Transcript of Tracking and Trending of Steam Generator Leak Rate (SGLR) Monitor Backgrounds and Source Checks...
Tracking and Trending of Steam Generator Leak Rate (SGLR) Monitor Backgrounds and Source ChecksAnthony T LonnettFENOC - BVPS Units 1 & 2PO Box 4 ( Mail Stop A-BV-RAD )Shippingport, PA 15077-0004Phone: 724-682-7523e-mail: [email protected]
Is there an Alternate Title to this Presentation?
Maybe…just ask yourself the following:
Question: How easy is it to get a repeat AFI?
Answer: Simple….just have more than one person assigned to implement a trending program.
Problem (INPO AFI CY.3-1)• Performance of rad monitors used
to identify pri-to-sec tube leakage is not adequately trended to promptly identify and evaluate loss of sensitivity between monitor calibrations
• This does not meet the guidance of Rec No. 3 to SOER 93-1, “Diagnosis and Mitigation of Reactor Coolant System Leakage Including Steam Generator Tube Ruptures”
Causes and Contributors - Part 1• A previous misconception that source
checks could not be quantitative• Ownership of the program was
assigned to more than one individual• Acceptance Criteria was not
displayed on the plots (graphs)• There was no continuity between the
two areas that needed trended (see next page for details)
Causes and Contributors - Part 2• Monitor bkgds were plotted monthly,
but source checks were plotted every 18 months. Neither of these were adequate
• Effect of bkgd subtract was not evaluated
• Data was plotted on a log scale rather than a linear scale.
• Data was plotted in terms of count rate rather than Percent Variance of the Acceptance Criteria.
Corrective Actions Related To:Obtaining Raw Data• Ownership of the trending program
was assigned to one individual • Changed station Logs to (1) require
weekly source checks, and (2) provide instructions on how to perform the source checks
• Initiated routine (weekly) trending of the background & source check data
• Added "background subtract value"
Corrective Actions Related To -Acceptance Criteria
• Developed the 1st Acceptance Criteria to require the current background or source check data point to be within a 3-sigma band of the historical average
Corrective Actions Related To -Acceptance Criteria
• Developed the 2nd Acceptance Criteria to require the current background or source check data point to be within +10% of the total average
Corrective Actions Related To -Acceptance Criteria• Implemented electronic
comparison to the two Acceptance Criteria described above
• Data outside the Acceptance Criteria must be documented in a Corrective Action to ensure an adequate investigation and resolution process is performed
Corrective Action Status
• In total, fourteen Corrective Actions were implemented to enhance the program for prompt detection of detector degradation
• All Corrective Actions have been implemented
• All SGLR program enhancements were implemented into a single station procedure
Evaluate Effectiveness of Corrective Actions
• The Corrective Actions implemented were evaluated using four separate methods
1st Method of Corrective Action Evaluation• The 1st method involved use of an
internal Effectiveness Review
• Results: A total of 4 additional comments were generated. They were evaluated and Corrective Actions were implemented
2nd Method of Corrective Action Evaluation
• The 2nd method involved an independent review from a Chemistry peer at INPO
• Results: A total of 4 comments were generated. They were evaluated and Corrective Actions were implemented
3rd Method of Corrective Action Evaluation
• The 3rd method involved an independent review from a Chemistry peer at another FENOC site
• Results: A total of 1 additional comment was generated. It was evaluated and Corrective Action was implemented
4th Method of Corrective Action Evaluation
• The 4th method involved a final internal critical evaluation of background and source-check trends to determine if the revised SGLR monitoring program identifies appropriate failures
• Results: No additional comments generated
Results
• The revised trending program now provides meaningful results
• Results are reported to station management
• Since implementation of the revised program, there have been several instances where the program identified a degrading trend in detector performance
Unit 1 SGLR Monitor Backgrounds
Unit 1 Steam Generator Leak Rate Monitors- Weekly Background Trends (without N-16 monitors) -
2004
-20%
-10%
0%
10%
20%
Acce
ptan
ce C
riter
ia%
Var
ianc
e
SGBD: RM-1BD-101 Acc Criteria Range: -10% to +10%)SJAE: RM-1SV-100 Acc Criteria Range: -10% to +10%)
Unit 1 SGLR Monitor Source Checks
Unit 1 Steam Generator Leak Rate Monitors- Weekly Source Check Trends -
2004
-20%
-10%
0%
10%
20%
Acce
ptan
ce C
riter
ia%
Var
ianc
e
SGBD: RM-1BD-101 Acc Criteria Range: -10% to +10%)SJAE: RM-1SV-100 Acc Criteria Range: -10% to +10%)Performance Trend (SGBD: RM-1BD-101)Performance Trend (SJAE: RM-1SV-100)
Unit 2 SGLR Monitor Backgrounds
Unit 2 Steam Generator Leak Rate Monitors- Weekly Background Trends -
2004
-20%
-10%
0%
10%
20%
Ace
ptan
ce C
riter
ia%
Var
ianc
e
SGBD: 2SSR-RQ100 Acc Criteria Range: -10% to +10%)SJAE: 2ARC-RQ100 Acc Criteria Range: -10% to +10%)Performance Trend (SJAE: 2ARC-RQ100)Performance Trend (SGBD: 2SSR-RQ100)
Unit 2 SGLR Monitor Source Checks
Unit 2 Steam Generator Leak Rate Monitors- Weekly Source Check Trends -
2004
-30%
-20%
-10%
0%
10%
20%
Acc
epta
nce
Crit
eria
% V
aria
nce
SGBD: 2SSR-RQ100 Acc Criteria Range: -10% to +10%)SJAE: 2ARC-RQ100 Acc Criteria Range: -10% to +10%)Performance Trend (SGBD: 2SSR-RQ100)Performance Trend (SJAE: 2ARC-RQ100)