Traffic Management System And Passenger Information System Western Railway Experience.

27
Traffic Management System And Passenger Information System Western Railway Experience

Transcript of Traffic Management System And Passenger Information System Western Railway Experience.

Traffic Management System And

Passenger Information System

Western Railway Experience

© B

omba

rdie

r In

c. o

r its

sub

sidi

arie

s. A

ll rig

hts

rese

rved

.

2

Contents

Need for an integrated control room

TMS - introduction

TMS - functionality

Visible Benefits to Customer derived from the project

© B

omba

rdie

r In

c. o

r its

sub

sidi

arie

s. A

ll rig

hts

rese

rved

.

3

Integrated control room - Why ?

Passengers’ concerns– Safe travel

– Punctuality

– Correct and timely information• More avenues of getting this information

– Availability of travel options

– Comfort

© B

omba

rdie

r In

c. o

r its

sub

sidi

arie

s. A

ll rig

hts

rese

rved

.

4

Integrated control room - Why (?) ...2

What is the controller supposed to do?– Pass on correct information to station masters for safe & efficient train

operation

– Ensure trains run as per time table

– Handle deviations in timetable factoring in unusual events/accidents.

– Quick decision making to optimize line capacity

– Ensure that ASMs execute Control Room instructions

What he really does?– Imagine the current condition in mind

– Keeps updating his own picture in mind by taking fresh inputs from station masters.

– Keeps filling arrival/departure time for trains at major stations

– In times of emergency, decision-making takes time – limitations of latest information about the event

© B

omba

rdie

r In

c. o

r its

sub

sidi

arie

s. A

ll rig

hts

rese

rved

.

5

TMS Traffic Management Systems

Modular

Robust

Open

Proven

Scalable

© B

omba

rdie

r In

c. o

r its

sub

sidi

arie

s. A

ll rig

hts

rese

rved

.

6

TrainPlanning

Train Operation

Train Control

TMS - Composition

© B

omba

rdie

r In

c. o

r its

sub

sidi

arie

s. A

ll rig

hts

rese

rved

.

7

TMSModular, Open System

TMS is not just a ‘auto charting’

© B

omba

rdie

r In

c. o

r its

sub

sidi

arie

s. A

ll rig

hts

rese

rved

.

8

TMS Centralised Traffic Control

© B

omba

rdie

r In

c. o

r its

sub

sidi

arie

s. A

ll rig

hts

rese

rved

.

9

TMS-WR Functionality Overview

Traffic Management System (TMS) for Railway Control Room Applications– State of the art Control Room

– Live Indications of station layout for close monitoring

– Interface with RVPU

– Alarms (Signaling / Traffic )

– Train Describer System

– Timetable Systems

– Passenger Information

– Management Information

– Train Graph

– Log Replay Facility for investigation

– Remote Control Operations (CTC)

© B

omba

rdie

r In

c. o

r its

sub

sidi

arie

s. A

ll rig

hts

rese

rved

.

13

WR traffic controller before TMS

© B

omba

rdie

r In

c. o

r its

sub

sidi

arie

s. A

ll rig

hts

rese

rved

.

14

TMS-WR Control Room

© B

omba

rdie

r In

c. o

r its

sub

sidi

arie

s. A

ll rig

hts

rese

rved

.

15

Typical Operator Station

© B

omba

rdie

r In

c. o

r its

sub

sidi

arie

s. A

ll rig

hts

rese

rved

.

16

TMS Live Indication - Churchgate

Rake #Train #

Route Set

Signal Aspect

Slots

Diamond crossing Points

© B

omba

rdie

r In

c. o

r its

sub

sidi

arie

s. A

ll rig

hts

rese

rved

.

17

TMS Train Describer System

© B

omba

rdie

r In

c. o

r its

sub

sidi

arie

s. A

ll rig

hts

rese

rved

.

18

TMS Remote Control DDR

© B

omba

rdie

r In

c. o

r its

sub

sidi

arie

s. A

ll rig

hts

rese

rved

.

19

TMS Alarms

© B

omba

rdie

r In

c. o

r its

sub

sidi

arie

s. A

ll rig

hts

rese

rved

.

20

TMS Log Replay

© B

omba

rdie

r In

c. o

r its

sub

sidi

arie

s. A

ll rig

hts

rese

rved

.

21

TMS - Passenger Information

© B

omba

rdie

r In

c. o

r its

sub

sidi

arie

s. A

ll rig

hts

rese

rved

.

22

TMS - Passenger Information

Pf Destination Sch. Time EIM Mode Coach

© B

omba

rdie

r In

c. o

r its

sub

sidi

arie

s. A

ll rig

hts

rese

rved

.

23

TMS - Passenger Information - 2

Pf Destination Sch. Time EIM Mode Coach

© B

omba

rdie

r In

c. o

r its

sub

sidi

arie

s. A

ll rig

hts

rese

rved

.

24

TMS Management Information Train Control Chart

© B

omba

rdie

r In

c. o

r its

sub

sidi

arie

s. A

ll rig

hts

rese

rved

.

25

TMS Management Information Punctuality Report

© B

omba

rdie

r In

c. o

r its

sub

sidi

arie

s. A

ll rig

hts

rese

rved

.

26

TMS Train Graph

© B

omba

rdie

r In

c. o

r its

sub

sidi

arie

s. A

ll rig

hts

rese

rved

.

27

Major benefits from the project

Real time information on train traffic available on Projection screens and also on Controllers workstations– Nothing is left for imagination since updated information is available

leading to safety enhancement.

Controller now ‘CONTROLS’ the traffic instead of recording and working the phones

Failure analysis based on Log & replay facility

Generation of MIS reports – Train Control Charts, Punctuality reports, Train Graphs and Failure reports

Multi-pronged communication facilitates better handling of unusual incidents– Motorman/guard to control room

– Motorman to motorman

– Motorman to guard

© B

omba

rdie

r In

c. o

r its

sub

sidi

arie

s. A

ll rig

hts

rese

rved

.

28

Major benefits from the project (passengers)

Then– Passengers waited on FOB to find which train would come first

– Passengers had information about only single train per platform

– Occasional errors in making announcements

Now– Passengers now know when their train is arriving (Expected in Minutes)

– Multi-level dissemination of train information• Indicators on platforms

• VDUs on strategic station locations

• Multi-lingual voice announcements

– Information about next 2 trains per platform

– Automatic announcements ensure timely and correct information

– Better forecasting is possible

© B

omba

rdie

r In

c. o

r its

sub

sidi

arie

s. A

ll rig

hts

rese

rved

.

29

TMS – Customer testimonial

© B

omba

rdie

r In

c. o

r its

sub

sidi

arie

s. A

ll rig

hts

rese

rved

.

30

Thank You