TRACE™ 700 Learning SeriesModule 6: Additional Features
Advanced OptionsgbXML ImportingModule 6 Exercise-Bringing It All Together
Learning Objectives• Access advanced load parameters
• Learn ways to improve input process
• Customize default settings for easier project creation
• How to easily compare results
TRACE™ 700 Learning Series
©Trane a business of Ingersoll Rand Module 06: Additional Features l 1
Change Load Parameters
SCREENCAST
Advanced Options
SCREENCAST
TRACE™ 700 Learning Series
©Trane a business of Ingersoll Rand Module 06: Additional Features l 2
Component and Project Tree Views
SCREENCAST
Customized Settings
SCREENCAST
TRACE™ 700 Learning Series
©Trane a business of Ingersoll Rand Module 06: Additional Features l 3
Report Features
SCREENCAST
Conclusion• Different load methodologies can impact the
overall calculated size of fans and coils• Every advanced feature can drastically impact
results – please adjust carefully• You can simplify the input and output process by
selecting different views
TRACE™ 700 Learning Series
©Trane a business of Ingersoll Rand Module 06: Additional Features l 4
Learning Objectives
• Define what is a gbXML file
• Understand the benefits of working with gbXMLfiles in TRACE
• Import and export a gbXML from TRACE
• Know the best practices to work with gbXML files
TRACE™ 700 Learning Series
©Trane a business of Ingersoll Rand Module 06: Additional Features l 5
What is gbXML?
• Green Building XML
• eXtensible Markup Language (XML) Computer language
gbXML is an open schema used to exchange building data from a modeling software to an analysis software and back.
Steps to Use a gbXML File with TRACE
1. Export gbXML from CAD program
2. Import the file into TRACE 700 (select the elements to import)
3. Verify and complete inputs
4. Run simulation
5. Verify outputs through reports
6. Export gbXML from TRACE 700
7. Import the gbXML file to the CAD program
TM
1
34567
2
TRACE™ 700 Learning Series
©Trane a business of Ingersoll Rand Module 06: Additional Features l 6
Import a gbXML file into TRACETM
SCREENCAST
Best practices
• Connected walls
• Plenum spaces
• Partitions
• Keep both files in your local computer
• Rooms with unique names - no special characters
• Verify your inputs
• Keep it simple
TRACE™ 700 Learning Series
©Trane a business of Ingersoll Rand Module 06: Additional Features l 7
Conclusion
• Green Building XML is used to transfer building data from a CAD software to TRACE to perform Load calculations
• Verify and complete inputs before running the load calculation
• Avoid importing partitions and plenums
TRACE™ 700 Learning Series
©Trane a business of Ingersoll Rand Module 06: Additional Features l 8
Purpose:• Practice creating a simple building using concepts
learned in the TRACE 700TM Load Design modules.
Procedure:• Begin with a new file.• Create and apply templates.• Assign rooms to their appropriate airside systems.• Calculate and analyze results.• Review Questions.
Exercise: Bringing It All Together
PayoffHow to apply the basics you have
learned to model a complex building.
Learn/practice methods to make
effective & efficient inputs.
TRACE™ 700 Learning Series
©Trane a business of Ingersoll Rand Module 06: Additional Features l 9
Office 101Office 102
Offi
ce 1
03O
ffice
104
Office 105 Office 106 Office 107
Break Room
Restroom2
Lobby
Data Center
South Corridor Area
1120 ft2
Door10’ wide8’ high
Glass30% for all walls except
Data Centerand Restrooms
North Corridor Area
1120 ft2
N
12’
15’
15’
35’
35’ 30’
50’
35’
15’
25’
15’
20’
35’
30’ 30’ 35’
15’
10’
Restroom 1
15’
20’
35’
35’
Note: Use the default values for any information not given. Begin with a new TRACE file.
For this exercise, you will be modeling a building that has been converted to an office/data center facility. Using what you have learned, model the building per the following information.
Methodology:CLTD (cooling), UATD (heating)
Location:Memphis, Tennessee
Let’s solve it together…
SCREENCAST
TRACE™ 700 Learning Series
©Trane a business of Ingersoll Rand Module 06: Additional Features l 10
Templates AnalysisRoom (#)
Internal LAirflow
ThermostatClgD/HtgD/R
HConstruction
People Lights Misc. L.
Office (7) Office Office Office 20 cfm/per 75/70/50% Y
Break Room (1) BR BR BR 20 cfm/per 75/70/50% Y
Restroom (2) RR RR RR 0 75/70/50% Y
Corridor(2) C C C .05 cfm/ft2 75/70/50% Y
Lobby (1) L L L 15 cfm/per 75/70/50% Y
DataC (1) DC DC DC .15 cfm/ft2 70/65/40% Y ‐ height
Create templates
SCREENCAST
TRACE™ 700 Learning Series
©Trane a business of Ingersoll Rand Module 06: Additional Features l 11
Create Rooms
Office 101Office 102
Offi
ce 1
03O
ffice
104
Office 105 Office 106 Office 107
Break Room
Restroom2
Lobby
Data Center
South Corridor Area
1120 ft2
Door10’ wide8’ high
Glass30% for all walls except
Data Centerand Restrooms
North Corridor Area
1120 ft2
N
12’
15’
15’
35’
35’ 30’
50’
35’
15’
25’
15’
20’
35’
30’ 30’ 35’
15’
10’
Restroom 1
15’
20’
35’
35’
SCREENCAST
Create Systems
SCREENCAST
TRACE™ 700 Learning Series
©Trane a business of Ingersoll Rand Module 06: Additional Features l 12
Assign Rooms to Systems
SCREENCAST
Calculate and View Results
SCREENCAST
TRACE™ 700 Learning Series
©Trane a business of Ingersoll Rand Module 06: Additional Features l 13
Review Questions1. Why would the Available (100%) schedule not be the best
schedule to select for the people schedule?
The Available (100%) schedule attributes 100% of the load 24/7 to allcalculations. Per ASHRAE recommendation (see 2009 ASHRAEHandbook of Fundamentals, p. 18.28), the heating design calculationshould not include internal heat gains (e.g. people).Therefore, applying this schedule would account for internal heatgains. Using this schedule could result in Undersizing the heatingcapacity.
Review Questions2. How would you model occupancy sensors for lighting in TRACE?
Since lighting schedules dictate when lighting heat gain is considered,simply create a lighting schedule that follows the occupancy schedule.In other words, if you have occupancy scheduled from 8 am to noonand then 1 pm to 5 pm. You would create a lighting schedule where thelights were on from 8 am to noon and 1 pm to 5 pm. All other hourswould show the lights as off.
TRACE™ 700 Learning Series
©Trane a business of Ingersoll Rand Module 06: Additional Features l 14
Review questions3. If the supply air temperature is lower than expected, what steps
could you take to increase the temperature?
The most obvious choice would be to set the temperature through CreateSystems on the Temp/Humidity tab. However, one should investigate first tobetter understand why TRACE reports the temperature at the lower value.Remember, TRACE psychrometrically calculates the supply air temperaturebased on the loads in the space. Therefore, reviewing the defined loads mayuncover an input error (poor scheduled, too high value, improper customconstruction, etc.). Another avenue to explore would be the Airflows tab inCreate Rooms. Perhaps airflows were defined. Remember, if airflow isdefined, TRACE will then determine the supply air temperature using thesensible heat equation. If the input airflow is low, TRACE will have to dropthe supply air temperature in order to satisfy the load.
Review questions4. If water-source heat pumps were used for the office spaces
instead of VAV, how would you set up the file so that Offices104 and 105 share a heat pump?
Aside from selecting the water-source heat pump system, you willfirst need to change the cooling coil location from Room to Zone.This can be done through Create Systems and selecting theAdvanced button on the Selection tab. Next, you will have tocreate a zone under the water-source heat pump system andassign Offices 104 and 105 to this zone. You can then assign allother offices to the system. Remember, any room assigneddirectly to the system is also considered a zone.
TRACE™ 700 Learning Series
©Trane a business of Ingersoll Rand Module 06: Additional Features l 15
Review questions
5. If you define a cooling supply air temperature, how will TRACE determine the associated CFM?
TRACE will solve the sensible heat equation using the calculated load and defined cooling supply air temperature to find the CFM.
phone I 608.787.3926
fax I 608.787.3005
email I [email protected]
Web I www.tranecds.com
contact us
TRACE™ 700 Learning Series
©Trane a business of Ingersoll Rand Module 06: Additional Features l 16