Trabajo Costos Metrado

download Trabajo Costos Metrado

of 2

description

academico

Transcript of Trabajo Costos Metrado

COSTOS INDIRECTOSITEMDESCRIPCIONMATERIALUNDUNIT $11.1MaterialesPeso (kg)Longitud (m)Peso(Kg/m)CantMaterialUnidadPeso T.(kg)Canal U 6"x3"x3mm2183.04288.007.5848ASTM A36mAngulo L4" x 3"x 316"119.1618.006.623ASTM A36mCanal U 6"x3"x4,5mm1081.00100.0010.8117ASTM A36mAngulo L 1 1/2" x 1/8 "720.56393.751.8366ASTM A36mAngulo L 3" x3"x3/16"2403.89434.705.5373ASTM A36mTubo cuadrado 4"x 4" x 3/16"539.0439.6513.608ASTM A36mAngulo L 2" x2"x 3/16 "3809.151049.353.63175ASTM A36mAngulo L 3"x3"x 1/4 "3212.43440.667.2981ASTM A36mAngulo L 3" x3"x3/16"521.0994.235.5316ASTM A36mFe liso 1/2" Atiesador109.14109.800.9919ASTM A36mFe liso 1/2" Arriostre402.75405.180.9968ASTM A36mCanal U 12"x3"x3/16"835.0050.0016.708ASTM A36m1.2OtrosArea Util (m2)Peso(Kg/m2)Calaminon T cubierta5907.671001.30045.9Fibra de vidrio21843.932OTROS MATERIALES21843.932.1SOLDADURASupercito diametro deKgCellocordKg2.2PINTURAm2MetradoPintura base de estructurasm2%Sold x VolAnticorrosivo Epoxica2.5millsGlnEsmaltemillsGlnThinerGlnAcabado de estructurasm2%Sold x VolEsmalte Epoxico2.5millsGlnThinnerGlnGratingm2%Sold x VolAmerlock 400millsGlnDiluyenteGlntrapo industrialkg2.3PERNOS Y ACCESORIOSPernos hexagonal ASTM A307 1/4\"-4Grado Unidad

COSTOS DIRECTOS

Hoja3