Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived...

167
Traffic Impact Study NNSA Development Project Route 150 and Botts Road Kansas City, Missouri Prepared for: Honeywell August 2007

Transcript of Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived...

Page 1: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

Traffic Impact Study

NNSA Development ProjectRoute 150 and Botts Road Kansas City, Missouri

Prepared for: Honeywell

August 2007

Page 2: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 3: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

Introduction

The purpose of this study was to assess the impact of the proposed National Nuclear Security Administration (NNSA) facility on the surrounding transportation system. The project will be generally located in the northwest quadrant of the Route 150 and Botts Road intersection in Kansas City, Missouri. The location of the proposed development relative to the major streets in the area is shown on Figure A-1 in Appendix A. Included in this study are discussions of the existing, existing plus initial development, and future conditions as they relate to traffic operations on the adjacent street system. The study includes trip generation projections, volume/capacity analyses, identification of improvements to the street system for the purposes of mitigating potential impacts of the proposed development, and a walkability assessment.

Proposed Development Plan

The Kansas City branch of the National Nuclear Security Administration (NNSA), operated by Honeywell Federal Manufacturing & Technologies, LLC, is planning to build a new facility in the northwest quadrant of the Route 150 and Botts Road intersection. The new facility will replace the existing plant located in the Bannister Road Federal Complex in Kansas City, Missouri. The plant is expected to maintain the existing workforce, which is comprised of approximately 2,700 employees that are split between three shifts. Shift times are flexible, but the majority of the employees work this general schedule:

� First Shift (Approximately 2,200 employees, 7:00 A.M. to 3:30 P.M.) � Second Shift (Approximately 300 employees, 3:30 P.M. to 12:00 A.M.) � Third Shift (Approximately 100 employees, 12:00 A.M. to 7:00 A.M.)

Detailed site information was not available at the time of this study; however, Honeywell staff indicated that the site would likely have two entrances on Botts Road, north of Route 150, and potentially one limited-access intersection on Route 150. For the purposes of this study, it was assumed that there would be two full-access driveways on Botts Road. The first (South Drive) was assumed to be located approximately 1,500 feet north of Route 150 and the second (North Drive) was assumed to be located approximately 800 feet north of the first driveway. A copy of the conceptual site plan for the proposed project has been included on Figure A-2.

Other Nearby Development Projects Several nearby development projects were considered for this study in addition to the proposed development. Brief descriptions of each of the nearby projects have been provided below.

Richards-Gebaur Redevelopment Project There is a plan currently being proposed to re-develop portions of the former Richards-Gebaur Air Force Base south of Route 150 and west of US-71. The current development plan proposes approximately 924 acres of industrial land and 52 acres of retail land. Access to the site along Route 150 will generally be provided at Botts Road and at Andrews Road (Andrews Road will be relocated from its current location). Access will also be provided to the southern portion of the project via the US-71 and 155th Street interchange. Internal to the site, Botts Road will be extended south from Route 150 and will serve as the primary north-south roadway. 155th Street will be the primary east-west corridor. Andrews Road is planned to be relocated approximately 1,000 feet west of its current location at Route 150 and will extend south then curving west to intersect Botts Road. Traffic volume projections for the industrial portion of the proposed project were developed based on traffic count data collected at similar local industrial developments within the Kansas City Metropolitan area. Traffic volume projections for the proposed retail portion of the project were estimated using the Institute of Transportation Engineers’ Trip Generation, 7th Edition.

Traffic Impact Study NNSA Development 1

Page 4: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

TranSystems is in the process of preparing a companion traffic study for the Richards-Gebaur site. That study focuses primarily on the Richards-Gebaur site and will include additional details about that proposed project.

Kansas City Southern Intermodal Facility The Kansas City Southern Railroad (KCS) is planning to build a rail-truck intermodal facility on the existing airport section of the Richards-Gebaur site. Traffic volume projections for this site were derived based on information provided by KCS. Thunderbird Road is planned as the primary access for the proposed facility.

Underground Industrial An underground industrial development is planned on the eastern edge of the Richards-Gebaur site. This project will include an underground mining/quarry operation and over time, as the mining is completed in areas the space will be converted to storage and industrial uses similar to some of the other underground facilities in the Kansas City area. The total amount of potential development for this project is undetermined at this time. For the purposes of this study, we have assumed an absorption rate of approximately 200,000 square feet of leasable industrial space per year after an initial five year lag time for quarry operations. Trip generation for this site was based on similar rates as those that were used for the above ground industrial development in this study. The development rate assumptions were based on information received from the developer.

Auto-load Facility Expansion There is an existing auto-load facility in operation on the western edge of the Richards-Gebaur site, near the old runway. This facility transfers vehicles manufactured by automakers to and from rail cars for transport and is expected to double their existing operations within the next 20 years. The primary access to the site is provided via 155th Street. Trip generation for this site was based on traffic counts taken in 2004 near the site along 155th Street.

Northeast corner of Route 150 and Botts Road Intersection Approximately 320 acres of currently undeveloped land in the northeast quadrant of the Route 150 and Botts Road intersection was considered for potential development. The land is zoned light industrial according to the Kansas City zoning map and was considered to develop as such for the purposes of this study. Trip generation and distributions were developed based on this assumption. There was also a recent plan to build a gas station / fast food restaurant in the northeast corner of the Route 150 and Colorado Avenue intersection. Information for this project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems in November 2006. In general, access to this area was considered to be provided via the Route 150 and Colorado Avenue intersection as well as two access locations north of Route 150 on Botts Road.

Study Area

Study Intersections To assess the impacts of the proposed development, several intersections were identified for study during the weekday A.M. and P.M. peak hours. The intersections are located in the immediate area of the site and include:

� Route 150 and Prospect Avenue � Route 150 and Thunderbird Road � Route 150 and Botts Road � Route 150 and Colorado Avenue � Route 150 and Andrews Road � Route 150 and West Outer Road � Route 150 and US-71 SB Ramps � Route 150 and US-71 NB Ramps � Route 150 and East Outer Road

Traffic Impact Study NNSA Development 2

Page 5: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

Existing Traffic Volumes Turning movement traffic counts were collected at the existing study intersections during a typical weekday in May 2004 from 6:45 to 8:45 A.M. and 4:15 to 6:15 P.M. The existing A.M. peak hour within the count period was found to generally be from 7:30 to 8:30 A.M. The existing P.M. peak hour within the count period was found to generally be from 5:00 to 6:00 P.M. The turning movement counts were adjusted to reflect 2006 conditions based on 24-hour machine count data collected on Route 150 in August 2006. The existing lane configurations and weekday peak hour traffic volumes have been illustrated on Figures A-3, A-4, and A-5.

Zoning The proposed development is located on vacant land and is generally bordered by Route 150 to the south, Botts Road to the east, and the KCS railroad to the west and north. The site is zoned for industrial uses according to the City’s land use plan.

Street Network According to the Kansas City Major Street Plan, Route 150 is a four-lane east/west expressway that serves as a connection to Johnson County, Kansas to the west of the proposed project and cities in eastern Jackson County, Missouri to the east. The posted speed limit on Route 150 is 45 mph east of Botts Road and 60 mph west of Botts Road. US-71 Highway is a north/south freeway that serves as a southern entrance point to the Greater Kansas City Metropolitan Area and connects to the nearby cities of Belton, Peculiar, and Raymore to the south. US-71 has both an east and west outer roads that serve various developments adjacent to the highway. In the near future, the connection between Route 150 and US-71 Highway will be reconfigured from a standard diamond interchange to a new single-point urban interchange (SPUI). This project is planned to begin construction within the next year and is illustrated on Figure A-6. Improvements are also planned to widen Route 150 to a four-lane divided arterial east of US 71 to Route 291 in the near future.

Prospect Avenue is classified as a secondary arterial and runs north/south to the west of the proposed development. Botts Road north of Route 150 is currently a two-lane rural roadway; however Jackson County is planning improvements that may upgrade the roadway to urban collector standards. Colorado Avenue is currently a stub street north of Route 150.

Future Traffic Growth Future traffic growth projections for this study were developed based on two primary sources of information, MoDOT historical traffic count maps and model data from the Mid-America Regional Council (MARC). The data indicates that the existing traffic volumes on Route 150 can be expected to increase by roughly 60 percent within the next 20 years. Botts Road traffic volumes were increased by two percent per year as well to account for potential growth or traffic shifts along this roadway. Additional information on the projected traffic growth can be found in Appendix B.

Analysis

The analysis of the proposed development’s impact includes estimates of vehicle trip generation, distribution of trips onto the street network, and analysis of peak hour operations. Each of these analysis techniques and their results are described below. The study focused on typical weekday A.M. and P.M. peak hour operations.

Trip Generation Trip generation estimates for this project were developed for the A.M. and P.M. peak hour conditions of the adjacent street traffic based on traffic counts conducted at the existing Bannister Road NNSA facility on June 28, 2007 from 6:00 to 8:30 A.M. and 2:00 to 4:30 P.M. The highest one-hour count within each period was used as the basis for trip generation for a conservative estimate. A breakdown of the count data collected has been included in Appendix B. The estimated daily, A.M. peak hour, and P.M. peak hour traffic volumes associated with the proposed and other nearby developments are listed in Table 1. Additional trip generation information can be found in Appendix B.

Traffic Impact Study NNSA Development 3

Page 6: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

Trip Distribution The trips generated by the proposed and other nearby developments were distributed onto the street system based on the trip distributions summarized in Table 2. Three general distributions were developed for use in this study – one for the NNSA employee trips, one for industrial uses, and one for retail uses. The NNSA distributions were developed based on general employee home zip code data received from Honeywell. The industrial distributions were based on the projected regional service area of the industrial developments, i.e. the surrounding populated cities. The retail distributions were based on the nearby residential areas. Detailed distribution patterns through the study intersections can be found in Appendix B. Trip distribution adjacent to the site will be driven in large part by the location of the drives to the parking areas and policies by the NNSA for gate usage. This study assumes relatively even distribution amongst the drives. As plans develop for the site, if this does not turn out to be the case, some localized changes to the recommended geometrics and the entrance intersections may be necessary.

Table 1 Trip Generation

ITE A.M. Peak Hour P.M. Peak Hour Land Use Intensity Code Daily Total In Out Total In Out Proposed Development NNSA 2,700 Emp --- 5,900 800 771 29 912 44 868

Total Proposed Development Trips 5,900 800 771 29 912 44 868 Other Nearby Planned Development Richards-Gebaur Industrial 924 Acres 130 32,827 2,718 2,038 679 3,217 933 2,284 Richards-Gebaur Retail 342,000 Sq. Ft. 820 15,103 327 200 127 1,409 677 732 Industrial (NE of Route 150/Botts) 320 Acres 130 11,363 941 706 235 1,114 323 791 Gas Station with Convenience Mart 8 Pumps 945 1,302 80 40 40 107 54 54 Fast Food with Drive-Through 3,000 Sq. Ft. 934 1,488 159 81 78 104 54 50

Internal Trips (20%) for Convenience Store 558 48 24 24 42 22 21 External Trips for Convenience Store 2,232 192 97 95 169 86 83

Pass-By Trips (60%) for Convenience Store 1,339 115 58 57 101 52 50 Non-Pass-By Trips for Convenience Store 893 77 39 38 68 34 33

Car Load Facility Expansion --- --- --- --- 90 57 33 106 9 97 Underground Industrial Development 75 Acres 130 2,663 221 165 55 261 76 185 KCS Intermodal Facility --- --- --- 2,867 221 100 121 271 142 129

Total Other Nearby Development Trips 67,055 4,709 3,364 1,346 6,547 2,246 4,301

Table 2 Trip Distribution

Direction To/From General Distributions Industrial NNSA Retail

North on US-71 Hwy South on US-71 Hwy West on Route 150 East on Route 150 North on Botts Rd South on Kensington/Westover South on Scott Ave North on E. Outer Road East on 155th St

50% 10% 30% 10% --- --- --- --- ---

55% 20% 10% 10% 5% --- --- --- ---

25% 15%

10% 30% 5% 15%

--- --- ---

Total 100% 100% 100%

Traffic Impact Study NNSA Development 4

Page 7: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

Traffic Operation Assessment

An assessment of traffic operations was made for three separate scenarios. These scenarios allowed for comparison of the before and after impacts of the proposed and other nearby developments in the study area. The scenarios studied included:

� Existing Conditions � Existing plus Initial Development Conditions � Future Year 2025 Conditions

The study intersections were evaluated based on the methodologies outlined in the Highway Capacity Manual, 2000 Edition, published by the Transportation Research Board. The operating conditions at an intersection are graded by the “level of service” experienced by drivers. Level of service (LOS) describes the quality of traffic operating conditions and is rated from “A” to “F”. LOS A represents the most desirable condition with free-flow movement of traffic with minimal delays. LOS F generally indicates severely congested conditions with excessive delays to motorists. Intermediate grades of B, C, D, and E reflect incremental increases in the average delay per stopped vehicle. Delay is measured in seconds per vehicle. Table 3 shows the upper limit of delay associated with each level of service for signalized and unsignalized intersections.

Table 3 Intersection Level of Service Delay Thresholds

Level of Service (LOS) Signalized Unsignalized A < 10 Seconds < 10 Seconds B < 20 Seconds < 15 Seconds C < 35 Seconds < 25 Seconds D < 55 Seconds < 35 Seconds E < 80 Seconds < 50 Seconds F ≥ 80 Seconds ≥ 50 Seconds

The LOS rating deemed acceptable varies by community, facility type and traffic control device. A LOS D is the desirable goal for movements at unsignalized intersections that must yield to other movements; however, a LOS E or F is often accepted for low to moderate traffic volumes where the installation of a traffic signal is not warranted by the conditions at the intersection or the location is deemed undesirable for signalization for other reasons. Other reasons may include the close proximity of an existing traffic signal or the presence of a convenient alternative path. For signalized intersections, level of service and average delay relate to all vehicles using the intersection. LOS D is the minimum desirable standard set by Kansas City for signalized intersections. All study intersections were evaluated using the Synchro analysis software package based on Highway Capacity Manual methods. Note that for analysis purposes, trucks were considered to be 10 percent of the total traffic mix at all study intersections. This amount appears to be somewhat higher than the existing percentage of trucks on Route 150. However, it was considered to be an appropriate, and potentially conservative, amount for use in this study, given the proposed development sizes and types in the area.

Existing Conditions The results for the intersection analyses of existing A.M. and P.M. peak hour conditions have been summarized in Table 4. The study intersections were evaluated with the existing lane configurations, traffic volumes, and traffic controls shown on Figures A-3, A-4, and A-5. Appendix C contains the analysis output files from Synchro.

Traffic Impact Study NNSA Development 5

Page 8: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

Table 4 Intersection Level of Service

Existing Conditions Intersection

Approach/Movement A.M. Peak Hour P.M. Peak Hour LOS Delay LOS Delay

Route 150 and Prospect Avenue Eastbound Shared Through / Left-turn Westbound Shared Through / Left-turn Northbound Shared Through / Left-turn

Northbound Right-turn Southbound Shared Through / Left-turn

Southbound Right-turn

B A F B F D

13.1 0.3

>100 10.9 >100 26.0

A A F D F B

0.1 8.3

>100 29.2 >100 11.5

Route 150 and Thunderbird Road Westbound Left-turn Northbound Left-turn

Northbound Right-turn

A F B

8.8 52.6 10.2

D F D

25.9 >100 26.9

Route 150 and Botts Road Eastbound Left-turn Westbound Left-turn

Northbound Shared Through / Left-turn Southbound Shared Through / Left-turn

D A F F

30.6 8.5

>100 >100

B C F F

10.6 24.0 >100 >100

Route 150 and Andrews Road Westbound Shared Through / Left-turn

Northbound Left-turn Northbound Right-turn

A F A

1.6 82.6 9.8

F F C

>100 >100 23.4

Route 150 and W. Outer Road All Movements (Signalized) A 7.5 C 32.0

Route 150 and US-71 SB Ramps All Movements (Signalized) C 23.1 F >100

Route 150 and US-71 NB Ramps All Movements (Signalized) F >100 F >100

Route 150 and E. Outer Road All Movements (Signalized) B 18.3 D 53.4

LOS – Level of Service Delay – Delay in Seconds per Vehicle

The analysis results indicate that operations at several study intersections are below desirable levels of service (LOS) under existing traffic conditions. In general, most of the stop-controlled cross-street movements along Route 150 experience long delays during the A.M. and P.M. peak hours. Although the delays are undesirable, traffic volumes at these locations are relatively low and do not appear to meet traffic signal warrant thresholds. In addition to the unsignalized intersections, the signalized US-71 Highway ramp intersections on Route 150 appear to be failing under existing traffic loads. These deficiencies are expected to be remedied with the new interchange.

Existing plus Initial Development Conditions The results for the intersection analyses of existing plus initial development A.M. and P.M. peak hour conditions have been summarized in Table 5. This scenario was developed to simulate traffic conditions approximately five years from now, considering the likely development of all planned projects in the area that will occur within that time frame. This scenario included the full development of the proposed NNSA facility as well as the projected initial development of the Richards-Gebaur and Kansas City Southern sites, plus the proposed gas station at the Route 150 and Colorado Avenue intersection. The initial Richards-Gebaur development considered was approximately 200 acres, including all of Phase 1 and about 35 percent of Tract D, based on estimates provided by the developer. The initial KCS intermodal facility was considered to be about 25 percent of the planned growth between now and the ultimate

Traffic Impact Study NNSA Development 6

Page 9: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

operation. Botts Road at Route 150 was considered as the primary access for the Richards-Gebaur traffic and Thunderbird Road at Route 150 was considered as the primary access for the KCS intermodal traffic. Background traffic growth on Route 150 for the five year development period was also considered. Trip generation projections for this scenario can be found in Appendix B.

The Route 150 and US-71 Highway interchange improvement project currently underway by MoDOT was assumed to be completed for this scenario. The improvements for this project include replacing the traditional diamond interchange with a single-point urban interchange (SPUI) and building bridges over Route 150 for the east and west outer roads. A right-in / right-out intersection will be provided for the west outer road at Route 150. Existing traffic volumes at the West Outer Road intersection were shifted to account for this geometric change. For example, at the Route 150 and West Outer Road intersection, the southbound left-turn volume was shifted to the northbound right-turn movement. The East Outer Road intersection will go away with the new interchange, but Route 150 will be connected to the East Outer Road via the White Avenue full-access intersection further east. A sketch of the Route 150 and US-71 Highway interchange improvements has been included on Figure A-6.

The assessment of existing plus development conditions is an iterative process that begins by applying existing plus development traffic volumes to the existing street system. As deficiencies were identified, improvements were considered and evaluated to achieve acceptable operations. The analysis of this scenario considered Thunderbird Road, Botts Road, and Andrews Road to be at-grade intersections with traffic signal control. The development traffic volumes for the proposed NNSA facility were split as evenly as possible between the Thunderbird Road and Botts Road intersections to spread the loading and minimize overall delays. The study intersections were evaluated with the existing plus initial development lane configurations, traffic volumes, and traffic controls shown on Figures A-7, A-8, and A-9. Appendix C contains the analysis output files from Synchro.

The improvements considered in the analyses of this scenario include the following: � Route 150 and Thunderbird Road / NNSA Drive (analyzed as a full-access at-grade intersection) – Install

a traffic signal at the intersection. Provide dedicated eastbound and westbound left- and right-turn lanes with minimum lengths of 450 feet plus appropriate taper. For the northbound approach, provide a minimum of two outbound lanes (one left-turn lane and a shared through / right-turn lane). For southbound, provide a minimum of three outbound lanes (dual left-turn lanes and a shared through / right-turn lane). The northbound and southbound turn lanes should provide a minimum length of 250 feet plus appropriate taper.

� Route 150 and Botts Road (analyzed as a full-access at-grade intersection) – Install a traffic signal at the intersection. Provide dual left-turn lanes and single right-turn lanes on the eastbound and westbound approaches, all with minimum lengths of 450. For the southbound approach, provide dual left-turn lanes, a through lane, and a separate right-turn lane. For the northbound approach, provide dual left-turn lanes, a through lane, and dual right-turn lanes. The northbound turn lanes should provide a minimum storage length of 300 feet plus appropriate tapers.

� Route 150 and Andrews Road (analyzed as a full-access at-grade intersection) – Install a traffic signal at the intersection. Provide separate eastbound and westbound left-turn lanes with minimum lengths of 450 feet plus appropriate taper. For the northbound and southbound approaches, provide a left-turn lane and a shared through / right-turn lane.

� NNSA North Drive and Botts Road (analyzed with stop control on the eastbound approach) – Provide a northbound left-turn lane and a southbound right-turn lane each with minimum lengths of 250 feet plus appropriate taper. Provide separate left- and right-turn lanes on the eastbound approach. A minimum throat distance (distance between the public street and the first internal intersection) of 250 feet should be provided on the private driveway.

� NNSA South Drive and Botts Road (analyzed with stop control on the eastbound approach) – Provide a northbound left-turn lane and a southbound right-turn lane each with minimum lengths of 250 feet plus appropriate taper. Provide separate left- and right-turn lanes on the eastbound approach. A minimum throat distance of 250 feet should be provided on the private driveway.

Traffic Impact Study NNSA Development 7

Page 10: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

Note that the improvements identified for the site driveways on Botts Road are relatively minor due to the fact that the site driveway on Route 150, in this scenario, was considered to serve a significant portion of traffic from the NNSA site as a full-access intersection. If the full-access driveway is not provided on Route 150, the improvements needed at the Botts Road intersections would be more substantial. Refer to the future scenario of this study for the ultimate improvement needs at the Botts Road intersections.

Table 5 Intersection Level of Service

Existing plus Initial Development Conditions Intersection

Approach/Movement

A.M. Peak Hour

P.M. Peak Hour

LOS Delay LOS Delay Route 150 and Prospect Avenue

Eastbound Shared Through / Left-turn Westbound Shared Through / Left-turn Northbound Shared Through / Left-turn

Northbound Right-turn Southbound Shared Through / Left-turn

Southbound Right-turn

D A F B F D

30.7 0.6

>100 12.5 >100 34.2

A C F E F B

0.2 19.6 >100 39.8 >100 13.9

Route 150 and Thunderbird Road All Movements (Signalized) D 53.9 F 93.7

Route 150 and Botts Road All Movements (Signalized) E 68.1 F >100

Route 150 and Andrews Road All Movements (Signalized) F >100 F >100

Route 150 and W. Outer Road* Northbound Right-turn Southbound Right-turn

B C

10.1 18.6

F B

>100 14.8

Route 150 and US-71 SPUI All Movements (Signalized) F 80.5 C 26.4

NNSA North Drive and Botts Road Eastbound Left-turn

Eastbound Right-turn Northbound Left-turn

B A A

12.1 8.8 7.7

B A A

10.2 9.5 7.5

NNSA South Drive and Botts Road Eastbound Left-turn

Eastbound Right-turn Northbound Left-turn

C A A

16.9 8.6 8.0

B B A

11.1 10.9 7.8

LOS – Level of Service Delay – Delay in Seconds per Vehicle * Number of through lanes reduced to three eastbound and westbound, based on HCM maximums for analysis. Results may be conservative.

Several study intersections along Route 150 are expected to perform poorly with the combined short-term traffic from all the developments in the area considered even with the improvements identified above. The Botts Road and Andrews Road intersections on Route 150 are projected to fail in at least one or both peak hour travel periods if considered as signalized intersections. In addition, the Route 150 and US-71 interchange is expected to perform below desirable LOS goals in the A.M. peak hour at the projected traffic conditions.

The study intersections were also evaluated considering Route 150 to extend the six-lane section (three through lanes in each direction) west from the new Route 150 and US-71 interchange improvements. The results of those

Traffic Impact Study NNSA Development 8

Page 11: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

analyses indicated that three of the four signalized study intersections on Route 150 would remain on the threshold of failing conditions at this level of development even with six lanes on Route 150. Analysis results for these key intersections have been summarized in Table 6.

Table 6 Intersection Level of Service

Existing plus Initial Development Conditions (With Six Lanes on Route 150) Intersection

Approach/Movement

A.M. Peak Hour

P.M. Peak Hour

LOS Delay LOS Delay Route 150 and Thunderbird Road

All Movements (Signalized) A 7.4 C 24.9 Route 150 and Botts Road

All Movements (Signalized) B 13.4 E 56.8 Route 150 and Andrews Road

All Movements (Signalized) D 39.6 F 86.6 Route 150 and US-71 SPUI

All Movements (Signalized) E 79.1 C 26.1

LOS – Level of Service Delay – Delay in Seconds per Vehicle

Future Conditions The future conditions analyses of this study include full build-out traffic from all of the planned projects in the area, including the proposed NNSA site, plus general background traffic growth along Route 150 and Botts Road. Given the results of the intermediate development analyses, an interchange was assumed at Route 150 and Botts Road for the future conditions with two separate configurations. The Route 150 and Andrews Road intersection was initially considered to be a signalized at-grade intersection. However, the initial analysis results indicated that the projected future traffic volumes on Route 150 would be too high to support a full-access intersection at this location. Therefore, Andrews Road was considered to provide RI/RO access to Route 150. With an interchange, the Botts Road site driveways were considered to be the primary access points for the NNSA site. Under this geometry configuration, the South Drive would be expected to meet peak hour traffic signal warrants and was therefore analyzed as such.

Alternative 1 included a diamond interchange at Route 150 and Botts Road. Thunderbird Road was considered to be rerouted to connect to Botts Road south of Route 150 and Andrews Road was considered to be RI/RO only. The results of the intersection analysis for Alternative 1 have been summarized in Table 7.

Alternative 2 included a split-diamond interchange between Thunderbird Road and Botts Road. That is, for the south side of the interchange, the eastbound off ramp from Route 150 would connect to Thunderbird Road and the eastbound on ramp to Route 150 would be connected to Botts Road. There would be a roadway adjacent to Route 150 that connects Thunderbird Road to Botts Road. The north side of the interchange would be similar, except the Route 150 off ramp would connect to Botts Road and the on ramp would connect to Thunderbird Road and a potential NNSA site driveway (only minor volumes were assigned to this drive, if it would be used as a major drive, some localized changes to the recommended intersection geometrics at the entrances would likely be necessary). The results of the intersection analysis for Alternative 2 have been summarized in Table 8. Note that the analysis results for the Route 150 study intersections at Prospect Avenue, Andrews Road, W. Outer Road, and US-71 SPUI are the same as Alternative 1 and were therefore not duplicated in this table.

Traffic Impact Study NNSA Development 9

Page 12: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

The general improvements considered in the analyses of this scenario include the following: � Route 150 and Botts Road Interchange – Provide a seven-lane bridge over Route 150 to accommodate a

three lanes northbound (left-turn lane, shared through / left turn lane, and a through lane) and four lanes southbound (dual left-turn lanes and two through lanes). The dedicated northbound and southbound left-turn lanes should be extended approximately 400 feet beyond the preceding ramp intersection. Dedicated right-turn lanes should be provided on Botts Road at both Route 150 on ramps. Four lanes should be provided on both Route 150 off ramps at Botts Road.

� Route 150 and Andrews Road (analyzed as a RIRO intersection) – Provide separate eastbound and westbound right-turn lanes on Route 150 at the Andrews Road intersection with minimum lengths of 450 feet plus appropriate tapers. Provide a right-turn lane on the northbound and southbound approaches.

� NNSA North Drive and Botts Road (analyzed with stop control on the east and west legs) – Provide separate left- and right-turn lanes on the northbound and southbound approaches, each with minimum lengths of 250 feet plus appropriate taper. Provide a left-turn lane and a shared through / right-turn lane on the eastbound and westbound approaches. The left turn lanes should provide a minimum storage length of 250 feet plus appropriate tapers.

� NNSA South Drive and Botts Road – Install a traffic signal at the intersection. For the southbound approach, provide a left-turn lane, two through lanes, and a separate right-turn lane. The southbound turn lanes should provide minimum lengths of 250 feet plus appropriate tapers. For the northbound approach, provide dual left-turn lanes, two through lanes, and separate right-turn lane. The northbound turn lanes should provide minimum lengths of 250 feet plus appropriate tapers.

� Route 150 and Prospect Avenue – It was assumed that dedicated eastbound and westbound left-turn lanes would be provided on Route 150 at Prospect Avenue by the future year 2025.

The study intersections were evaluated with the future lane configurations, traffic volumes, and traffic controls shown on Figures A-10 through A-15. Appendix C contains the analysis output files from Synchro.

The future conditions analysis results indicate that an interchange at Route 150 and Botts Road would generally accommodate the traffic for the proposed adjacent developments. However, the Route 150 and US-71 interchange is expected to operate below desirable LOS conditions in the peak A.M. and P.M. weekday travel periods with all of the planned development in the area. This interchange appears to be designed to its maximum geometric potential for the given interchange configuration. Therefore, additional system-wide improvements may need to be considered to alleviate congestion at this interchange during the A.M. and P.M. peak hour travel periods after all planned developments are built in the area. The stop-controlled movements at the unsignalized study intersections along Route 150 are expected to experience long delays due to the high volumes of through traffic on Route 150. Although the delays would be undesirable at these locations, it was determined that traffic signal warrants would not be met at Route 150 and Prospect Avenue with the projected traffic volumes. Furthermore, Route 150 would no longer be able to support at-grade signalized intersections between Botts Road and US-71 at the projected traffic volumes.

Traffic Impact Study NNSA Development 10

Page 13: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

Table 7 Intersection Level of Service

Future Conditions (Alternative 1) Intersection

Approach/Movement A.M. Peak Hour P.M. Peak Hour LOS Delay LOS Delay

Route 150 and Prospect Avenue Eastbound Left-turn Westbound Left-turn

Northbound Shared Through / Left-turn Northbound Right-turn

Southbound Shared Through / Left-turn Southbound Right-turn

F C F C F F

>100 19.5 >100 21.3 >100 87.1

D F F F F D

27.9 >100 >100 >100 >100 29.5

WB Route 150 Ramps and Botts Road All Movements (Signalized) C 24.3 D 36.5

EB Route 150 Ramps and Botts Road All Movements (Signalized) C 22.0 D 46.1

Route 150 and Andrews Road Northbound Right-turn Southbound Right-turn

B F

12.2 >100

F C

>100 24.6

Route 150 and W. Outer Road* Northbound Right-turn Southbound Right-turn

B F

12.3 >100

F C

>100 25.0

Route 150 and US-71 SPUI All Movements (Signalized) F >100 F 91.8

NNSA North Drive and Botts Road Eastbound Left-turn

Eastbound Shared Through / Right-turn Westbound Left-turn

Westbound Shared Through / Right-turn Northbound Left-turn Southbound Left-turn

C C C B A A

19.1 16.4 22.5 12.2 8.0 8.1

B B F B A A

12.8 11.0 61.9 10.5 7.6 8.0

NNSA South Drive and Botts Road All Movements (Signalized) D 37.3 D 40.3

LOS – Level of Service Delay – Delay in Seconds per Vehicle * Number of through lanes reduced to three eastbound and westbound, based on HCM maximums for analysis. Results may be conservative.

Traffic Impact Study NNSA Development 11

Page 14: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

Table 8 Intersection Level of Service

Future Conditions (Alternative 2) Intersection A.M. Peak Hour P.M. Peak Hour

Approach/Movement LOS Delay LOS Delay WB Route 150 Ramps and Thunderbird Road

Westbound Left-turn A 7.4 A 7.5 Northbound Left-turn B 12.8 D 25.3

Northbound Shared Through / Right-turn C 18.5 D 31.8 Southbound C 16.0 C 19.8

EB Route 150 Ramps and Thunderbird Road Eastbound Left-turn A 7.3 A 7.3

Southbound Left-turn C 21.3 B 14.8 Southbound Shared Through / Right-turn D 32.7 C 15.8

Northbound C 17.6 B 12.7 WB Route 150 Ramps and Botts Road

All Movements (Signalized) C 24.3 C 31.5 EB Route 150 Ramps and Botts Road

All Movements (Signalized) C 22.5 D 39.9 NNSA North Drive and Botts Road

Eastbound Left-turn C 17.5 B 13.2 Eastbound Shared Through / Right-turn B 13.8 B 10.5

Westbound Left-turn C 19.9 E 48.1 Westbound Shared Through / Right-turn B 10.8 B 10.2

Northbound Left-turn A 7.9 A 7.6 Southbound Left-turn A 8.1 A 8.1

NNSA South Drive and Botts Road All Movements (Signalized) C 24.5 D 36.7

LOS – Level of Service Delay – Delay in Seconds per Vehicle

Walkability Analysis

The City of Kansas City, Missouri prepared the Kansas City Walkability Plan, March 2003, in an effort to align with the FOCUS Kansas City Strategic and Comprehensive Plan’s effort to promote choice in transportation. The FOCUS Plan emphasizes the importance of all transportation modes and the Walkability Plan specifically addresses the pedestrian mode. The purpose of conducting a walkability assessment, through the use of the Pedestrian LOS Impact Analysis Manual, is to ensure that impacts to walkability be considered in addition to other traffic impacts in a development plan.

The Pedestrian Area Type for the study area has been identified by the City to be “Neighborhood Activity Centers and Corridors,” based on other studies in the immediate area. Specific origins and destinations for pedestrian activities were not identified for this particular study. However, there do not appear to be many properties nearby (within ¼ mile as identified by the FOCUS Plan) that would potentially produce or attract pedestrians to and from the proposed site, such as retail and residential uses. In general, the existing area surrounding the proposed development does not appear to include pedestrian amenities.

The study area could generally be characterized as rural industrial. Route 150 is currently an expressway facility with relatively high speed limits and traffic volumes, including a significant amount of truck traffic, which is not conducive to pedestrian traffic. The proposed development is expected to provide some pedestrian amenities on site, primarily to accommodate employees walking to and from parking areas to the building(s).

Traffic Impact Study NNSA Development 12

Page 15: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

Discussion

Route 150 With the widening of Route 150 west of US-71 Highway, the roadway has seen significant traffic growth in the past several years. Traffic volumes increased from approximately 17,000 vehicles per day in 1998 to around 25,000 in 2004. With all of the proposed developments plus the general growth in through traffic on Route 150, the corridor is expected to carry roughly 70,000 vehicles per day. At this traffic volume level, Route 150 would not be able to operate as an expressway facility with at grade intersections, as there will not be sufficient capacity for traffic signals to operate, even with the widening of Route 150 to three lanes in each direction.

The actual timing of each development project in the area will determine how long at-grade intersections may accommodate the traffic needs of the Route 150 corridor. This study identified that with significant improvements, Route 150 may be able to operate with traffic signals at the Thunderbird Road, Botts Road, and Andrews Road intersections up to about the five year projected development mark of projects in this area. Around that level of development, the signalized at-grade intersections are expected to begin to fail even with the consideration of six through lanes on Route 150. Based on the analyses performed in this study, a diamond interchange at Route 150 and Botts Road, with a seven-lane bridge (or eight, if a shared through-left turn lane is not used on the northbound approach), can be expected to accommodate the projected future traffic volumes from the proposed projects in this area.

Botts Road Projected traffic volumes indicate two northbound through lanes and three southbound through lanes should be provided on Botts Road between the south NNSA Drive and the westbound Route 150 ramp intersection. Between the north and south NNSA drives, two through lanes should be provided in each direction on Botts Road. North of the north NNSA drive, Botts Road could transition back to a three-lane industrial commercial section, i.e. one through lane in each direction and a center two-way left-turn lane (TWLTL).

MoDOT access management standards suggest that the first full-access intersection adjacent to an interchange should be a minimum one-quarter mile (1,320 feet) away from the nearest ramp intersection. The same standards suggest that a limited-access driveway should be spaced a minimum one-eighth mile from the nearest ramp intersection. These minimum distances should be provided to maximize efficient traffic operations near the interchange.

Summary

This study documents the impact of the proposed NNSA development project to be located in the northwest quadrant of the Route 150 and Botts Road intersection in Kansas City, Missouri. This study included the analysis of the intersections adjacent to and surrounding the proposed development for typical weekday A.M. and P.M. peak hours of operation. Brief descriptions of the results for each study scenario have been provided below.

Existing Conditions This scenario considered only the existing traffic volumes at the study intersections. The analysis results indicated that drivers at several study intersections experience long delays under existing peak hour traffic conditions. The planned Route 150 and US-71 interchange project is expected to improve traffic operations.

Existing plus Initial Development Conditions This scenario took into consideration the full build-out of the proposed NNSA site, as well as initial projected build-outs of other planned developments in the area. Initial build-outs of other planned projects for this scenario included portions of the Richards-Gebaur and KCS Intermodal sites, as well as the proposed gas station site on the north side of Route 150. The analysis results for this scenario indicated that most study intersections along Route 150 would

Traffic Impact Study NNSA Development 13

Page 16: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

operate with failing levels of service, when considered as at-grade intersections. Widening Route 150 to three lanes in each direction would bring operations closer to desirable LOS goals under the projected traffic conditions; however, the Route 150 intersections at Botts Road, Andrews Road, and US-71 would still be expected to perform below desirable LOS during at least one peak hour study period.

Future Year 2025 Conditions This scenario considered full build-out of all planned projects in the area plus general background traffic growth along Route 150 and Botts Road. An interchange at Route 150 and Botts Road can be expected to provide adequate access to Route 150 for the surrounding developments. However, the Route 150 and US-71 interchange is expected to operate below desirable LOS conditions in the peak A.M. and P.M. weekday travel periods with all of the planned development in the area. This interchange appears to be designed to its maximum geometric potential for the given interchange configuration. Therefore, additional system-wide improvements may need to be considered to alleviate congestion at this interchange during the A.M. and P.M. peak hour travel periods after all planned developments are built in the area.

Traffic Impact Study NNSA Development 14

Page 17: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

123456789101112131415

Appendix A - Figures

Figure A- Location Map Figure A- Site Plan Figure A- Existing Lane Configurations Figure A- Existing A.M. Peak Hour Traffic Volumes Figure A- Existing P.M. Peak Hour Traffic Volumes Figure A- Route 150 and US-71 SPUI Improvements Sketch Figure A- Existing plus Initial Development Lane Configurations Figure A- Existing plus Initial Development A.M. Peak Hour Traffic Volumes Figure A- Existing plus Initial Development P.M. Peak Hour Traffic Volumes Figure A- Future Year 2025 (Alt 1) Lane Configurations Figure A- Future Year 2025 (Alt 1) Peak Hour Traffic Volumes Figure A- Future Year 2025 (Alt 1) P.M. Peak Hour Traffic Volumes Figure A- Future Year 2025 (Alt 2) Lane Configurations Figure A- Future Year 2025 (Alt 2) Peak Hour Traffic Volumes Figure A- Future Year 2025 (Alt 2) P.M. Peak Hour Traffic Volumes

Traffic Impact Study NNSA Development

Page 18: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 19: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 20: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 21: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 22: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 23: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 24: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 25: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 26: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 27: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 28: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 29: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 30: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 31: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 32: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 33: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

Appendix B – Trip Generation and Distribution

See attached worksheets.

Traffic Impact Study NNSA Development

Page 34: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA Bannister Federal Complex Traffic Count Data Summary June 28, 2007

Time (A.M. Peak)

Number of Vehicles Bannister and 95th

Bannister and Wayne NW Lot Sante Fe

and Liberty TOTAL One Hour Running Totals

6:00 to 6:15 86 43 40 27 196 800 6:15 to 6:30 123 24 61 33 241 791 6:30 to 6:45 93 11 42 23 169 719 6:45 to 7:00 111 18 42 23 194 683

6107:00 to 7:15 113 25 35 14 187 7:15 to 7:30 107 21 35 6 169 533 7:30 to 7:45 99 14 18 2 133 457 7:45 to 8:00 76 14 22 9 121 8:00 to 8:15 65 14 25 6 110 8:15 to 8:30 65 16 11 1 93

TOTAL 938 200 331 144 1613

Time (P.M. Peak)

Number of Vehicles Bannister and 95th

Bannister and Wayne NW Lot Sante Fe

and Liberty TOTAL One Hour Running Totals

2:00 to 2:15 36 10 10 4 60 262 2:15 to 2:30 34 9 1 4 48 634 2:30 to 2:45 53 14 4 2 73 773 2:45 to 3:00 38 18 20 5 81 867 3:00 to 3:15 203 71 97 61 432 912 3:15 to 3:30 92 24 40 31 187 641 3:30 to 3:45 102 25 28 12 167 603 3:45 to 4:00 70 14 27 15 126 4:00 to 4:15 94 24 35 8 161 4:15 to 4:30 90 29 24 6 149

TOTAL 812 238 286 148 1484

Page 35: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA Traffic StudyKansas City, Missouri

Trip Generation

ITE Weekday AM Peak Hour PM Peak Hour Code Trips Trips % In % Out # In # Out Trips % In % Out # In # Out

Proposed Development NNSA Development*** 2,700 Employees --- 5,900 800 96% 4% 771 29 912 5% 95% 44 868

Total Proposed Development Trips 5,900 800 771 29 912 44 868 Nearby Planned Development Richards-Gebaur Industrial (Phase 1)* 151 Acres 130 5,362 444 75% 25% 333 111 525 29% 71% 152 373 Richards-Gebaur Industrial (Tract D)* 138 Acres 130 4,916 407 75% 25% 305 102 482 29% 71% 140 342 Richards-Gebaur Industrial (Phase 2)* 130 Acres 130 4,616 382 75% 25% 287 96 452 29% 71% 131 321 Richards-Gebaur Industrial (Phase 3)* 142 Acres 130 5,042 417 75% 25% 313 104 494 29% 71% 143 351 Richards-Gebaur Industrial (Phase 4)* 171 Acres 130 6,072 503 75% 25% 377 126 595 29% 71% 173 423 Richards-Gebaur Industrial (Phase 5)* 33 Acres 130 1,172 97 75% 25% 73 24 115 29% 71% 33 82 Richards-Gebaur Industrial (Phase 6)* 159 Acres 130 5,646 467 75% 25% 351 117 553 29% 71% 160 393 Richards-Gebaur Retail** 342,000 Sq. Ft. 820 15,103 327 61% 39% 200 127 1,409 48% 52% 677 732 Industrial n/o M-150, e/o Botts* 320 Acres 130 11,363 941 75% 25% 706 235 1,114 29% 71% 323 791 Gas Station with Convenience Mart 8 Pumps 945 1,302 80 50% 50% 40 40 107 50% 50% 54 54 Fast Food with Drive-Through 3,000 Sq. Ft. 934 1,488 159 51% 49% 81 78 104 52% 48% 54 50

Internal Trips (20%) for Convenience Store 558 48 24 24 42 22 21 External Trips for Convenience Store 2,232 192 97 95 169 86 83

Pass-By Trips (60%) for Convenience Store 1,339 115 58 57 101 52 50 Non-Pass-By Trips for Convenience Store 893 77 39 38 68 34 33

Car Load Facility Expansion (approx. double existing) 90 63% 37% 57 33 106 8% 92% 9 97 Underground Industrial Development* 75 Acres 130 2,663 221 75% 25% 165 55 261 29% 71% 76 185 KC Southern Intermodal Facility 200,000 Lifts/Year 2,867 221 45% 55% 100 121 271 52% 48% 142 129

Total Other Nearby Development Trips 67,055 4,709 3,364 1,346 6,547 2,246 4,301

Initial Development (5-Year Scenario) NNSA Development 2,700 Employees --- 5,500 800 96% 4% 771 29 912 5% 95% 44 868 Richards-Gebaur Industrial (Phase 1) 151 Acres 130 5,362 444 75% 25% 333 111 525 29% 71% 152 373 Richards-Gebaur Industrial (Tract D) 49 Acres 130 1,740 144 75% 25% 108 36 171 29% 71% 49 121 KC Southern Intermodal 50,000 Lifts/Year 717 55 25 30 68 36 32 Gas Station with Convenience Mart 8 Pumps 945 1,302 80 50% 50% 40 40 107 50% 50% 54 54 Fast Food with Drive-Through 3,000 Sq. Ft. 934 1,488 159 51% 49% 81 78 104 52% 48% 54 50

Internal Trips (20%) for Convenience Store 558 48 24 24 42 22 21 External Trips for Convenience Store 2,232 192 97 95 169 86 83

Pass-By Trips (60%) for Convenience Store 1,339 115 58 57 101 52 50 Non-Pass-By Trips for Convenience Store 893 77 39 38 68 34 33

Total 5-Year Buildout Non-Pass-By 14,212 1,520 1,276 244 1,743 316 1,427 Total 5-Year Buildout Pass-By 1,339 115 58 57 101 52 50

INITIAL DEVELOPMENT SCENARIO

Intensity

TOTAL PROPOSED AND NEARBY PLANNED PROJECTS

*Using rates based on traffic volumes counted from a similar industrial park in the KC Metro area (Heartland Meadows)**Using 15% F.A.R.***Based on traffic counts taken at the existing NNSA Bannister Road facility in June 2007

P101070294 (P101060276) August 2007

Page 36: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA Traffic StudyKansas City, Missouri

Raw 2004 Existing Traffic Volumes

AM Peak Hour

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É 1 Ë | | É 38 Ë | | É 43 Ë | | É 35 Ë | | É 53 Ë | | É 162 Ë | | É Ë | | É 471 Ë | | É 83

1776 1754 Å — + — — — + — Å 1754 1798 1642 1642 Å — + — — — + — Å 1642 1642 1642 1599 Å — + — — — + — Å 1599 1635 1579 1520 Å — + — — — + — Å 1520 1578 1593 1540 Å — + — — — + — Å 1540 1544 1497 1335 Å — + — — — + — Å 1335 1454 1433 800 Å — + — — — + — Å 800 1271 1319 1195 Å — + — — — + — Å 1195 1291 21 É | | Ë 6 É | | Ë É | | Ë 1 59 É | | Ë 58 É | | Ë 4 É | | Ë 119 633 É | | Ë 124 É | | Ë 13

2480 | Apr-04 | 2464 2157 | | 2157 2157 | Apr-04 | 2079 2022 | Apr-04 | 1998 1981 | Apr-04 | 1972 1916 | Apr-04 | 1816 1796 | Apr-04 | 1525 1580 | Apr-04 | 1527 44 Ê | TJB | Ì 4 Ê | | Ì 69 Ê | TJB | Ì 6 Ê | TJB | Ì Ê | TJB | Ì 41 Ê | TJB | Ì 103 147 Ê | TJB | Ì 37 Ê | TJB | Ì

704 656 Æ — + — — — + — Æ 656 666 515 515 Æ — + — — — + — Æ 515 515 515 438 Æ — + — — — + — Æ 438 444 443 414 Æ — + — — — + — Æ 414 420 388 387 Æ — + — — — + — Æ 387 428 419 259 Æ — + — — — + — Æ 259 362 363 216 Æ — + — — — + — Æ 216 254 261 210 Æ — + — — — + — Æ 210 236 4 Ì | | Ê 6 Ì | | Ê 8 Ì | | Ê 29 Ì | | Ê 6 1 Ì | | Ê 160 Ì | | Ê Ì | | Ê 38 14 Ì | | Ê 26

Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

41

122

27

64

4595

2144

33

66

88

638

843

9 49

16

915

3

6910

4

35

2987

58

152

5965

6 153

6 1

195

441

695

160

162

279

265

119

103

279

265

671

618

633

147

671

618

3847

1

1427

13

228

171

124

3720

1 51

5117

1

26

83

P101060276 November 2006

Page 37: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

NNSA Traffic StudyKansas City, Missouri

Raw 2004 Existing Traffic Volumes

PM Peak Hour

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É 6 Ë | | É 9 Ë | | É 61 Ë | | É 23 Ë | | É 204 Ë | | É 320 Ë | | É Ë | | É 114 Ë | | É 12

637 630 Å — + — — — + — Å 630 665 682 682 Å — + — — — + — Å 682 682 682 619 Å — + — — — + — Å 619 642 614 596 Å — + — — — + — Å 596 832 858 644 Å — + — — — + — Å 644 651 653 333 Å — + — — — + — Å 333 421 500 250 Å — + — — — + — Å 250 364 310 264 Å — + — — — + — Å 264 337 1 É | | Ë 26 É | | Ë 2 É | | Ë 18 É | | Ë 236 10 É | | Ë 7 É | | Ë 88 250 É | | Ë 46 É | | Ë 61

2400 | Apr-04 | 2425 2480 | | 2480 2480 | Apr-04 | 2371 2160 | Apr-04 | 2152 2191 | Apr-04 | 2390 2396 | Apr-04 | 2785 2750 | Apr-04 | 2523 2627 | Apr-04 | 2265 1 Ê | TJB | Ì 18 Ê | | Ì 89 Ê | TJB | Ì 20 Ê | TJB | Ì Ê | TJB | Ì 364 Ê | TJB | Ì 785 204 Ê | TJB | Ì 12 Ê | TJB | Ì

1763 1730 Æ — + — — — + — Æ 1730 1760 1798 1798 Æ — + — — — + — Æ 1798 1798 1798 1709 Æ — + — — — + — Æ 1709 1729 1546 1294 Æ — + — — — + — Æ 1294 1320 1333 1330 Æ — + — — — + — Æ 1330 1739 1743 1579 Æ — + — — — + — Æ 1579 2364 2250 2046 Æ — + — — — + — Æ 2046 2159 2317 1903 Æ — + — — — + — Æ 1903 1928 32 Ì | | Ê 12 Ì | | Ê Ì | | Ê 252 Ì | | Ê 26 3 Ì | | Ê 45 164 Ì | | Ê Ì | | Ê 113 402 Ì | | Ê 25

Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

326

7517

1741

2618

9154

11

16

33

13

129 61

81

20

219

3

289

2 11

2

23

252

488

236

532

1844

26 320

414

44

572

736

4

69

1055

45

572

164

320

252

1105

8878

5

252

1105

363

318

250

204

363

318

113

114

402

463

61

561

51

4612

98

2727

51

25

12

P101060276 November 2006

Page 38: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA Traffic StudyKansas City, Missouri

Ballanced 2004 Existing Traffic Volumes

AM Peak Hour

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

4949

4949

153

153

104

104

104

104

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É 1 Ë | | É 38 Ë | | É 43 Ë | | É 35 Ë | | É 53 Ë | | É 162 Ë | | É Ë | | É 471 Ë | | É 83

1715 1693 Å — + — — — + — Å 1693 1737 1581 1581 Å — + — — — + — Å 1581 1581 1581 1538 Å — + — — — + — Å 1538 1574 1574 1515 Å — + — — — + — Å 1515 1573 1573 1520 Å — + — — — + — Å 1520 1524 1524 1362 Å — + — — — + — Å 1362 1481 1481 848 Å — + — — — + — Å 848 1319 1319 1195 Å — + — — — + — Å 1195 1291 21 É | | Ë 6 É | | Ë É | | Ë 1 59 É | | Ë 58 É | | Ë 4 É | | Ë 119 633 É | | Ë 124 É | | Ë 13

2402 | Apr-04 | 2386 2079 | | 2079 2079 | Apr-04 | 2001 2001 | Apr-04 | 1977 1977 | Apr-04 | 1968 1968 | Apr-04 | 1868 1868 | Apr-04 | 1597 1597 | Apr-04 | 1544 44 Ê | TJB | Ì 4 Ê | | Ì 69 Ê | TJB | Ì 6 Ê | TJB | Ì Ê | TJB | Ì 41 Ê | TJB | Ì 103 147 Ê | TJB | Ì 37 Ê | TJB | Ì

687 639 Æ — + — — — + — Æ 639 649 498 498 Æ — + — — — + — Æ 498 498 498 421 Æ — + — — — + — Æ 421 427 427 398 Æ — + — — — + — Æ 398 404 404 403 Æ — + — — — + — Æ 403 444 444 284 Æ — + — — — + — Æ 284 387 387 240 Æ — + — — — + — Æ 240 278 278 227 Æ — + — — — + — Æ 227 253 4 Ì | | Ê 6 Ì | | Ê 8 Ì | | Ê 29 Ì | | Ê 6 1 Ì | | Ê 160 Ì | | Ê Ì | | Ê 38 14 Ì | | Ê 26

Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

41

122

27

64

4595

2144

33

66

88

638

843

9 49

4949

4949

16

915

315

3 15

3

6910

4 10

4 10

4 10

4 10

4

35

2987

58

152

5965

6 153

6 1

195

441

695

160

162

279

265

119

103

279

265

671

618

633

147

671

618

3847

1

1427

13

228

171

124

3720

1 51

5117

1

26

83

P101060276 November 2006

Page 39: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

8181

8181

193

193

112

112

112

112

NNSA Traffic StudyKansas City, Missouri

Ballanced 2004 Existing Traffic Volumes

PM Peak Hour

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É 6 Ë | | É 9 Ë | | É 61 Ë | | É 23 Ë | | É 204 Ë | | É 320 Ë | | É Ë | | É 114 Ë | | É 12

677 670 Å — + — — — + — Å 670 705 722 722 Å — + — — — + — Å 722 722 722 659 Å — + — — — + — Å 659 682 682 664 Å — + — — — + — Å 664 900 900 686 Å — + — — — + — Å 686 693 693 373 Å — + — — — + — Å 373 461 461 211 Å — + — — — + — Å 211 325 325 279 Å — + — — — + — Å 279 352 1 É | | Ë 26 É | | Ë 2 É | | Ë 18 É | | Ë 236 10 É | | Ë 7 É | | Ë 88 250 É | | Ë 46 É | | Ë 61

2440 | Apr-04 | 2465 2429 | | 2429 2429 | Apr-04 | 2320 2320 | Apr-04 | 2312 2312 | Apr-04 | 2511 2511 | Apr-04 | 2900 2900 | Apr-04 | 2673 2673 | Apr-04 | 2311 1 Ê | TJB | Ì 18 Ê | | Ì 89 Ê | TJB | Ì 20 Ê | TJB | Ì Ê | TJB | Ì 364 Ê | TJB | Ì 785 204 Ê | TJB | Ì 12 Ê | TJB | Ì

1763 1730 Æ — + — — — + — Æ 1730 1760 1707 1707 Æ — + — — — + — Æ 1707 1707 1707 1618 Æ — + — — — + — Æ 1618 1638 1638 1386 Æ — + — — — + — Æ 1386 1412 1412 1409 Æ — + — — — + — Æ 1409 1818 1818 1654 Æ — + — — — + — Æ 1654 2439 2439 2235 Æ — + — — — + — Æ 2235 2348 2348 1934 Æ — + — — — + — Æ 1934 1959 32 Ì | | Ê 12 Ì | | Ê Ì | | Ê 252 Ì | | Ê 26 3 Ì | | Ê 45 164 Ì | | Ê Ì | | Ê 113 402 Ì | | Ê 25

Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

326

7517

1741

2618

9154

11

16

33

13

129 61

8181

8181

81

20

219

319

3 19

3

289

2 11

2 11

2 11

2 11

2 11

2

23

252

488

236

532

1844

26 320

414

44

572

736

4

69

1055

45

572

164

320

252

1105

8878

5

252

1105

363

318

250

204

363

318

113

114

402

463

61

561

51

4612

98

2727

51

25

12

P101060276 November 2006

Page 40: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA Traffic StudyKansas City, Missouri

2004-2006 Traffic Volume Growth

AM Peak Hour

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É 87 Ë | | É Ë | | É Ë | | É

435 435 Å — + — — — + — Å 435 435 435 435 Å — + — — — + — Å 435 435 435 435 Å — + — — — + — Å 435 435 435 435 Å — + — — — + — Å 435 435 435 435 Å — + — — — + — Å 435 435 435 348 Å — + — — — + — Å 348 348 348 218 Å — + — — — + — Å 218 218 218 218 Å — + — — — + — Å 218 218 É | | Ë É | | Ë É | | Ë É | Aug and | Ë É | | Ë É | | Ë 131 É | | Ë É | | Ë

445 | | 445 445 | | 445 445 | | 445 445 | September | 445 445 | | 445 445 | | 356 356 | | 220 220 | | 220 Ê | | Ì Ê | | Ì Ê | | Ì Ê | 2006 | Ì Ê | | Ì Ê | | Ì 6 Ê | | Ì Ê | | Ì

10 10 Æ — + — — — + — Æ 10 10 10 10 Æ — + — — — + — Æ 10 10 10 10 Æ — + — — — + — Æ 10 10 10 10 Æ — + — — — + — Æ 10 10 10 10 Æ — + — — — + — Æ 10 10 10 8 Æ — + — — — + — Æ 8 8 8 2 Æ — + — — — + — Æ 2 2 2 2 Æ — + — — — + — Æ 2 2 Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê 2 Ì | | Ê Ì | | Ê Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

287

2 87

287

131

6

131

6 13

1 6

P101060276 November 2006

Page 41: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA Traffic StudyKansas City, Missouri

2004-2006 Traffic Volume Growth

PM Peak Hour

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

59 59 48 48

59 48

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É 59 Ë | | É Ë | | É Ë | | É

99 99 Å — + — — — + — Å 99 99 99 99 Å — + — — — + — Å 99 99 99 99 Å — + — — — + — Å 99 99 99 99 Å — + — — — + — Å 99 99 99 99 Å — + — — — + — Å 99 99 99 40 Å — + — — — + — Å 40 40 40 20 Å — + — — — + — Å 20 20 20 20 Å — + — — — + — Å 20 20 É | | Ë É | | Ë É | | Ë É | Aug and | Ë É | | Ë É | | Ë 20 É | | Ë É | | Ë

576 | | 576 576 | | 576 576 | | 576 576 | September | 576 576 | | 576 576 | | 469 469 | | 401 401 | | 401 Ê | | Ì Ê | | Ì Ê | | Ì Ê | 2006 | Ì Ê | | Ì Ê | | Ì 48 Ê | | Ì Ê | | Ì

477 477 Æ — + — — — + — Æ 477 477 477 477 Æ — + — — — + — Æ 477 477 477 477 Æ — + — — — + — Æ 477 477 477 477 Æ — + — — — + — Æ 477 477 477 477 Æ — + — — — + — Æ 477 477 477 429 Æ — + — — — + — Æ 429 429 429 382 Æ — + — — — + — Æ 382 382 382 382 Æ — + — — — + — Æ 382 382 Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê 48 Ì | | Ê Ì | | Ê Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

48 20

48 48 20 20

P101060276 November 2006

Page 42: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA Traffic StudyKansas City, Missouri

Existing Traffic Volumes

AM Peak Hour

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É 1 Ë | | É 38 Ë | | É 43 Ë | | É 35 Ë | | É 53 Ë | | É 249 Ë | | É Ë | | É 471 Ë | | É 83

2150 2128 Å — + — — — + — Å 2128 2172 2016 2016 Å — + — — — + — Å 2016 2016 2016 1973 Å — + — — — + — Å 1973 2009 2009 1950 Å — + — — — + — Å 1950 2008 2008 1955 Å — + — — — + — Å 1955 1959 1959 1710 Å — + — — — + — Å 1710 1829 1829 1066 Å — + — — — + — Å 1066 1537 1537 1413 Å — + — — — + — Å 1413 1509 21 É | | Ë 6 É | | Ë É | | Ë 1 59 É | | Ë 58 É | | Ë 4 É | | Ë 119 764 É | | Ë 124 É | | Ë 13

2847 | | 2831 2524 | | 2524 2524 | | 2446 2446 | | 2422 2422 | | 2413 2413 | | 2224 2224 | | 1817 1817 | | 1764 44 Ê | | Ì 4 Ê | | Ì 69 Ê | | Ì 6 Ê | | Ì Ê | | Ì 41 Ê | | Ì 103 153 Ê | | Ì 37 Ê | | Ì

697 649 Æ — + — — — + — Æ 649 659 508 508 Æ — + — — — + — Æ 508 508 508 431 Æ — + — — — + — Æ 431 437 437 408 Æ — + — — — + — Æ 408 414 414 413 Æ — + — — — + — Æ 413 454 454 292 Æ — + — — — + — Æ 292 395 395 242 Æ — + — — — + — Æ 242 280 280 229 Æ — + — — — + — Æ 229 255 4 Ì | | Ê 6 Ì | | Ê 8 Ì | | Ê 29 Ì | | Ê 6 1 Ì | | Ê 162 Ì | | Ê Ì | | Ê 38 14 Ì | | Ê 26

Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

41

122

27

64

4595

2144

33

66

88

638

843

9 49

4949

4949

4949

4949

16

915

315

3 15

3 15

315

3

6910

4 10

4 10

4 10

4 10

4 10

4 10

4 10

4 10

4

35

2987

5815

2

5965

6 153

6 1

195

441

695

162

249

281

352

119

103

281

352

802

624

802

764

153

3847

1

624

1427

1322

8 17

1

124

3720

1 51

5117

1

26

83

P101070294 (P101060276) August 2007

Page 43: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

81 193

112

NNSA Traffic StudyKansas City, Missouri

Existing Traffic Volumes

PM Peak Hour

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É

6 Ë | | É 9 Ë | | É 61 Ë | | É 23 Ë | | É 204 Ë | | É 379 Ë | | É Ë | | É 114 Ë | | É 12 776 769 Å — + — — — + — Å 769 804 821 821 Å — + — — — + — Å 821 821 821 758 Å — + — — — + — Å 758 781 781 763 Å — + — — — + — Å 763 999 999 785 Å — + — — — + — Å 785 792 792 413 Å — + — — — + — Å 413 501 501 231 Å — + — — — + — Å 231 345 345 299 Å — + — — — + — Å 299 372

1 É | | Ë 26 É | | Ë 2 É | | Ë 18 É | | Ë 236 10 É | | Ë 7 É | | Ë 88 270 É | | Ë 46 É | | Ë 61 3016 | | 3041 3005 | | 3005 3005 | | 2896 2896 | | 2888 2888 | | 3087 3087 | | 3369 3369 | | 3074 3074 | | 2712

1 Ê | | Ì 18 Ê | | Ì 89 Ê | | Ì 20 Ê | | Ì Ê | | Ì 364 Ê | | Ì 785 252 Ê | | Ì 12 Ê | | Ì 2240 2207 Æ — + — — — + — Æ 2207 2237 2184 2184 Æ — + — — — + — Æ 2184 2184 2184 2095 Æ — + — — — + — Æ 2095 2115 2115 1863 Æ — + — — — + — Æ 1863 1889 1889 1886 Æ — + — — — + — Æ 1886 2295 2295 2083 Æ — + — — — + — Æ 2083 2868 2868 2617 Æ — + — — — + — Æ 2617 2730 2730 2316 Æ — + — — — + — Æ 2316 2341

32 Ì | | Ê 12 Ì | | Ê Ì | | Ê 252 Ì | | Ê 26 3 Ì | | Ê 45 212 Ì | | Ê Ì | | Ê 113 402 Ì | | Ê 25 Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

326

7517

1741

2618

9154

11

16

33

13

129 61

8181

8181

8181

8181

20

219

319

3 19

3 19

3

289

2 11

2 11

2 11

2 11

2 11

2 11

2 11

2 11

2

23

252

488

236

532

1844

26 320

414

44

572

736

4

69

1055

45

572

212

379

300

1164

8878

5

300

1164

383

366

270

252

383

366

113

402

463

61

114

561

51

4612

98

2727

51

25

12

P101070294 (P101060276) August 2007

Page 44: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA Traffic StudyKansas City, Missouri

Existing Traffic Volumes Redistributed for Interchange Improvements

AM Peak Hour

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

4949

4949

153

153

104

104

104

104

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É 1 Ë | | É 38 Ë | | É 43 Ë | | É 35 Ë | | É 53 Ë | | É 4 249 Ë | | É Ë | | É 471 Ë | | É 83

2150 2128 Å — + — — — + — Å 2128 2172 2016 2016 Å — + — — — + — Å 2016 2016 2016 1973 Å — + — — — + — Å 1973 2009 2009 1950 Å — + — — — + — Å 1950 2008 2008 1955 Å — + — — — + — Å 1955 1959 1959 1710 Å — + — — — + — Å 1710 1829 1829 1066 Å — + — — — + — Å 1066 1537 1537 1413 Å — + — — — + — Å 1413 1509 21 É | | Ë 6 É | | Ë É | | Ë 1 59 É | | Ë 58 É | | Ë É | | Ë 119 764 É | | Ë 124 É | | Ë 13

2847 | | 2831 2524 | | 2524 2524 | | 2446 2446 | | 2422 2422 | | 2413 2413 | | 2224 2224 | | 1817 1817 | | 1764 44 Ê | | Ì 4 Ê | | Ì 69 Ê | | Ì 6 Ê | | Ì Ê | | Ì Ê | | Ì 103 153 Ê | | Ì 37 Ê | | Ì

697 649 Æ — + — — — + — Æ 649 659 508 508 Æ — + — — — + — Æ 508 508 508 431 Æ — + — — — + — Æ 431 437 437 408 Æ — + — — — + — Æ 408 414 414 413 Æ — + — — — + — Æ 413 454 454 292 Æ — + — — — + — Æ 292 395 395 242 Æ — + — — — + — Æ 242 280 280 229 Æ — + — — — + — Æ 229 255 4 Ì | | Ê 6 Ì | | Ê 8 Ì | | Ê 29 Ì | | Ê 6 1 Ì | | Ê 41 162 Ì | | Ê Ì | | Ê 38 14 Ì | | Ê 26

Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

41

122

27

64

4595

2144

33

66

88

638

843

9 49

4949

4949

16

915

315

3 15

3

6910

4 10

4 10

4 10

4 10

4

35

2987

58

152

5965

6 153

153

4257

41

4

414

162

249

281

352

119

103

281

352

802

624

764

153

802

624

3847

1

1427

13

228

171

124

3720

1 51

5117

1

26

83

P101060276 November 2006

Page 45: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

8181

8181

193

193

112

112

112

112

NNSA Traffic StudyKansas City, Missouri

Existing Traffic Volumes Redistributed for Interchange Improvements

PM Peak Hour

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É 6 Ë | | É 9 Ë | | É 61 Ë | | É 23 Ë | | É 214 Ë | | É 7 379 Ë | | É Ë | | É 114 Ë | | É 12

776 769 Å — + — — — + — Å 769 804 821 821 Å — + — — — + — Å 821 821 821 758 Å — + — — — + — Å 758 781 781 763 Å — + — — — + — Å 763 999 999 785 Å — + — — — + — Å 785 792 792 413 Å — + — — — + — Å 413 501 501 231 Å — + — — — + — Å 231 345 345 299 Å — + — — — + — Å 299 372 1 É | | Ë 26 É | | Ë 2 É | | Ë 18 É | | Ë 236 É | | Ë É | | Ë 88 270 É | | Ë 46 É | | Ë 61

3016 | | 3041 3005 | | 3005 3005 | | 2896 2896 | | 2888 2888 | | 3087 3087 | | 3369 3369 | | 3074 3074 | | 2712 1 Ê | | Ì 18 Ê | | Ì 89 Ê | | Ì 20 Ê | | Ì Ê | | Ì Ê | | Ì 785 252 Ê | | Ì 12 Ê | | Ì

2240 2207 Æ — + — — — + — Æ 2207 2237 2184 2184 Æ — + — — — + — Æ 2184 2184 2184 2095 Æ — + — — — + — Æ 2095 2115 2115 1863 Æ — + — — — + — Æ 1863 1889 1889 1886 Æ — + — — — + — Æ 1886 2295 2295 2083 Æ — + — — — + — Æ 2083 2868 2868 2617 Æ — + — — — + — Æ 2617 2730 2730 2316 Æ — + — — — + — Æ 2316 2341 32 Ì | | Ê 12 Ì | | Ê Ì | | Ê 252 Ì | | Ê 26 3 Ì | | Ê 409 212 Ì | | Ê Ì | | Ê 113 402 Ì | | Ê 25

Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

326

7517

1741

2618

9154

11

16

33

13

129 61

8181

8181

81

20

219

319

3 19

3

289

2 11

2 11

2 11

2 11

2 11

2

23

252

488

236

532

1844

26 321

43

214

412

221

409

7

409

7

212

379

300

1164

8878

5

300

1164

383

366

270

252

383

366

113

114

402

463

61

561

51

4612

98

2727

51

25

12

P101060276 November 2006

Page 46: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

88 193

105

NNSA Traffic StudyKansas City, Missouri

Existing plus Initial Development Traffic Volumes (Three At-Grade Intersections)

AM Peak Hour

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

15 Ë | | É

131 Å — + — — — + — Å

116 É | | Ë

136 | |

1 Ê | | Ì

5 Æ — + — — — + — Æ

4 Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

23 Ë | | É

254 Å — + — — — + — Å

231 É | | Ë

264 | |

1 Ê | | Ì

10 Æ — + — — — + — Æ

9 Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É

1 Ë | | É 38 3 Ë | | É 308 43 Ë | | É 382 67 Ë | | É 68 53 Ë | | É 4 970 Ë | | É Ë | | É 471 Ë | | É 83 2525 2503 Å — + — — — + — Å 2503 2547 2391 2379 Å — + — — — + — Å 2379 2705 2705 2617 Å — + — — — + — Å 2617 3309 3309 3183 Å — + — — — + — Å 3183 3309 3309 3256 Å — + — — — + — Å 3256 3260 3260 2290 Å — + — — — + — Å 2290 2409 2409 1349 Å — + — — — + — Å ### 1820 1820 1696 Å — + — — — + — Å 1696 1792

21 É | | Ë 6 9 É | | Ë 18 44 É | | Ë 310 59 É | | Ë 58 É | | Ë É | | Ë 119 1060 É | | Ë 124 É | | Ë 133512 | | 3496 3189 | | 3451 3451 | | 3968 3968 | | 3945 3945 | | 3936 3936 | | 2988 2988 | | 2135 2135 | | 2082

44 Ê | | Ì 4 77 Ê | | Ì 12 69 Ê | | Ì 19 29 Ê | | Ì 29 Ê | | Ì Ê | | Ì 103 301 Ê | | Ì 37 Ê | | Ì 987 939 Æ — + — — — + — Æ 939 949 798 714 Æ — + — — — + — Æ 714 746 746 537 Æ — + — — — + — Æ 537 659 659 601 Æ — + — — — + — Æ 601 636 636 635 Æ — + — — — + — Æ 635 676 676 476 Æ — + — — — + — Æ 476 579 579 277 Æ — + — — — + — Æ 277 315 315 264 Æ — + — — — + — Æ 264 290

4 Ì | | Ê 6 8 Ì | | Ê 21 140 Ì | | Ê 103 29 Ì | | Ê 6 1 Ì | | Ê 41 200 Ì | | Ê Ì | | Ê 38 14 Ì | | Ê 26 Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

Andrews Rd. & Kensington Ave.

Ë È Ì Ê Ç É

6 Ë | | É 73 70 63 Å — + — — — + — Å 63 142

1 É | | Ë 6 75 | | 168

1 Ê | | Ì 22 5 3 Æ — + — — — + — Æ 3 26

1 Ì | | Ê 1 Ì È Ë É Ç Ê

155th St. & Andrews Rd. 155th St. & Westover/Kensington 155th St. & Proposed Drive 155th St. & Scott Ave. (Frontage) 155th St. & US71 W. Ramps 155th St. & US71 E. Ramps 155th St. & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É

16 Ë | | É 27 Ë | | É 80 Ë | | É Ë | | É 350 Ë | | É Ë | | É 473 127 Ë | | É 84 73 57 Å — + — — — + — Å 57 139 139 83 Å — + — — — + — Å 83 254 254 254 Å — + — — — + — Å 254 254 254 187 Å — + — — — + — Å 187 477 477 127 Å — + — — — + — Å 127 159 159 152 Å — + — — — + — Å 152 625 625 486 Å — + — — — + — Å 486 571

É | | Ë 55 56 É | | Ë 91 É | | Ë 67 É | | Ë 290 É | | Ë 32 7 É | | Ë 12 É | | Ë 1 118 | | 180 180 | | 449 449 | | 449 449 | | 1383 1383 | | 1124 1124 | | 900 900 | | 683

8 Ê | | Ì 8 1 Ê | | Ì 6 Ê | | Ì Ê | | Ì Ê | | Ì 75 729 Ê | | Ì 160 Ê | | Ì 8 45 33 Æ — + — — — + — Æ 33 41 41 20 Æ — + — — — + — Æ 20 195 195 195 Æ — + — — — + — Æ 195 195 195 179 Æ — + — — — + — Æ 179 906 906 890 Æ — + — — — + — Æ 890 965 965 236 Æ — + — — — + — Æ 236 275 275 103 Æ — + — — — + — Æ 103 112

4 Ì | | Ê 20 Ì | | Ê 169 Ì | | Ê 16 Ì | | Ê 727 16 Ì | | Ê Ì | | Ê 39 12 Ì | | Ê 1 Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

41

122

27

64

4595

2144

33

66

88

638

161

68

3

1539

8376

7610

425

15

86

2218

12

7492

185

5540

0

81

19

7735

9 7

781

30

38

6

271

73

2130

8

140

439

234

15

3541

450

6262

5353

7676

7272

631

019

237

597

513

513

297

297

144

6923

11

116

1

115

196

147

451

451

220

220

221

221

105

105

8010

338

2

2967

8796

5829

152

193

5929

65

97

668

153

153

4257

41

4

414

350

200

970

425

319

1073

7511

910

3

425

319

1073

1202

1098

772

729

1060

301

1202

10

98

772

473

3847

1

127

14

313

8 27

813

383

228

171

160

124

37

124

5 20

1 51

5117

1

84

26

83

P101070294 (P101060276) August 2007

474

15 55

74

2014

635 91

486

5634

011

5

169 16

306

290

1100

6779

4

727 16

48

32

48 46 46

7 39 1216

3 1

30

1214

1 1

Page 47: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

83 239

155

NNSA Traffic StudyKansas City, Missouri

Existing plus Initial Development Traffic Volumes (Three At-Grade Intersections)

PM Peak Hour

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

1 Ë | | É

7 Å — + — — — + — Å

7 É | | Ë

155 | |

17 Ê | | Ì

148 Æ — + — — — + — Æ

130 Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

1 Ë | | É

15 Å — + — — — + — Å

13 É | | Ë

301 | |

26 Ê | | Ì

286 Æ — + — — — + — Æ

260 Ì | | Ê

Ì È Ë É Ç Ê

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É

6 Ë | | É 9 87 Ë | | É 18 61 Ë | | É 43 25 Ë | | É 26 214 Ë | | É 7 598 Ë | | É Ë | | É 114 Ë | | É 12 1145 1138 Å — + — — — + — Å 1138 1173 1190 1094 Å — + — — — + — Å 1094 1136 1136 925 Å — + — — — + — Å 925 1109 1109 1066 Å — + — — — + — Å 1066 1328 1328 1114 Å — + — — — + — Å 1114 1121 1121 523 Å — + — — — + — Å 523 611 611 284 Å — + — — — + — Å 284 398 398 352 Å — + — — — + — Å 352 425

1 É | | Ë 26 10 É | | Ë 25 150 É | | Ë 141 18 É | | Ë 236 É | | Ë É | | Ë 88 327 É | | Ë 46 É | | Ë 61 3764 | | 3789 3753 | | 4054 4054 | | 4634 4634 | | 4626 4626 | | 4825 4825 | | 4632 4632 | | 3509 3509 | | 3147

1 Ê | | Ì 18 4 Ê | | Ì 347 89 Ê | | Ì 411 60 Ê | | Ì 59 Ê | | Ì Ê | | Ì 785 1023 Ê | | Ì 12 Ê | | Ì 2619 2586 Æ — + — — — + — Æ 2586 2616 2563 2548 Æ — + — — — + — Æ 2548 2918 2918 2768 Æ — + — — — + — Æ 2768 3525 3525 3213 Æ — + — — — + — Æ 3213 3298 3298 3295 Æ — + — — — + — Æ 3295 3704 3704 3236 Æ — + — — — + — Æ 3236 4021 4021 2998 Æ — + — — — + — Æ 2998 3111 3111 2697 Æ — + — — — + — Æ 2697 2722

32 Ì | | Ê 12 11 Ì | | Ê 23 61 Ì | | Ê 346 252 Ì | | Ê 26 3 Ì | | Ê 409 468 Ì | | Ê Ì | | Ê 113 402 Ì | | Ê 25 Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

Andrews Rd. & Kensington Ave.

Ë È Ì Ê Ç É

1 Ë | | É 16 4 3 Å — + — — — + — Å 3 19

É | | Ë

69 | | 753 3 Ê | | Ì 652

65 56 Æ — + — — — + — Æ 56 734 6 Ì | | Ê 26

Ì È Ë É Ç Ê

155th St. & Andrews Rd. 155th St. & Westover/Kensington 155th St. & Proposed Drive 155th St. & Scott Ave. (Frontage) 155th St. & US71 W. Ramps 155th St. & US71 E. Ramps 155th St. & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É

5 Ë | | É 6 Ë | | É 17 Ë | | É Ë | | É 777 Ë | | É Ë | | É 103 141 Ë | | É 31 14 9 Å — + — — — + — Å 9 19 19 15 Å — + — — — + — Å 15 171 171 171 Å — + — — — + — Å 171 171 171 158 Å — + — — — + — Å 158 1052 1052 275 Å — + — — — + — Å 275 318 318 299 Å — + — — — + — Å 299 402 402 246 Å — + — — — + — Å 246 287

É | | Ë 4 4 É | | Ë 139 É | | Ë 13 É | | Ë 894 É | | Ë 43 19 É | | Ë 15 É | | Ë 10 122 | | 190 190 | | 640 640 | | 640 640 | | 1836 1836 | | 1428 1428 | | 1053 1053 | | 925

11 Ê | | Ì 69 1 Ê | | Ì 215 Ê | | Ì Ê | | Ì Ê | | Ì 348 572 Ê | | Ì 132 Ê | | Ì 123108 97 Æ — + — — — + — Æ 97 171 171 114 Æ — + — — — + — Æ 114 469 469 469 Æ — + — — — + — Æ 469 469 469 325 Æ — + — — — + — Æ 325 784 784 762 Æ — + — — — + — Æ 762 1110 1110 538 Æ — + — — — + — Æ 538 651 651 503 Æ — + — — — + — Æ 503 638

Ì | | Ê 5 56 Ì | | Ê 140 Ì | | Ê 144 Ì | | Ê 459 22 Ì | | Ê Ì | | Ê 113 16 Ì | | Ê 12 Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

326

7517

1741

2618

9154

11

16

33

13

129

56

111

8774

6761

6171

436

43

4

6965

225

347

9111

675

6 68

456

113

104

1749

23

2342

32

22

626

16

23

18

61

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

6126

01

130

1

235

450

202

472

215

141

411

487

698

603

115

089

1937

496

132

1734

643

252

2548

884

236

59

532

170

1860

44

86

2626

321

43

214

412

221

409

7

409

7

777

468

598

1125

55

6 13

83

348

8878

5

1125

556

1383

675

440

1137

572

327

1023

675

440

1137

103

113

114

141

402

526

9 46

3

123

61

434

561

51

132

4612

216

5 98

27

2751

31

25

12

472

211

211

213

213

8282

603

357

357

1326

717

132

119

119

145

145

138

138

P101070294 (P101060276) August 2007

4

4

9 5

5 5643

023

5

139

593

416

319 140

144

1038

894

1510

1347

2

459 22

65

43

65 132

132

19 113 16

315 10

60

1529

2 12

Page 48: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA Traffic StudyKansas City, Missouri

Future Year 2025 Traffic Volumes (Diamond Interchange w/ Thunderbird Eliminated and Andrews/Colorado RIRO)

AM Peak Hour

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

15 Ë | | É

208 Å — + — — — + — Å 59 193 É | | Ë 59

216 | | 200 1 Ê | | Ì

8 Æ — + — — — + — Æ 141 7 Ì | | Ê 141

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

23 Ë | | É

563 Å — + — — — + — Å 170

540 É | | Ë 170

584 | | 481

1 Ê | | Ì

21 Æ — + — — — + — Æ 311 20 Ì | | Ê 311

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É 1 Ë | | É 38 Ë | | É 113 Ë | | É 921 102 Ë | | É 350 53 Ë | | É 4 1819 Ë | | É Ë | | É 471 Ë | | É 83

3681 3659 Å — + — — — + — Å 3659 3703 3547 3547 Å — + — — — + — Å 3547 3547 3536 3147 Å — + — — — + — Å 3147 4933 4945 4843 Å — + — — — + — Å 4843 5193 5193 5140 Å — + — — — + — Å 5140 5144 5144 3325 Å — + — — — + — Å 3325 3495 3495 2032 Å — + — — — + — Å 2032 2503 2503 2379 Å — + — — — + — Å 2379 2475 21 É | | Ë 6 É | | Ë 276 É | | Ë 866 É | | Ë É | | Ë É | | Ë 170 1463 É | | Ë 124 É | | Ë 13

5566 | | 5550 5243 | | 5243 5231 | | 6208 6220 | | 6421 6421 | | 6412 6412 | | 4547 4547 | | 2942 2942 | | 2889 44 Ê | | Ì 4 Ê | | Ì 423 Ê | | Ì 229 Ê | | Ì Ê | | Ì Ê | | Ì 103 669 Ê | | Ì 37 Ê | | Ì

1885 1837 Æ — + — — — + — Æ 1837 1847 1696 1696 Æ — + — — — + — Æ 1696 1696 1696 764 Æ — + — — — + — Æ 764 1275 1275 1174 Æ — + — — — + — Æ 1174 1228 1228 1227 Æ — + — — — + — Æ 1227 1268 1268 949 Æ — + — — — + — Æ 949 1052 1052 383 Æ — + — — — + — Æ 383 439 439 388 Æ — + — — — + — Æ 388 414 4 Ì | | Ê 6 Ì | | Ê 509 Ì | | Ê 283 101 Ì | | Ê 54 1 Ì | | Ê 41 319 Ì | | Ê Ì | | Ê 56 14 Ì | | Ê 26

Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

41

122

27

64

4595

2144

33

66

88

638

509

113

2023

715

1375

341

341

151

151

174

174

108

108

124

866

229

170

5919

3316

8516

85

668

668

284

276

423

540

119

31

559

1344

13

44

493

493

494

494

160

160

160

283

921

311

141

101

102

101

102

154

453

54

350

5435

0

153

153

4257

41

4

414

319

1819

489

1922

170

103

489

1922

1519

1140

1519

14

6366

9

5647

1

1140

1427

1322

8 17

1

124

3720

1 51

5117

1

26

83

P101070294 (P101060276) August 2007

Page 49: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA Traffic StudyKansas City, Missouri

Future Year 2025 Traffic Volumes (Diamond Interchange w/ Thunderbird Eliminated and Andrews/Colorado RIRO)

PM Peak Hour

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

1 Ë | | É

12 Å — + — — — + — Å 198 11 É | | Ë 198

246 | | 262 17 Ê | | Ì

234 Æ — + — — — + — Æ 65 217 Ì | | Ê 65

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

1 Ë | | É

32 Å — + — — — + — Å 533 31 É | | Ë 533

666 | | 723 26 Ê | | Ì

634 Æ — + — — — + — Æ 189

608 Ì | | Ê 189

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É 6 Ë | | É 9 Ë | | É 308 Ë | | É 170 144 Ë | | É 155 214 Ë | | É 7 1148 Ë | | É Ë | | É 114 Ë | | É 12

2298 2291 Å — + — — — + — Å 2291 2326 2343 2343 Å — + — — — + — Å 2343 2343 2303 1329 Å — + — — — + — Å 1329 2172 2211 2067 Å — + — — — + — Å 2067 2223 2223 2009 Å — + — — — + — Å 2009 2016 2016 868 Å — + — — — + — Å 868 978 978 475 Å — + — — — + — Å 475 589 589 543 Å — + — — — + — Å 543 616 1 É | | Ë 26 É | | Ë 666 É | | Ë 673 É | | Ë É | | Ë É | | Ë 111 504 É | | Ë 46 É | | Ë 61

6132 | | 6157 6121 | | 6121 6082 | | 7533 7573 | | 7486 7486 | | 7685 7685 | | 6725 6725 | | 4640 4640 | | 42781 Ê | | Ì 18 Ê | | Ì 298 Ê | | Ì 1384 Ê | | Ì Ê | | Ì Ê | | Ì 785 1867 Ê | | Ì 12 Ê | | Ì

3834 3801 Æ — + — — — + — Æ 3801 3831 3778 3778 Æ — + — — — + — Æ 3778 3778 3778 3222 Æ — + — — — + — Æ 3222 5362 5362 5077 Æ — + — — — + — Æ 5077 5264 5264 5261 Æ — + — — — + — Æ 5261 5670 5670 4962 Æ — + — — — + — Æ 4962 5747 5747 3879 Æ — + — — — + — Æ 3879 4051 4051 3637 Æ — + — — — + — Æ 3637 366232 Ì | | Ê 12 Ì | | Ê 258 Ì | | Ê 756 285 Ì | | Ê 187 3 Ì | | Ê 409 708 Ì | | Ê Ì | | Ê 172 402 Ì | | Ê 25

Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

326

7517

1741

2618

9154

11

16

33

13

129

258

308

608

121

71

931

1692

1692

551

551

552

552

137

137

138

673

1384

533

198

2353

2159

2159

82

6 82

635

4

666

298

3126

1117

1422

46

8 46

8 24

824

8 27

4 27

4 19

819

8 21

5

756

170

189

65

285

144

285

144

471

299

187

155

187

155

321

43

214

412

221

409

7

409

7

708

1148

818

1933

111

785

818

1933

675

1981

675

504

1867

172

114

1981

402

463

6156

1 51

4612

98

2727

51

25

12

P101070294 (P101060276) August 2007

Page 50: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA Traffic StudyKansas City, Missouri

Future Year 2025 Traffic Volumes (Split Diamond Interchange w/ Andrews/Colorado RIRO)

AM Peak Hour

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

15 Ë | | É

170 Å — + — — — + — Å 59 154 É | | Ë 59

176 | | 200 1 Ê | | Ì

6 Æ — + — — — + — Æ 141 6 Ì | | Ê 141

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

23 Ë | | É

370 Å — + — — — + — Å 170

347 É | | Ë 170

391 | | 481

1 Ê | | Ì

21 Æ — + — — — + — Æ 311 20 Ì | | Ê 311

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É 1 Ë | | É 38 1 Ë | | É 231 111 Ë | | É 689 102 Ë | | É 350 53 Ë | | É 4 1819 Ë | | É Ë | | É 471 Ë | | É 83

3681 3659 Å — + — — — + — Å 3659 3703 3547 3510 Å — + — — — + — Å 3510 3811 3799 3448 Å — + — — — + — Å 3448 4933 4945 4843 Å — + — — — + — Å 4843 5193 5193 5140 Å — + — — — + — Å 5140 5144 5144 3325 Å — + — — — + — Å 3325 3495 3495 2032 Å — + — — — + — Å 2032 2503 2503 2379 Å — + — — — + — Å 2379 2475 21 É | | Ë 6 36 É | | Ë 70 240 É | | Ë 796 É | | Ë É | | Ë É | | Ë 170 1463 É | | Ë 124 É | | Ë 13

5566 | | 5550 5243 | | 5561 5550 | | 6208 6220 | | 6421 6421 | | 6412 6412 | | 4547 4547 | | 2942 2942 | | 2889 44 Ê | | Ì 4 Ê | | Ì 423 Ê | | Ì 229 Ê | | Ì Ê | | Ì Ê | | Ì 103 669 Ê | | Ì 37 Ê | | Ì

1885 1837 Æ — + — — — + — Æ 1837 1847 1696 1666 Æ — + — — — + — Æ 1666 1751 1751 849 Æ — + — — — + — Æ 849 1275 1275 1174 Æ — + — — — + — Æ 1174 1228 1228 1227 Æ — + — — — + — Æ 1227 1268 1268 949 Æ — + — — — + — Æ 949 1052 1052 383 Æ — + — — — + — Æ 383 439 439 388 Æ — + — — — + — Æ 388 414 4 Ì | | Ê 6 30 Ì | | Ê 85 479 Ì | | Ê 198 101 Ì | | Ê 54 1 Ì | | Ê 41 319 Ì | | Ê Ì | | Ê 56 14 Ì | | Ê 26

Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

41

122

27

64

4595

2144

33

66

88

638

301

100

70

1

221

36

233

121

231

8523

1

479

111

2023

615

1275

340

340

150

150

173

173

108

108

124

796

229

170

5917

1214

5314

53

628

628

284

240

423

347

115

41

438

1113

11

13

454

454

455

455

160

160

160

198

689

311

141

101

102

101

102

154

453

54

350

5435

0

153

153

4257

41

4

414

319

1819

489

1922

170

103

489

1922

1519

1140

1519

14

6366

9

5647

1

1140

1427

1322

8 17

1

124

3720

1 51

5117

1

26

83

P101070294 (P101060276) August 2007

Page 51: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA Traffic StudyKansas City, Missouri

Future Year 2025 Traffic Volumes (Split Diamond Interchange w/ Andrews/Colorado RIRO)

PM Peak Hour

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

1 Ë | | É

10 Å — + — — — + — Å 198 9 É | | Ë 198

201 | | 262 17 Ê | | Ì

191 Æ — + — — — + — Æ 65 174 Ì | | Ê 65

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

1 Ë | | É

21 Å — + — — — + — Å 533 20 É | | Ë 533

655 | | 723 26 Ê | | Ì

634 Æ — + — — — + — Æ 189

608 Ì | | Ê 189

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É 6 Ë | | É 9 43 Ë | | É 13 264 Ë | | É 156 144 Ë | | É 155 214 Ë | | É 7 1148 Ë | | É Ë | | É 114 Ë | | É 12

2298 2291 Å — + — — — + — Å 2291 2326 2343 2261 Å — + — — — + — Å 2261 2374 2334 1490 Å — + — — — + — Å 1490 2154 2194 2002 Å — + — — — + — Å 2002 2223 2223 2009 Å — + — — — + — Å 2009 2016 2016 868 Å — + — — — + — Å 868 978 978 475 Å — + — — — + — Å 475 589 589 543 Å — + — — — + — Å 543 616 1 É | | Ë 26 39 É | | Ë 99 580 É | | Ë 508 48 É | | Ë 66 É | | Ë É | | Ë 111 504 É | | Ë 46 É | | Ë 61

6132 | | 6157 6121 | | 6200 6160 | | 7516 7555 | | 7486 7486 | | 7685 7685 | | 6725 6725 | | 4640 4640 | | 42781 Ê | | Ì 18 Ê | | Ì 298 Ê | | Ì 1384 Ê | | Ì Ê | | Ì Ê | | Ì 785 1867 Ê | | Ì 12 Ê | | Ì

3834 3801 Æ — + — — — + — Æ 3801 3831 3778 3736 Æ — + — — — + — Æ 3736 3826 3826 3313 Æ — + — — — + — Æ 3313 5362 5362 5077 Æ — + — — — + — Æ 5077 5264 5264 5261 Æ — + — — — + — Æ 5261 5670 5670 4962 Æ — + — — — + — Æ 4962 5747 5747 3879 Æ — + — — — + — Æ 3879 4051 4051 3637 Æ — + — — — + — Æ 3637 366232 Ì | | Ê 12 43 Ì | | Ê 90 215 Ì | | Ê 665 285 Ì | | Ê 187 3 Ì | | Ê 409 708 Ì | | Ê Ì | | Ê 172 402 Ì | | Ê 25

Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

326

7517

1741

2618

9154

11

16

33

13

129

4343

142

99

43

271

39

57

129

13

9013

215

264

608

117

41

723

1648

1648

507

507

509

509

137

137

138

508

1384

533

198

1968

2103

2103

78

0 78

035

4

580

298

2026

917

1245

45

4 45

4 24

524

5 27

1 27

1 19

819

8 21

5

665

156

189

65

285

144

350

66

144

585

48

299

235

155

187

155

321

43

214

412

221

409

7

409

7

708

1148

818

1933

111

785

818

1933

675

1981

675

504

1867

172

114

1981

402

463

6156

1 51

4612

98

2727

51

25

12

P101070294 (P101060276) August 2007

Page 52: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA North Drive & Botts Rd.

NNSA Traffic StudyKansas City, Missouri

Intermodal Trips (Full Build - Split Diamond Interchange at Botts)

AM Peak Hour

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É 50 Ë | | É Ë | | É Ë | | É

36 36 Å — + — — — + — Å 36 36 36 Å — + — — — + — Å 70 70 70 Å — + — — — + — Å 70 70 70 70 Å — + — — — + — Å 70 70 70 70 Å — + — — — + — Å 70 70 70 20 Å — + — — — + — Å 20 20 20 10 Å — + — — — + — Å 10 10 10 10 Å — + — — — + — Å 10 10 É | | Ë 36 É | | Ë 70 É | | Ë É | | Ë É | | Ë É | | Ë 10 É | | Ë É | | Ë

66 | | 66 66 | | 155 155 | | 155 155 | | 155 155 | | 155 155 | | 93 93 | | 22 22 | | 22 Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì 61 Ê | | Ì Ê | | Ì

30 30 Æ — + — — — + — Æ 30 30 30 Æ — + — — — + — Æ 85 85 85 Æ — + — — — + — Æ 85 85 85 85 Æ — + — — — + — Æ 85 85 85 85 Æ — + — — — + — Æ 85 85 85 73 Æ — + — — — + — Æ 73 73 73 12 Æ — + — — — + — Æ 12 12 12 12 Æ — + — — — + — Æ 12 12 Ì | | Ê 30 Ì | | Ê 85 Ì | | Ê Ì | | Ê Ì | | Ê 12 Ì | | Ê Ì | | Ê Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

3010

0

7022

1

3612

1

85 1250

12

50

1250

10

61

10

61

10

61

P101070294 (P101060276) August 2007

Page 53: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA North Drive & Botts Rd.

NNSA Traffic StudyKansas City, Missouri

Intermodal Trips (Full Build - Split Diamond Interchange at Botts)

PM Peak Hour

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É 71 Ë | | É Ë | | É Ë | | É

39 39 Å — + — — — + — Å 39 39 39 Å — + — — — + — Å 99 99 99 Å — + — — — + — Å 99 99 99 99 Å — + — — — + — Å 99 99 99 99 Å — + — — — + — Å 99 99 99 28 Å — + — — — + — Å 28 28 28 14 Å — + — — — + — Å 14 14 14 14 Å — + — — — + — Å 14 14 É | | Ë 39 É | | Ë 99 É | | Ë É | | Ë É | | Ë É | | Ë 14 É | | Ë É | | Ë

81 | | 81 81 | | 190 190 | | 190 190 | | 190 190 | | 190 190 | | 106 106 | | 27 27 | | 27 Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì 65 Ê | | Ì Ê | | Ì

43 43 Æ — + — — — + — Æ 43 43 43 Æ — + — — — + — Æ 90 90 90 Æ — + — — — + — Æ 90 90 90 90 Æ — + — — — + — Æ 90 90 90 90 Æ — + — — — + — Æ 90 90 90 77 Æ — + — — — + — Æ 77 77 77 13 Æ — + — — — + — Æ 13 13 13 13 Æ — + — — — + — Æ 13 13 Ì | | Ê 43 Ì | | Ê 90 Ì | | Ê Ì | | Ê Ì | | Ê 13 Ì | | Ê Ì | | Ê Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

4314

2

9927

1

3912

9

90 1371

13

71

1371

14

65

14

65

14

65

P101070294 (P101060276) August 2007

Page 54: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA North Drive & Botts Rd.

NNSA Traffic StudyKansas City, Missouri

Intermodal Trips (Full Build - Diamond Interchange at Botts)

AM Peak Hour

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É 50 Ë | | É Ë | | É Ë | | É

36 36 Å — + — — — + — Å 36 36 36 36 Å — + — — — + — Å 36 36 36 Å — + — — — + — Å 70 70 70 Å — + — — — + — Å 70 70 70 70 Å — + — — — + — Å 70 70 70 20 Å — + — — — + — Å 20 20 20 10 Å — + — — — + — Å 10 10 10 10 Å — + — — — + — Å 10 10 É | | Ë É | | Ë 36 É | | Ë 70 É | | Ë É | | Ë É | | Ë 10 É | | Ë É | | Ë

66 | | 66 66 | | 66 66 | | 155 155 | | 155 155 | | 155 155 | | 93 93 | | 22 22 | | 22 Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì 61 Ê | | Ì Ê | | Ì

30 30 Æ — + — — — + — Æ 30 30 30 30 Æ — + — — — + — Æ 30 30 30 Æ — + — — — + — Æ 85 85 85 Æ — + — — — + — Æ 85 85 85 85 Æ — + — — — + — Æ 85 85 85 73 Æ — + — — — + — Æ 73 73 73 12 Æ — + — — — + — Æ 12 12 12 12 Æ — + — — — + — Æ 12 12 Ì | | Ê Ì | | Ê 30 Ì | | Ê 85 Ì | | Ê Ì | | Ê 12 Ì | | Ê Ì | | Ê Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

3010

0

7022

1

3612

1

85 1250

12

50

1250

10

61

10

61

10

61

P101070294 (P101060276) August 2007

Page 55: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA North Drive & Botts Rd.

NNSA Traffic StudyKansas City, Missouri

Intermodal Trips (Full Build - Diamond Interchange at Botts)

PM Peak Hour

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É 71 Ë | | É Ë | | É Ë | | É

39 39 Å — + — — — + — Å 39 39 39 39 Å — + — — — + — Å 39 39 39 Å — + — — — + — Å 99 99 99 Å — + — — — + — Å 99 99 99 99 Å — + — — — + — Å 99 99 99 28 Å — + — — — + — Å 28 28 28 14 Å — + — — — + — Å 14 14 14 14 Å — + — — — + — Å 14 14 É | | Ë É | | Ë 39 É | | Ë 99 É | | Ë É | | Ë É | | Ë 14 É | | Ë É | | Ë

81 | | 81 81 | | 81 81 | | 190 190 | | 190 190 | | 190 190 | | 106 106 | | 27 27 | | 27 Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì 65 Ê | | Ì Ê | | Ì

43 43 Æ — + — — — + — Æ 43 43 43 43 Æ — + — — — + — Æ 43 43 43 Æ — + — — — + — Æ 90 90 90 Æ — + — — — + — Æ 90 90 90 90 Æ — + — — — + — Æ 90 90 90 77 Æ — + — — — + — Æ 77 77 77 13 Æ — + — — — + — Æ 13 13 13 13 Æ — + — — — + — Æ 13 13 Ì | | Ê Ì | | Ê 43 Ì | | Ê 90 Ì | | Ê Ì | | Ê 13 Ì | | Ê Ì | | Ê Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

4314

2

9927

1

3912

9

90 1371

13

71

1371

14

65

14

65

14

65

P101070294 (P101060276) August 2007

Page 56: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA Traffic StudyKansas City, Missouri

Car Load Facility Expansion Trips

AM Peak Hour

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É

5 5 Å — + — — — + — Å 5 5 5 5 Å — + — — — + — Å 5 5 5 5 Å — + — — — + — Å 5 5 5 5 Å — + — — — + — Å 5 5 5 5 Å — + — — — + — Å 5 5 5 5 Å — + — — — + — Å 5 8 8 3 Å — + — — — + — Å 3 3 3 3 Å — + — — — + — Å 3 3 É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë 3 5 É | | Ë É | | Ë

14 | | 14 14 | | 14 14 | | 14 14 | | 14 14 | | 14 14 | | 8 8 | | 5 5 | | 5 Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì

9 9 Æ — + — — — + — Æ 9 9 9 9 Æ — + — — — + — Æ 9 9 9 9 Æ — + — — — + — Æ 9 9 9 9 Æ — + — — — + — Æ 9 9 9 9 Æ — + — — — + — Æ 9 9 9 Æ — + — — — + — Æ Æ — + — — — + — Æ 2 2 2 Æ — + — — — + — Æ 2 2 Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê 9 Ì | | Ê Ì | | Ê 2 Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

911

311 7

57

2

P101070294 (P101060276) August 2007

Page 57: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA Traffic StudyKansas City, Missouri

Car Load Facility Expansion Trips

PM Peak Hour

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É

15 15 Å — + — — — + — Å 15 15 15 15 Å — + — — — + — Å 15 15 15 15 Å — + — — — + — Å 15 15 15 15 Å — + — — — + — Å 15 15 15 15 Å — + — — — + — Å 15 15 15 15 Å — + — — — + — Å 15 15 15 0 Å — + — — — + — Å 0 0 0 0 Å — + — — — + — Å 0 0 É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë 0 15 É | | Ë É | | Ë

16 | | 16 16 | | 16 16 | | 16 16 | | 16 16 | | 16 16 | | 15 15 | | 5 5 | | 5 Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì

1 1 Æ — + — — — + — Æ 1 1 1 1 Æ — + — — — + — Æ 1 1 1 1 Æ — + — — — + — Æ 1 1 1 1 Æ — + — — — + — Æ 1 1 1 1 Æ — + — — — + — Æ 1 1 1 Æ — + — — — + — Æ Æ — + — — — + — Æ 5 5 5 Æ — + — — — + — Æ 5 5 Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê 1 Ì | | Ê Ì | | Ê 5 Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

12

02 19

1519

5

P101070294 (P101060276) August 2007

Page 58: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA Traffic StudyKansas City, Missouri

NNSA Trips (Initial Development Scenario)

AM Peak Hour

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

15 Ë | | É

131 Å — + — — — + — Å

116 É | | Ë

136 | |

1 Ê | | Ì

5 Æ — + — — — + — Æ

4 Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

23 Ë | | É

254 Å — + — — — + — Å

231 É | | Ë

264 | |

1 Ê | | Ì

10 Æ — + — — — + — Æ

9 Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É 3 Ë | | É 308 Ë | | É 347 Ë | | É Ë | | É 424 Ë | | É Ë | | É Ë | | É

3 3 Å — + — — — + — Å 3 3 3 Å — + — — — + — Å 308 308 308 Å — + — — — + — Å 308 655 655 655 Å — + — — — + — Å 655 655 655 655 Å — + — — — + — Å 655 655 655 231 Å — + — — — + — Å 231 231 231 77 Å — + — — — + — Å 77 77 77 77 Å — + — — — + — Å 77 77É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë 154 É | | Ë É | | Ë

80 | | 80 80 | | 320 320 | | 680 680 | | 680 680 | | 680 680 | | 250 250 | | 80 80 | | 80 Ê | | Ì 77 Ê | | Ì 12 Ê | | Ì 13 Ê | | Ì Ê | | Ì Ê | | Ì 16 Ê | | Ì Ê | | Ì

77 77 Æ — + — — — + — Æ 77 77 77 Æ — + — — — + — Æ 12 12 12 Æ — + — — — + — Æ 12 25 25 25 Æ — + — — — + — Æ 25 25 25 25 Æ — + — — — + — Æ 25 25 25 19 Æ — + — — — + — Æ 19 19 19 3 Æ — + — — — + — Æ 3 3 3 3 Æ — + — — — + — Æ 3 3 Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê 6 Ì | | Ê Ì | | Ê Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

315

1240

0

7738

6

308

923

415

1313

44

2727

2323

39

13 347

360

360

144

144

40

231

111

61

347

347

116

116

117

117

1 1

1

642

46

424

642

4

154

16

154

16

154

16

P101070294 (P101060276) August 2007

Page 59: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA Traffic StudyKansas City, Missouri

NNSA Trips (Initial Development Scenario)

PM Peak Hour

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

1 Ë | | É

7 Å — + — — — + — Å

7 É | | Ë

155 | |

17 Ê | | Ì

148 Æ — + — — — + — Æ

130 Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

1 Ë | | É

15 Å — + — — — + — Å

13 É | | Ë

301 | |

26 Ê | | Ì

286 Æ — + — — — + — Æ

260 Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É 87 Ë | | É 18 Ë | | É 20 Ë | | É Ë | | É 24 Ë | | É Ë | | É Ë | | É

87 87 Å — + — — — + — Å 87 87 87 Å — + — — — + — Å 18 18 18 Å — + — — — + — Å 18 37 37 37 Å — + — — — + — Å 37 37 37 37 Å — + — — — + — Å 37 37 37 13 Å — + — — — + — Å 13 13 13 4 Å — + — — — + — Å 4 4 4 4 Å — + — — — + — Å 4 4 É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë 9 É | | Ë É | | Ë

91 | | 91 91 | | 365 365 | | 775 775 | | 775 775 | | 775 775 | | 577 577 | | 91 91 | | 91 Ê | | Ì 4 Ê | | Ì 347 Ê | | Ì 391 Ê | | Ì Ê | | Ì Ê | | Ì 477 Ê | | Ì Ê | | Ì

4 4 Æ — + — — — + — Æ 4 4 4 Æ — + — — — + — Æ 347 347 347 Æ — + — — — + — Æ 347 738 738 738 Æ — + — — — + — Æ 738 738 738 738 Æ — + — — — + — Æ 738 738 738 564 Æ — + — — — + — Æ 564 564 564 87 Æ — + — — — + — Æ 87 87 87 87 Æ — + — — — + — Æ 87 87 Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê 174 Ì | | Ê Ì | | Ê Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

8743

4

347

456

422

18

260

113

01

391

391

130

130

132

132

11

2

391

20

410

410

164

164

46

1326

717

20

20

7 7

33

33

26

26

43

174

2417

4 24

174

24

9 47

7

9 47

7 9

477

P101070294 (P101060276) August 2007

Page 60: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA Traffic StudyKansas City, Missouri

NNSA Trips (Future Scenario - Diamond Interchange Alternative)

AM Peak Hour

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

15 Ë | | É

208 Å — + — — — + — Å

193 É | | Ë

216 | |

1 Ê | | Ì

8 Æ — + — — — + — Æ

7 Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

23 Ë | | É

563 Å — + — — — + — Å

540 É | | Ë

584 | |

1 Ê | | Ì

21 Æ — + — — — + — Æ

20 Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É 3 Ë | | É 655 Ë | | É Ë | | É 424 Ë | | É Ë | | É Ë | | É

3 3 Å — + — — — + — Å 3 3 3 3 Å — + — — — + — Å 3 3 3 Å — + — — — + — Å 655 655 655 Å — + — — — + — Å 655 655 655 655 Å — + — — — + — Å 655 655 655 231 Å — + — — — + — Å 231 231 231 77 Å — + — — — + — Å 77 77 77 77 Å — + — — — + — Å 77 77É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë 154 É | | Ë É | | Ë

80 | | 80 80 | | 80 80 | | 680 680 | | 680 680 | | 680 680 | | 250 250 | | 80 80 | | 80 Ê | | Ì Ê | | Ì 77 Ê | | Ì 25 Ê | | Ì Ê | | Ì Ê | | Ì 16 Ê | | Ì Ê | | Ì

77 77 Æ — + — — — + — Æ 77 77 77 77 Æ — + — — — + — Æ 77 77 77 Æ — + — — — + — Æ 25 25 25 Æ — + — — — + — Æ 25 25 25 25 Æ — + — — — + — Æ 25 25 25 19 Æ — + — — — + — Æ 19 19 19 3 Æ — + — — — + — Æ 3 3 3 3 Æ — + — — — + — Æ 3 3 Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê 6 Ì | | Ê Ì | | Ê Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

320

237

1528

287

730

3023

2339

2576

076

022

4 22

440

7754

01

193

173

2 73

2 19

3 19

3 19

4 19

4 1

1 1

655

642

46

424

642

4

154

16

154

16

154

16

P101070294 (P101060276) August 2007

Page 61: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA Traffic StudyKansas City, Missouri

NNSA Trips (Future Scenario - Diamond Interchange Alternative)

PM Peak Hour

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

1 Ë | | É

12 Å — + — — — + — Å

11 É | | Ë

246 | |

17 Ê | | Ì

234 Æ — + — — — + — Æ

217 Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

1 Ë | | É

32 Å — + — — — + — Å

31 É | | Ë

666 | |

26 Ê | | Ì

634 Æ — + — — — + — Æ

608 Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É 87 Ë | | É 37 Ë | | É Ë | | É 24 Ë | | É Ë | | É Ë | | É

87 87 Å — + — — — + — Å 87 87 87 87 Å — + — — — + — Å 87 87 87 Å — + — — — + — Å 37 37 37 Å — + — — — + — Å 37 37 37 37 Å — + — — — + — Å 37 37 37 13 Å — + — — — + — Å 13 13 13 4 Å — + — — — + — Å 4 4 4 4 Å — + — — — + — Å 4 4 É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë 9 É | | Ë É | | Ë

91 | | 91 91 | | 91 91 | | 775 775 | | 775 775 | | 775 775 | | 577 577 | | 91 91 | | 91 Ê | | Ì Ê | | Ì 4 Ê | | Ì 738 Ê | | Ì Ê | | Ì Ê | | Ì 477 Ê | | Ì Ê | | Ì

4 4 Æ — + — — — + — Æ 4 4 4 4 Æ — + — — — + — Æ 4 4 4 Æ — + — — — + — Æ 738 738 738 Æ — + — — — + — Æ 738 738 738 738 Æ — + — — — + — Æ 738 738 738 564 Æ — + — — — + — Æ 564 564 564 87 Æ — + — — — + — Æ 87 87 87 87 Æ — + — — — + — Æ 87 87 Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê 174 Ì | | Ê Ì | | Ê Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

8760

81

217

182

582

521

721

721

821

81

12

738

866

866

255

255

46

431

2611

1742

42

11

11

37

37

26

26

43

37

174

2417

4 24

174

24

9 47

7

9 47

7 9

477

P101070294 (P101060276) August 2007

Page 62: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

39 40 1

NNSA Traffic StudyKansas City, Missouri

NNSA Trips (Future Scenario - Split Diamond Interchange Alternative)

AM Peak Hour

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

15 Ë | | É

170 Å — + — — — + — Å

154 É | | Ë

176 | |

1 Ê | | Ì

6 Æ — + — — — + — Æ

6 Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

23 Ë | | É

370 Å — + — — — + — Å

347 É | | Ë

391 | |

1 Ê | | Ì

21 Æ — + — — — + — Æ

20 Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É

Ë | | É 1 Ë | | É 231 1 Ë | | É 424 Ë | | É Ë | | É 424 Ë | | É Ë | | É Ë | | É3 3 Å — + — — — + — Å 3 3 3 1 Å — + — — — + — Å 1 233 233 231 Å — + — — — + — Å 231 655 655 655 Å — + — — — + — Å 655 655 655 655 Å — + — — — + — Å 655 655 655 231 Å — + — — — + — Å 231 231 231 77 Å — + — — — + — Å 77 77 77 77 Å — + — — — + — Å 77 77

É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë 154 É | | Ë É | | Ë

80 | | 80 80 | | 310 310 | | 680 680 | | 680 680 | | 680 680 | | 250 250 | | 80 80 | | 80 Ê | | Ì Ê | | Ì 77 Ê | | Ì 25 Ê | | Ì Ê | | Ì Ê | | Ì 16 Ê | | Ì Ê | | Ì

77 77 Æ — + — — — + — Æ 77 77 77 77 Æ — + — — — + — Æ 77 77 77 Æ — + — — — + — Æ 25 25 25 Æ — + — — — + — Æ 25 25 25 25 Æ — + — — — + — Æ 25 25 25 19 Æ — + — — — + — Æ 19 19 19 3 Æ — + — — — + — Æ 3 3 3 3 Æ — + — — — + — Æ 3 3 Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê 6 Ì | | Ê Ì | | Ê Ì | | Ê

Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

Andrews Rd. & Kensington Ave.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

155th St. & Andrews Rd. 155th St. & Westover/Kensington 155th St. & Proposed Drive 155th St. & Scott Ave. (Frontage) 155th St. & US71 W. Ramps 155th St. & US71 E. Ramps 155th St. & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É

Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É

Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å

É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë

| | | | | | | | | | | | | |Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì

Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ

Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê

Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

11 23

3

231

231

120

236

1526

266

629

2923

23

25

527

527

184

184

7734

71

154

150

1 50

1 15

4 15

4 15

5 15

5 1

1

424

642

46

424

642

4

154

16

154

16

154

16

P101070294 (P101060276) August 2007

Page 63: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

2 46 43

NNSA Traffic StudyKansas City, Missouri

NNSA Trips (Future Scenario - Split Diamond Interchange Alternative)

PM Peak Hour

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

1 Ë | | É

10 Å — + — — — + — Å

9 É | | Ë

201 | |

17 Ê | | Ì

191 Æ — + — — — + — Æ

174 Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

1 Ë | | É

21 Å — + — — — + — Å

20 É | | Ë

655 | |

26 Ê | | Ì

634 Æ — + — — — + — Æ

608 Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É

Ë | | É 43 Ë | | É 13 43 Ë | | É 24 Ë | | É Ë | | É 24 Ë | | É Ë | | É Ë | | É 87 87 Å — + — — — + — Å 87 87 87 43 Å — + — — — + — Å 43 57 57 13 Å — + — — — + — Å 13 37 37 37 Å — + — — — + — Å 37 37 37 37 Å — + — — — + — Å 37 37 37 13 Å — + — — — + — Å 13 13 13 4 Å — + — — — + — Å 4 4 4 4 Å — + — — — + — Å 4 4

É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë 9 É | | Ë É | | Ë

91 | | 91 91 | | 61 61 | | 775 775 | | 775 775 | | 775 775 | | 577 577 | | 91 91 | | 91 Ê | | Ì Ê | | Ì 4 Ê | | Ì 738 Ê | | Ì Ê | | Ì Ê | | Ì 477 Ê | | Ì Ê | | Ì

4 4 Æ — + — — — + — Æ 4 4 4 4 Æ — + — — — + — Æ 4 4 4 Æ — + — — — + — Æ 738 738 738 Æ — + — — — + — Æ 738 738 738 738 Æ — + — — — + — Æ 738 738 738 564 Æ — + — — — + — Æ 564 564 564 87 Æ — + — — — + — Æ 87 87 87 87 Æ — + — — — + — Æ 87 87 Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê 174 Ì | | Ê Ì | | Ê Ì | | Ê

Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

Andrews Rd. & Kensington Ave.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

155th St. & Andrews Rd. 155th St. & Westover/Kensington 155th St. & Proposed Drive 155th St. & Scott Ave. (Frontage) 155th St. & US71 W. Ramps 155th St. & US71 E. Ramps 155th St. & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É

Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É

Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å

É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë

| | | | | | | | | | | | | |Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì

Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ

Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê

Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

4343 57 13

13 4360

81

174

178

178

117

417

417

517

51

1

738

810

810

210

210

420

269

1729

29

9

9 35

35

26

26

24

174

2417

4 24

174

24

9 47

7

9 47

7 9

477

P101070294 (P101060276) August 2007

Page 64: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA Traffic StudyKansas City, Missouri

Colorado Avenue Industrial Development Trips (Full Build w/ RIRO Andrews / Colorado)

AM Peak Hour

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å 59 É | | Ë 59

| | 200 Ê | | Ì

Æ — + — — — + — Æ 141 Ì | | Ê 141 Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å 141 É | | Ë 141

| | 423 Ê | | Ì

Æ — + — — — + — Æ 282 Ì | | Ê 282 Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É 35 Ë | | É 212 35 Ë | | É 282 Ë | | É 353 Ë | | É Ë | | É Ë | | É

71 71 Å — + — — — + — Å 71 71 71 71 Å — + — — — + — Å 71 71 59 24 Å — + — — — + — Å 24 235 247 212 Å — + — — — + — Å 212 494 494 494 Å — + — — — + — Å 494 494 494 141 Å — + — — — + — Å 141 141 141 71 Å — + — — — + — Å 71 71 71 71 Å — + — — — + — Å 71 71 É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë 71 É | | Ë É | | Ë

282 | | 282 282 | | 282 270 | | 400 412 | | 659 659 | | 659 659 | | 282 282 | | 94 94 | | 94 Ê | | Ì Ê | | Ì 212 Ê | | Ì 165 Ê | | Ì Ê | | Ì Ê | | Ì 118 Ê | | Ì Ê | | Ì

212 212 Æ — + — — — + — Æ 212 212 212 212 Æ — + — — — + — Æ 212 212 212 Æ — + — — — + — Æ 165 165 165 Æ — + — — — + — Æ 165 165 165 165 Æ — + — — — + — Æ 165 165 165 141 Æ — + — — — + — Æ 141 141 141 24 Æ — + — — — + — Æ 24 24 24 24 Æ — + — — — + — Æ 24 24 Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê 24 Ì | | Ê Ì | | Ê Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

3520

020

059

5959

59

165

141

5962

3

212

623

200

200

423

423

141

141

141

141

212

3535 31

8

282

282

282

141

2435

324

35

3

2435

3

71

118

71

118

71

118

P101070294 (P101060276) August 2007

Page 65: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA Traffic StudyKansas City, Missouri

Colorado Avenue Industrial Development Trips (Full Build w/ RIRO Andrews / Colorado)

PM Peak Hour

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å 198 É | | Ë 198

| | 262 Ê | | Ì

Æ — + — — — + — Æ 65 Ì | | Ê 65 Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å 474 É | | Ë 474

| | 604 Ê | | Ì

Æ — + — — — + — Æ 129 Ì | | Ê 129 Ì È Ë É Ç Ê

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É 119 Ë | | É 97 119 Ë | | É 129 Ë | | É 161 Ë | | É Ë | | É Ë | | É

237 237 Å — + — — — + — Å 237 237 237 237 Å — + — — — + — Å 237 237 198 79 Å — + — — — + — Å 79 176 215 97 Å — + — — — + — Å 97 226 226 226 Å — + — — — + — Å 226 226 226 65 Å — + — — — + — Å 65 65 65 32 Å — + — — — + — Å 32 32 32 32 Å — + — — — + — Å 32 32 É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë 32 É | | Ë É | | Ë

334 | | 334 334 | | 334 295 | | 729 769 | | 780 780 | | 780 780 | | 539 539 | | 111 111 | | 111 Ê | | Ì Ê | | Ì 97 Ê | | Ì 553 Ê | | Ì Ê | | Ì Ê | | Ì 395 Ê | | Ì Ê | | Ì

97 97 Æ — + — — — + — Æ 97 97 97 97 Æ — + — — — + — Æ 97 97 97 Æ — + — — — + — Æ 553 553 553 Æ — + — — — + — Æ 553 553 553 553 Æ — + — — — + — Æ 553 553 553 474 Æ — + — — — + — Æ 474 474 474 79 Æ — + — — — + — Æ 79 79 79 79 Æ — + — — — + — Æ 79 79 Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê 79 Ì | | Ê Ì | | Ê Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

119

553

672

866

9719

4

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd. 67

219

819

819

819

8

474

198

866

262

262

194

6565

65

65

9712

9 65

119

119

248

129

129

7916

179

16

1

7916

1

32

395

32

395

32

395

P101070294 (P101060276) August 2007

Page 66: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É 166 Ë | | É Ë | | É Ë | | É

33 33 Å — + — — — + — Å 33 33 33 33 Å — + — — — + — Å 33 33 33 Å — + — — — + — Å 233 233 233 Å — + — — — + — Å 233 233 233 233 Å — + — — — + — Å 233 233 233 67 Å — + — — — + — Å 67 67 67 33 Å — + — — — + — Å 33 33 33 33 Å — + — — — + — Å 33 33 É | | Ë É | | Ë 33 É | | Ë 233 É | | Ë É | | Ë É | | Ë 33 É | | Ë É | | Ë

133 | | 133 133 | | 133 133 | | 311 311 | | 311 311 | | 311 311 | | 133 133 | | 44 44 | | 44 Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì 55 Ê | | Ì Ê | | Ì

100 100 Æ — + — — — + — Æ 100 100 100 100 Æ — + — — — + — Æ 100 100 100 Æ — + — — — + — Æ 78 78 78 Æ — + — — — + — Æ 78 78 78 78 Æ — + — — — + — Æ 78 78 78 67 Æ — + — — — + — Æ 67 67 67 11 Æ — + — — — + — Æ 11 11 11 11 Æ — + — — — + — Æ 11 11 Ì | | Ê Ì | | Ê 100 Ì | | Ê 78 Ì | | Ê Ì | | Ê 11 Ì | | Ê Ì | | Ê Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd.

NNSA Traffic StudyKansas City, Missouri

RGB Phase 1 Trips

AM Peak Hour

Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.10

033

3

233

444

3311

1

78 1116

611

16

6

1116

6

33

55

33

55

33

55

P101070294 (P101060276) August 2007

Page 67: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É 76 Ë | | É Ë | | É Ë | | É

112 112 Å — + — — — + — Å 112 112 112 112 Å — + — — — + — Å 112 112 112 Å — + — — — + — Å 107 107 107 Å — + — — — + — Å 107 107 107 107 Å — + — — — + — Å 107 107 107 30 Å — + — — — + — Å 30 30 30 15 Å — + — — — + — Å 15 15 15 15 Å — + — — — + — Å 15 15 É | | Ë É | | Ë 112 É | | Ë 107 É | | Ë É | | Ë É | | Ë 15 É | | Ë É | | Ë

158 | | 158 158 | | 158 158 | | 368 368 | | 368 368 | | 368 368 | | 254 254 | | 53 53 | | 53 Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì 187 Ê | | Ì Ê | | Ì

46 46 Æ — + — — — + — Æ 46 46 46 46 Æ — + — — — + — Æ 46 46 46 Æ — + — — — + — Æ 261 261 261 Æ — + — — — + — Æ 261 261 261 261 Æ — + — — — + — Æ 261 261 261 224 Æ — + — — — + — Æ 224 224 224 37 Æ — + — — — + — Æ 37 37 37 37 Æ — + — — — + — Æ 37 37 Ì | | Ê Ì | | Ê 46 Ì | | Ê 261 Ì | | Ê Ì | | Ê 37 Ì | | Ê Ì | | Ê Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd.

NNSA Traffic StudyKansas City, Missouri

RGB Phase 1 Trips

PM Peak Hour

Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.46

152

107

525

112

373

261 37

7637

76

3776

15

187

15

187

15

187

P101070294 (P101060276) August 2007

Page 68: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É 153 Ë | | É Ë | | É Ë | | É

31 31 Å — + — — — + — Å 31 31 31 31 Å — + — — — + — Å 31 31 31 Å — + — — — + — Å 214 214 214 Å — + — — — + — Å 214 214 214 214 Å — + — — — + — Å 214 214 214 61 Å — + — — — + — Å 61 61 61 31 Å — + — — — + — Å 31 31 31 31 Å — + — — — + — Å 31 31 É | | Ë É | | Ë 31 É | | Ë 214 É | | Ë É | | Ë É | | Ë 31 É | | Ë É | | Ë

122 | | 122 122 | | 122 122 | | 285 285 | | 285 285 | | 285 285 | | 122 122 | | 41 41 | | 41 Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì 51 Ê | | Ì Ê | | Ì

92 92 Æ — + — — — + — Æ 92 92 92 92 Æ — + — — — + — Æ 92 92 92 Æ — + — — — + — Æ 71 71 71 Æ — + — — — + — Æ 71 71 71 71 Æ — + — — — + — Æ 71 71 71 61 Æ — + — — — + — Æ 61 61 61 10 Æ — + — — — + — Æ 10 10 10 10 Æ — + — — — + — Æ 10 10 Ì | | Ê Ì | | Ê 92 Ì | | Ê 71 Ì | | Ê Ì | | Ê 10 Ì | | Ê Ì | | Ê Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd.

NNSA Traffic StudyKansas City, Missouri

RGB Tract D Trips

AM Peak Hour

Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.92

305

214

407

3110

2

71 1015

310

15

3

1015

3

31

51

31

51

31

51

P101070294 (P101060276) August 2007

Page 69: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É 70 Ë | | É Ë | | É Ë | | É

103 103 Å — + — — — + — Å 103 103 103 103 Å — + — — — + — Å 103 103 103 Å — + — — — + — Å 98 98 98 Å — + — — — + — Å 98 98 98 98 Å — + — — — + — Å 98 98 98 28 Å — + — — — + — Å 28 28 28 14 Å — + — — — + — Å 14 14 14 14 Å — + — — — + — Å 14 14 É | | Ë É | | Ë 103 É | | Ë 98 É | | Ë É | | Ë É | | Ë 14 É | | Ë É | | Ë

145 | | 145 145 | | 145 145 | | 337 337 | | 337 337 | | 337 337 | | 233 233 | | 48 48 | | 48 Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì 171 Ê | | Ì Ê | | Ì

42 42 Æ — + — — — + — Æ 42 42 42 42 Æ — + — — — + — Æ 42 42 42 Æ — + — — — + — Æ 239 239 239 Æ — + — — — + — Æ 239 239 239 239 Æ — + — — — + — Æ 239 239 239 205 Æ — + — — — + — Æ 205 205 205 34 Æ — + — — — + — Æ 34 34 34 34 Æ — + — — — + — Æ 34 34 Ì | | Ê Ì | | Ê 42 Ì | | Ê 239 Ì | | Ê Ì | | Ê 34 Ì | | Ê Ì | | Ê Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd.

NNSA Traffic StudyKansas City, Missouri

RGB Tract D Trips

PM Peak Hour

Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.42

140

9848

2

103

342

239 34

7034

70

3470

14

171

14

171

14

171

P101070294 (P101060276) August 2007

Page 70: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA North Drive & Botts Rd.

NNSA Traffic StudyKansas City, Missouri

RGB Phase 2 Trips (Andrews RIRO)

AM Peak Hour

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É 143 Ë | | É Ë | | É Ë | | É

29 29 Å — + — — — + — Å 29 29 29 29 Å — + — — — + — Å 29 29 29 Å — + — — — + — Å 201 201 201 Å — + — — — + — Å 201 201 201 201 Å — + — — — + — Å 201 201 201 57 Å — + — — — + — Å 57 57 57 29 Å — + — — — + — Å 29 29 29 29 Å — + — — — + — Å 29 29 É | | Ë É | | Ë 29 É | | Ë 201 É | | Ë É | | Ë É | | Ë 29 É | | Ë É | | Ë

115 | | 115 115 | | 115 115 | | 291 291 | | 268 268 | | 268 268 | | 115 115 | | 38 38 | | 38 Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì 48 Ê | | Ì Ê | | Ì

86 86 Æ — + — — — + — Æ 86 86 86 86 Æ — + — — — + — Æ 86 86 86 72 Æ — + — — — + — Æ 72 91 91 19 Æ — + — — — + — Æ 19 67 67 67 Æ — + — — — + — Æ 67 67 67 57 Æ — + — — — + — Æ 57 57 57 10 Æ — + — — — + — Æ 10 10 10 10 Æ — + — — — + — Æ 10 10 Ì | | Ê Ì | | Ê 14 Ì | | Ê 19 72 Ì | | Ê 48 Ì | | Ê 10 Ì | | Ê Ì | | Ê Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

1421

5

201

263

2948

19 7272 119 48

48 1014

310

14

3

1014

3

29

48

29

48

29

48

P101070294 (P101060276) August 2007

Page 71: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA North Drive & Botts Rd.

NNSA Traffic StudyKansas City, Missouri

RGB Phase 2 Trips (Andrews RIRO)

PM Peak Hour

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É 66 Ë | | É Ë | | É Ë | | É

96 96 Å — + — — — + — Å 96 96 96 96 Å — + — — — + — Å 96 96 96 Å — + — — — + — Å 92 92 92 Å — + — — — + — Å 92 92 92 92 Å — + — — — + — Å 92 92 92 26 Å — + — — — + — Å 26 26 26 13 Å — + — — — + — Å 13 13 13 13 Å — + — — — + — Å 13 13 É | | Ë É | | Ë 96 É | | Ë 92 É | | Ë É | | Ë É | | Ë 13 É | | Ë É | | Ë

136 | | 136 136 | | 136 136 | | 189 189 | | 317 317 | | 317 317 | | 219 219 | | 45 45 | | 45 Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì 161 Ê | | Ì Ê | | Ì

39 39 Æ — + — — — + — Æ 39 39 39 39 Æ — + — — — + — Æ 39 39 39 33 Æ — + — — — + — Æ 33 97 97 64 Æ — + — — — + — Æ 64 225 225 225 Æ — + — — — + — Æ 225 225 225 193 Æ — + — — — + — Æ 193 193 193 32 Æ — + — — — + — Æ 32 32 32 32 Æ — + — — — + — Æ 32 32 Ì | | Ê Ì | | Ê 7 Ì | | Ê 64 33 Ì | | Ê 161 Ì | | Ê 32 Ì | | Ê Ì | | Ê Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

798

9225

9

9616

1

64 3333 193

161

161 32

6632

66

3266

13

161

13

161

13

161

P101070294 (P101060276) August 2007

Page 72: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA Traffic Study Kansas City, Missouri

RGB Phase 3 Trips

AM Peak Hour

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Note some or all of these trips were assigned to 155th Street

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë | | É Å — + — — — + — Å É | | Ë

| | Ê | | Ì Æ — + — — — + — Æ Ì | | Ê Ì È Ë É Ç Ê

Ë È Ì Ê Ç É Ë | | É Å — + — — — + — Å É | | Ë

| | Ê | | Ì Æ — + — — — + — Æ Ì | | Ê Ì È Ë É Ç Ê

Ë È Ì Ê Ç É Ë | | É Å — + — — — + — Å É | | Ë

| | Ê | | Ì Æ — + — — — + — Æ Ì | | Ê Ì È Ë É Ç Ê

Ë È Ì Ê Ç É Ë | | É Å — + — — — + — Å É | | Ë

| | Ê | | Ì Æ — + — — — + — Æ Ì | | Ê Ì È Ë É Ç Ê

Ë È Ì Ê Ç É Ë | | É Å — + — — — + — Å É | | Ë

| | Ê | | Ì Æ — + — — — + — Æ Ì | | Ê Ì È Ë É Ç Ê

Ë È Ì Ê Ç É Ë | | É Å — + — — — + — Å É | | Ë

| | Ê | | Ì Æ — + — — — + — Æ Ì | | Ê Ì È Ë É Ç Ê

Ë È Ì Ê Ç É Ë | | É Å — + — — — + — Å É | | Ë

| | Ê | | Ì Æ — + — — — + — Æ Ì | | Ê Ì È Ë É Ç Ê

Ë È Ì Ê Ç É Ë | | É Å — + — — — + — Å É | | Ë

| | Ê | | Ì Æ — + — — — + — Æ Ì | | Ê Ì È Ë É Ç Ê

P101070294 (P101060276) August 2007

Page 73: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA Traffic Study Kansas City, Missouri

RGB Phase 3 Trips

PM Peak Hour

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Note some or all of these trips were assigned to 155th Street

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë | | É Å — + — — — + — Å É | | Ë

| | Ê | | Ì Æ — + — — — + — Æ Ì | | Ê Ì È Ë É Ç Ê

Ë È Ì Ê Ç É Ë | | É Å — + — — — + — Å É | | Ë

| | Ê | | Ì Æ — + — — — + — Æ Ì | | Ê Ì È Ë É Ç Ê

Ë È Ì Ê Ç É Ë | | É Å — + — — — + — Å É | | Ë

| | Ê | | Ì Æ — + — — — + — Æ Ì | | Ê Ì È Ë É Ç Ê

Ë È Ì Ê Ç É Ë | | É Å — + — — — + — Å É | | Ë

| | Ê | | Ì Æ — + — — — + — Æ Ì | | Ê Ì È Ë É Ç Ê

Ë È Ì Ê Ç É Ë | | É Å — + — — — + — Å É | | Ë

| | Ê | | Ì Æ — + — — — + — Æ Ì | | Ê Ì È Ë É Ç Ê

Ë È Ì Ê Ç É Ë | | É Å — + — — — + — Å É | | Ë

| | Ê | | Ì Æ — + — — — + — Æ Ì | | Ê Ì È Ë É Ç Ê

Ë È Ì Ê Ç É Ë | | É Å — + — — — + — Å É | | Ë

| | Ê | | Ì Æ — + — — — + — Æ Ì | | Ê Ì È Ë É Ç Ê

Ë È Ì Ê Ç É Ë | | É Å — + — — — + — Å É | | Ë

| | Ê | | Ì Æ — + — — — + — Æ Ì | | Ê Ì È Ë É Ç Ê

P101070294 (P101060276) August 2007

Page 74: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA Traffic Study Kansas City, Missouri

RGB Phase 4, 5, and 6 Trips

AM Peak Hour

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Note some or all of these trips were assigned to 155th Street

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

320

80

240

Ë È Ì Ê Ç É Ë | | É

80 Å — + — — — + — Å 80 É | | Ë

| | 320 Ê | | Ì

240 Æ — + — — — + — Æ 240 Ì | | Ê Ì È Ë É Ç Ê

240

80

Ë È Ì Ê Ç É Ë | | É

80 Å — + — — — + — Å 80 É | | Ë

320 | | 320 Ê | | Ì

240 Æ — + — — — + — Æ 240 Ì | | Ê Ì È Ë É Ç Ê

240

80 80

240

320

240

80

Ë È Ì Ê Ç É Ë | | É Å — + — — — + — Å

80 É | | Ë 40 | |

Ê | | Ì Æ — + — — — + — Æ

240 Ì | | Ê 13 Ì È Ë É Ç Ê

53

13

40

53

13

40

Ë È Ì Ê Ç É Ë | | É

40 Å — + — — — + — Å 40 É | | Ë

| | 53 Ê | | Ì

13 Æ — + — — — + — Æ 13 Ì | | Ê Ì È Ë É Ç Ê

13

40

53

40

13

Ë È Ì Ê Ç É Ë | | É

40 Å — + — — — + — Å 40 É | | Ë

| | Ê | | Ì

13 Æ — + — — — + — Æ 13 Ì | | Ê Ì È Ë É Ç Ê

53

13

40

53

13

40

Ë È Ì Ê Ç É Ë | | É

40 Å — + — — — + — Å 40 É | | Ë 40

| | Ê | | Ì

13 Æ — + — — — + — Æ 13 Ì | | Ê Ì È Ë É Ç Ê

93

13

80

93

80

13

Ë È Ì Ê Ç É Ë | | É

80 Å — + — — — + — Å 80 É | | Ë

| | 107 Ê | | Ì

13 Æ — + — — — + — Æ 13 Ì | | Ê 13 Ì È Ë É Ç Ê

27

80

107

27

80

Ë È Ì Ê Ç É Ë | | É

80 Å — + — — — + — Å 80 É | | Ë

| | Ê | | Ì

27 Æ — + — — — + — Æ 27 Ì | | Ê Ì È Ë É Ç Ê

107

27

80

240

280

4037

4

8093

13

40

4040 13

13

13

P101070294 (P101060276) August 2007

Page 75: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA Traffic Study Kansas City, Missouri

RGB Phase 4, 5, and 6 Trips

PM Peak Hour

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Note some or all of these trips were assigned to 155th Street

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

379

110

269

Ë È Ì Ê Ç É Ë | | É

269 Å — + — — — + — Å 269 É | | Ë

| | 379 Ê | | Ì

110 Æ — + — — — + — Æ 110 Ì | | Ê Ì È Ë É Ç Ê

110

269

Ë È Ì Ê Ç É Ë | | É

269 Å — + — — — + — Å 269 É | | Ë

379 | | 379 Ê | | Ì

110 Æ — + — — — + — Æ 110 Ì | | Ê Ì È Ë É Ç Ê

110

269 269

110

379

269

110

Ë È Ì Ê Ç É Ë | | É Å — + — — — + — Å

269 É | | Ë 18 | |

Ê | | Ì Æ — + — — — + — Æ

110 Ì | | Ê 45 Ì È Ë É Ç Ê

63

18

45

63

18

45

Ë È Ì Ê Ç É Ë | | É

18 Å — + — — — + — Å 18 É | | Ë

| | 63 Ê | | Ì

45 Æ — + — — — + — Æ 45 Ì | | Ê Ì È Ë É Ç Ê

18

45

63

18

45

Ë È Ì Ê Ç É Ë | | É

18 Å — + — — — + — Å 18 É | | Ë

| | Ê | | Ì

45 Æ — + — — — + — Æ 45 Ì | | Ê Ì È Ë É Ç Ê

63

18

45

63

45

18

Ë È Ì Ê Ç É Ë | | É

18 Å — + — — — + — Å 18 É | | Ë 18

| | Ê | | Ì

45 Æ — + — — — + — Æ 45 Ì | | Ê Ì È Ë É Ç Ê

81

45

37

81

37

45

Ë È Ì Ê Ç É Ë | | É

37 Å — + — — — + — Å 37 É | | Ë

| | 126 Ê | | Ì

45 Æ — + — — — + — Æ 45 Ì | | Ê 45 Ì È Ë É Ç Ê

37

90

126

37

90

Ë È Ì Ê Ç É Ë | | É

37 Å — + — — — + — Å 37 É | | Ë

| | Ê | | Ì

90 Æ — + — — — + — Æ 90 Ì | | Ê Ì È Ë É Ç Ê

126

37

90

110

128

1844

2

269

314

45

18

1818 45

45

45

P101070294 (P101060276) August 2007

Page 76: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA Traffic Study Kansas City, Missouri

RGB Retail Trips

AM Peak Hour

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Note some or all of these trips were assigned to 155th Street

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë | | É Å — + — — — + — Å É | | Ë

| | Ê | | Ì Æ — + — — — + — Æ Ì | | Ê Ì È Ë É Ç Ê

Ë È Ì Ê Ç É Ë | | É Å — + — — — + — Å É | | Ë

| | Ê | | Ì Æ — + — — — + — Æ Ì | | Ê Ì È Ë É Ç Ê

Ë È Ì Ê Ç É Ë | | É Å — + — — — + — Å É | | Ë

| | Ê | | Ì Æ — + — — — + — Æ Ì | | Ê Ì È Ë É Ç Ê

Ë È Ì Ê Ç É Ë | | É Å — + — — — + — Å É | | Ë

| | Ê | | Ì Æ — + — — — + — Æ Ì | | Ê Ì È Ë É Ç Ê

Ë È Ì Ê Ç É Ë | | É Å — + — — — + — Å É | | Ë

| | Ê | | Ì Æ — + — — — + — Æ Ì | | Ê Ì È Ë É Ç Ê

Ë È Ì Ê Ç É Ë | | É Å — + — — — + — Å É | | Ë

| | Ê | | Ì Æ — + — — — + — Æ Ì | | Ê Ì È Ë É Ç Ê

Ë È Ì Ê Ç É Ë | | É Å — + — — — + — Å É | | Ë

| | Ê | | Ì Æ — + — — — + — Æ Ì | | Ê Ì È Ë É Ç Ê

Ë È Ì Ê Ç É Ë | | É Å — + — — — + — Å É | | Ë

| | Ê | | Ì Æ — + — — — + — Æ Ì | | Ê Ì È Ë É Ç Ê

P101070294 (P101060276) August 2007

Page 77: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA Traffic Study Kansas City, Missouri

RGB Retail Trips

PM Peak Hour

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Note some or all of these trips were assigned to 155th Street

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë | | É Å — + — — — + — Å É | | Ë

| | Ê | | Ì Æ — + — — — + — Æ Ì | | Ê Ì È Ë É Ç Ê

Ë È Ì Ê Ç É Ë | | É Å — + — — — + — Å É | | Ë

| | Ê | | Ì Æ — + — — — + — Æ Ì | | Ê Ì È Ë É Ç Ê

Ë È Ì Ê Ç É Ë | | É Å — + — — — + — Å É | | Ë

| | Ê | | Ì Æ — + — — — + — Æ Ì | | Ê Ì È Ë É Ç Ê

Ë È Ì Ê Ç É Ë | | É Å — + — — — + — Å É | | Ë

| | Ê | | Ì Æ — + — — — + — Æ Ì | | Ê Ì È Ë É Ç Ê

Ë È Ì Ê Ç É Ë | | É Å — + — — — + — Å É | | Ë

| | Ê | | Ì Æ — + — — — + — Æ Ì | | Ê Ì È Ë É Ç Ê

Ë È Ì Ê Ç É Ë | | É Å — + — — — + — Å É | | Ë

| | Ê | | Ì Æ — + — — — + — Æ Ì | | Ê Ì È Ë É Ç Ê

Ë È Ì Ê Ç É Ë | | É Å — + — — — + — Å É | | Ë

| | Ê | | Ì Æ — + — — — + — Æ Ì | | Ê Ì È Ë É Ç Ê

Ë È Ì Ê Ç É Ë | | É Å — + — — — + — Å É | | Ë

| | Ê | | Ì Æ — + — — — + — Æ Ì | | Ê Ì È Ë É Ç Ê

P101070294 (P101060276) August 2007

Page 78: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É Ë | | É 67 Ë | | É 68 Ë | | É 5 Ë | | É Ë | | É Ë | | É

26 26 Å — + — — — + — Å 26 26 26 26 Å — + — — — + — Å 26 26 26 26 Å — + — — — + — Å 26 26 26 -41 Å — + — — — + — Å -41 27 27 27 Å — + — — — + — Å 27 27 27 22 Å — + — — — + — Å 22 22 22 14 Å — + — — — + — Å 14 14 14 14 Å — + — — — + — Å 14 14 É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë 8 É | | Ë É | | Ë

38 | | 38 38 | | 38 38 | | 38 38 | | 39 39 | | 39 39 | | 31 31 | | 16 16 | | 16 Ê | | Ì Ê | | Ì Ê | | Ì 29 Ê | | Ì 29 Ê | | Ì Ê | | Ì 7 Ê | | Ì Ê | | Ì

12 12 Æ — + — — — + — Æ 12 12 12 12 Æ — + — — — + — Æ 12 12 12 12 Æ — + — — — + — Æ 12 12 12 -17 Æ — + — — — + — Æ -17 12 12 12 Æ — + — — — + — Æ 12 12 12 10 Æ — + — — — + — Æ 10 10 10 2 Æ — + — — — + — Æ 2 2 2 2 Æ — + — — — + — Æ 2 2 Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê 2 Ì | | Ê Ì | | Ê Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd.

NNSA Traffic StudyKansas City, Missouri

Colorado Avenue Convenience Store Development Trips

AM Peak Hour

Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

6796

2919

3

2997

68

25

2 5

25

8 7

8 7

8 7

P101070294 (P101060276) August 2007

Page 79: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É Ë | | É 25 Ë | | É 26 Ë | | É 7 Ë | | É Ë | | É Ë | | É

10 10 Å — + — — — + — Å 10 10 10 10 Å — + — — — + — Å 10 10 10 10 Å — + — — — + — Å 10 10 10 -15 Å — + — — — + — Å -15 11 11 11 Å — + — — — + — Å 11 11 11 4 Å — + — — — + — Å 4 4 4 2 Å — + — — — + — Å 2 2 2 2 Å — + — — — + — Å 2 2 É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë 2 É | | Ë É | | Ë

34 | | 34 34 | | 34 34 | | 34 34 | | 34 34 | | 34 34 | | 25 25 | | 21 21 | | 21 Ê | | Ì Ê | | Ì Ê | | Ì 60 Ê | | Ì 59 Ê | | Ì Ê | | Ì 2 Ê | | Ì Ê | | Ì

24 24 Æ — + — — — + — Æ 24 24 24 24 Æ — + — — — + — Æ 24 24 24 24 Æ — + — — — + — Æ 24 24 24 -36 Æ — + — — — + — Æ -36 23 23 23 Æ — + — — — + — Æ 23 23 23 21 Æ — + — — — + — Æ 21 21 21 18 Æ — + — — — + — Æ 18 18 18 18 Æ — + — — — + — Æ 18 18 Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê 2 Ì | | Ê Ì | | Ê Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd.

NNSA Traffic StudyKansas City, Missouri

Colorado Avenue Convenience Store Development Trips

PM Peak Hour

Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

2584

5917

0

6086

26

27

2 7

27

2 2

2 2

2 2

P101070294 (P101060276) August 2007

Page 80: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

P101070294 (P101060276) August 2007

2574

5099

825

17 2541

33

8

41

33

Hwy 150 & Andrews/Colorado

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É 41 Ë | | É Ë | | É Ë | | É

17 17 Å — + — — — + — Å 17 17 17 17 Å — + — — — + — Å 17 17 17 8 Å — + — — — + — Å 8 58 58 58 Å — + — — — + — Å 58 58 58 58 Å — + — — — + — Å 58 58 58 17 Å — + — — — + — Å 17 25 25 17 Å — + — — — + — Å 17 17 17 17 Å — + — — — + — Å 17 17 É | | Ë É | | Ë 8 É | | Ë 50 É | | Ë É | | Ë É | | Ë 8 8 É | | Ë É | | Ë

66 | | 66 66 | | 66 66 | | 99 99 | | 99 99 | | 99 99 | | 41 41 | | 22 22 | | 22 Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì 14 Ê | | Ì Ê | | Ì

50 50 Æ — + — — — + — Æ 50 50 50 50 Æ — + — — — + — Æ 50 50 50 25 Æ — + — — — + — Æ 25 41 41 41 Æ — + — — — + — Æ 41 41 41 41 Æ — + — — — + — Æ 41 41 41 17 Æ — + — — — + — Æ 17 17 17 3 Æ — + — — — + — Æ 3 6 6 6 Æ — + — — — + — Æ 6 6 Ì | | Ê Ì | | Ê 25 Ì | | Ê 17 Ì | | Ê Ì | | Ê 25 Ì | | Ê Ì | | Ê 3 Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

41

11

14

814

11

3

14

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

NNSA Traffic StudyKansas City, Missouri

RGB Underground Development Trips

AM Peak Hour

Note some or all of these trips were assigned to 155th Street

Page 81: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

P101070294 (P101060276) August 2007

1134

2311

7

2883

56 1119

15

4

19

15

Hwy 150 & Andrews/Colorado

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É 19 Ë | | É Ë | | É Ë | | É

56 56 Å — + — — — + — Å 56 56 56 56 Å — + — — — + — Å 56 56 56 28 Å — + — — — + — Å 28 51 51 51 Å — + — — — + — Å 51 51 51 51 Å — + — — — + — Å 51 51 51 32 Å — + — — — + — Å 32 35 35 8 Å — + — — — + — Å 8 8 8 8 Å — + — — — + — Å 8 8 É | | Ë É | | Ë 28 É | | Ë 23 É | | Ë É | | Ë É | | Ë 4 28 É | | Ë É | | Ë

78 | | 78 78 | | 78 78 | | 117 117 | | 117 117 | | 117 117 | | 91 91 | | 26 26 | | 26 Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì 46 Ê | | Ì Ê | | Ì

23 23 Æ — + — — — + — Æ 23 23 23 23 Æ — + — — — + — Æ 23 23 23 11 Æ — + — — — + — Æ 11 67 67 67 Æ — + — — — + — Æ 67 67 67 67 Æ — + — — — + — Æ 67 67 67 56 Æ — + — — — + — Æ 56 56 56 9 Æ — + — — — + — Æ 9 19 19 19 Æ — + — — — + — Æ 19 19 Ì | | Ê Ì | | Ê 11 Ì | | Ê 56 Ì | | Ê Ì | | Ê 11 Ì | | Ê Ì | | Ê 9 Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

19

37

46

2846

37

9

46

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

NNSA Traffic StudyKansas City, Missouri

RGB Underground Development Trips

PM Peak Hour

Note some or all of these trips were assigned to 155th Street

Page 82: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA North Drive & Botts Rd.

NNSA Traffic StudyKansas City, Missouri

Projected Background Growth Trips (2006 - 2025)

AM Peak Hour

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É 234 Ë | | É Ë | | É Ë | | É

1170 1170 Å — + — — — + — Å 1170 1170 1170 1170 Å — + — — — + — Å 1170 1170 1170 1170 Å — + — — — + — Å 1170 1170 1170 1170 Å — + — — — + — Å 1170 1170 1170 1170 Å — + — — — + — Å 1170 1170 1170 936 Å — + — — — + — Å 936 936 936 585 Å — + — — — + — Å 585 585 585 585 Å — + — — — + — Å 585 585 É | | Ë É | | Ë É | | Ë É | 3.0% | Ë É | | Ë É | | Ë 351 É | | Ë É | | Ë

1415 | | 1415 1415 | | 1415 1415 | | 1415 1415 | Per Year | 1415 1415 | | 1415 1415 | | 1132 1132 | | 634 634 | | 634 Ê | | Ì Ê | | Ì Ê | | Ì Ê | Flat Rate | Ì Ê | | Ì Ê | | Ì 147 Ê | | Ì Ê | | Ì

245 245 Æ — + — — — + — Æ 245 245 245 245 Æ — + — — — + — Æ 245 245 245 245 Æ — + — — — + — Æ 245 245 245 245 Æ — + — — — + — Æ 245 245 245 245 Æ — + — — — + — Æ 245 245 245 196 Æ — + — — — + — Æ 196 196 196 49 Æ — + — — — + — Æ 49 49 49 49 Æ — + — — — + — Æ 49 49 Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê 49 Ì | | Ê Ì | | Ê Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

4923

449

23

4

4923

4

351

147

351

147

351

147

P101070294 (P101060276) August 2007

Page 83: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA North Drive & Botts Rd.

NNSA Traffic StudyKansas City, Missouri

Projected Background Growth Trips (2006 - 2025)

PM Peak Hour

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É 275 Ë | | É Ë | | É Ë | | É

458 458 Å — + — — — + — Å 458 458 458 458 Å — + — — — + — Å 458 458 458 458 Å — + — — — + — Å 458 458 458 458 Å — + — — — + — Å 458 458 458 458 Å — + — — — + — Å 458 458 458 183 Å — + — — — + — Å 183 183 183 92 Å — + — — — + — Å 92 92 92 92 Å — + — — — + — Å 92 92 É | | Ë É | | Ë É | | Ë É | 3.0% | Ë É | | Ë É | | Ë 92 É | | Ë É | | Ë

1576 | | 1576 1576 | | 1576 1576 | | 1576 1576 | Per Year | 1576 1576 | | 1576 1576 | | 1189 1189 | | 986 986 | | 986 Ê | | Ì Ê | | Ì Ê | | Ì Ê | Flat Rate | Ì Ê | | Ì Ê | | Ì 112 Ê | | Ì Ê | | Ì

1118 1118 Æ — + — — — + — Æ 1118 1118 1118 1118 Æ — + — — — + — Æ 1118 1118 1118 1118 Æ — + — — — + — Æ 1118 1118 1118 1118 Æ — + — — — + — Æ 1118 1118 1118 1118 Æ — + — — — + — Æ 1118 1118 1118 1006 Æ — + — — — + — Æ 1006 1006 1006 894 Æ — + — — — + — Æ 894 894 894 894 Æ — + — — — + — Æ 894 894 Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê 112 Ì | | Ê Ì | | Ê Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

112

275

112

275

112

275

92

112

92

112

92

112

P101070294 (P101060276) August 2007

Page 84: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

P101070294 (P101060276) August 2007

32 4

3636

3636

3636

3636

36

91

36

9191

91

91

55

55

55

55

55

55

55

55

55

19

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É 32 Ë | | É 19 Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É

32 32 Å — + — — — + — Å 32 32 32 32 Å — + — — — + — Å 32 32 32 Å — + — — — + — Å 19 19 19 Å — + — — — + — Å 19 19 19 19 Å — + — — — + — Å 19 19 19 19 Å — + — — — + — Å 19 19 19 19 Å — + — — — + — Å 19 19 19 19 Å — + — — — + — Å 19 19 É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë

68 | | 68 68 | | 68 68 | | 23 23 | | 23 23 | | 23 23 | | 23 23 | | 23 23 | | 23 Ê | | Ì Ê | | Ì 36 Ê | | Ì 4 Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì

36 36 Æ — + — — — + — Æ 36 36 36 36 Æ — + — — — + — Æ 36 36 36 Æ — + — — — + — Æ 4 4 4 Æ — + — — — + — Æ 4 4 4 4 Æ — + — — — + — Æ 4 4 4 4 Æ — + — — — + — Æ 4 4 4 4 Æ — + — — — + — Æ 4 4 4 4 Æ — + — — — + — Æ 4 4 Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

NNSA Traffic StudyKansas City, Missouri

Botts Road Growth / Traffic Shift

AM Peak Hour

NNSA North Drive & Botts Rd.

Page 85: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

P101070294 (P101060276) August 2007

41 14

5555

5555

5555

5555

55

115

48

115

115

115

115

60

60

60

60

60

60

60

60

60

12

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É 41 Ë | | É 12 Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É

41 41 Å — + — — — + — Å 41 41 41 41 Å — + — — — + — Å 41 41 41 Å — + — — — + — Å 12 12 12 Å — + — — — + — Å 12 12 12 12 Å — + — — — + — Å 12 12 12 12 Å — + — — — + — Å 12 12 12 12 Å — + — — — + — Å 12 12 12 12 Å — + — — — + — Å 12 12 É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë

89 | | 89 89 | | 89 89 | | 26 26 | | 26 26 | | 26 26 | | 26 26 | | 26 26 | | 26 Ê | | Ì Ê | | Ì 48 Ê | | Ì 14 Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì

48 48 Æ — + — — — + — Æ 48 48 48 48 Æ — + — — — + — Æ 48 48 48 Æ — + — — — + — Æ 14 14 14 Æ — + — — — + — Æ 14 14 14 14 Æ — + — — — + — Æ 14 14 14 14 Æ — + — — — + — Æ 14 14 14 14 Æ — + — — — + — Æ 14 14 14 14 Æ — + — — — + — Æ 14 14 Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

NNSA Traffic StudyKansas City, Missouri

Botts Road Growth / Traffic Shift

PM Peak Hour

NNSA North Drive & Botts Rd.

Page 86: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA North Drive & Botts Rd.

NNSA Traffic StudyKansas City, Missouri

Andrews/Colorado Traffic Adjustments for Interchange

AM Peak Hour

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å 29 É | | Ë 29

| | 58 Ê | | Ì

Æ — + — — — + — Æ 29 Ì | | Ê 29 Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | ÉÅ — + — — — + — Å Å — + — — — + — Å -59 Å — + — — — + — Å -59 -1 -1 58 Å — + — — — + — Å 58 Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — ÅÉ | | Ë É | | Ë 59 É | | Ë 58 -59 É | | Ë -58 É | | Ë É | | Ë É | | Ë É | | Ë

| | | | | | -1 -1 | | | | | | | | | |Ê | | Ì Ê | | Ì 29 Ê | | Ì 29 -29 Ê | | Ì -29 Ê | | Ì Ê | | Ì Ê | | Ì Ê | | ÌÆ — + — — — + — Æ Æ — + — — — + — Æ -29 Æ — + — — — + — Æ -29 29 Æ — + — — — + — Æ 29 Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — ÆÌ | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | ÊÌ È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

5829

29

5829

2911

758

58

5929

59

29

29

29

-58

-29

-58

-29

-117

-5

8

-59

-29

-59

-29

P101070294 (P101060276) August 2007

Page 87: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA North Drive & Botts Rd.

NNSA Traffic StudyKansas City, Missouri

Andrews/Colorado Traffic Adjustments for Interchange

PM Peak Hour

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å 59 É | | Ë 59

| | 119 Ê | | Ì

Æ — + — — — + — Æ 60 Ì | | Ê 60 Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | ÉÅ — + — — — + — Å Å — + — — — + — Å -18 Å — + — — — + — Å -18 218 218 236 Å — + — — — + — Å 236 Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — ÅÉ | | Ë É | | Ë 18 É | | Ë 236 -18 É | | Ë -236 É | | Ë É | | Ë É | | Ë É | | Ë

| | | | | | 217 217 | | | | | | | | | |Ê | | Ì Ê | | Ì 60 Ê | | Ì 59 -60 Ê | | Ì -59 Ê | | Ì Ê | | Ì Ê | | Ì Ê | | ÌÆ — + — — — + — Æ Æ — + — — — + — Æ -60 Æ — + — — — + — Æ -60 -1 -1 59 Æ — + — — — + — Æ 59 Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — ÆÌ | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | ÊÌ È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

236

5959

236

5959

254

119

119

1860

18

60

60

60

-236

-59

-236

-59

-254

-1

19

-18

-60

-18

-60

P101070294 (P101060276) August 2007

Page 88: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

P101070294 (P101060276) August 2007

50%

10%

50%

40%

3%2%

3%3%

3%3%

5%

45%

45%

18

%

18%

5%

30%

15%

45

%

45%

15

%

15%

15

%

15%

45%

55%

55

%

55%

20%

20%

20

%

Ë È Ì Ê Ç É

2% Ë | | É

17% Å — + — — — + — Å

15% É | | Ë

17% | |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

3% Ë | | É

33% Å — + — — — + — Å

30% É | | Ë

33% | |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É 40% Ë | | É 45% Ë | | É Ë | | É 55% Ë | | É Ë | | É Ë | | É Å — + — — — + — Å Å — + — — — + — Å 40% 40% 40% Å — + — — — + — Å 40% 85% 85% 85% Å — + — — — + — Å 85% 85% 85% 85% Å — + — — — + — Å 85% 85% 85% 30% Å — + — — — + — Å 30% 30% 30% 10% Å — + — — — + — Å 10% 10% 10% 10% Å — + — — — + — Å 10% 10% É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë 20% É | | Ë É | | Ë

10% | | 10% 10% | | 40% 40% | | 85% 85% | | 85% 85% | | 85% 85% | | 30% 30% | | 10% 10% | | 10% Ê | | Ì 10% Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì

10% 10% Æ — + — — — + — Æ 10% 10% 10% Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

NNSA Traffic StudyKansas City, Missouri

Trip Distribution - NNSA Development (Initial Development Scenario)

Inbound

NNSA North Drive & Botts Rd.

Page 89: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA Traffic StudyKansas City, Missouri

Trip Distribution - NNSA Development (Initial Development Scenario)

Outbound

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

17% | |

2% Ê | | Ì

17% Æ — + — — — + — Æ

15% Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

33% | |

3% Ê | | Ì

33% Æ — + — — — + — Æ

30% Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É 10% Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É

10% 10% Å — + — — — + — Å 10% 10% 10% Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë

10% | | 10% 10% | | 40% 40% | | 85% 85% | | 85% 85% | | 85% 85% | | 65% 65% | | 10% 10% | | 10% Ê | | Ì Ê | | Ì 40% Ê | | Ì 45% Ê | | Ì Ê | | Ì Ê | | Ì 55% Ê | | Ì Ê | | Ì Æ — + — — — + — Æ Æ — + — — — + — Æ 40% 40% 40% Æ — + — — — + — Æ 40% 85% 85% 85% Æ — + — — — + — Æ 85% 85% 85% 85% Æ — + — — — + — Æ 85% 85% 85% 65% Æ — + — — — + — Æ 65% 65% 65% 10% Æ — + — — — + — Æ 10% 10% 10% 10% Æ — + — — — + — Æ 10% 10% Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê 20% Ì | | Ê Ì | | Ê Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

20%

20

%

20%

10%

50%

40%

50%

45%

30%

15%

45%

45

%

15%

15

%15

%15

%

45%

45%

18

%

18%

5%

3%

2%3%

3%

3%

3%

5%

55%

55%

55

%

P101070294 (P101060276) August 2007

Page 90: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA Traffic StudyKansas City, Missouri

Trip Distribution - NNSA Development (Future Scenario - Diamond Interchange Alternative)

Inbound

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

2% Ë | | É

27% Å — + — — — + — Å

25% É | | Ë

27% | |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

3% Ë | | É

73% Å — + — — — + — Å

70% É | | Ë

73% | |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É Ë | | É 85% Ë | | É Ë | | É 55% Ë | | É Ë | | É Ë | | É Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å 85% 85% 85% Å — + — — — + — Å 85% 85% 85% 85% Å — + — — — + — Å 85% 85% 85% 30% Å — + — — — + — Å 30% 30% 30% 10% Å — + — — — + — Å 10% 10% 10% 10% Å — + — — — + — Å 10% 10% É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë 20% É | | Ë É | | Ë

10% | | 10% 10% | | 10% 10% | | 85% 85% | | 85% 85% | | 85% 85% | | 30% 30% | | 10% 10% | | 10% Ê | | Ì Ê | | Ì 10% Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì

10% 10% Æ — + — — — + — Æ 10% 10% 10% 10% Æ — + — — — + — Æ 10% 10% 10% Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

3%2%

3%3%

3%3%

5%

95%

95%

28%

28

%5%

10%

70%

25%

95

%

95%

25

%

25%

25

%

25%

85%

55%

55

%

55%

20%

20%

20

%

P101070294 (P101060276) August 2007

Page 91: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA Traffic StudyKansas City, Missouri

Trip Distribution - NNSA Development (Future Scenario - Diamond Interchange Alternative)

Outbound

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

27% | |

2% Ê | | Ì

27% Æ — + — — — + — Æ

25% Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

73% | |

3% Ê | | Ì

73% Æ — + — — — + — Æ

70% Ì | | Ê

Ì È Ë É Ç Ê

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É 10% Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É

10% 10% Å — + — — — + — Å 10% 10% 10% 10% Å — + — — — + — Å 10% 10% 10% Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë

10% | | 10% 10% | | 10% 10% | | 85% 85% | | 85% 85% | | 85% 85% | | 65% 65% | | 10% 10% | | 10% Ê | | Ì Ê | | Ì Ê | | Ì 85% Ê | | Ì Ê | | Ì Ê | | Ì 55% Ê | | Ì Ê | | Ì Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ 85% 85% 85% Æ — + — — — + — Æ 85% 85% 85% 85% Æ — + — — — + — Æ 85% 85% 85% 65% Æ — + — — — + — Æ 65% 65% 65% 10% Æ — + — — — + — Æ 10% 10% 10% 10% Æ — + — — — + — Æ 10% 10% Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê 20% Ì | | Ê Ì | | Ê Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd. 10

%70

%25

%

20%

20

%

20%

85%

95%

95%

55%

55%

55

%

95%

25

%

25%

25%

25%

95%

28%

28

%5%

3%

2%3%

3%

3%

3%

5%

P101070294 (P101060276) August 2007

Page 92: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

P101070294 (P101060276) August 2007

30%

30%

30%

3%2%

3%3%

3%3%

65%

65%

23

%

23%

10%

45%

20%

65

%

65%

20

%

20%

20

%

20%

55%

55%

55

%

55%

20%

20%

20

%

Ë È Ì Ê Ç É

2% Ë | | É

22% Å — + — — — + — Å

20% É | | Ë

22% | |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

3% Ë | | É

48% Å — + — — — + — Å

45% É | | Ë

48% | |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É

Ë | | É Ë | | É 30% Ë | | É 55% Ë | | É Ë | | É 55% Ë | | É Ë | | É Ë | | É

Å — + — — — + — Å Å — + — — — + — Å 30% 30% 30% Å — + — — — + — Å 30% 85% 85% 85% Å — + — — — + — Å 85% 85% 85% 85% Å — + — — — + — Å 85% 85% 85% 30% Å — + — — — + — Å 30% 30% 30% 10% Å — + — — — + — Å 10% 10% 10% 10% Å — + — — — + — Å 10% 10% É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë 20% É | | Ë É | | Ë

10% | | 10% 10% | | 40% 40% | | 85% 85% | | 85% 85% | | 85% 85% | | 30% 30% | | 10% 10% | | 10% Ê | | Ì Ê | | Ì 10% Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì

10% 10% Æ — + — — — + — Æ 10% 10% 10% 10% Æ — + — — — + — Æ 10% 10% 10% Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ

Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê

Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

Andrews Rd. & Kensington Ave.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

155th St. & Andrews Rd. 155th St. & Westover/Kensington 155th St. & Proposed Drive 155th St. & Scott Ave. (Frontage) 155th St. & US71 W. Ramps 155th St. & US71 E. Ramps 155th St. & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É

Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É

Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å

É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë

| | | | | | | | | | | | | |Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì

Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ

Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê

Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

5% 5%

NNSA Traffic StudyKansas City, Missouri

Trip Distribution - NNSA Development (Future Scenario - Split Diamond Interchange Alternative)

Inbound

NNSA North Drive & Botts Rd.

Page 93: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

5% 5%

NNSA Traffic StudyKansas City, Missouri

Trip Distribution - NNSA Development (Future Scenario - Split Diamond Interchange Alternative)

Outbound

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

22% | |

2% Ê | | Ì

22% Æ — + — — — + — Æ

20% Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

73% | |

3% Ê | | Ì

73% Æ — + — — — + — Æ

70% Ì | | Ê

Ì È Ë É Ç Ê

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É

Ë | | É 5% Ë | | É 5% Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É 10% 10% Å — + — — — + — Å 10% 10% 10% 5% Å — + — — — + — Å 5% 5% 5% Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å

É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë

10% | | 10% 10% | | 5% 5% | | 85% 85% | | 85% 85% | | 85% 85% | | 65% 65% | | 10% 10% | | 10% Ê | | Ì Ê | | Ì Ê | | Ì 85% Ê | | Ì Ê | | Ì Ê | | Ì 55% Ê | | Ì Ê | | Ì

Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ 85% 85% 85% Æ — + — — — + — Æ 85% 85% 85% 85% Æ — + — — — + — Æ 85% 85% 85% 65% Æ — + — — — + — Æ 65% 65% 65% 10% Æ — + — — — + — Æ 10% 10% 10% 10% Æ — + — — — + — Æ 10% 10% Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê 20% Ì | | Ê Ì | | Ê Ì | | Ê

Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

Andrews Rd. & Kensington Ave.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

155th St. & Andrews Rd. 155th St. & Westover/Kensington 155th St. & Proposed Drive 155th St. & Scott Ave. (Frontage) 155th St. & US71 W. Ramps 155th St. & US71 E. Ramps 155th St. & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É

Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É

Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å

É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë

| | | | | | | | | | | | | |Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì

Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ

Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê

Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

5%5% 5%

20%

20

%

20%

85%

90%

90%

55%

55%

55

%

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

5%70

%20

%90

%

20%

20

%20

%20

%

90%

23

%

23%

3%

2%3%

3%

3%

3%

P101070294 (P101060276) August 2007

Page 94: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA Traffic StudyKansas City, Missouri

Trip Distribution - Colorado Avenue Industrial Development (Full Build w/ RIRO Andrews / Colorado)

Inbound

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| | 20% Ê | | Ì

Æ — + — — — + — Æ 20% Ì | | Ê 20% Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| | 40% Ê | | Ì

Æ — + — — — + — Æ 40% Ì | | Ê 40% Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É Ë | | É 30% Ë | | É 40% Ë | | É 50% Ë | | É Ë | | É Ë | | É Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å 30% 30% 30% Å — + — — — + — Å 30% 70% 70% 70% Å — + — — — + — Å 70% 70% 70% 20% Å — + — — — + — Å 20% 20% 20% 10% Å — + — — — + — Å 10% 10% 10% 10% Å — + — — — + — Å 10% 10% É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë 10% É | | Ë É | | Ë

30% | | 30% 30% | | 30% 30% | | 30% 30% | | 70% 70% | | 70% 70% | | 20% 20% | | 10% 10% | | 10% Ê | | Ì Ê | | Ì 30% Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì

30% 30% Æ — + — — — + — Æ 30% 30% 30% 30% Æ — + — — — + — Æ 30% 30% 30% Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

60%

30%

60%

20%

20

%

60%

60

%

20%

20%

20

%

20%

30%

40%

40%

40%

50%

50

%

50%

40%

20

%

10%

10%

10

%

P101070294 (P101060276) August 2007

Page 95: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA Traffic StudyKansas City, Missouri

Trip Distribution - Colorado Avenue Industrial Development (Full Build w/ RIRO Andrews / Colorado)

Outbound

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å 25% É | | Ë 25%

| | 25% Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å 60% É | | Ë 60%

| | 60% Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É 15% Ë | | É 15% Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É

30% 30% Å — + — — — + — Å 30% 30% 30% 30% Å — + — — — + — Å 30% 30% 25% 10% Å — + — — — + — Å 10% 10% 15% Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë

30% | | 30% 30% | | 30% 25% | | 80% 85% | | 70% 70% | | 70% 70% | | 60% 60% | | 10% 10% | | 10% Ê | | Ì Ê | | Ì Ê | | Ì 70% Ê | | Ì Ê | | Ì Ê | | Ì 50% Ê | | Ì Ê | | Ì Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ 70% 70% 70% Æ — + — — — + — Æ 70% 70% 70% 70% Æ — + — — — + — Æ 70% 70% 70% 60% Æ — + — — — + — Æ 60% 60% 60% 10% Æ — + — — — + — Æ 10% 10% 10% 10% Æ — + — — — + — Æ 10% 10% Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê 10% Ì | | Ê Ì | | Ê Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

15%

85%

85

%

25%

25%

25

%

25%

70%

60%

25

%

10%

10

%

10%

85%

15%

15%

15%

85%

25%

50%

50%

50

%

25%

P101070294 (P101060276) August 2007

Page 96: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA Traffic StudyKansas City, Missouri

Trip Distribution - Richards Gebaur Industrial (Phase 1)

Inbound

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

50%

50

%

50%

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É 50% Ë | | É Ë | | É Ë | | É Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å 70% 70% 70% Å — + — — — + — Å 70% 70% 70% 70% Å — + — — — + — Å 70% 70% 70% 20% Å — + — — — + — Å 20% 20% 20% 10% Å — + — — — + — Å 10% 10% 10% 10% Å — + — — — + — Å 10% 10% É | | Ë É | | Ë É | | Ë 70% É | | Ë É | | Ë É | | Ë 10% É | | Ë É | | Ë

30% | | 30% 30% | | 30% 30% | | 70% 70% | | 70% 70% | | 70% 70% | | 20% 20% | | 10% 10% | | 10% Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì

30% 30% Æ — + — — — + — Æ 30% 30% 30% 30% Æ — + — — — + — Æ 30% 30% 30% Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Ì | | Ê Ì | | Ê 30% Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

30%

100%

70%

100% 10%

10%

10

%

P101070294 (P101060276) August 2007

Page 97: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA Traffic StudyKansas City, Missouri

Trip Distribution - Richards Gebaur Industrial (Phase 1)

Outbound

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

50%

50%

50

%

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É

30% 30% Å — + — — — + — Å 30% 30% 30% 30% Å — + — — — + — Å 30% 30% 30% Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å É | | Ë É | | Ë 30% É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë

30% | | 30% 30% | | 30% 30% | | 70% 70% | | 70% 70% | | 70% 70% | | 60% 60% | | 10% 10% | | 10% Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì 50% Ê | | Ì Ê | | Ì Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ 70% 70% 70% Æ — + — — — + — Æ 70% 70% 70% 70% Æ — + — — — + — Æ 70% 70% 70% 60% Æ — + — — — + — Æ 60% 60% 60% 10% Æ — + — — — + — Æ 10% 10% 10% 10% Æ — + — — — + — Æ 10% 10% Ì | | Ê Ì | | Ê Ì | | Ê 70% Ì | | Ê Ì | | Ê 10% Ì | | Ê Ì | | Ê Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

100%

30%

100%

70%

10%

10

%

10%

P101070294 (P101060276) August 2007

Page 98: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA Traffic StudyKansas City, Missouri

Trip Distribution - Richards Gebaur Industrial (Phase 2 - Andrews RIRO)

Inbound

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

50%

50

%

50%

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É 50% Ë | | É Ë | | É Ë | | É Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å 70% 70% 70% Å — + — — — + — Å 70% 70% 70% 70% Å — + — — — + — Å 70% 70% 70% 20% Å — + — — — + — Å 20% 20% 20% 10% Å — + — — — + — Å 10% 10% 10% 10% Å — + — — — + — Å 10% 10% É | | Ë É | | Ë É | | Ë 70% É | | Ë É | | Ë É | | Ë 10% É | | Ë É | | Ë

30% | | 30% 30% | | 30% 30% | | 95% 95% | | 70% 70% | | 70% 70% | | 20% 20% | | 10% 10% | | 10% Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì

30% 30% Æ — + — — — + — Æ 30% 30% 30% 30% Æ — + — — — + — Æ 30% 30% 30% 25% Æ — + — — — + — Æ 25% 25% 25% Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Ì | | Ê Ì | | Ê 5% Ì | | Ê 25% Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

5%75

%

70%

75%

25%

25%

25%

10%

10%

10

%

P101070294 (P101060276) August 2007

Page 99: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA Traffic StudyKansas City, Missouri

Trip Distribution - Richards Gebaur Industrial (Phase 2 Andrews RIRO)

Outbound

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

50%

50%

50

%

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É

30% 30% Å — + — — — + — Å 30% 30% 30% 30% Å — + — — — + — Å 30% 30% 30% Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å É | | Ë É | | Ë 30% É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë

30% | | 30% 30% | | 30% 30% | | 20% 20% | | 70% 70% | | 70% 70% | | 60% 60% | | 10% 10% | | 10% Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì 50% Ê | | Ì Ê | | Ì Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ 20% 20% 20% Æ — + — — — + — Æ 20% 70% 70% 70% Æ — + — — — + — Æ 70% 70% 70% 60% Æ — + — — — + — Æ 60% 60% 60% 10% Æ — + — — — + — Æ 10% 10% 10% 10% Æ — + — — — + — Æ 10% 10% Ì | | Ê Ì | | Ê Ì | | Ê 20% Ì | | Ê 50% Ì | | Ê 10% Ì | | Ê Ì | | Ê Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

50%

30%

50%

20%

50%

50%

50%

10%

10

%

10%

P101070294 (P101060276) August 2007

Page 100: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA Traffic Study Kansas City, Missouri

Trip Distribution - Richards Gebaur Industrial (Phase 3)

Inbound

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & W. Outer Rd.Hwy 150 & Andrews/Colorado Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë

| | | | | | | | | | | | | | | | Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

P101070294 (P101060276) August 2007

Page 101: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA Traffic Study Kansas City, Missouri

Trip Distribution - Richards Gebaur Industrial (Phase 3)

Outbound

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë

| | | | | | | | | | | | | | | | Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

P101070294 (P101060276) August 2007

Page 102: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA Traffic StudyKansas City, Missouri

Trip Distribution - Richards Gebaur Industrial (Phases 4, 5, and 6)

Inbound

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | ÉÅ — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å 5% 5% 5% Å — + — — — + — Å 5% 5% 5% 5% Å — + — — — + — Å 5% 5% 5% 5% Å — + — — — + — Å 5% 10% 10% 10% Å — + — — — + — Å 10% 10% 10% 10% Å — + — — — + — Å 10% 10% É | | Ë É | | Ë É | | Ë 5% É | | Ë É | | Ë É | | Ë 5% É | | Ë É | | Ë

30% | | 30% 30% | | 30% 30% | | 5% 5% | | 5% 5% | | 5% 5% | | 10% 10% | | 10% 10% | | 10% Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì

30% 30% Æ — + — — — + — Æ 30% 30% 30% 30% Æ — + — — — + — Æ 30% 30% 30% Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Ì | | Ê Ì | | Ê 30% Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

30%

35%

5%35

% 5%

5%

5%

P101070294 (P101060276) August 2007

Page 103: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA Traffic StudyKansas City, Missouri

Trip Distribution - Richards Gebaur Industrial (Phases 4, 5, and 6)

Outbound

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É

30% 30% Å — + — — — + — Å 30% 30% 30% 30% Å — + — — — + — Å 30% 30% 30% Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å É | | Ë É | | Ë 30% É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë

30% | | 30% 30% | | 30% 30% | | 5% 5% | | 5% 5% | | 5% 5% | | 5% 5% | | 10% 10% | | 10%Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | ÌÆ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ 5% 5% 5% Æ — + — — — + — Æ 5% 5% 5% 5% Æ — + — — — + — Æ 5% 5% 5% 5% Æ — + — — — + — Æ 5% 5% 5% 5% Æ — + — — — + — Æ 5% 10% 10% 10% Æ — + — — — + — Æ 10% 10% Ì | | Ê Ì | | Ê Ì | | Ê 5% Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê 5% Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

35%

30%

35%

5%

5%

5%

5%

P101070294 (P101060276) August 2007

Page 104: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA Traffic Study Kansas City, Missouri

Trip Distribution - 155th Street Retail

Inbound

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë

| | | | | | | | | | | | | | | | Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

P101070294 (P101060276) August 2007

Page 105: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA Traffic Study Kansas City, Missouri

Trip Distribution - 155th Street Retail

Outbound

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & W. Outer Rd.Hwy 150 & Andrews/Colorado Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë

| | | | | | | | | | | | | | | | Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

P101070294 (P101060276) August 2007

Page 106: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA Traffic StudyKansas City, Missouri

Trip Distribution - Intermodal Facility (Full Build - Split Diamond Interchange at Botts)

Inbound

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

50%

50

%

50%

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É 50% Ë | | É Ë | | É Ë | | É Å — + — — — + — Å Å — + — — — + — Å 70% 70% 70% Å — + — — — + — Å 70% 70% 70% 70% Å — + — — — + — Å 70% 70% 70% 70% Å — + — — — + — Å 70% 70% 70% 20% Å — + — — — + — Å 20% 20% 20% 10% Å — + — — — + — Å 10% 10% 10% 10% Å — + — — — + — Å 10% 10% É | | Ë É | | Ë 70% É | | Ë É | | Ë É | | Ë É | | Ë 10% É | | Ë É | | Ë

30% | | 30% 30% | | 70% 70% | | 70% 70% | | 70% 70% | | 70% 70% | | 20% 20% | | 10% 10% | | 10% Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì

30% 30% Æ — + — — — + — Æ 30% 30% 30% Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Ì | | Ê 30% Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

30%

100%

70%

100% 10%

10%

10

%

P101070294 (P101060276) August 2007

Page 107: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA Traffic StudyKansas City, Missouri

Trip Distribution - Intermodal Facility (Full Build - Split Diamond Interchange at Botts)

Outbound

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

50%

50%

50

%

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É

30% 30% Å — + — — — + — Å 30% 30% 30% Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å É | | Ë 30% É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë

30% | | 30% 30% | | 70% 70% | | 70% 70% | | 70% 70% | | 70% 70% | | 60% 60% | | 10% 10% | | 10% Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì 50% Ê | | Ì Ê | | Ì Æ — + — — — + — Æ Æ — + — — — + — Æ 70% 70% 70% Æ — + — — — + — Æ 70% 70% 70% 70% Æ — + — — — + — Æ 70% 70% 70% 70% Æ — + — — — + — Æ 70% 70% 70% 60% Æ — + — — — + — Æ 60% 60% 60% 10% Æ — + — — — + — Æ 10% 10% 10% 10% Æ — + — — — + — Æ 10% 10% Ì | | Ê Ì | | Ê 70% Ì | | Ê Ì | | Ê Ì | | Ê 10% Ì | | Ê Ì | | Ê Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

100%

30%

100%

70%

10%

10

%

10%

P101070294 (P101060276) August 2007

Page 108: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA Traffic StudyKansas City, Missouri

Trip Distribution - Intermodal Facility (Full Build - Diamond Interchange at Botts)

Inbound

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

50%

50

%

50%

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É 50% Ë | | É Ë | | É Ë | | É Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å 70% 70% 70% Å — + — — — + — Å 70% 70% 70% 70% Å — + — — — + — Å 70% 70% 70% 20% Å — + — — — + — Å 20% 20% 20% 10% Å — + — — — + — Å 10% 10% 10% 10% Å — + — — — + — Å 10% 10% É | | Ë É | | Ë É | | Ë 70% É | | Ë É | | Ë É | | Ë 10% É | | Ë É | | Ë

30% | | 30% 30% | | 30% 30% | | 70% 70% | | 70% 70% | | 70% 70% | | 20% 20% | | 10% 10% | | 10% Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì

30% 30% Æ — + — — — + — Æ 30% 30% 30% 30% Æ — + — — — + — Æ 30% 30% 30% Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Ì | | Ê Ì | | Ê 30% Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

30%

100%

70%

100% 10%

10%

10

%

P101070294 (P101060276) August 2007

Page 109: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA Traffic StudyKansas City, Missouri

Trip Distribution - Intermodal Facility (Full Build - Diamond Interchange at Botts)

Outbound

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

50%

50%

50

%

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É

30% 30% Å — + — — — + — Å 30% 30% 30% 30% Å — + — — — + — Å 30% 30% 30% Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å É | | Ë É | | Ë 30% É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë

30% | | 30% 30% | | 30% 30% | | 70% 70% | | 70% 70% | | 70% 70% | | 60% 60% | | 10% 10% | | 10% Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì 50% Ê | | Ì Ê | | Ì Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ 70% 70% 70% Æ — + — — — + — Æ 70% 70% 70% 70% Æ — + — — — + — Æ 70% 70% 70% 60% Æ — + — — — + — Æ 60% 60% 60% 10% Æ — + — — — + — Æ 10% 10% 10% 10% Æ — + — — — + — Æ 10% 10% Ì | | Ê Ì | | Ê Ì | | Ê 70% Ì | | Ê Ì | | Ê 10% Ì | | Ê Ì | | Ê Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

100%

30%

100%

70%

10%

10

%

10%

P101070294 (P101060276) August 2007

Page 110: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA Traffic StudyKansas City, Missouri

Trip Distribution - Car Load Facility

Inbound

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | ÉÅ — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å 10% 10% 10% Å — + — — — + — Å 10% 10% 10% 10% Å — + — — — + — Å 10% 10% É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë 10% É | | Ë É | | Ë

30% | | 30% 30% | | 30% 30% | | 30% 30% | | 30% 30% | | 30% 30% | | 10% 10% | | 10% 10% | | 10% Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì

30% 30% Æ — + — — — + — Æ 30% 30% 30% 30% Æ — + — — — + — Æ 30% 30% 30% 30% Æ — + — — — + — Æ 30% 30% 30% 30% Æ — + — — — + — Æ 30% 30% 30% 30% Æ — + — — — + — Æ 30% 30% 30% Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê 30% Ì | | Ê Ì | | Ê Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

30%

40%

10%

40

%

P101070294 (P101060276) August 2007

Page 111: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA Traffic StudyKansas City, Missouri

Trip Distribution - Car Load Facility

Outbound

NNSA North Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É

30% 30% Å — + — — — + — Å 30% 30% 30% 30% Å — + — — — + — Å 30% 30% 30% 30% Å — + — — — + — Å 30% 30% 30% 30% Å — + — — — + — Å 30% 30% 30% 30% Å — + — — — + — Å 30% 30% 30% 30% Å — + — — — + — Å 30% 30% 30% Å — + — — — + — Å Å — + — — — + — Å É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë É | | Ë 30% É | | Ë É | | Ë

30% | | 30% 30% | | 30% 30% | | 30% 30% | | 30% 30% | | 30% 30% | | 30% 30% | | 10% 10% | | 10% Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ 10% 10% 10% Æ — + — — — + — Æ 10% 10% Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê 10% Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

40%

30%

40%

10%

P101070294 (P101060276) August 2007

Page 112: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA North Drive & Botts Rd.

NNSA Traffic StudyKansas City, Missouri

Trip Distribution - Underground Development

Inbound

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É 25% Ë | | É Ë | | É Ë | | É Å — + — — — + — Å Å — + — — — + — Å Å — + — — — + — Å 30% 30% 30% Å — + — — — + — Å 30% 30% 30% 30% Å — + — — — + — Å 30% 30% 30% 5% Å — + — — — + — Å 5% 10% 10% 10% Å — + — — — + — Å 10% 10% 10% 10% Å — + — — — + — Å 10% 10% É | | Ë É | | Ë É | | Ë 30% É | | Ë É | | Ë É | | Ë 5% É | | Ë É | | Ë

30% | | 30% 30% | | 30% 30% | | 45% 45% | | 45% 45% | | 45% 45% | | 10% 10% | | 10% 10% | | 10% Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì

30% 30% Æ — + — — — + — Æ 30% 30% 30% 30% Æ — + — — — + — Æ 30% 30% 30% 15% Æ — + — — — + — Æ 15% 15% 15% 15% Æ — + — — — + — Æ 15% 15% 15% 15% Æ — + — — — + — Æ 15% 15% 15% Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ Ì | | Ê Ì | | Ê 15% Ì | | Ê Ì | | Ê Ì | | Ê 15% Ì | | Ê Ì | | Ê Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

15%

45%

30%

45%

15%

25%

20

%

5%

25%

20%

25

%

P101070294 (P101060276) August 2007

Page 113: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

NNSA North Drive & Botts Rd.

NNSA Traffic StudyKansas City, Missouri

Trip Distribution - Underground Development

Outbound

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

NNSA South Drive & Botts Rd.

Ë È Ì Ê Ç É

Ë | | É

Å — + — — — + — Å

É | | Ë

| |

Ê | | Ì

Æ — + — — — + — Æ

Ì | | Ê

Ì È Ë É Ç Ê

Hwy 150 & Prospect Ave. Hwy 150 & T-Bird Rd. / NNSA Drive Hwy 150 & Botts Rd. Hwy 150 & Andrews/Colorado Hwy 150 & W. Outer Rd. Hwy 150 & US71 W. Ramps Hwy 150 & US71 E. Ramps Hwy 150 & E. Outer Rd.

Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë È Ì Ê Ç É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É Ë | | É

30% 30% Å — + — — — + — Å 30% 30% 30% 30% Å — + — — — + — Å 30% 30% 30% 15% Å — + — — — + — Å 15% 15% 15% 15% Å — + — — — + — Å 15% 15% 15% 15% Å — + — — — + — Å 15% 15% 15% 15% Å — + — — — + — Å 15% 15% 15% Å — + — — — + — Å Å — + — — — + — Å É | | Ë É | | Ë 15% É | | Ë É | | Ë É | | Ë É | | Ë 15% É | | Ë É | | Ë

30% | | 30% 30% | | 30% 30% | | 45% 45% | | 45% 45% | | 45% 45% | | 45% 45% | | 10% 10% | | 10% Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì Ê | | Ì 25% Ê | | Ì Ê | | Ì Æ — + — — — + — Æ Æ — + — — — + — Æ Æ — + — — — + — Æ 30% 30% 30% Æ — + — — — + — Æ 30% 30% 30% 30% Æ — + — — — + — Æ 30% 30% 30% 30% Æ — + — — — + — Æ 30% 30% 30% 5% Æ — + — — — + — Æ 5% 10% 10% 10% Æ — + — — — + — Æ 10% 10% Ì | | Ê Ì | | Ê Ì | | Ê 30% Ì | | Ê Ì | | Ê Ì | | Ê Ì | | Ê 5% Ì | | Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê Ì È Ë É Ç Ê

45%

15%

45%

30%

20%

25

%

15%

25%

20

%

5%

25%

P101070294 (P101060276) August 2007

Page 114: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems

Appendix C – Capacity Analysis Worksheets

See attached worksheets.

Traffic Impact Study NNSA Development

Page 115: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 116: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 117: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 118: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 119: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 120: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 121: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 122: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 123: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 124: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 125: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 126: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 127: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 128: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 129: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 130: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 131: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 132: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 133: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 134: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 135: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 136: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 137: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 138: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 139: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 140: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 141: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 142: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 143: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 144: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 145: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 146: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 147: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 148: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 149: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 150: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 151: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 152: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 153: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 154: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 155: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 156: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 157: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 158: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 159: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 160: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 161: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 162: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 163: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 164: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 165: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 166: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems
Page 167: Traffic Impact Study - GSA · PDF fileTraffic volume projections for this site were derived ... project was taken from the Proposed Gas Station Traffic Impact Study prepared by TranSystems