Traffic Study
-
Upload
city-of-lake-elsinore -
Category
Documents
-
view
218 -
download
1
description
Transcript of Traffic Study
41 Corporate Park, Suite 300
Irvine, CA 92606
Prepared by:
Aric Evatt, PTP Charlene S. Hwang, PE
Prepared for:
JIC-CP DIAMOND DEVELOPMENT, LLC 7777 Center Avenue, Suite 300 Huntington Beach, CA 92647
DIAMOND SPECIFIC PLAN TRAFFIC IMPACT ANALYSIS
LAKE ELSINORE, CALIFORNIA
April 13, 2009
JN: 06187-02 AE:CH:lr
DRAFT
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
This Page Intentionally Left Blank
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
This Page Intentionally Left Blank
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
This Page Intentionally Left Blank
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
Intersection Total Improvements Required by 2012
Total Improvements Required by 2014
Total Improvements Required by 2016
Total Improvements Required by GP Buildout TUMF Improvements TIF Improvements
Local Mitigation (Improvements not covered
by TUMF/TIF)
Project % for Local
Mitigation
Main St. (NS) & Lakeshore Dr. (EW) None Install Signal None 1.SBL, 1.EBT, 1.WBT N/A N/A Install Signal, 1.SBL, 1.EBT, 1.WBT 11.40%
Auto Center Dr. (NS) & Franklin St. (EW) Intersection Does Not Exist Intersection Does Not Exist Intersection Does Not Exist
Signal Installation, 1.NBL, 1.NBT, 1.NBR with Overlap Phasing, 1.SBL, 1.SBT, 1.EBL, 2.EBT,
1.EBR, 2.WBL, 2.WBT, 1.WBR with Overlap Phasing
N/A
Signal Installation, 1.NBL, 1.NBT, 1.NBR with Overlap Phasing, 1.SBL, 1.SBT, 1.EBL, 2.EBT,
1.EBR, 2.WBL, 2.WBT, 1.WBR with Overlap Phasing
None 8.30%
Auto Center Dr. (NS) & Old Franklin St. (EW) Intersection Does Not Exist Intersection Does Not Exist Intersection Does Not Exist 1.NBT, 1.SBL, 1.SBT N/A 1.NBT, 1.SBL, 1.SBT None 18.30%
I-15 SB Ramps (NS) & Franklin St. (EW) Intersection Does Not Exist Intersection Does Not Exist Intersection Does Not Exist 1.SBT/L, 1.SBR, 2.EBT, 1.EBR, 1.WBL, 2.WBT
Included in Railroad Canyon Interchange Reconstruction N/A None 8.00%
I-15 NB Ramps (NS) & Franklin St. (EW) Intersection Does Not Exist Intersection Does Not Exist Intersection Does Not Exist 1.NBT/L, 1.NBR, 1.EBL, 2.EBT, 2.WBT
Included in Railroad Canyon Interchange Reconstruction N/A None 6.40%
Avenue 6 (NS) & Lakeshore Dr. (EW) Install Signal None None 1.SBL, Restripe SBT/R as SBR, 2.EBT, 2.WBT, 1.WBR N/A
Install Signal, 1.SBL, Restripe SBT/R as SBR, 2.EBT, 2.WBT,
1.WBRNone 10.80%
Summerhill Dr. (NS) & Railroad Canyon Rd. (EW) 1.EBT, Overlap Phasing EBR 1.SBL, 1.SBT 1.WBL 1.NBR with Overlap Phasing, 2.WBR with Overlap Phasing N/A
1.SBT, 1.SBL, 1.EBT, Overlap Phasing EBR, 1.WBL, 1. WBR with
Overlap Phasing
1.NBR with Overlap Phasing, 1.WBR with Overlap Phasing 13.90%
I-15 NB Ramps (NS) & Railroad Canyon Rd. (EW) None 1.NBL, Free Right for NBR, 1.WBT None 2.NBL, Free Right for SBR, 2.EBL, 1.EBR Interchange Reconstruction TBD None 6.23%
I-15 SB Ramps (NS) & Railroad Canyon Rd. (EW) 1.WBL 1.SBR, 1.EBT None 1.NBR, 1.SBL, 2.WBL, 2.WBR with Overlap Phasing Interchange Reconstruction TBD None 3.45%
Auto Center Dr. (NS) & Diamond Dr. (EW) None 1.WBT 1.EBL 1.NBL, 1.SBL, 1.SBR, 1.EBR, 1.WBR 1.WBT 1.NBL, 1.SBL, 1.SBR, 1.EBL,
1.EBR, 1.WBR None 16.20%
Diamond Dr. (NS) & Lakeshore Dr. (EW) None 1.NBL, 1.EBL, Overlap Phasing WBR 1.SBR with Overlap Phasing 1.NBT, 1.NBR, 1.SBT, 1.SBR with
Overlap Phasing, 1.EBT, 1.WBT1.SBT, 1.SBR with Overlap
Phasing
1.NBL, 1.NBT, 1.NBR, 1.EBL, 1.EBT, 1.WBT, Overlap Phasing
WBR1.SBR with Overlap Phasing 16.70%
Diamond Dr. (NS) & Campbell St. (EW) 1.NBL, 1.EBL/T/R, Restripe WBR as WBT/R Install Signal, 1.EBL None 1.SBR, 1.EBR with Overlap
Phasing N/A N/A
Install Signal, 1.NBL, 1.SBR, 1.EBL, 1.EBL/T/R, 1.EBR with
Overlap Phasing, Restripe WBR as WBT/R
44.20%
Diamond Dr. (NS) & Sylvester St. (EW) None None Install Signal None N/A Install Signal None 29.80%
Mission Trail (NS) & Campbell St. (EW) Install Signal, Restripe for 1.EBL and 1.EBT/R, 1.WBL None None 1.NBL, 1.NBT, 1.SBL, 1.SBT,
1.EBL, Overlap Phasing on EBR 1.NBT, 1.SBT N/A
Install Signal, 1.NBL, 1.SBL, 1.EBL, Restripe for 1.EBL and 1.EBT/R, Overlap Phasing on
EBR, 1.WBL
7.00%
Mission Trail (NS) & Malaga Rd. (EW) None None None 1.NBL, 1.NBT, 1.NBR, 1.SBL, 1.SBT 1.NBT, 1.SBT 1.NBL, 1.NBR, 1.SBL None 28.30%
Mission Trail (NS) & Elberta Rd. (EW) Install Signal None None 1.NBL, 1.NBT, 1.SBT, 1.EBL, 1.EBT/R, Restripe WBR as WBT/R 1.NBT, 1.SBT N/A
Install Signal, 1. NBL, 1.EBL, 1.EBT/R, Restripe WBR as
WBT/R18.90%
Mission Trail (NS) & Olive St. (EW) Install Signal, 1.EBL, 1.WBL None None 1.NBL, 1.EBT None Install Signal, 1.NBL, 1.EBL, 1. EBT, 1.WBL None 15.90%
Mission Trail (NS) & Lemon St. (EW) Install Signal, 1.SBL None 1.WBL, Restripe WBL/T/R as WBR None None Install Signal, 1.SBL, 1.WBL,
Restripe WBL/T/R as WBR None 13.10%
Mission Trail (NS) & Bundy Canyon Rd. (EW) None 1.SBL, 1.EBL, 1.WBL, Overlap Phasing WBR None 1.NBL, 1.EBT, 1.EBR, 1.WBL,
1.WBT
1.NBL, 1.SBL, 1.EBL, 1.EBT, 1.EBR, 2.WBL, 1.WBT, Overlap
Phasing WBRN/A None 7.10%
I-15 SB Ramps (NS) & Bundy Canyon Rd. (EW) None None None 1.SBL, 1.EBT, 1.EBR, 1.WBL, 1.WBT Interchange Reconstruction N/A None 2.00%
I-15 NB Ramps (NS) & Bundy Canyon Rd. (EW) None None 1.NBR 1.NBL, 1.EBL, 1.EBT, 1.WBT, 1.WBR Interchange Reconstruction N/A None 1.90%
FUTURE INTERSECTION IMPROVEMENTS AND LOCAL MITIGATION
TABLE 8-2
__________________________________________________________________________________Diamond Specific Plan Traffic Impact AnalysisCity of Lake Elsinore, CA (JN: 06187-02RIV)U:\UcJobs\_06100-06500\_06100\06187\Excel\06187-02RIV\Table 8-1
181
This Page Intentionally Left Blank
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
This Page Intentionally Left Blank
198