbemadeofnonessentialbusandessentialbusconnectedbyabustiebreaker.The
nonessential
bus
with
main
bus
1shall
supply
to
non
essential
loads
and
unit
auxiliary
loads,
while
the
essentialbuswithmainbus2shallsupplytoessentialloadsandunitauxiliaryloadsasbackuptomain
bus1.
Themain400VACdistributionboardsshallbeinstalledindoorin theauxiliaryelectricalroomatelevation245mondownstreamsideofthepowerhouse.
-
7/28/2019 Training NBE 400V AC System R0
6/39
NewBongEscape
BalanceofPlant
400VACSwitchgearStructure
TheframeisconsistsofsquaresteelstubeswithYsectionconnectedbyrivets.
-
7/28/2019 Training NBE 400V AC System R0
7/39
NewBongEscape
BalanceofPlant
400VACSwitchgearStructure
Theframebaseoflowvoltagecabinetisconsistsoffoursquaresteeltubes.Itcaninstallonthetrough
directly.Thecabinetisassembledwithparts,suchasdoors,rearplates,sideplates,partitions,supports,
busbars,functionalunit.Thedimensionsofpartsandpartitions
aremodular.
-
7/28/2019 Training NBE 400V AC System R0
8/39
NewBongEscape
BalanceofPlant
400VACSwitchgearStructure
Therespartitionbetweeneverypanelormainbusbarandunits.Passagewaysofcablesaresealed.The
equipmentscanensurethatforfaultsineverycircuit,changethebreakersandcomponents,inspectand
repairthecableswithoutswitchingoffmainbusbar.
-
7/28/2019 Training NBE 400V AC System R0
9/39
NewBongEscape
BalanceofPlant
400VACSwitchgearStructure
Forthecabinet,thecablescancomeinfromtoporbottom.Insidethecabinet,thereshorizontalcable
ductandverticalcableduct.Theyarecompletelyseparatedwith
horizontalbusbar.Theverticalcable
ductisfromhorizontalcableductontoptothehorizontalcableductonbottom.
-
7/28/2019 Training NBE 400V AC System R0
10/39
NewBongEscape
BalanceofPlant
400VACSwitchgearStructure
ThematerialofmainplugincontactsisBe
Cualloy.Theyaremadeofmultiplesprungsilverlamination
andconnectwithCdropperbars.Be
Cualloyhastheabilitiesofresistpressureandflexibility.Multiple
sprungsilverlaminationhasconductivity.Andtheyaugmenttheinterfacebetweencontactsand
dropperbar.
The
problem
for
the
life
of
contact:
the
main
plug
in
contacts,
which
are
made
of
Be
Cu
alloyandmultiplesprungsilverlamination,arealwayspressed.
Insomecompressingdistance,thelifeof
maincontactscanbeincreased.
-
7/28/2019 Training NBE 400V AC System R0
11/39
NewBongEscape
BalanceofPlant
400VACSwitchgearStructure
Inthelowvoltagecabinet,themainbusbaranddropperbarareCcopper.
-
7/28/2019 Training NBE 400V AC System R0
12/39
NewBongEscape
BalanceofPlant
400VACSwitchgear400V
AC
Switchgear
Pictures
PhysicalPicture
-
7/28/2019 Training NBE 400V AC System R0
13/39
NewBongEscape
BalanceofPlant
400VACSwitchgear
2. Major Technical Data
-
7/28/2019 Training NBE 400V AC System R0
14/39
NewBongEscape
BalanceofPlant
400VACSwitchgearSystem
Parameter:
Detail information refer to the specif ication NBE-207-02-001_R1
-
7/28/2019 Training NBE 400V AC System R0
15/39
NewBongEscape
BalanceofPlant
400VACSwitchgear
3. Design
-
7/28/2019 Training NBE 400V AC System R0
16/39
NewBongEscape
BalanceofPlant
400VACSwitchgearDesign
The400Vlowvoltagedistributionboardsshallbedesigned,manufacturedandtestedinaccordancewithIEC
60439andIEC60529.
Thedevicesprovidedwiththeswitchgearassembliesshallincludelowvoltagepoweraircircuitbreakers,
molded
case
circuit
breakers,
busbar,
current
transformers,
voltage
transformers,
meters,
indication
lamps,
relays,controlelementsandassociatedwiringandtestblocks.
Lowvoltagepoweraircircuitbreakersshallbe3poleelectricallyandmechanicallytripfreedrawouttype
andshallbecompletedwithinterpolebarriersforeliminatingallfaultcommunication,arcquenchers,
manualand
electrical
stored
energy
operating
mechanism,
mechanical
position
indicator,
and
shall
be
mountedonadrawoutmechanisminthebreakercompartment.
Allmolded
casecircuitbreakersshallbelocalmanualoperatedfixedtype
andshallhavethermaland
magnetictrippingdevices.
Theremoteelectricallyoperatedcircuitbreakersshallbeequippedwithpushbuttonsforlocalcontrol,andaLocal
Remote
selectorswitch.Allelectricallyoperatedcircuitbreakersshallbeprovidedwithsufficient
numberofauxiliarycontactsforoperation,control,interlockingandlocal/remoteindication.
-
7/28/2019 Training NBE 400V AC System R0
17/39
NewBongEscape
BalanceofPlant
400VACSwitchgearDesign
-
7/28/2019 Training NBE 400V AC System R0
18/39
NewBongEscape
BalanceofPlant
400VACSwitchgear
4. Outline Drawing and Installation
-
7/28/2019 Training NBE 400V AC System R0
19/39
N B E B l f Pl
-
7/28/2019 Training NBE 400V AC System R0
20/39
NewBongEscape
BalanceofPlant
400VACSwitchgearGeneral
Installation
Requirement:
Regulatethefirstcabinets/transportationunit.
Installthenextcabinetaccordingtothearrangeorder,andconnecttheframeofcabinettillthe
arrangementis
ended.
Cleantheconnectionareaofmaincircuitandconnectthemaincircuitandaux.circuit.
Installcablestofeedcabinets(payattentiontotorque).
Connectearthingpointofcabinetstooverallearthingsystem.
Duringthe
above
process
be
sure
that
connections
points
of
main circuits/transportationisolatedpointsmustreachthetightentorque.
Eachblockof400VACcabinetshallbeearthedatleastwith2points
Afterinstallationfinished,cleanthelocationandthematerialswhichareinsidethecabinets.Alsocleanthe
partswhich
are
irrelevant
for
the
running
of
the
cabinets
such
as
tools,
packing
material,
conductions.
Lockthedoor
N B E B l f Pl t
-
7/28/2019 Training NBE 400V AC System R0
21/39
NewBongEscape
BalanceofPlant
400VACSwitchgearGeneralInstallationMethodontheGround(recommend)
Whentheincomingunitisfrombottom,thecableslotisrequiredontheground.
Cabinetsshould
be
installed
on
the
pedestal
which
is
embedded
in
the
concrete
ground.
The
horizontal
error
of
the pedestalis1mm/permeter.
Cabinetsshouldbeconnectedwiththepedestal(withweldingorscrews).Thegroundingisreliable.
Thelengthofweldinglineinfrontandbackofeverycabinetis
20mm.Allweldinglineshouldbecoatedwith
antisepsis.Whenfixingcabinetsonthepedestal(withweldingorscrews),Thehorizontalerrorofthepedestalis
1mm/permeter.Thegroundingisreliable.Allweldinglinesarecoatedwithantisepsis.Toensurethe
bendingradiusofcablesandenoughspace,suggesttheminheightofcablechannelis500mm.
New Bong Escape Balance of Plant
-
7/28/2019 Training NBE 400V AC System R0
22/39
NewBongEscape
BalanceofPlant
400VACSwitchgearThe
Sketch
Map
for
Installing
BLTS
New Bong Escape Balance of Plant
-
7/28/2019 Training NBE 400V AC System R0
23/39
NewBongEscape
BalanceofPlant
400VACSwitchgearThe
Sketch
Map
for
Connection
Between
Cabinets
New Bong Escape Balance of Plant
-
7/28/2019 Training NBE 400V AC System R0
24/39
NewBongEscape
BalanceofPlant
400VACSwitchgearThe
Sketch
Map
for
Connecting
Busbar
Between
Cabinets
New Bong Escape Balance of Plant
-
7/28/2019 Training NBE 400V AC System R0
25/39
NewBongEscape
BalanceofPlant
400VACSwitchgearCable
Connection
The sketch map of connection for control
busbar between cabinets
New Bong Escape Balance of Plant
-
7/28/2019 Training NBE 400V AC System R0
26/39
NewBongEscape
BalanceofPlant
400VACSwitchgearCable
Connection
The sketch map of di rect connection for
breakers and loading components
The sketch map for connection without
holes between cables and C-copper
-
7/28/2019 Training NBE 400V AC System R0
27/39
-
7/28/2019 Training NBE 400V AC System R0
28/39
NewBongEscape BalanceofPlant
-
7/28/2019 Training NBE 400V AC System R0
29/39
g p
400VACSwitchgearInspect
in
Incoming
Unit
Inspect the type of breakers. Copper connection of breaker.
Inspect whether degree of protection (distance between phases, creepage,distance, arc distance) meets
requirements.
Inspect the action property of breaker (switch on and off 5 times).
Inspect whether mechanical interlock system is reliable.
Inspect whether control circuit.
InspectinFeederUnit
Inspect whether components meet requirements.
Internal interlock of mechanical and electrical parts whether is reliable.
Inspect whether panel can be operated normally (including contacting property of insert parts).
Inspect whether electrical and mechanical interlock are reliable.
Inspect action property in control circuit and main components (switch on and off 5 times).
-
7/28/2019 Training NBE 400V AC System R0
30/39
NewBongEscape BalanceofPlant
-
7/28/2019 Training NBE 400V AC System R0
31/39
g p
400VACSwitchgearEliminate
the
general
faults
Whenhavingfaults,youmusttaketheemergencystepatthefirsttimeonsite.Recordthephenomenon.
Thegeneralfaultscanbeeliminatedasfollowingsteps:
No. Fault Possible reason Solution
1Main circuit breaker can not switch on
There is no control voltage. Switch on control power breaker.
Voltage inspector does not work.Adjust or replace the voltage inspector
Under voltage release has not been energized/ damaged. Check the wiring or replace the coil.
2Feeder circuit breaker is tripping.
The setting value of overload/short is too low. Reset the overload/short setting value
Load or its wiring has mistake. Eliminate loading faults.
The breakers capacity is too small. Increase the switchs capacity
3 Theres fog/ taste. Connection area of conductor didnt tighten. Stop the power supply and tighten the connection points.
4 Capacitor unit cabinet does not work.No load and the current is too small.
See manuals of components for other faults.Use again when having more loading.
5 Faults of other components See manuals of components
NewBongEscape BalanceofPlant
-
7/28/2019 Training NBE 400V AC System R0
32/39
400VACSwitchgearEnergizingLoadBreakers
ACB in Fixed Uni t Cabinets
Infixedunitcabinet,energizingmethodofACBisthesamewith
incomingunitcabinet.Butbefore
energizing,
inspect
the
isolation
for
loading
cables.
If
the
isolation
of
cables
is
no
problem,
operate
the
breakeraccordingtoabovementionedsteps.
NewBongEscape BalanceofPlant
-
7/28/2019 Training NBE 400V AC System R0
33/39
400VACSwitchgear
Adjust the Protective Value of BreakerNZM2
NZM2
PKZ2
NewBongEscape BalanceofPlant
-
7/28/2019 Training NBE 400V AC System R0
34/39
400VACSwitchgear Give Operating PowerControl operating power is the main factor to start up circuits. Therefore, before energizing, give
working power in time for all loads in loading circuit.
State of Normal Running
When normal running, it should be light for the white indicator lights of control bar. When normal running, all doors
of cabinets should be closed and each panel are in connection position. Operating handle of panel is in I.
NewBongEscape BalanceofPlant
-
7/28/2019 Training NBE 400V AC System R0
35/39
400VACSwitchgear
Monitoring Item of Normal Running
Voltageofthreephaseswhetherisnormalbyobservingvoltagemeter.Ifthererecurrentmetersinthe
circuit,pleaseinspectthecurrentduringrunning.Ifitsnecessary,pleaseinstallthetongtestammeterto
inspectthebalanceofthreephases. Ifitsdigitalfunctionalmeter,onlyoperatefunctionalkeystolook
the
current,voltage,powerandsoon
Monitoring Item of Equipments for Stopping Running
Whenstoppingrunning,theindicatorlightOFF
ison.The
handleofbreakerisino
position.Switchoff
thebreaker.
NewBongEscape BalanceofPlant
-
7/28/2019 Training NBE 400V AC System R0
36/39
400VACSwitchgear6.Maintenance
MaintenanceinRunning
Iftheequipmentshaveproblemsduringrunning,ortermmaintenanceandinspection,cutpowerfor
runningequipment.Afterfinishingmaintenance,givepoweragain.
The following points should be attended.
Inspectthoroughlyforthismaintenance.Theinspectionwhetherperfectreally.
Inspectthesiteofmaintenance,mainincomingcircuitbreakermustinconnectionposition.Powerstorageof
breakeris
ok.
Beforestartinguprunningagain,itmustbeensuredthatallbreakerloadhasntfaults.Theisolationofcables
is10M.Energizingbreakeriscorrespondingwithcableload.
Resumetostartupreferringtotherequirementsinfirsttime.
MaintenancePeriod
Suggest:newrunningequipmentsaremaintainedoneyear.Later,maintainonceevery2to5years.(Depend
onenvironmentoraskmanufacture.)
NewBongEscape BalanceofPlant
-
7/28/2019 Training NBE 400V AC System R0
37/39
400VACSwitchgear StepsforMaintenance1.Maintenancepersonshouldbetheprofessionalelectricianwhoistrained.Faultsshouldberecorded.
2.Checkindicatorlightswithpower.
3.Switchoffmainpower(includinghighvoltagepart),auxiliarypowerandcontrolpower,checkitandsure
thereis
no
power
and
connect
main
circuit
to
ground
4.Openallcabinetdoorsandcheckmaincircuitconnection
points
torque,meanwhilecheckwhetherthere
isbreakdowncausedbyoverload
5.Carbonizationhasappearedcheckandmaintenancetherelevantpartsandchangethedamagedparts.
If
the
color
has
changed
but
it
still
has
gloss
tighten
the
torque.
6.Checkwhetherthereisuncommonphenomenon,ifthereispleasechecktherelevantconductorofmain
plugandchangedamagedpartsAttention:mainplugofwithdrawablecomponentsandcannotattach
object,plugscanbeusedagainaftertheywerecleanedandpaintedVaseline)
7.Cleantheinsideofcabinetwithbrushandcloth(ifthereiscontrolwiringdropped,tightenitagain)
Cleantheoutsideofcabinets(solventisnotpermitted)
NewBongEscape BalanceofPlant
-
7/28/2019 Training NBE 400V AC System R0
38/39
400VACSwitchgear
Itemsbefore/aftermaintenance
Before Maintenance
MaintenanceworkcannotdowithpowerON.
Mainand
auxiliary
power
relevant
wirings
must
be
switch
OFF.
WithdrawablepartsandcomponentsmustbesettoOFF
position.
Verifythereisnopower.
Shortandgroundconnectionprotectionmustbedone.
After Maintenance
Toolscannotleaveincabinets.
Disconnectprotectiveactions
Check
isolation
and
make
a
record.
Takeawaylockingdevices
Placewithdrawablepartstoconnectionposition
Supplythepower
NewBongEscape BalanceofPlant
-