ISS INTERNATIONAL SpA TRAINING & KNOW-HOW TRANSFER SERVICES Il presente documento è proprietà della ISS International SpA e non può essere, totalmente o parzialmente, direttamente o indirettamente, trasferito, riprodotto, copiato, rivelato o usato, senza l’autorizzazione della ISS International SpA. The present document is property of ISS International SpA and shall not be totally or partially, directly or indirectly, transferred, reproduced, copied, disclosed or used, without the authorization of ISS International SpA. Training Training & Know & Know- how Transfer how Transfer CLIENT PERIOD DESCRIPTION Name Logo COUNTRY Year Duration Plant / Unit Training Type Saipem SpA Algeria 2010 6 months Sonatrach Menzel Ledjmet East (MLE) project Oil&Gas treatment plant & pipeline Works at heights; Lifting works Saipem SpA Algeria 2010 24 months Sonatrach Menzel Ledjmet East (MLE) project Oil&Gas treatment plant & pipeline Orientation HSE course for all people involved on site. 3000 people approx., no. 20 main contractors, no.1 strategic partner. Saipem SpA Algeria 2010 26 months Sonatrach Menzel Ledjmet East (MLE) project Oil&Gas treatment plant & pipeline Operation Mechanical Maintenance Instrument Maintenance Electrical Maintenance Saipem SpA Kuwait 2010 6 months Building New Booster Station BS-160 at South East of Kuwait Operation Mechanical Maintenance Instrument Maintenance Electrical Maintenance Saipem SpA Algeri 2010 24 months GNL-3Z project plant located in Arzew LNG Grass-Root plant Operation Maintenance Linde Italia Qatar 2010 1 month Pearl GTL Doha Operation Maintenance Instrument ECU (ENI Corporate University SpA) Italy 2009 / 2010 6 months Special Project III (Trecate Oil Treatment Plant) Electrical – On Shore ECU (ENI Corporate University SpA) Italy 2009 / 2010 14 months Special Project III (Trecate Oil Treatment Plant) Process – On Shore Agip KCO Kazakhstan 2009/2010 12 months Combined Cycle Power Plant Electrical Process

Transcript of Training & Know-how Transfer - ISS International · Agip KCO Kazakhstan 2009/2010 12 months...

Page 1: Training & Know-how Transfer - ISS International · Agip KCO Kazakhstan 2009/2010 12 months Combined Cycle Power Plant • Electrical • Process . ISS INTERNATIONAL SpA TRAINING

ISS INTERNATIONAL SpA TRAINING & KNOW-HOW TRANSFER SERVICES

Il pr

esen

te d

ocum

ento

è p

ropr

ietà

del

la IS

S In

tern

atio

nal S

pA e

non

può

ess

ere,

tota

lmen

te o

par

zial

men

te, d

iretta

men

te o

indi

retta

men

te, t

rasf

erito

, rip

rodo

tto, c

opia

to, r

ivel

ato

o us

ato,

sen

za l’

auto

rizza

zion

e de

lla IS

S In

tern

atio

nal S

pA.

The

pres

ent d

ocum

ent i

s pr

oper

ty o

f IS

S In

tern

atio

nal S

pA a

nd s

hall

not b

e to

tally

or p

artia

lly, d

irect

ly o

r ind

irect

ly, t

rans

ferr

ed, r

epro

duce

d, c

opie

d, d

iscl

osed

or u

sed,

with

out t

he a

utho

rizat

ion

of IS

S In

tern

atio

nal S

pA.

TrainingTraining & Know & Know--how Transferhow Transfer CLIENT PERIOD DESCRIPTION

Name Logo COUNTRY

Year Duration Plant / Unit Training Type

Saipem SpA

Algeria 2010 6 months Sonatrach Menzel Ledjmet East (MLE) project Oil&Gas treatment plant & pipeline

• Works at heights; • Lifting works

Saipem SpA

Algeria 2010 24 months Sonatrach Menzel Ledjmet East (MLE) project Oil&Gas treatment plant & pipeline

• Orientation HSE course for all people involved on site. 3000 people approx., no. 20 main contractors, no.1 strategic partner.

Saipem SpA

Algeria 2010 26 months Sonatrach Menzel Ledjmet East (MLE) project Oil&Gas treatment plant & pipeline

• Operation • Mechanical Maintenance • Instrument Maintenance

Electrical Maintenance

Saipem SpA

Kuwait 2010 6 months Building New Booster Station BS-160 at South East of Kuwait

• Operation • Mechanical Maintenance • Instrument Maintenance • Electrical Maintenance

Saipem SpA

Algeri 2010 24 months GNL-3Z project plant located in Arzew LNG Grass-Root plant

• Operation • Maintenance

Linde Italia

Qatar 2010 1 month Pearl GTL Doha

• Operation • Maintenance • Instrument

ECU (ENI Corporate University SpA)

Italy 2009 / 2010 6 months Special Project III (Trecate Oil Treatment Plant)

• Electrical – On Shore

ECU (ENI Corporate University SpA)

Italy 2009 / 2010 14 months Special Project III (Trecate Oil Treatment Plant) • Process – On Shore

Agip KCO

Kazakhstan 2009/2010 12 months Combined Cycle Power Plant • Electrical

• Process

Page 2: Training & Know-how Transfer - ISS International · Agip KCO Kazakhstan 2009/2010 12 months Combined Cycle Power Plant • Electrical • Process . ISS INTERNATIONAL SpA TRAINING

ISS INTERNATIONAL SpA TRAINING & KNOW-HOW TRANSFER SERVICES

CLIENT PERIOD DESCRIPTION

Name Logo COUNTRY

Year Duration Plant / Unit Training Type

PITC

Kazakhstan 2009 2 months Varios Plants • Oil & Gas Management

Course

Qcon

Qatar 2009 2 months VOC Plant • Process

• Maintenance

ENIPower

Italy 2009 6 months

Combined Cycle Power Plant Mantova • Electrical

Technip KTI SpA

Qatar 2009 2 months

Hydrogen Unit (Ras Laffan)

• Maintenance • Process

ENI E&P

Italy 2008/ 2009 1 months Refinery • Process

Technip KTI SpA

Italy 2009 1 month

Internal Training (KTI Classroom)

• Instrument • Automation

ECU (ENI Corporate University SpA)

Italy 2007 / 2009 18 months Special Project II (Val D’Agri Oil Treatment Plant) • Process – On Shore

ECU (ENI Corporate University SpA)

Italy 2007 / 2009 18 months Special Project II (Spilamberto Oil Treatment Plant) • Process – On Shore

ECU (ENI Corporate University SpA)

Italy 2007 / 2009 18 months Special Project II (Roseto Oil Treatment Plant) • Process – On Shore

ECU (ENI Corporate University SpA)

Congo 2007 / 2009 18 months Special Project II (Zatchi Platform ) • Process – Off Shore

ECU (ENI Corporate University SpA)

Italy 2007 / 2009 18 months Special Project II (Torrente Tona Power Plant) • Power Distribution

ECU (ENI Corporate University SpA)

Italy 2007 / 2009 18 months Special Project II (Val D’Agri Power Plant) • Power Distribution

Page 3: Training & Know-how Transfer - ISS International · Agip KCO Kazakhstan 2009/2010 12 months Combined Cycle Power Plant • Electrical • Process . ISS INTERNATIONAL SpA TRAINING

ISS INTERNATIONAL SpA TRAINING & KNOW-HOW TRANSFER SERVICES

CLIENT PERIOD DESCRIPTION

Name Logo COUNTRY

Year Duration Plant / Unit Training Type

ECU (ENI Corporate University SpA)

Italy 2008 / 2009 18 months

Special Project II (Kashagan – Kazakhstan)

• Electrical

Technip SpA

Saudi Arabia 2007 / 2009 8 months

Ethylene Plant (Yansab – Saudi Arabia) • Process

Technip KTI SpA

Egypt 2007 / 2008 2 months

Gas Compression Station (El Arish – Egypt)

• Maintenance • Process

ISS International Training Center

Italy 2007/2008 16 months

Various Plant Private Users

• Process • Instrument • Mechanical • Piping

ECU (ENI Corporate University SpA)

Italy 2008 2 months

Up stream Oil Treatment Plant (Val D’Agri – Italy) • Process

PITC

Kazakhstan 2008 1 months Varios Plants • Warehouse Mng

ENI E&P

Congo 2008/ 2009 12 months

Zatchi Platform (Congo) • Process

ECU (ENI Corporate University SpA)

Italy 2007 / 2008 2 months Power Plant • Process

ECU (ENI Corporate University SpA)

Italy 2008 2 months

Up stream Oil Treatment Plant (Crotone – Italy) • Process

ECU (ENI Corporate University SpA)

Italy 2007 2 months Various Gas Up-stream Plants • Geology

• Seismic

PITC

Kazakhstan 2007 2 months Varios Plants • Petroleum Contract Mng

Page 4: Training & Know-how Transfer - ISS International · Agip KCO Kazakhstan 2009/2010 12 months Combined Cycle Power Plant • Electrical • Process . ISS INTERNATIONAL SpA TRAINING

ISS INTERNATIONAL SpA TRAINING & KNOW-HOW TRANSFER SERVICES

CLIENT PERIOD DESCRIPTION

Name Logo COUNTRY

Year Duration Plant / Unit Training Type

PITC

Kazakhstan 2007 2 months Varios Plants • HSE

PITC

Kazakhstan 2007 2 months Varios Plants • Logistic Management

ISS International Training Center

Italy 2006/2007 12 months

Various Plant Private Users

• Process • Instrument • Mechanical • Piping

PITC

Kazakhstan 2007 2 months Varios Plants • Prevention Risk

Eni E&P

Congo 2007 2 months

Gas Plant (Pointe Noire – Congo) • Process

ECU (ENI Corporate University SpA)

World Wide 2006 / 2007 12 months

Special Project I (Kashagan - Kazakhstan)

• Process • Production

ECU (ENI Corporate University SpA)

Kazakhstan 2006 2 months

Power Plant (Kashagan - Kazakhstan) • Power

ECU (ENI Corporate University SpA)

Kazakhstan 2006 2 months

Power Plant (Kashagan - Kazakhstan)

• Sckills and Competencies development

JGC

Qatar - Italy 2006 3 months

Refinery (Qatar) • Electrical

Agip KCO

Kazakhstan 2006 4 months (Kashagan - Kazakhstan) • Process

Page 5: Training & Know-how Transfer - ISS International · Agip KCO Kazakhstan 2009/2010 12 months Combined Cycle Power Plant • Electrical • Process . ISS INTERNATIONAL SpA TRAINING

ISS INTERNATIONAL SpA TRAINING & KNOW-HOW TRANSFER SERVICES

CLIENT PERIOD DESCRIPTION

Name Logo COUNTRY

Year Duration Plant / Unit Training Type

ECU (ENI Corporate University SpA)

Tunisia 2006 6 months Varios Palnts • Training Mng

JGC

Qatar 2006 4 months

Refinery (Qatar) • HSE

Guascor Italia

Italy 2006 3 months

Oil Treatment Plant (Gela – Italy)

• Process • Production • Maintenance

Nooter Erksen - CCT

Moroc 2005 2 months

General Training Department- Moroc • Training Services

DLF (Karachagank Project - KPO BV)

Kazakhstan 2005 4

months Down stream treatment Plants (Kazakhstan) • Skills and Competencies

ECU (ENI Corporate University SpA)

Italy 2005 2 months Refinery • Training Coordination

ECU (ENI Corporate University SpA)

Italy 2005 1 month Varios Plants • Drilling