SAVAIR ENERGY LTD.
Technical Queries: SEL-TQ-FS001-01
PROJECT : Replacement of Process Pump, Fire Water Pump & Fire Water Jet Monitor at ONGC, Ahmedabad Asset.PLANT: ETP Jhalora Effluent transfer pump VENDOR: FLOWSERVE
Sr. Parameters ONGC-ES Compliance By Vendor SAVAIR REMARKS C&T reply1 Manufacturer Name Flowserve2 Model No. 65-40 CPX3153 QTY 2 Nos Vendor to Comply yes4 Capacity (Normal) 60 m3/hr Vendor to Comply yes5 Capacity (Rated) 60 m3/hr 60 m3/hr6 Head (meters) 150 m 150 m7 Discharge pressure 15 kg/cm2g Vendor to Comply yes8 Suction Connection (Site:4") 65 mm/150#/RF9 Discharge Connection (Site:3") 40 mm/150#/RF
10 Rated Speed 1450/2900 Rpm. 2960 Vendor to Comply yes11 Efficiency of Pump 49.90%12 Rated Power (KW) 49 Kw13 Driver Power (kW) 75 kW
14 Liquid Handled
15 Pump Should be confirm ISO 2858/DIN 5199/Din 245616 Operating Temperature Deg C. up to 80 Deg c.17 Arrow Of Pump Rotation on Casing By VendorA Material of construction1 CASE SS316 (ASTM 743 Gr CF8M) A315 CF8M2 IMPELLER SS316 (ASTM 743 Gr CF8M) A890 GR.A1 (DUPLEX)3 SHAFT SS316 (ASTM 276 type 316) SS316 Vendor to Comply yes
4 BASEPLATE M.S FABRICATED Vendor to Comply
5 SHAFT SLEEVE SS (ASTM 743 Gr CF8) SS316 Vendor to Comply SS3166 WEAR RING SS316 /(ASTM 743 Gr CF8M) NA Vendor to Comply Not applicable7 Gland For packing SS 316 (ASTM 743 Gr CF8M)8 Bearing Housing CI (ASTM 48) DI
9 Casing Gasket Compressed non-asbestos fiber
10 Gland Packing
11 Stage Single12 Casing type single stage/Volute Vendor to Comply yes13 Mounting Vendor to Comply Foot14 Split Vendor to Comply Radial split15 Impeller Diameter- RATED 31416 MAXIMUM 32017 MINIMUM 25618 Bearing type & No. DE/NDE Vendor to Comply 6309 / 330919 Lubrication system oil20 Packing type (size & No.) chesterton21 Coupling type / Mfr Flexible spacer / Rathi
22 Sound Level Vendor to Comply yes
23 Weight & overall dimensions Vendor to Comply later24 Performance characteristics of pump E591/0129/225 Accessories of pump
a pressure guage at suction Vendor to Comply not considered
Effluent water with dissolved chemicals/minerals & Traces of crude oil
Heavy duty single M.S. Fabricated (Plate IS 2062 Gr. B or ASTM /A-36 & C Channels ISME 200 as per IS 808)
MS fabricated epoxy painted
TIWA teflon impreganated white non asbestos/graphite impregnated
less than 90dba at a sdistance 1 mtr from pump
3" dial jelly filled, stem mounted range 5m to 10m
b pressure guage at Discharge Vendor to Comply not considered
c Gauge Dampener Vendor to Comply not considered
d Name Plate as per Purchaser demand Vendor to Comply as per Flowserve std
B Electrical Motor
1 Type Sq. Cage Induction Motor yes
2 Make Vendor to Comply yes
3 Duty Contnuous (S1)
4 Model/Frame Vendor to Comply E280M
5 Area of Classification Hazardous Area( Zone 1) Vendor to Comply yes
6 Type of explosion protection EX (d) Vendor to Comply yes
7 Method Of starting ATS starters Vendor to Comply to be confirmed later
8 Rated Power HP/(KW) Vendor to Comply 49
9 BKW at full load Vendor to Comply 60.2
10 Rated Speed Rpm Vendor to Comply 2960
11 Starting current ampere Vendor to Comply later
12 Full load current ampere Vendor to Comply later
13Voltage/Frequency / Phase
Vendor to Comply yes
14 Frequency Vendor to Comply 50Hz
15 Type of bearing (DE & NDE) Vendor to Comply later
16 Number of pole 2 pole Vendor to Comply yes
17Service Factor
Vendor to Comply 1.15
18Ambient Temp/ Temp Rise in° C
Vendor to Comply yes
19Applicable Coad / Standerds
Vendor to Comply IS 2148
20Type of Lubrication
Grease Vendor to Comply yes
21 Full load Torque Vendor to Comply later
22Starting Torque % of full load Torque
Vendor to Comply later
23 Efficiency at 100% load Vendor to Comply later
24 Efficiency at 75%, 50%, 25% load Vendor to Comply later
25Degree Of Protection
Vendor to Comply IP55
26Insulation Class
Vendor to Comply yes
27Starting Method
Vendor to Comply DOL
28Space Heaters watts/Volts
240 Volts AC Vendor to Comply ok
3" dial jelly filled, stem mounted range(1/2" BSP/NPT) range of pump approx 1.4 times rated pressure.1/2" threaded SS valve along with suitable for Pressure Guage
Flameproof Sq. Cage Induction Motor ( energy Efficient)
Vendor to Comply motor is energy Efficient
CGL/KEC/Siemens/NGEF/BBL/GEC/ALSTHOM
415±6% / 50± 3% /
50 ° C / limited to CI "B" insulationIS 325/IS -2148/IS12615/IS-4029m& as per Standerd Specification MV motor
Class F (with temp. rise to class B)
29Maximum No Of Start / Stop Permitted
Vendor to Comply later
30No. of Terminals
3 Vendor to Comply later
31Rotation viewed from NDE
Vendor to Comply ccw from Cpg end
32Coupling/Pully
Vendor to Comply coupling
33Locked Rotor Current % Amps
Vendor to Comply later
34Locked Rotor withstand time- Hot-Secs
Vendor to Comply later
35Locked Rotor withstand time- Cold-Secs
Vendor to Comply later
36Stator/Rotor Time constant minutes
Vendor to Comply later
37Power factor at 100% load
Vendor to Comply later
38Power factor at 75%, 50%, 25% load
Vendor to Comply later
39Brakdown or pull out Torque %
Vendor to Comply later
40GD2 of Motor
Vendor to Comply later
41 GD2 of Loadr Vendor to Comply later42 Starting time (At 100%, 75% V) Sec. Vendor to Comply later
43Canopy to be provided
TEFC, IP-55 (Ex-'d' for Zone 1 Vendor to Comply canopy not considered
44 Cable Size / TypeVendor to Comply
later
45 Fault levelVendor to Comply
later
46 Fan For Motor Cooling Driven By Vendor to Comply ok
47 Yes/No Vendor to Comply
48 Yes/No Vendor to Comply
49 Yes/No Vendor to Comply
50 Yes/No Vendor to Comply
51 Yes/No Vendor to Comply
52 Yes/No Vendor to Comply
53 Yes/No Vendor to Comply
ok
54 Yes/No Vendor to Comply
55 Yes/No Vendor to Comply
56 Yes/No Vendor to Comply
ok
for motor space heater shall be 2CX4 sq. mm (Cu) 1.1 KV PVC/ Armoured Cable
40 KW for 0.25 Sec. for Motor above 30 KW
The terminal box shall be spacious enough and shall be suitable for the cable size as specified by ONGC during drawing approval stage.
as per motor vendor's std
The cable gland shall be DGMS flame proof , double compression type brass nickel-plated type in case of flame proof motors(Ex-'d')
as per motor vendor's std
The cable gland shall be double compression type brass nickel-plated type for Non FLP Motors
as per motor vendor's std
The terminal box shall be suitable for type of enclosures selected for FLP/Non-FLP Motors
as per motor vendor's std
The motor shall be painted with corrosion resistant epoxy paint of light grey;grade 631 as per IS:5
as per motor vendor's std
On- line Greasing arrangement shall be provided for motors offered.
as per motor vendor's std
Space heater of sufficient capacity shall be provided for the motors above 30KW
Terminal box shall be rotatable through 360º at 90º interval
as per motor vendor's std
Energy Efficient Motor Supplied(Efficiency guaranteed as per IS:12615)
as per motor vendor's std
he flameproof motor shall be in accordance with IS:2148 and suitable for Zone1/Zone2 Gas groupIIA/IIB and temp.class T3
57 Yes/No
Vendor to Comply
ok
58 Yes/No
Vendor to Comply
ok
C SCOPE OF SUPPLY
1 Filter back wash pump with motor Vendor to Comply ok2 Foundation Bolts (If applicable) Vendor to Comply ok3 First Fill Up Lubricant Vendor to Comply ok4 Discharge Check Valve Vendor to Comply NA5 Companion Flanges Vendor to Comply ok6 Local Control Panel Hazardous Area( Zone 1) Vendor to Comply Not in our scope7 Temperature And Pressure Gauages Vendor to Comply Not in our scope
8Common skid for Motor & Pump with alignment
Vendor to Comply ok
D OTHER DETAILS
1 Special Tools For Maintenance, If Any Vendor to Comply NA2 Commissioning Spares Vendor to Comply ok
The following drawings/certificates shall be furnished for ONGC approval after LOI(prior to manufecturing clearance) a) Motor dimension drg. b) Hot/Cold withstand erstic curves of the motor. c) A Copy of DGMS approval certificate forFLP(Ex-'d') Motor
The following Third party Inspection/QA Deptt.of ONGC(whichever is applicable) release certificates alongwith the supply of the motors: a) Routine test Certificates b) Type test certificate
SAVAIR ENERGY LTD.
Technical Queries: SEL-TQ-FS001-02
PROJECT : Replacement of Process Pump, Fire Water Pump & Fire Water Jet Monitor at ONGC, Ahmedabad Asset.PLANT: CTF Kalol
Sr. Parameters ONGC-ES1 Manufacturer Name2 Model No.3 QTY 3Nos4 Capacity (Normal) 45 m3/hr5 Capacity (Rated) 45 m3/hr6 Head (meters) 150 m7 Discharge pressure 15 kg/cm2g8 Suction Connection Suction Connection(Site:2")9 Discharge Connection Discharge Connection(Site:1.5")
10 Rated Speed 1450/2900 Rpm.11 Efficiency of Pump12 Rated Power (KW)13 Driver Power (kW)
14Liquid Handled
15 Pump Should be confirm ISO 2858/DIN 5199/Din 245616 Operating Temperature Deg C. up to 80 Deg c.17 Arrow Of Pump Rotation on Casing By VendorA Material of construction1 CASE SS316 (ASTM 743 Gr CF8M)2 IMPELLER SS316 (ASTM 743 Gr CF8M)3 SHAFT SS316 (ASTM 276 type 316)
4
BASEPLATE
5 SHAFT SLEEVE SS (ASTM 743 Gr CF8)
6WEAR RING SS316 /(ASTM 743 Gr CF8M)
7Gland For packing SS 316 (ASTM 743 Gr CF8M)
8 Bearing Housing CI (ASTM 48)9 Casing Gasket Compressed non-asbestos fiber
Effluent water with dissolved chemicals/minerals & Traces of crude oil
Heavy duty single M.S. Fabricated (Plate IS 2062 Gr. B or ASTM /A-36 & C Channels ISME 200 as per IS 808)
10Gland Packing
11 Stage12 Casing type single stage/Volute13 Mounting14 Split15 Impeller Diameter- RATED16 MAXIMUM17 MINIMUM18 Bearing type & No. DE/NDE19 Lubrication system20 Packing type (size & No.)21 Coupling type / Mfr
22Sound Level
23 Weight & overall dimensions24 Performance characteristics of pump25 Accessories of pump
apressure guage at suction
b
pressure guage at Discharge
cGauge Dampener
d Name Plate as per Purchaser demandB Electrical Motor
1Type
2Make
3 Duty Contnuous (S1)4 Model/Frame5 Area of Classification Hazardous Area( Zone 1)6 Type of explosion protection EX (d)7 Method Of starting ATS starters8 Rated Power HP/(KW)9 BKW at full load
10 Rated Speed Rpm11 Starting current ampere12 Full load current ampere13 Voltage/Frequency / Phase
TIWA teflon impreganated white non asbestos/graphite impregnated
less than 90dba at a sdistance 1 mtr from pump
3" dial jelly filled, stem mounted range 5m to 10m
3" dial jelly filled, stem mounted range(1/2" BSP/NPT) range of pump approx 1.4 times rated pressure.
1/2" threaded SS valve along with suitable for Pressure Guage
Flameproof Sq. Cage Induction Motor ( energy Efficient)
CGL/KEC/Siemens/NGEF/BBL/GEC/ALSTHOM
415±6% / 50± 3% /
14 Frequency15 Type of bearing (DE & NDE)16 Number of pole 2 pole17 Service Factor18 Ambient Temp/ Temp Rise in° C
19 Applicable Coad / Standerds20 Type of Lubrication Grease21 Full load Torque22 Starting Torque % of full load Torque23 Efficiency at 100% load24 Efficiency at 75%, 50%, 25% load25 Degree Of Protection26 Insulation Class Class F (with temp. rise to class B)27 Starting Method28 Space Heaters watts/Volts 240 Volts AC
29 Maximum No Of Start / Stop Permitted30 No. of Terminals 331 Rotation viewed from NDE32 Coupling/Pully33 Locked Rotor Current % Amps
34 Locked Rotor withstand time- Hot-Secs
35 Locked Rotor withstand time- Cold-Secs36 Stator/Rotor Time constant minutes37 Power factor at 100% load38 Power factor at 75%, 50%, 25% load39 Brakdown or pull out Torque %40 GD2 of Motor41 GD2 of Loadr42 Starting time (At 100%, 75% V) Sec.43 Canopy to be provided TEFC, IP-55 (Ex-'d' for Zone 1
44Cable Size / Type
45Fault level
46 Fan For Motor Cooling Driven By
47
Yes/No
50 ° C / limited to CI "B" insulation
IS 325/IS -2148/IS12615/IS-4029m& as per Standerd Specification MV motor
for motor space heater shall be 2CX4 sq. mm (Cu) 1.1 KV PVC/ Armoured Cable
40 KW for 0.25 Sec. for Motor above 30 KW
The terminal box shall be spacious enough and shall be suitable for the cable size as specified by ONGC during drawing approval stage.
48
Yes/No
49Yes/No
50Yes/No
51Yes/No
52Yes/No
53Yes/No
54Yes/No
55Yes/No
56
Yes/No
57
Yes/No
58
Yes/No
C SCOPE OF SUPPLY
1 Filter back wash pump with motor 2 Foundation Bolts (If applicable)
The cable gland shall be DGMS flame proof , double compression type brass nickel-plated type in case of flame proof motors(Ex-'d')
The cable gland shall be double compression type brass nickel-plated type for Non FLP Motors
The terminal box shall be suitable for type of enclosures selected for FLP/Non-FLP Motors
The motor shall be painted with corrosion resistant epoxy paint of light grey;grade 631 as per IS:5
On- line Greasing arrangement shall be provided for motors offered.
Space heater of sufficient capacity shall be provided for the motors above 30KW
Terminal box shall be rotatable through 360º at 90º interval
Energy Efficient Motor Supplied(Efficiency guaranteed as per IS:12615)
he flameproof motor shall be in accordance with IS:2148 and suitable for Zone1/Zone2 Gas groupIIA/IIB and temp.class T3
The following drawings/certificates shall be furnished for ONGC approval after LOI(prior to manufecturing clearance) a) Motor dimension drg. b) Hot/Cold withstand erstic curves of the motor. c) A Copy of DGMS approval certificate forFLP(Ex-'d') Motor
The following Third party Inspection/QA Deptt.of ONGC(whichever is applicable) release certificates alongwith the supply of the motors: a) Routine test Certificates b) Type test certificate
3 First Fill Up Lubricant4 Discharge Check Valve5 Companion Flanges6 Local Control Panel Hazardous Area( Zone 1)7 Temperature And Pressure Gauages
8D OTHER DETAILS
1 Special Tools For Maintenance, If Any2 Commissioning Spares3 Mandatory Spares 4 Packing & Shipment5 Surface Protection & Painting
6 Inspection And Tests
E DOCUMENTS TO BE ENCLOSED WITH THE OFFER
1 Layout/ G.A Drawing of Pump and Motor, 2 Capacity calculation sheet based on site condition3 Performance Curves of Pump and Motor4 Filled in motor Data Sheet 5 Utility Requirement details,If any6 Civil load details
F DEVIATION IF ANY
Note: 1) Please send the updated data sheets & GAD with load data2) Comply the sheet and send it before 14th Aug, 2012
Common skid for Motor & Pump with alignment
PROJECT : Replacement of Process Pump, Fire Water Pump & Fire Water Jet Monitor at ONGC, Ahmedabad Asset.
By Vendor SAVAIR REMARKS C&T replyFlowserve
65-40 CPX315Vendor to Comply yesVendor to Comply yes
45 m3/hr150 m
Vendor to Comply yes65 mm/150#/RF40 mm/150#/RF
296044.60%41.2 Kw75 kW
Vendor to Comply yes
Vendor to Comply yesVendor to Comply yesVendor to Comply yes
SS316SS316SS316
MS
SS316
SS316 Not applicable
Vendor to Comply SS316 gland plate
Vendor to Comply DIVendor to Comply PTFE
Vendor to Comply ok
SingleVendor to Comply yesVendor to Comply FootVendor to Comply Radial split
308320256
Vendor to Comply 6309 / 3309oil
chestertonFlexible spacer / Rathi
Vendor to Comply yes
Vendor to Comply laterE591/0129/2
Vendor to Comply
Vendor to Comply not considered
Vendor to Comply not considered
Vendor to Comply not considered
Vendor to Comply as per Flowserve std
Sq. Cage Induction Motor yes
Vendor to Comply yes
yesVendor to Comply E280MVendor to Comply yesVendor to Comply yesVendor to Comply to be confirmed laterVendor to Comply 41.2Vendor to Comply 56.2Vendor to Comply 2960Vendor to Comply laterVendor to Comply laterVendor to Comply yes
Vendor to Comply motor is energy Efficient
Vendor to Comply 50HzVendor to Comply laterVendor to Comply yesVendor to Comply 1.15Vendor to Comply yes
Vendor to Comply IS 2148
Vendor to Comply yesVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply IP55Vendor to Comply yesVendor to Comply DOLVendor to Comply ok
Vendor to Comply later
Vendor to Comply laterVendor to Comply ccw from Cpg endVendor to Comply coulingVendor to Comply later
Vendor to Comply later
Vendor to Comply later
Vendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply canopy not considered
Vendor to Complylater
Vendor to Complylater
Vendor to Comply ok
Vendor to Comply
as per motor vendor's std
Vendor to Comply
as per motor vendor's std
Vendor to Complyas per motor vendor's std
Vendor to Complyas per motor vendor's std
Vendor to Complyas per motor vendor's std
Vendor to Complyas per motor vendor's std
Vendor to Complyok
Vendor to Complyas per motor vendor's std
Vendor to Complyas per motor vendor's std
Vendor to Comply
ok
Vendor to Comply
ok
Vendor to Comply
ok
Vendor to Comply okVendor to Comply ok
Vendor to Comply okVendor to Comply NAVendor to Comply okVendor to Comply Not in our scopeVendor to Comply Not in our scope
Vendor to Comply ok
Vendor to Comply NAVendor to Comply okVendor to Comply okVendor to Comply okVendor to Comply okVendor to Comply ok
Vendor to Comply okVendor to Comply okVendor to Comply okVendor to Comply laterVendor to Comply NAVendor to Comply ok
SAVAIR ENERGY LTD.
Technical Queries: SEL-TQ-FS001-04
PROJECT : Replacement of Process Pump, Fire Water Pump & Fire Water Jet Monitor at ONGC, Ahmedabad Asset.PLANT:ETP II Kalol channel water transfer pump
Sr. Parameters ONGC-ES1 Manufacturer Name2 Model No.3 QTY 2 Nos4 Capacity (Normal) 3.96 m3/hr5 Capacity (Rated) 3.96 m3/hr6 Head (meters) 25 m7 Discharge pressure 2.5 kg/cm2g8 Suction Connection Suction Connection(Site:1")9 Discharge Connection Discharge Connection(Site:0.5")
10 Rated Speed 1450/2900 Rpm.11 Efficiency of Pump12 Rated Power (KW)13 Driver Power (kW)14 Liquid Handled Channel water transfer pump15 Pump Should be confirm ISO 2858/DIN 5199/Din 245616 Operating Temperature Deg C. up to 80 Deg c.17 Arrow Of Pump Rotation on Casing By VendorA Material of construction1 CASE SS316 (ASTM 743 Gr CF8M)2 IMPELLER SS316 (ASTM 743 Gr CF8M)3 SHAFT SS316 (ASTM 276 type 316)
4 BASEPLATE
5 SHAFT SLEEVE SS (ASTM 743 Gr CF8)6 WEAR RING SS316 /(ASTM 743 Gr CF8M)7 Gland For packing SS 316 (ASTM 743 Gr CF8M)8 Bearing Housing CI (ASTM 48)9 Casing Gasket Compressed non-asbestos fiber
10 Gland Packing
11 Stage12 Casing type single stage/Volute13 Mounting14 Split15 Impeller Diameter- RATED16 MAXIMUM
Heavy duty single M.S. Fabricated (Plate IS 2062 Gr. B or ASTM /A-36 & C Channels ISME 200 as per IS 808)
TIWA teflon impreganated white non asbestos/graphite impregnated
17 MINIMUM18 Bearing type & No. DE/NDE19 Lubrication system20 Packing type (size & No.)21 Coupling type / Mfr
22 Sound Level
23 Weight & overall dimensions24 Performance characteristics of pump25 Accessories of pump
a pressure guage at suction
b pressure guage at Discharge
c Gauge Dampener
d Name Plate as per Purchaser demand
B Electrical Motor
1 Type
2 Make
3 Duty Contnuous (S1)4 Model/Frame5 Area of Classification Hazardous Area( Zone 1)6 Type of explosion protection EX (d)7 Method Of starting DOL8 Rated Power HP/(KW)9 BKW at full load
10 Rated Speed Rpm11 Starting current ampere12 Full load current ampere13 Voltage/Frequency / Phase14 Frequency15 Type of bearing (DE & NDE)16 Number of pole 2 pole17 Service Factor18 Ambient Temp/ Temp Rise in° C
19Applicable Coad / Standerds
less than 90dba at a sdistance 1 mtr from pump
3" dial jelly filled, stem mounted range 5m to 10m
3" dial jelly filled, stem mounted range(1/2" BSP/NPT) range of pump approx 1.4 times rated pressure.
1/2" threaded SS valve along with suitable for Pressure Guage
Flameproof Sq. Cage Induction Motor ( energy Efficient)
CGL/KEC/Siemens/NGEF/BBL/GEC/ALSTHOM
415±6% / 50± 3% /
50 ° C / limited to CI "B" insulation
IS 325/IS -2148/IS12615/IS-4029m& as per Standerd Specification MV motor
20 Type of Lubrication Grease21 Full load Torque22 Starting Torque % of full load Torque23 Efficiency at 100% load24 Efficiency at 75%, 50%, 25% load25 Degree Of Protection26 Insulation Class Class F (with temp. rise to class B)27 Starting Method28 Space Heaters watts/Volts 240 Volts AC29 Maximum No Of Start / Stop Permitted30 No. of Terminals 331 Rotation viewed from NDE32 Coupling/Pully33 Locked Rotor Current % Amps34 Locked Rotor withstand time- Hot-Secs35 Locked Rotor withstand time- Cold-Secs36 Stator/Rotor Time constant minutes37 Power factor at 100% load38 Power factor at 75%, 50%, 25% load39 Brakdown or pull out Torque %40 GD2 of Motor41 GD2 of Loadr42 Starting time (At 100%, 75% V) Sec.
43Canopy to be provided
TEFC, IP-55 (Ex-'d' for Zone 1
44 Cable Size / Type
45 Fault level
46 Fan For Motor Cooling Driven By
47 Yes/No
48 Yes/No
49 Yes/No
50 Yes/No
51 Yes/No
52 Yes/No
for motor space heater shall be 2CX4 sq. mm (Cu) 1.1 KV PVC/ Armoured Cable
40 KW for 0.25 Sec. for Motor above 30 KW
The terminal box shall be spacious enough and shall be suitable for the cable size as specified by ONGC during drawing approval stage.
The cable gland shall be DGMS flame proof , double compression type brass nickel-plated type in case of flame proof motors(Ex-'d')
The cable gland shall be double compression type brass nickel-plated type for Non FLP Motors
The terminal box shall be suitable for type of enclosures selected for FLP/Non-FLP Motors
The motor shall be painted with corrosion resistant epoxy paint of light grey;grade 631 as per IS:5
On- line Greasing arrangement shall be provided for motors offered.
53 Yes/No
54 Yes/No
55 Yes/No
56 Yes/No
57 Yes/No
58 Yes/No
C SCOPE OF SUPPLY
1 Filter back wash pump with motor 2 Foundation Bolts (If applicable)3 First Fill Up Lubricant4 Discharge Check Valve5 Companion Flanges6 Local Control Panel Hazardous Area( Zone 1)7 Temperature And Pressure Gauages8 Common skid for Motor & Pump with alignment
D OTHER DETAILS
1 Special Tools For Maintenance, If Any2 Commissioning Spares3 Mandatory Spares 4 Packing & Shipment5 Surface Protection & Painting
6 Inspection And Tests
E DOCUMENTS TO BE ENCLOSED WITH THE OFFER
1 Layout/ G.A Drawing of Pump and Motor, 2 Capacity calculation sheet based on site condition3 Performance Curves of Pump and Motor4 Filled in motor Data Sheet 5 Utility Requirement details,If any6 Civil load details
F DEVIATION IF ANY
Note: 1) Please send the updated data sheets & GAD with load data
Space heater of sufficient capacity shall be provided for the motors above 30KW
Terminal box shall be rotatable through 360º at 90º interval
Energy Efficient Motor Supplied(Efficiency guaranteed as per IS:12615)
he flameproof motor shall be in accordance with IS:2148 and suitable for Zone1/Zone2 Gas groupIIA/IIB and temp.class T3
The following drawings/certificates shall be furnished for ONGC approval after LOI(prior to manufecturing clearance) a) Motor dimension drg. b) Hot/Cold withstand erstic curves of the motor. c) A Copy of DGMS approval certificate forFLP(Ex-'d') Motor
The following Third party Inspection/QA Deptt.of ONGC(whichever is applicable) release certificates alongwith the supply of the motors: a) Routine test Certificates b) Type test certificate
PROJECT : Replacement of Process Pump, Fire Water Pump & Fire Water Jet Monitor at ONGC, Ahmedabad Asset.
By Vendor SAVAIR REMARK C&T replyFlowserve
40-25 CPX125Vendor to Comply yesVendor to Comply yes
4 m3/hr25 m
Vendor to Comply yes40 mm/150#/RF25 mm/150#/RF
284023.60%1.14 Kw2.2 kW
Vendor to Comply yesVendor to Comply yesVendor to Comply yesVendor to Comply yes
A315 CF8MA890 GR.A1 (DUPLEX)
SS316
M.S FABRICATED
SS316NA Vendor to Comply NA
Vendor to ComplyVendor to Comply DIVendor to Comply PTFE
Vendor to Comply OK
SingleVendor to Comply yesVendor to Comply FootVendor to Comply Radial split
136140
98Vendor to Comply 6207 / 3306
oilchesterton
Flexible spacer / Rathi
Vendor to Comply YES
Vendor to Comply laterE591/0001/1
Vendor to Comply
Vendor to Comply not considered
Vendor to Comply not considered
Vendor to Comply not considered
Vendor to Comply
Vendor to ComplyVendor to Comply
Sq. Cage Induction Motor yes
Vendor to Comply yes
Vendor to Comply E90LVendor to Comply yesVendor to Comply yesVendor to Comply yesVendor to Comply 1.14Vendor to Comply 1.69Vendor to Comply 2840Vendor to Comply laterVendor to Comply laterVendor to Comply yesVendor to Comply 50HzVendor to Comply laterVendor to Comply yesVendor to Comply 1.15Vendor to Comply yes
Vendor to Comply IS-2148
as per Flowserve std
Vendor to Comply motor is energy Efficient
Vendor to Comply yesVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply IP55Vendor to Comply yesVendor to Comply DOLVendor to Comply okVendor to Comply laterVendor to Comply laterVendor to Comply ccw from Cpg endVendor to Comply couplingVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply later
Vendor to Comply
Vendor to Complylater
Vendor to Complylater
Vendor to Comply ok
Vendor to Comply
Vendor to Comply
Vendor to Comply
Vendor to Comply
Vendor to Comply
Vendor to Comply
canopy not considered
as per motor vendor's std
as per motor vendor's std
as per motor vendor's std
as per motor vendor's std
as per motor vendor's std
as per motor vendor's std
Vendor to Complyok
Vendor to Comply
Vendor to Comply
Vendor to Complyok
Vendor to Comply
ok
Vendor to Comply
ok
Vendor to Comply okVendor to Comply okVendor to Comply okVendor to Comply NAVendor to Comply okVendor to Comply Not in our scopeVendor to Comply Not in our scopeVendor to Comply ok
Vendor to Comply NAVendor to Comply okVendor to Comply okVendor to Comply okVendor to Comply okVendor to Comply ok
Vendor to Comply okVendor to Comply okVendor to Comply okVendor to Comply laterVendor to Comply NAVendor to Comply ok
as per motor vendor's std
as per motor vendor's std
SAVAIR ENERGY LTD.
Technical Queries: SEL-TQ-FS001-05
PROJECT : Replacement of Process Pump, Fire Water Pump & Fire Water Jet Monitor at ONGC, Ahmedabad Asset.PLANT:CWIP I Kalol booster pump
Sr. Parameters ONGC-ES1 Manufacturer Name2 Model No.3 QTY 3 Nos4 Capacity (Normal) 51.01 m3/hr5 Capacity (Rated) 51.01 m3/hr6 Head (meters)7 Discharge pressure 2 kg/cm2g8 Suction Connection Suction Connection(Site:1")9 Discharge Connection Discharge Connection(Site:0.5")
10 Rated Speed 1450/2900 Rpm.11 Efficiency of Pump12 Rated Power (KW)13 Driver Power (kW)14 Liquid Handled15 Pump Should be confirm ISO 2858/DIN 5199/Din 245616 Operating Temperature Deg C. up to 80 Deg c.17 Arrow Of Pump Rotation on Casing By VendorA Material of construction1 CASE SS316 (ASTM 743 Gr CF8M)2 IMPELLER SS316 (ASTM 743 Gr CF8M)3 SHAFT SS316 (ASTM 276 type 316)
4 BASEPLATE
5 SHAFT SLEEVE SS (ASTM 743 Gr CF8)6 WEAR RING SS316 /(ASTM 743 Gr CF8M)7 Gland For packing SS 316 (ASTM 743 Gr CF8M)8 Bearing Housing CI (ASTM 48)9 Casing Gasket Compressed non-asbestos fiber
10 Gland Packing
11 Stage12 Casing type single stage/Volute13 Mounting14 Split
Heavy duty single M.S. Fabricated (Plate IS 2062 Gr. B or ASTM /A-36 & C Channels ISME 200 as per IS 808)
TIWA teflon impreganated white non asbestos/graphite impregnated
15 Impeller Diameter- RATED16 MAXIMUM17 MINIMUM18 Bearing type & No. DE/NDE19 Lubrication system20 Packing type (size & No.)21 Coupling type / Mfr
22 Sound Level
23 Weight & overall dimensions24 Performance characteristics of pump25 Accessories of pump
a pressure guage at suction
b pressure guage at Discharge
c Gauge Dampener
d Name Plate as per Purchaser demand
B Electrical Motor
1 Type
2 Make
3 Duty Contnuous (S1)
4 Model/Frame
5 Area of Classification Hazardous Area( Zone 1)
6 Type of explosion protection EX (d)
7 Method Of starting DOL starter
8 Rated Power HP/(KW)
9 BKW at full load
10 Rated Speed Rpm
less than 90dba at a sdistance 1 mtr from pump
3" dial jelly filled, stem mounted range 5m to 10m
3" dial jelly filled, stem mounted range(1/2" BSP/NPT) range of pump approx 1.4 times rated pressure.
1/2" threaded SS valve along with suitable for Pressure Guage
Flameproof Sq. Cage Induction Motor ( energy Efficient)
CGL/KEC/Siemens/NGEF/BBL/GEC/ALSTHOM
11 Starting current ampere
12 Full load current ampere
13Voltage/Frequency / Phase
14 Frequency
15 Type of bearing (DE & NDE)
16 Number of pole 2 pole
17Service Factor
18Ambient Temp/ Temp Rise in° C
19Applicable Coad / Standerds
20Type of Lubrication
Grease
21Full load Torque
22Starting Torque % of full load Torque
23Efficiency at 100% load
24Efficiency at 75%, 50%, 25% load
25Degree Of Protection
26Insulation Class
Class F (with temp. rise to class B)
27Starting Method
28Space Heaters watts/Volts
240 Volts AC
29Maximum No Of Start / Stop Permitted
30No. of Terminals
3
31Rotation viewed from NDE
32Coupling/Pully
415±6% / 50± 3% /
50 ° C / limited to CI "B" insulation
IS 325/IS -2148/IS12615/IS-4029m& as per Standerd Specification MV motor
33Locked Rotor Current % Amps
34Locked Rotor withstand time- Hot-Secs
35Locked Rotor withstand time- Cold-Secs
36Stator/Rotor Time constant minutes
37Power factor at 100% load
38Power factor at 75%, 50%, 25% load
39Brakdown or pull out Torque %
40GD2 of Motor
41GD2 of Loadr
42Starting time (At 100%, 75% V) Sec.
43Canopy to be provided
TEFC, IP-55 (Ex-'d' for Zone 1
44 Cable Size / Type
45 Fault level
46Fan For Motor Cooling Driven By
47 Yes/No
48 Yes/No
49 Yes/No
50 Yes/No
for motor space heater shall be 2CX4 sq. mm (Cu) 1.1 KV PVC/ Armoured Cable
40 KW for 0.25 Sec. for Motor above 30 KW
The terminal box shall be spacious enough and shall be suitable for the cable size as specified by ONGC during drawing approval stage.
The cable gland shall be DGMS flame proof , double compression type brass nickel-plated type in case of flame proof motors(Ex-'d')
The cable gland shall be double compression type brass nickel-plated type for Non FLP Motors
The terminal box shall be suitable for type of enclosures selected for FLP/Non-FLP Motors
51 Yes/No
52 Yes/No
53 Yes/No
54 Yes/No
55 Yes/No
56 Yes/No
57 Yes/No
58 Yes/No
C SCOPE OF SUPPLY
1Filter back wash pump with motor
2Foundation Bolts (If applicable)
3First Fill Up Lubricant
4Discharge Check Valve
5Companion Flanges
6Local Control Panel
Hazardous Area( Zone 1)
The motor shall be painted with corrosion resistant epoxy paint of light grey;grade 631 as per IS:5
On- line Greasing arrangement shall be provided for motors offered.
Space heater of sufficient capacity shall be provided for the motors above 30KW
Terminal box shall be rotatable through 360º at 90º interval
Energy Efficient Motor Supplied(Efficiency guaranteed as per IS:12615)
he flameproof motor shall be in accordance with IS:2148 and suitable for Zone1/Zone2 Gas groupIIA/IIB and temp.class T3
The following drawings/certificates shall be furnished for ONGC approval after LOI(prior to manufecturing clearance) a) Motor dimension drg. b) Hot/Cold withstand erstic curves of the motor. c) A Copy of DGMS approval certificate forFLP(Ex-'d') Motor
The following Third party Inspection/QA Deptt.of ONGC(whichever is applicable) release certificates alongwith the supply of the motors: a) Routine test Certificates b) Type test certificate
7Temperature And Pressure Gauages
8
D OTHER DETAILS
1Special Tools For Maintenance, If Any
2Commissioning Spares
3Mandatory Spares
4Packing & Shipment
5Surface Protection & Painting
6Inspection And Tests
E DOCUMENTS TO BE ENCLOSED WITH THE OFFER
1Layout/ G.A Drawing of Pump and Motor,
2Capacity calculation sheet based on site condition
3Performance Curves of Pump and Motor
4Filled in motor Data Sheet
5Utility Requirement details,If any
6Civil load details
F DEVIATION IF ANY
Note: 1) Please send the updated data sheets & GAD with load data2) Comply the sheet and send it before 14th Aug, 2012
Common skid for Motor & Pump with alignment
PROJECT : Replacement of Process Pump, Fire Water Pump & Fire Water Jet Monitor at ONGC, Ahmedabad Asset.
BY Vendor SAVAIR REMARK C&T replyFlowserve
80-50 CPX125Vendor to Comply yesVendor to Comply yes
51 m3/hr20 m
Vendor to Comply yes80 mm/150#/RF50 mm/150#/RF
290064.40%4.31 Kw5.5 kW
Vendor to Comply yesVendor to Comply yesVendor to Comply yesVendor to Comply yes
A216 WCBA890 GR.A1 (DUPLEX)
SS316
M.S FABRICATED
SS316NA NA
Vendor to ComplyVendor to Comply DIVendor to Comply PTFE
Vendor to Comply ok
SingleVendor to Comply yesVendor to Comply FootVendor to Comply Radial split
12914098
Vendor to Comply 6207 / 3306oil
chestertonFlexible spacer / Rathi
Vendor to Comply yes
Vendor to Comply laterE591/0004/1
Vendor to Comply
Vendor to Comply not considered
Vendor to Comply not considered
Vendor to Comply not considered
Vendor to Comply
yes
Vendor to Comply yes
Vendor to Comply E132M
Vendor to Comply yes
Vendor to Comply yes
Vendor to Comply yes
Vendor to Comply 4.31
Vendor to Comply 5.12
Vendor to Comply 2900
as per Flowserve std
Sq. Cage Induction Motor
Vendor to Comply motor is energy Efficient
Vendor to Comply later
Vendor to Comply later
Vendor to Comply yes
Vendor to Comply 50Hz
Vendor to Comply later
Vendor to Comply yes
Vendor to Comply 1.15
Vendor to Comply yes
Vendor to Comply IS-2148
Vendor to Comply yes
Vendor to Comply later
Vendor to Comply later
Vendor to Comply later
Vendor to Comply later
Vendor to Comply IP 55
Vendor to Comply yes
Vendor to Comply DOL
Vendor to Comply ok
Vendor to Comply later
Vendor to Comply later
Vendor to Comply later
Vendor to Comply later
Vendor to Comply later
Vendor to Comply later
Vendor to Comply later
Vendor to Comply later
Vendor to Comply later
Vendor to Comply later
Vendor to Comply later
Vendor to Comply later
Vendor to Comply later
Vendor to Comply later
Vendor to Comply
Vendor to Complylater
Vendor to Complylater
Vendor to Complyok
Vendor to Comply
Vendor to Comply
Vendor to Comply
Vendor to Comply
canopy not considered
as per motor vendor's std
as per motor vendor's std
as per motor vendor's std
as per motor vendor's std
Vendor to Comply
Vendor to Comply
Vendor to Complyok
Vendor to Comply
Vendor to Comply
Vendor to Comply
ok
Vendor to Comply
ok
Vendor to Comply
ok
Vendor to Comply ok
Vendor to Comply ok
Vendor to Comply ok
Vendor to Comply NA
Vendor to Comply ok
Vendor to Comply Not in our scope
as per motor vendor's std
as per motor vendor's std
as per motor vendor's std
as per motor vendor's std
Vendor to Comply Not in our scope
Vendor to Comply ok
Vendor to Comply NA
Vendor to Comply ok
Vendor to Comply ok
Vendor to Comply ok
Vendor to Comply ok
Vendor to Comply ok
Vendor to Comply ok
Vendor to Comply ok
Vendor to Comply ok
Vendor to Comply later
Vendor to Comply NA
Vendor to Comply ok
SAVAIR ENERGY LTD.
Technical Queries: SEL-TQ-FS001-06
PROJECT : Replacement of Process Pump, Fire Water Pump & Fire Water Jet Monitor at ONGC, Ahmedabad Asset.PLANT: CWIP II Kalol booster pump
Sr. Parameters ONGC-ES BY Vendor1 Manufacturer Name Flowserve2 Model No. 80-50 CPX1253 QTY 4 Nos4 Capacity (Normal) 51.01 m3/hr5 Capacity (Rated) 51.01 m3/hr 51 m3/hr6 Head (meters) 20 m7 Discharge pressure 2 kg/cm2g8 Suction Connection Suction Connection(Site:3") 80 mm/150#/RF9 Discharge Connection Discharge Connection(Site:2") 50 mm/150#/RF
10 Rated Speed 1450/2900 Rpm. 290011 Efficiency of Pump 64.40%12 Rated Power (KW) 4.31 Kw13 Driver Power (kW) 5.5 kW14 Liquid Handled15 Pump Should be confirm ISO 2858/DIN 5199/Din 245616 Operating Temperature Deg C. up to 80 Deg c.17 Arrow Of Pump Rotation on Casing By VendorA Material of construction1 CASE SS316 (ASTM 743 Gr CF8M) A216 WCB2 IMPELLER SS316 (ASTM 743 Gr CF8M) A890 GR.A1 (DUPLEX)3 SHAFT SS316 (ASTM 276 type 316) SS316
4 BASEPLATE M.S FABRICATED
5 SHAFT SLEEVE SS (ASTM 743 Gr CF8) SS3166 WEAR RING SS316 /(ASTM 743 Gr CF8M) NA7 Gland For packing SS 316 (ASTM 743 Gr CF8M)8 Bearing Housing CI (ASTM 48)9 Casing Gasket Compressed non-asbestos fiber
10 Gland Packing
11 Stage Single12 Casing type single stage/Volute13 Mounting14 Split
Heavy duty single M.S. Fabricated (Plate IS 2062 Gr. B or ASTM /A-36 & C Channels ISME 200 as per IS 808)
TIWA teflon impreganated white non asbestos/graphite impregnated
15 Impeller Diameter- RATED 12916 MAXIMUM 14017 MINIMUM 9818 Bearing type & No. DE/NDE19 Lubrication system oil20 Packing type (size & No.) chesterton21 Coupling type / Mfr Flexible spacer / Rathi
22 Sound Level
23 Weight & overall dimensions24 Performance characteristics of pump E591/0004/125 Accessories of pump
a pressure guage at suction
b pressure guage at Discharge
c Gauge Dampener
d Name Plate as per Purchaser demandB Electrical Motor
1 Type
2 Make
3 Duty Contnuous (S1)
4 Model/Frame
5 Area of Classification Hazardous Area( Zone 1)
6 Type of explosion protection EX (d)
7 Method Of starting DOL starter
8 Rated Power HP/(KW)
9 BKW at full load
10 Rated Speed Rpm
11 Starting current ampere
less than 90dba at a sdistance 1 mtr from pump
3" dial jelly filled, stem mounted range 5m to 10m
3" dial jelly filled, stem mounted range(1/2" BSP/NPT) range of pump approx 1.4 times rated pressure.
1/2" threaded SS valve along with suitable for Pressure Guage
Flameproof Sq. Cage Induction Motor ( energy Efficient)
Sq. Cage Induction Motor
CGL/KEC/Siemens/NGEF/BBL/GEC/ALSTHOM
12 Full load current ampere
13Voltage/Frequency / Phase
14 Frequency
15 Type of bearing (DE & NDE)
16 Number of pole 2 pole
17Service Factor
18Ambient Temp/ Temp Rise in° C
19Applicable Coad / Standerds
20Type of Lubrication
Grease
21Full load Torque
22Starting Torque % of full load Torque
23Efficiency at 100% load
24Efficiency at 75%, 50%, 25% load
25Degree Of Protection
26Insulation Class
Class F (with temp. rise to class B)
27Starting Method
28Space Heaters watts/Volts
240 Volts AC
29Maximum No Of Start / Stop Permitted
30No. of Terminals
3
31Rotation viewed from NDE
32Coupling/Pully
33Locked Rotor Current % Amps
415±6% / 50± 3% /
50 ° C / limited to CI "B" insulation
IS 325/IS -2148/IS12615/IS-4029m& as per Standerd Specification MV motor
34Locked Rotor withstand time- Hot-Secs
35Locked Rotor withstand time- Cold-Secs
36Stator/Rotor Time constant minutes
37Power factor at 100% load
38Power factor at 75%, 50%, 25% load
39Brakdown or pull out Torque %
40GD2 of Motor
41GD2 of Loadr
42Starting time (At 100%, 75% V) Sec.
43Canopy to be provided
TEFC, IP-55 (Ex-'d' for Zone 1
44 Cable Size / Type
45 Fault level
46Fan For Motor Cooling Driven By
47 Yes/No
48 Yes/No
49 Yes/No
50 Yes/No
51 Yes/No
for motor space heater shall be 2CX4 sq. mm (Cu) 1.1 KV PVC/ Armoured Cable
40 KW for 0.25 Sec. for Motor above 30 KW
The terminal box shall be spacious enough and shall be suitable for the cable size as specified by ONGC during drawing approval stage.
The cable gland shall be DGMS flame proof , double compression type brass nickel-plated type in case of flame proof motors(Ex-'d')
The cable gland shall be double compression type brass nickel-plated type for Non FLP Motors
The terminal box shall be suitable for type of enclosures selected for FLP/Non-FLP Motors
The motor shall be painted with corrosion resistant epoxy paint of light grey;grade 631 as per IS:5
52 Yes/No
53 Yes/No
54 Yes/No
55 Yes/No
56 Yes/No
57 Yes/No
58 Yes/No
C SCOPE OF SUPPLY
1Filter back wash pump with motor
2Foundation Bolts (If applicable)
3First Fill Up Lubricant
4Discharge Check Valve
5Companion Flanges
6Local Control Panel
Hazardous Area( Zone 1)
7Temperature And Pressure Gauages
On- line Greasing arrangement shall be provided for motors offered.
Space heater of sufficient capacity shall be provided for the motors above 30KW
Terminal box shall be rotatable through 360º at 90º interval
Energy Efficient Motor Supplied(Efficiency guaranteed as per IS:12615)
he flameproof motor shall be in accordance with IS:2148 and suitable for Zone1/Zone2 Gas groupIIA/IIB and temp.class T3
The following drawings/certificates shall be furnished for ONGC approval after LOI(prior to manufecturing clearance) a) Motor dimension drg. b) Hot/Cold withstand erstic curves of the motor. c) A Copy of DGMS approval certificate forFLP(Ex-'d') Motor
The following Third party Inspection/QA Deptt.of ONGC(whichever is applicable) release certificates alongwith the supply of the motors: a) Routine test Certificates b) Type test certificate
8
D OTHER DETAILS
1Special Tools For Maintenance, If Any
2Commissioning Spares
3Mandatory Spares
4Packing & Shipment
5Surface Protection & Painting
6Inspection And Tests
E DOCUMENTS TO BE ENCLOSED WITH THE OFFER
1Layout/ G.A Drawing of Pump and Motor,
2Capacity calculation sheet based on site condition
3Performance Curves of Pump and Motor
4Filled in motor Data Sheet
5Utility Requirement details,If any
6Civil load details
F DEVIATION IF ANY
Note: 1) Please send the updated data sheets & GAD with load data2) Comply the sheet and send it before 14th Aug, 2012
Common skid for Motor & Pump with alignment
PROJECT : Replacement of Process Pump, Fire Water Pump & Fire Water Jet Monitor at ONGC, Ahmedabad Asset.
SAVAIR REMARK C&T reply
Vendor to Comply yesVendor to Comply yes
Vendor to Comply yes
Vendor to Comply yesVendor to Comply yesVendor to Comply yesVendor to Comply yes
NAVendor to ComplyVendor to Comply DIVendor to Comply PTFE
Vendor to Comply ok
Vendor to Comply yesVendor to Comply FootVendor to Comply Radial split
Vendor to Comply 6207 / 3306
Vendor to Comply yes
Vendor to Comply later
Vendor to Comply not considered
Vendor to Comply not considered
Vendor to Comply not considered
Vendor to Comply as per Flowserve std
Vendor to Comply
yes
Vendor to Comply yes
Vendor to Comply E132M
Vendor to Comply yes
Vendor to Comply yes
Vendor to Comply yes
Vendor to Comply 4.31
Vendor to Comply 5.12
Vendor to Comply 2900
Vendor to Comply later
Vendor to Comply motor is energy Efficient
Vendor to Comply later
Vendor to Comply yes
Vendor to Comply 50Hz
Vendor to Comply later
Vendor to Comply yes
Vendor to Comply 1.15
Vendor to Comply yes
Vendor to Comply IS-2148
Vendor to Comply yes
Vendor to Comply later
Vendor to Comply later
Vendor to Comply later
Vendor to Comply later
Vendor to Comply IP 55
Vendor to Comply yes
Vendor to Comply DOL
Vendor to Comply ok
Vendor to Comply later
Vendor to Comply later
Vendor to Comply later
Vendor to Comply later
Vendor to Comply later
Vendor to Comply later
Vendor to Comply later
Vendor to Comply later
Vendor to Comply later
Vendor to Comply later
Vendor to Comply later
Vendor to Comply later
Vendor to Comply later
Vendor to Comply later
Vendor to Comply
Vendor to Complylater
Vendor to Complylater
Vendor to Complyok
Vendor to Comply
Vendor to Comply
Vendor to Comply
Vendor to Comply
Vendor to Comply
canopy not considered
as per motor vendor's std
as per motor vendor's std
as per motor vendor's std
as per motor vendor's std
as per motor vendor's std
Vendor to Comply
Vendor to Complyok
Vendor to Comply
Vendor to Comply
Vendor to Comply
ok
Vendor to Comply
ok
Vendor to Comply
ok
Vendor to Comply ok
Vendor to Comply ok
Vendor to Comply ok
Vendor to Comply NA
Vendor to Comply ok
Vendor to Comply Not in our scope
Vendor to Comply Not in our scope
as per motor vendor's std
as per motor vendor's std
as per motor vendor's std
Vendor to Comply ok
Vendor to Comply NA
Vendor to Comply ok
Vendor to Comply ok
Vendor to Comply ok
Vendor to Comply ok
Vendor to Comply ok
Vendor to Comply ok
Vendor to Comply ok
Vendor to Comply ok
Vendor to Comply later
Vendor to Comply NA
Vendor to Comply ok
SAVAIR ENERGY LTD.
Technical Queries: SEL-TQ-FS001-07
PROJECT : Replacement of Process Pump, Fire Water Pump & Fire Water Jet Monitor at ONGC, Ahmedabad Asset.PLANT:ETP II Kalol Filter feed pump
Sr. Parameters ONGC-ES1 Manufacturer Name2 Model No.3 QTY 2 Nos4 Capacity (Normal) 50 m3/hr5 Capacity (Rated) 50 m3/hr6 Head (meters)7 Discharge pressure 10 kg/cm2g8 Suction Connection Suction Connection(Site:2.5")9 Discharge Connection Discharge Connection(Site:2")
10 Rated Speed 1450/2900 Rpm.11 Efficiency of Pump12 Rated Power (KW)13 Driver Power (kW)14 Liquid Handled Filter feed pump with motor15 Pump Should be confirm ISO 2858/DIN 5199/Din 245616 Operating Temperature Deg C. up to 80 Deg c.17 Arrow Of Pump Rotation on Casing By VendorA Material of construction1 CASE SS316 (ASTM 743 Gr CF8M)2 IMPELLER SS316 (ASTM 743 Gr CF8M)3 SHAFT SS316 (ASTM 276 type 316)
4 BASEPLATE
5 SHAFT SLEEVE SS (ASTM 743 Gr CF8)6 WEAR RING SS316 /(ASTM 743 Gr CF8M)7 Gland For packing SS 316 (ASTM 743 Gr CF8M)8 Bearing Housing CI (ASTM 48)
9 Casing Gasket Compressed non-asbestos fiber
10 Gland Packing
11 Stage12 Casing type single stage/Volute13 Mounting
Heavy duty single M.S. Fabricated (Plate IS 2062 Gr. B or ASTM /A-36 & C Channels ISME 200 as per IS 808)
TIWA teflon impreganated white non asbestos/graphite impregnated
14 Split15 Impeller Diameter- RATED16 MAXIMUM17 MINIMUM18 Bearing type & No. DE/NDE19 Lubrication system20 Packing type (size & No.)21 Coupling type / Mfr
22 Sound Level
23 Weight & overall dimensions24 Performance characteristics of pump25 Accessories of pump
a pressure guage at suction
b pressure guage at Discharge
c Gauge Dampener
d Name Plate as per Purchaser demand
B Electrical Motor
1 Type
2 Make
3 Duty Contnuous (S1)4 Model/Frame5 Area of Classification Hazardous Area( Zone 1)6 Type of explosion protection EX (d)7 Method Of starting DOL8 Rated Power HP/(KW)9 BKW at full load
10 Rated Speed Rpm11 Starting current ampere12 Full load current ampere13 Voltage/Frequency / Phase14 Frequency15 Type of bearing (DE & NDE)16 Number of pole 2 pole
less than 90dba at a sdistance 1 mtr from pump
3" dial jelly filled, stem mounted range 5m to 10m
3" dial jelly filled, stem mounted range(1/2" BSP/NPT) range of pump approx 1.4 times rated pressure.
1/2" threaded SS valve along with suitable for Pressure Guage
Flameproof Sq. Cage Induction Motor ( energy Efficient)
CGL/KEC/Siemens/NGEF/BBL/GEC/ALSTHOM
415±6% / 50± 3% /
17 Service Factor
18Ambient Temp/ Temp Rise in° C
19Applicable Coad / Standerds
20 Type of Lubrication Grease21 Full load Torque22 Starting Torque % of full load Torque23 Efficiency at 100% load24 Efficiency at 75%, 50%, 25% load25 Degree Of Protection
26Insulation Class
Class F (with temp. rise to class B)
27 Starting Method28 Space Heaters watts/Volts 240 Volts AC29 Maximum No Of Start / Stop Permitted30 No. of Terminals 331 Rotation viewed from NDE32 Coupling/Pully33 Locked Rotor Current % Amps34 Locked Rotor withstand time- Hot-Secs
35Locked Rotor withstand time- Cold-Secs
36 Stator/Rotor Time constant minutes37 Power factor at 100% load38 Power factor at 75%, 50%, 25% load39 Brakdown or pull out Torque %40 GD2 of Motor41 GD2 of Loadr42 Starting time (At 100%, 75% V) Sec.
43Canopy to be provided
TEFC, IP-55 (Ex-'d' for Zone 1
44 Cable Size / Type
45 Fault level
46 Fan For Motor Cooling Driven By
47 Yes/No
50 ° C / limited to CI "B" insulation
IS 325/IS -2148/IS12615/IS-4029m& as per Standerd Specification MV motor
for motor space heater shall be 2CX4 sq. mm (Cu) 1.1 KV PVC/ Armoured Cable
40 KW for 0.25 Sec. for Motor above 30 KW
The terminal box shall be spacious enough and shall be suitable for the cable size as specified by ONGC during drawing approval stage.
48 Yes/No
49 Yes/No
50 Yes/No
51 Yes/No
52 Yes/No
53 Yes/No
54 Yes/No
55 Yes/No
56 Yes/No
57 Yes/No
58 Yes/No
C SCOPE OF SUPPLY
1 Filter back wash pump with motor 2 Foundation Bolts (If applicable)3 First Fill Up Lubricant
The cable gland shall be DGMS flame proof , double compression type brass nickel-plated type in case of flame proof motors(Ex-'d')
The cable gland shall be double compression type brass nickel-plated type for Non FLP Motors
The terminal box shall be suitable for type of enclosures selected for FLP/Non-FLP Motors
The motor shall be painted with corrosion resistant epoxy paint of light grey;grade 631 as per IS:5
On- line Greasing arrangement shall be provided for motors offered.
Space heater of sufficient capacity shall be provided for the motors above 30KW
Terminal box shall be rotatable through 360º at 90º interval
Energy Efficient Motor Supplied(Efficiency guaranteed as per IS:12615)
he flameproof motor shall be in accordance with IS:2148 and suitable for Zone1/Zone2 Gas groupIIA/IIB and temp.class T3
The following drawings/certificates shall be furnished for ONGC approval after LOI(prior to manufecturing clearance) a) Motor dimension drg. b) Hot/Cold withstand erstic curves of the motor. c) A Copy of DGMS approval certificate forFLP(Ex-'d') Motor
The following Third party Inspection/QA Deptt.of ONGC(whichever is applicable) release certificates alongwith the supply of the motors: a) Routine test Certificates b) Type test certificate
4 Discharge Check Valve5 Companion Flanges6 Local Control Panel Hazardous Area( Zone 1)7 Temperature And Pressure Gauages
8
D OTHER DETAILS
1 Special Tools For Maintenance, If Any2 Commissioning Spares3 Mandatory Spares 4 Packing & Shipment5 Surface Protection & Painting
6 Inspection And Tests
E DOCUMENTS TO BE ENCLOSED WITH THE OFFER
1 Layout/ G.A Drawing of Pump and Motor, 2 Capacity calculation sheet based on site condition3 Performance Curves of Pump and Motor4 Filled in motor Data Sheet 5 Utility Requirement details,If any6 Civil load details
F DEVIATION IF ANY
Note: 1) Please send the updated data sheets & GAD with load data2) Comply the sheet and send it before 14th Aug, 2012
Common skid for Motor & Pump with alignment
PROJECT : Replacement of Process Pump, Fire Water Pump & Fire Water Jet Monitor at ONGC, Ahmedabad Asset.
By Vendor SAVAIR REMARK C&T replyFlowserve
65-40 CPX315Vendor to Comply yesVendor to Comply yes
50 m3/hr100 m
Vendor to Comply yes65 mm/150#/RF40 mm/150#/RF
296046.00%29.6 Kw37 kW
Vendor to Comply yesVendor to Comply yesVendor to Comply yesVendor to Comply yes
A315CF8MA890 GR.A1 (DUPLEX)
SS316
M.S FABRICATED
SS316NA NA
Vendor to ComplyVendor to Comply DI
Vendor to Comply PTFE
Vendor to Comply ok
Singleyes
Foot Foot
Radial Radial split265320256
Vendor to Comply 6309 / 3309oil
chestertonFlexible spacer / Rathi
Vendor to Comply yes
Vendor to Comply laterE591/0129/2
Vendor to Comply
Vendor to Comply not considered
Vendor to Comply not considered
Vendor to Comply not considered
Vendor to Comply as per Flowserve std
Sq. Cage Induction Motor
Vendor to Comply yes
yesVendor to Comply E200LVendor to Comply yesVendor to Comply yesVendor to Comply yesVendor to Comply 29.6Vendor to Comply 34.3Vendor to Comply 2960Vendor to Comply laterVendor to Comply laterVendor to Comply yesVendor to Comply 50HzVendor to Comply laterVendor to Comply yes
Vendor to Comply motor is energy Efficient
Vendor to Comply 1.15
Vendor to Comply yes
Vendor to Comply IS-2148
Vendor to Comply yesVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply IP 55
Vendor to Comply yes
Vendor to Comply DOLVendor to Comply okVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply later
Vendor to Comply later
Vendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply later
Vendor to Comply
Vendor to Complylater
Vendor to Complylater
Vendor to Comply ok
Vendor to Comply
canopy not considered
as per motor vendor's std
Vendor to Comply
Vendor to Comply
Vendor to Comply
Vendor to Comply
Vendor to Comply
Vendor to Complyok
Vendor to Comply
Vendor to Comply
Vendor to Comply
ok
Vendor to Comply
ok
Vendor to Comply
ok
Vendor to Comply okVendor to Comply okVendor to Comply ok
as per motor vendor's std
as per motor vendor's std
as per motor vendor's std
as per motor vendor's std
as per motor vendor's std
as per motor vendor's std
as per motor vendor's std
Vendor to Comply NAVendor to Comply okVendor to Comply Not in our scopeVendor to Comply Not in our scope
Vendor to Comply ok
Vendor to Comply NAVendor to Comply okVendor to Comply okVendor to Comply okVendor to Comply okVendor to Comply ok
Vendor to Comply okVendor to Comply okVendor to Comply okVendor to Comply laterVendor to Comply NAVendor to Comply ok
SAVAIR ENERGY LTD.
Technical Queries: SEL-TQ-FS001-08
PROJECT : Replacement of Process Pump, Fire Water Pump & Fire Water Jet Monitor at ONGC, Ahmedabad Asset.PLANT:: ETP II Kalol Sludge Transfer pump
Sr. Parameters ONGC-ES1 Manufacturer Name2 Model No.3 QTY 1 No.4 Capacity (Normal) 50 m3/hr5 Capacity (Rated) 50 m3/hr6 Head (meters)7 Discharge pressure 5 kg/cm2g8 Suction Connection Suction Connection(Site:2")9 Discharge Connection Discharge Connection(Site:2")
10 Rated Speed 1450/2900 Rpm.11 Efficiency of Pump12 Rated Power (KW)13 Driver Power (kW)14 Liquid Handled15 Pump Should be confirm ISO 2858/DIN 5199/Din 245616 Operating Temperature Deg C. up to 80 Deg c.17 Arrow Of Pump Rotation on Casing By VendorA Material of construction1 CASE SS316 (ASTM 743 Gr CF8M)2 IMPELLER SS316 (ASTM 743 Gr CF8M)3 SHAFT SS316 (ASTM 276 type 316)
4 BASEPLATE
5 SHAFT SLEEVE SS (ASTM 743 Gr CF8)6 WEAR RING SS316 /(ASTM 743 Gr CF8M)7 Gland For packing SS 316 (ASTM 743 Gr CF8M)8 Bearing Housing CI (ASTM 48)9 Casing Gasket Compressed non-asbestos fiber
10 Gland Packing
11 Stage12 Casing type single stage/Volute13 Mounting14 Split15 Impeller Diameter- RATED16 MAXIMUM
Heavy duty single M.S. Fabricated (Plate IS 2062 Gr. B or ASTM /A-36 & C Channels
ISME 200 as per IS 808)
TIWA teflon impreganated white non asbestos/graphite impregnated
17 MINIMUM18 Bearing type & No. DE/NDE19 Lubrication system20 Packing type (size & No.)21 Coupling type / Mfr
22 Sound Level
23 Weight & overall dimensions24 Performance characteristics of pump25 Accessories of pump
a pressure guage at suction
b pressure guage at Discharge
c Gauge Dampener
d Name Plateas per Purchaser demand
B Electrical Motor
1 Type
2 Make
3 Duty Contnuous (S1)4 Model/Frame5 Area of Classification Hazardous Area( Zone 1)6 Type of explosion protection EX (d)7 Method Of starting DOL8 Rated Power HP/(KW)9 BKW at full load
10 Rated Speed Rpm11 Starting current ampere12 Full load current ampere13 Voltage/Frequency / Phase14 Frequency15 Type of bearing (DE & NDE)16 Number of pole 2 pole17 Service Factor18 Ambient Temp/ Temp Rise in° C
19Applicable Coad / Standerds
20 Type of Lubrication Grease21 Full load Torque
less than 90dba at a sdistance 1 mtr from pump
3" dial jelly filled, stem mounted range 5m to 10m
3" dial jelly filled, stem mounted range(1/2" BSP/NPT) range of pump
approx 1.4 times rated pressure.
1/2" threaded SS valve along with suitable for Pressure Guage
Flameproof Sq. Cage Induction Motor ( energy Efficient)
CGL/KEC/Siemens/NGEF/BBL/GEC/ALSTHOM
415±6% / 50± 3% /
50 ° C / limited to CI "B" insulation
IS 325/IS -2148/IS12615/IS-4029m& as per Standerd Specification MV motor
22 Starting Torque % of full load Torque23 Efficiency at 100% load24 Efficiency at 75%, 50%, 25% load25 Degree Of Protection26 Insulation Class Class F (with temp. rise to class B)27 Starting Method28 Space Heaters watts/Volts 240 Volts AC29 Maximum No Of Start / Stop Permitted30 No. of Terminals 331 Rotation viewed from NDE32 Coupling/Pully33 Locked Rotor Current % Amps34 Locked Rotor withstand time- Hot-Secs35 Locked Rotor withstand time- Cold-Secs36 Stator/Rotor Time constant minutes37 Power factor at 100% load38 Power factor at 75%, 50%, 25% load39 Brakdown or pull out Torque %40 GD2 of Motor41 GD2 of Loadr42 Starting time (At 100%, 75% V) Sec.
43Canopy to be provided TEFC, IP-55 (Ex-'d' for Zone 1
44 Cable Size / Type
45 Fault level
46 Fan For Motor Cooling Driven By
47
Yes/No
48Yes/No
49Yes/No
50Yes/No
51Yes/No
for motor space heater shall be 2CX4 sq. mm (Cu) 1.1 KV PVC/ Armoured Cable
40 KW for 0.25 Sec. for Motor above 30 KW
The terminal box shall be spacious enough and shall be suitable for the cable size as specified by ONGC during drawing approval stage.
The cable gland shall be DGMS flame proof , double compression type brass nickel-plated type in case of flame proof motors(Ex-'d')
The cable gland shall be double compression type brass nickel-plated type for Non FLP Motors
The terminal box shall be suitable for type of enclosures selected for FLP/Non-FLP Motors
The motor shall be painted with corrosion resistant epoxy paint of light grey;grade 631 as per IS:5
52Yes/No
53Yes/No
54Yes/No
55Yes/No
56Yes/No
57
Yes/No
58
Yes/No C SCOPE OF SUPPLY
1 Filter back wash pump with motor 2 Foundation Bolts (If applicable)3 First Fill Up Lubricant4 Discharge Check Valve5 Companion Flanges6 Local Control Panel Hazardous Area( Zone 1)7 Temperature And Pressure Gauages
8Common skid for Motor & Pump with alignment
D OTHER DETAILS
1 Special Tools For Maintenance, If Any2 Commissioning Spares3 Mandatory Spares 4 Packing & Shipment5 Surface Protection & Painting
6 Inspection And Tests
E DOCUMENTS TO BE ENCLOSED WITH THE OFFER
1 Layout/ G.A Drawing of Pump and Motor, 2 Capacity calculation sheet based on site condition3 Performance Curves of Pump and Motor4 Filled in motor Data Sheet
On- line Greasing arrangement shall be provided for motors offered.
Space heater of sufficient capacity shall be provided for the motors above 30KW
Terminal box shall be rotatable through 360º at 90º interval
Energy Efficient Motor Supplied(Efficiency guaranteed as per IS:12615)
he flameproof motor shall be in accordance with IS:2148 and suitable for Zone1/Zone2 Gas groupIIA/IIB and temp.class T3
The following drawings/certificates shall be furnished for ONGC approval after LOI(prior to manufecturing clearance) a) Motor dimension drg. b) Hot/Cold withstand erstic curves of the motor. c) A Copy of DGMS approval certificate forFLP(Ex-'d') Motor
The following Third party Inspection/QA Deptt.of ONGC(whichever is applicable) release certificates alongwith the supply of the motors: a) Routine test Certificates b) Type test certificate
5 Utility Requirement details,If any6 Civil load details
F DEVIATION IF ANY
Note: 1) Please send the updated data sheets & GAD with load data2) Comply the sheet and send it before 14th Aug, 2012
PROJECT : Replacement of Process Pump, Fire Water Pump & Fire Water Jet Monitor at ONGC, Ahmedabad Asset.
By Vendor SAVAIR REMARK C&T Flowserve
80-50 CPX200Vendor to Comply yesVendor to Comply yes
50 m3/hr50 m
80 mm/150#/RF50 mm/150#/RF
294065.60%10.4 Kw15 kW
A315CF8MA890 GR.A1 (DUPLEX)
SS316
M.S FABRICATED
SS316NA
DIPTFE
ok
SingleHorizontal yes
Foot FootRadial Radial split
186210
168
oilchesterton
Flexible spacer / Rathi
yes
E591/0015/1
not considered
not considered
not considered
Sq. Cage Induction Motor yes
Vendor to Comply yes
Vendor to Comply E160LVendor to Comply yesVendor to Comply yesVendor to Comply yesVendor to Comply 10.4Vendor to Comply 14.2Vendor to Comply 2940Vendor to Comply laterVendor to Comply laterVendor to Comply yesVendor to Comply 50HzVendor to Comply laterVendor to Comply yesVendor to Comply 1.15Vendor to Comply yes
Vendor to Comply IS-2148
Vendor to Comply yesVendor to Comply later
as per Flowserve std
Vendor to Comply motor is energy
Efficient
Vendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply IP 55Vendor to Comply yesVendor to Comply DOLVendor to Comply okVendor to Comply laterVendor to Comply laterVendor to Comply CCW from cpgVendor to Comply couplingVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply later
Vendor to Comply
Vendor to Comply later
Vendor to Comply later
Vendor to Comply ok
Vendor to Comply
Vendor to Comply
Vendor to Comply
Vendor to Comply
Vendor to Comply
canopy not considered
as per motor vendor's std
as per motor vendor's std
as per motor vendor's std
as per motor vendor's std
as per motor vendor's std
Vendor to Comply
Vendor to Comply ok
Vendor to Comply
Vendor to Comply
Vendor to Comply ok
Vendor to Comply ok
Vendor to Comply ok
Vendor to Comply okVendor to Comply okVendor to Comply okVendor to Comply NAVendor to Comply okVendor to Comply Not in our scopeVendor to Comply Not in our scope
Vendor to Comply ok
Vendor to Comply NAVendor to Comply okVendor to Comply okVendor to Comply okVendor to Comply okVendor to Comply ok
Vendor to Comply okVendor to Comply okVendor to Comply okVendor to Comply later
as per motor vendor's std
as per motor vendor's std
as per motor vendor's std
SAVAIR ENERGY LTD.
Technical Queries: SEL-TQ-FS001-09
PROJECT : Replacement of Process Pump, Fire Water Pump & Fire Water Jet Monitor at ONGC, Ahmedabad Asset.PLANT :ETP I Kalol CONDITIONED WATER TRANSFER PUMP
Sr. Parameters ONGC-ES1 Manufacturer Name2 Model No.3 QTY 1 No.4 Capacity (Normal)5 Capacity (Rated) 100 m3/hr6 Head (meters)7 Discharge pressure 10 kg/cm2g8 Suction Connection Suction Connection(Site:6")9 Discharge Connection Discharge Connection(Site:4")
10 Rated Speed 1450/2900 Rpm.11 Efficiency of Pump12 Rated Power (KW)13 Driver Power (kW)
14 Liquid Handled
15 Pump Should be confirm ISO 2858/DIN 5199/Din 245616 Operating Temperature Deg C. up to 80 Deg c.17 Arrow Of Pump Rotation on Casing By VendorA Material of construction1 CASE SS316 (ASTM 743 Gr CF8M)2 IMPELLER SS316 (ASTM 743 Gr CF8M)3 SHAFT SS316 (ASTM 276 type 316)
4 BASEPLATE
5 SHAFT SLEEVE SS (ASTM 743 Gr CF8)6 WEAR RING SS316 /(ASTM 743 Gr CF8M)7 Gland For packing SS 316 (ASTM 743 Gr CF8M)8 Bearing Housing CI (ASTM 48)9 Casing Gasket Compressed non-asbestos fiber
10 Gland Packing
11 Stage12 Casing type single stage/Volute13 Mounting
CONT. TRANSFER OF TREATED EFFLUENT/WATER
Heavy duty single M.S. Fabricated (Plate IS 2062 Gr. B or ASTM /A-36 & C Channels ISME 200 as per IS 808)
TIWA teflon impreganated white non asbestos/graphite impregnated
14 Split15 Impeller Diameter- RATED16 MAXIMUM17 MINIMUM18 Bearing type & No. DE/NDE19 Lubrication system20 Packing type (size & No.)21 Coupling type / Mfr
22 Sound Level
23 Weight & overall dimensions24 Performance characteristics of pump25 Accessories of pump
a pressure guage at suction
b pressure guage at Discharge
c Gauge Dampener
d Name Plate as per Purchaser demand
B Electrical Motor
1 Type
2 Make
3 Duty Contnuous (S1)4 Model/Frame5 Area of Classification Hazardous Area( Zone 1)6 Type of explosion protection EX (d)7 Method Of starting DOL8 Rated Power HP/(KW)9 BKW at full load
10 Rated Speed Rpm11 Starting current ampere12 Full load current ampere13 Voltage/Frequency / Phase14 Frequency15 Type of bearing (DE & NDE)16 Number of pole 2 pole17 Service Factor
less than 90dba at a sdistance 1 mtr from pump
3" dial jelly filled, stem mounted range 5m to 10m
3" dial jelly filled, stem mounted range(1/2" BSP/NPT) range of pump approx 1.4 times rated pressure.
1/2" threaded SS valve along with suitable for Pressure Guage
Flameproof Sq. Cage Induction Motor ( energy Efficient)
CGL/KEC/Siemens/NGEF/BBL/GEC/ALSTHOM
415±6% / 50± 3% /
18Ambient Temp/ Temp Rise in° C
19Applicable Coad / Standerds
20 Type of Lubrication Grease21 Full load Torque22 Starting Torque % of full load Torque23 Efficiency at 100% load24 Efficiency at 75%, 50%, 25% load25 Degree Of Protection
26Insulation Class
Class F (with temp. rise to class B)
27 Starting Method28 Space Heaters watts/Volts 240 Volts AC29 Maximum No Of Start / Stop Permitted30 No. of Terminals 331 Rotation viewed from NDE32 Coupling/Pully33 Locked Rotor Current % Amps34 Locked Rotor withstand time- Hot-Secs35 Locked Rotor withstand time- Cold-Secs36 Stator/Rotor Time constant minutes37 Power factor at 100% load38 Power factor at 75%, 50%, 25% load39 Brakdown or pull out Torque %40 GD2 of Motor41 GD2 of Loadr42 Starting time (At 100%, 75% V) Sec.
43Canopy to be provided
TEFC, IP-55 (Ex-'d' for Zone 1
44 Cable Size / Type
45 Fault level
46 Fan For Motor Cooling Driven By
47 Yes/No
48 Yes/No
49 Yes/No
50 ° C / limited to CI "B" insulation
IS 325/IS -2148/IS12615/IS-4029m& as per Standerd Specification MV motor
for motor space heater shall be 2CX4 sq. mm (Cu) 1.1 KV PVC/ Armoured Cable
40 KW for 0.25 Sec. for Motor above 30 KW
The terminal box shall be spacious enough and shall be suitable for the cable size as specified by ONGC during drawing approval stage.
The cable gland shall be DGMS flame proof , double compression type brass nickel-plated type in case of flame proof motors(Ex-'d')
The cable gland shall be double compression type brass nickel-plated type for Non FLP Motors
50 Yes/No
51 Yes/No
52 Yes/No
53 Yes/No
54 Yes/No
55 Yes/No
56 Yes/No
57 Yes/No
58 Yes/No
C SCOPE OF SUPPLY
1 Filter back wash pump with motor 2 Foundation Bolts (If applicable)3 First Fill Up Lubricant4 Discharge Check Valve5 Companion Flanges6 Local Control Panel Hazardous Area( Zone 1)7 Temperature And Pressure Gauages8 Common skid for Motor & Pump with alignment
D OTHER DETAILS
1 Special Tools For Maintenance, If Any2 Commissioning Spares3 Mandatory Spares 4 Packing & Shipment5 Surface Protection & Painting
6 Inspection And Tests
E DOCUMENTS TO BE ENCLOSED WITH THE OFFER
1 Layout/ G.A Drawing of Pump and Motor, 2 Capacity calculation sheet based on site condition
The terminal box shall be suitable for type of enclosures selected for FLP/Non-FLP Motors
The motor shall be painted with corrosion resistant epoxy paint of light grey;grade 631 as per IS:5
On- line Greasing arrangement shall be provided for motors offered.
Space heater of sufficient capacity shall be provided for the motors above 30KW
Terminal box shall be rotatable through 360º at 90º interval
Energy Efficient Motor Supplied(Efficiency guaranteed as per IS:12615)
he flameproof motor shall be in accordance with IS:2148 and suitable for Zone1/Zone2 Gas groupIIA/IIB and temp.class T3
The following drawings/certificates shall be furnished for ONGC approval after LOI(prior to manufecturing clearance) a) Motor dimension drg. b) Hot/Cold withstand erstic curves of the motor. c) A Copy of DGMS approval certificate forFLP(Ex-'d') Motor
The following Third party Inspection/QA Deptt.of ONGC(whichever is applicable) release certificates alongwith the supply of the motors: a) Routine test Certificates b) Type test certificate
3 Performance Curves of Pump and Motor4 Filled in motor Data Sheet 5 Utility Requirement details,If any6 Civil load details
F DEVIATION IF ANY
Note: 1) Please send the updated data sheets & GAD with load data2) Comply the sheet and send it before 14th Aug, 2012
PROJECT : Replacement of Process Pump, Fire Water Pump & Fire Water Jet Monitor at ONGC, Ahmedabad Asset.
By Vendor SAVAIR REMARK C&T replyFlowserve
100-65CPX315Vendor to Comply yesVendor to Comply
100 m3/hr yes100 m
10 kg/cm2g100mm/150#/RF65 mm/150#/RF
296058.00%49.9 Kw75 kW
Vendor to Complyyes
Vendor to Comply yes
up to 50 Deg c.Vendor to Comply yes
A315CF8MA890 GR.A1 (DUPLEX)
SS316
M.S FABRICATED
SS316NA NA
Vendor to ComplyVendor to Comply DIVendor to Comply PTFE
Vendor to Comply ok
SingleHorizontal yes
Foot Foot
Radial Radial split262320256
Vendor to Comply 6311 / 3311oil
chestertonFlexible spacer / Rathi
Vendor to Comply yes
Vendor to Comply laterE591/0015/1
Vendor to Comply
Vendor to Comply not considered
Vendor to Comply not considered
Vendor to Comply not considered
Vendor to Comply
Vendor to Comply
Sq. Cage Induction Motor yes
Vendor to Comply yes
Vendor to Comply yesVendor to Comply E280MVendor to Comply yesVendor to Comply yesVendor to Comply yes
75Kw 46.9Vendor to Comply 56.3Vendor to Comply 2960Vendor to Comply laterVendor to Comply laterVendor to Comply yesVendor to Comply 50HzVendor to Comply laterVendor to Comply yesVendor to Comply 1.15
as per Flowserve std
Vendor to Comply motor is energy
Efficient
Vendor to Comply yes
Vendor to Comply IS-2148
Vendor to Comply yesVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply IP 55
Vendor to Comply yes
Vendor to Comply DOLVendor to Comply okVendor to Comply laterVendor to Comply laterVendor to Comply CCW from cpgVendor to Comply couplingVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply later
Vendor to Comply
Vendor to Comply later
Vendor to Comply later
Vendor to Comply ok
Vendor to Comply
Vendor to Comply
Vendor to Comply
canopy not considered
as per motor vendor's std
as per motor vendor's std
as per motor vendor's std
Vendor to Comply
Vendor to Comply
Vendor to Comply
Vendor to Comply ok
Vendor to Comply
Vendor to Comply
Vendor to Comply ok
Vendor to Comply ok
Vendor to Comply ok
Vendor to Comply okVendor to Comply okVendor to Comply okVendor to Comply NAVendor to Comply okVendor to Comply Not in our scopeVendor to Comply Not in our scopeVendor to Comply ok
Vendor to Comply NAVendor to Comply okVendor to Comply okVendor to Comply okVendor to Comply okVendor to Comply ok
Vendor to Comply okVendor to Comply ok
as per motor vendor's std
as per motor vendor's std
as per motor vendor's std
as per motor vendor's std
as per motor vendor's std
SAVAIR ENERGY LTD.
Technical Queries: SEL-TQ-FS001-10
PROJECT : Replacement of Process Pump, Fire Water Pump & Fire Water Jet Monitor at ONGC, Ahmedabad Asset.PLANT: GGS- V -KALOL EEFLUENT DISPATCH PUMP
Sr. Parameters ONGC-ES1 Manufacturer Name2 Model No.3 QTY 1 No.4 Capacity (Normal)5 Capacity (Rated) 45 m3/hr6 Head (meters)7 Discharge pressure 15 kg/cm2g8 Suction Connection Suction Connection(Site:6")9 Discharge Connection Discharge Connection(Site:4")
10 Rated Speed 1450/2900 Rpm.11 Efficiency of Pump12 Rated Power (KW)13 Driver Power (kW)14 Liquid Handled EFFLUENT15 Pump Should be confirm ISO 2858/DIN 5199/Din 2456
16 Operating Temperature Deg C. up to 80 Deg c.
17 Arrow Of Pump Rotation on Casing By VendorA Material of construction1 CASE SS316 (ASTM 743 Gr CF8M)2 IMPELLER SS316 (ASTM 743 Gr CF8M)3 SHAFT SS316 (ASTM 276 type 316)
4 BASEPLATE
5 SHAFT SLEEVE SS (ASTM 743 Gr CF8)6 WEAR RING SS316 /(ASTM 743 Gr CF8M)7 Gland For packing SS 316 (ASTM 743 Gr CF8M)8 Bearing Housing CI (ASTM 48)9 Casing Gasket Compressed non-asbestos fiber
10 Gland Packing
11 Stage12 Casing type Horizontal13 Mounting
Heavy duty single M.S. Fabricated (Plate IS 2062 Gr. B or ASTM /A-36 & C Channels ISME 200 as per IS 808)
TIWA teflon impreganated white non asbestos/graphite impregnated
14 Split15 Impeller Diameter- RATED16 MAXIMUM17 MINIMUM18 Bearing type & No. DE/NDE19 Lubrication system20 Packing type (size & No.)21 Coupling type / Mfr
22 Sound Level
23 Weight & overall dimensions24 Performance characteristics of pump25 Accessories of pump
a pressure guage at suction
b pressure guage at Discharge
c Gauge Dampener
d Name Plate as per Purchaser demand
B Electrical Motor
1 Type
2 Make
3 Duty Contnuous (S1)4 Model/Frame5 Area of Classification Hazardous Area( Zone 1)6 Type of explosion protection EX (d)7 Method Of starting ATS Starter8 Rated Power HP/(KW)9 BKW at full load
10 Rated Speed Rpm11 Starting current ampere12 Full load current ampere13 Voltage/Frequency / Phase14 Frequency15 Type of bearing (DE & NDE)16 Number of pole 2 pole17 Service Factor
less than 90dba at a sdistance 1 mtr from pump
3" dial jelly filled, stem mounted range 5m to 10m
3" dial jelly filled, stem mounted range(1/2" BSP/NPT) range of pump approx 1.4 times rated pressure.
1/2" threaded SS valve along with suitable for Pressure Guage
Flameproof Sq. Cage Induction Motor ( energy Efficient)
CGL/KEC/Siemens/NGEF/BBL/GEC/ALSTHOM
415±6% / 50± 3% /
18Ambient Temp/ Temp Rise in° C
19Applicable Coad / Standerds
20 Type of Lubrication Grease21 Full load Torque22 Starting Torque % of full load Torque23 Efficiency at 100% load24 Efficiency at 75%, 50%, 25% load25 Degree Of Protection
26Insulation Class
Class F (with temp. rise to class B)
27 Starting Method28 Space Heaters watts/Volts 240 Volts AC29 Maximum No Of Start / Stop Permitted30 No. of Terminals 331 Rotation viewed from NDE32 Coupling/Pully33 Locked Rotor Current % Amps34 Locked Rotor withstand time- Hot-Secs35 Locked Rotor withstand time- Cold-Secs36 Stator/Rotor Time constant minutes37 Power factor at 100% load38 Power factor at 75%, 50%, 25% load39 Brakdown or pull out Torque %40 GD2 of Motor41 GD2 of Loadr42 Starting time (At 100%, 75% V) Sec.
43Canopy to be provided
TEFC, IP-55 (Ex-'d' for Zone 1
44 Cable Size / Type
45 Fault level
46 Fan For Motor Cooling Driven By
47 Yes/No
48 Yes/No
49 Yes/No
50 ° C / limited to CI "B" insulation
IS 325/IS -2148/IS12615/IS-4029m& as per Standerd Specification MV motor
for motor space heater shall be 2CX4 sq. mm (Cu) 1.1 KV PVC/ Armoured Cable
40 KW for 0.25 Sec. for Motor above 30 KW
The terminal box shall be spacious enough and shall be suitable for the cable size as specified by ONGC during drawing approval stage.
The cable gland shall be DGMS flame proof , double compression type brass nickel-plated type in case of flame proof motors(Ex-'d')
The cable gland shall be double compression type brass nickel-plated type for Non FLP Motors
50 Yes/No
51 Yes/No
52 Yes/No
53 Yes/No
54Terminal box shall be rotatable through 360º at 90º interval
Yes/No
55 Yes/No
56 Yes/No
57 Yes/No
58 Yes/No
C SCOPE OF SUPPLY
1 Filter back wash pump with motor 2 Foundation Bolts (If applicable)3 First Fill Up Lubricant4 Discharge Check Valve5 Companion Flanges
6Local Control Panel
Hazardous Area( Zone 1)
7Temperature And Pressure Gauages
8 Common skid for Motor & Pump with alignmentD OTHER DETAILS
1 Special Tools For Maintenance, If Any2 Commissioning Spares3 Mandatory Spares 4 Packing & Shipment5 Surface Protection & Painting
6 Inspection And Tests
E DOCUMENTS TO BE ENCLOSED WITH THE OFFER
1 Layout/ G.A Drawing of Pump and Motor,
The terminal box shall be suitable for type of enclosures selected for FLP/Non-FLP Motors
The motor shall be painted with corrosion resistant epoxy paint of light grey;grade 631 as per IS:5
On- line Greasing arrangement shall be provided for motors offered.
Space heater of sufficient capacity shall be provided for the motors above 30KW
Energy Efficient Motor Supplied(Efficiency guaranteed as per IS:12615)
he flameproof motor shall be in accordance with IS:2148 and suitable for Zone1/Zone2 Gas groupIIA/IIB and temp.class T3
The following drawings/certificates shall be furnished for ONGC approval after LOI(prior to manufecturing clearance) a) Motor dimension drg. b) Hot/Cold withstand erstic curves of the motor. c) A Copy of DGMS approval certificate forFLP(Ex-'d') Motor
The following Third party Inspection/QA Deptt.of ONGC(whichever is applicable) release certificates alongwith the supply of the motors: a) Routine test Certificates b) Type test certificate
2 Capacity calculation sheet based on site condition3 Performance Curves of Pump and Motor4 Filled in motor Data Sheet 5 Utility Requirement details,If any6 Civil load details
F DEVIATION IF ANY
Note: 1) Please send the updated data sheets & GAD with load data
2) Comply the sheet and send it before 14th Aug, 2012
PROJECT : Replacement of Process Pump, Fire Water Pump & Fire Water Jet Monitor at ONGC, Ahmedabad Asset.
By Vendor SAVAIR REMARK C&T replyFlowserve
65-40CPX315Vendor to Comply yesVendor to Comply yes
45m3/hr
65 mm/150#/RF40 mm/150#/RF
296044.60%41.2 Kw75 kW
EFFLUENTVendor to Comply yes
Vendor to Comply yes
CF8MA890 GR.A1 (DUPLEX)
SS316
M.S FABRICATED
SS316NA NA
Vendor to ComplyVendor to Comply DIVendor to Comply PTFE
Vendor to Comply ok
SingleHorizontal yes
Foot Foot
15 KG/CM2
up to 50°C. Mim 10°C, max80°C
Radial Radial split308320256
Vendor to Comply 6309 / 3309oil
chestertonFlexible spacer / Rathi
Vendor to Comply yes
Vendor to Comply laterE591/0015/1
Vendor to Comply
Vendor to Comply
Vendor to Comply
Vendor to Comply
Vendor to Comply
Vendor to Comply
Sq. Cage Induction Motor yes
Vendor to Comply yes
Vendor to Comply yesVendor to Comply E280MVendor to Comply yesVendor to Comply yesVendor to Comply
75Kw 46.9Vendor to Comply 56.3Vendor to Comply 2960Vendor to Comply laterVendor to Comply laterVendor to Comply yesVendor to Comply 50HzVendor to Comply laterVendor to Comply yesVendor to Comply 1.15
not considered
not considered
not considered
as per Flowserve std
Vendor to Comply motor is energy
Efficient
Vendor to Comply yes
Vendor to Comply IS-2148
Vendor to Comply yesVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply IP 55
Vendor to Comply yes
Vendor to Comply DOLVendor to Comply okVendor to Comply laterVendor to Comply laterVendor to Comply CCW from cpgVendor to Comply couplingVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply later
Vendor to Comply
Vendor to Comply later
Vendor to Comply later
Vendor to Comply ok
Vendor to Comply
Vendor to Comply
Vendor to Comply
canopy not considered
as per motor vendor's std
as per motor vendor's std
as per motor vendor's std
Vendor to Comply
Vendor to Comply
Vendor to Comply
Vendor to Comply ok
Vendor to Comply
Vendor to Comply
Vendor to Comply ok
Vendor to Comply ok
Vendor to Comply ok
Vendor to Comply okVendor to Comply okVendor to Comply okVendor to Comply NAVendor to Comply ok
Vendor to Comply
Vendor to Comply
Vendor to Comply ok
Vendor to Comply NAVendor to Comply okVendor to Comply okVendor to Comply okVendor to Comply okVendor to Comply ok
Vendor to Comply ok
as per motor vendor's std
as per motor vendor's std
as per motor vendor's std
as per motor vendor's std
as per motor vendor's std
Not in our scope
Not in our scope
SAVAIR ENERGY LTD.
Technical Queries: SEL-TQ-FS001-14
PROJECT : Replacement of Process Pump, Fire Water Pump & Fire Water Jet Monitor at ONGC, Ahmedabad Asset.PLANT : ETP-I EFFLUENT TRANSFER PUMP
Sr. Parameters ONGC-ES1 Manufacturer Name2 Model No.3 QTY 1 No.4 Capacity (Normal)5 Capacity (Rated) 100 m3/hr6 Head (meters)7 Discharge pressure 5 kg/cm2g8 Suction Connection Suction Connection(Site:4")9 Discharge Connection Discharge Connection(Site:3")
10 Rated Speed 1450/2900 Rpm.11 Efficiency of Pump12 Rated Power (KW)13 Driver Power (kW)14 Liquid Handled EFFLUENT TRANSFER15 Pump Should be confirm ISO 2858/DIN 5199/Din 2456
16 Operating Temperature Deg C. up to 80°C
17 Arrow Of Pump Rotation on Casing By VendorA Material of construction1 CASE SS316 (ASTM 743 Gr CF8M)2 IMPELLER SS316 (ASTM 743 Gr CF8M)3 SHAFT SS316 (ASTM 276 type 316)
4 BASEPLATE
5 SHAFT SLEEVE SS (ASTM 743 Gr CF8)6 WEAR RING SS316 /(ASTM 743 Gr CF8M)7 Gland For packing SS 316 (ASTM 743 Gr CF8M)8 Bearing Housing CI (ASTM 48)9 Casing Gasket Compressed non-asbestos fiber
10 Gland Packing
11 Stage12 Casing type Horizontal13 Mounting14 Split15 Impeller Diameter- RATED16 MAXIMUM17 MINIMUM
Heavy duty single M.S. Fabricated (Plate IS 2062 Gr. B or ASTM /A-36 & C Channels ISME 200 as per IS 808)
TIWA teflon impreganated white non asbestos/graphite impregnated
18 Bearing type & No. DE/NDE19 Lubrication system20 Packing type (size & No.)21 Coupling type / Mfr
22 Sound Level
23 Weight & overall dimensions24 Performance characteristics of pump25 Accessories of pump
a pressure guage at suction
b pressure guage at Discharge
c Gauge Dampener
d Name Plate as per Purchaser demandB Electrical Motor
1 Type
2 Make
3 Duty Contnuous (S1)4 Model/Frame5 Area of Classification Hazardous Area( Zone 1)6 Type of explosion protection EX (d)7 Method Of starting ATS Starter8 Rated Power HP/(KW) 309 BKW at full load
10 Rated Speed Rpm11 Starting current ampere12 Full load current ampere13 Voltage/Frequency / Phase14 Frequency15 Type of bearing (DE & NDE)16 Number of pole 2 pole17 Service Factor
18Ambient Temp/ Temp Rise in° C
19Applicable Coad / Standerds
20 Type of Lubrication Grease21 Full load Torque22 Starting Torque % of full load Torque23 Efficiency at 100% load
less than 90dba at a sdistance 1 mtr from pump
3" dial jelly filled, stem mounted range 5m to 10m
3" dial jelly filled, stem mounted range(1/2" BSP/NPT) range of pump approx 1.4 times rated pressure.
1/2" threaded SS valve along with suitable for Pressure Guage
Flameproof Sq. Cage Induction Motor ( energy Efficient)
CGL/KEC/Siemens/NGEF/BBL/GEC/ALSTHOM
415±6% / 50± 3% /
50 ° C / limited to CI "B" insulation
IS 325/IS -2148/IS12615/IS-4029m& as per Standerd Specification MV motor
24 Efficiency at 75%, 50%, 25% load25 Degree Of Protection
26Insulation Class
Class F (with temp. rise to class B)
27 Starting Method28 Space Heaters watts/Volts 240 Volts AC29 Maximum No Of Start / Stop Permitted30 No. of Terminals 331 Rotation viewed from NDE32 Coupling/Pully33 Locked Rotor Current % Amps34 Locked Rotor withstand time- Hot-Secs35 Locked Rotor withstand time- Cold-Secs36 Stator/Rotor Time constant minutes37 Power factor at 100% load38 Power factor at 75%, 50%, 25% load39 Brakdown or pull out Torque %40 GD2 of Motor41 GD2 of Loadr42 Starting time (At 100%, 75% V) Sec.
43Canopy to be provided
TEFC, IP-55 (Ex-'d' for Zone 1
44 Cable Size / Type
45 Fault level
46 Fan For Motor Cooling Driven By
47 Yes/No
48 Yes/No
49 Yes/No
50 Yes/No
51 Yes/No
52 Yes/No
53 Yes/No
54Terminal box shall be rotatable through 360º at 90º interval
Yes/No
55 Yes/No
for motor space heater shall be 2CX4 sq. mm (Cu) 1.1 KV PVC/ Armoured Cable
40 KW for 0.25 Sec. for Motor above 30 KW
The terminal box shall be spacious enough and shall be suitable for the cable size as specified by ONGC during drawing approval stage.
The cable gland shall be DGMS flame proof , double compression type brass nickel-plated type in case of flame proof motors(Ex-'d')
The cable gland shall be double compression type brass nickel-plated type for Non FLP Motors
The terminal box shall be suitable for type of enclosures selected for FLP/Non-FLP Motors
The motor shall be painted with corrosion resistant epoxy paint of light grey;grade 631 as per IS:5
On- line Greasing arrangement shall be provided for motors offered.
Space heater of sufficient capacity shall be provided for the motors above 30KW
Energy Efficient Motor Supplied(Efficiency guaranteed as per IS:12615)
56 Yes/No
57 Yes/No
58 Yes/No
C SCOPE OF SUPPLY
1 Filter back wash pump with motor 2 Foundation Bolts (If applicable)3 First Fill Up Lubricant4 Discharge Check Valve5 Companion Flanges
6Local Control Panel
Hazardous Area( Zone 1)
7Temperature And Pressure Gauages
8 Common skid for Motor & Pump with alignmentD OTHER DETAILS
1 Special Tools For Maintenance, If Any2 Commissioning Spares3 Mandatory Spares 4 Packing & Shipment5 Surface Protection & Painting
6 Inspection And Tests
E DOCUMENTS TO BE ENCLOSED WITH THE OFFER
1 Layout/ G.A Drawing of Pump and Motor, 2 Capacity calculation sheet based on site condition3 Performance Curves of Pump and Motor4 Filled in motor Data Sheet 5 Utility Requirement details,If any6 Civil load details
F DEVIATION IF ANY
Note: 1) Please send the updated data sheets & GAD with load data2) Comply the sheet and send it before 14th Aug, 2012
he flameproof motor shall be in accordance with IS:2148 and suitable for Zone1/Zone2 Gas groupIIA/IIB and temp.class T3
The following drawings/certificates shall be furnished for ONGC approval after LOI(prior to manufecturing clearance) a) Motor dimension drg. b) Hot/Cold withstand erstic curves of the motor. c) A Copy of DGMS approval certificate forFLP(Ex-'d') Motor
The following Third party Inspection/QA Deptt.of ONGC(whichever is applicable) release certificates alongwith the supply of the motors: a) Routine test Certificates b) Type test certificate
PROJECT : Replacement of Process Pump, Fire Water Pump & Fire Water Jet Monitor at ONGC, Ahmedabad Asset.
By Vendor SAVAIR REMARK C&T Flowserve
100-65CPX200Vendor to Comply yesVendor to Comply yes
100 m3/hr100 m
100 mm/150#/RF60 mm/150#/RF
294065.50%
20.42 Kw30 kW
EFFLUENTVendor to Comply yes
Vendor to Comply yes
A315 CF8MA890 GR.A1 (DUPLEX)
SS316
M.S FABRICATED
SS316NA
Vendor to ComplyVendor to Comply DIVendor to Comply PTFE
Vendor to Comply ok
SingleHorizontal yes
Foot FootRadial Radial split
180210152
5 KG/CM2
up to 30°C. Mim 10°C, max50°C
Vendor to Comply 6309 / 3309oil
chestertonFlexible spacer / Rathi
Vendor to Comply yes
Vendor to Comply later
Vendor to Comply not considered
Vendor to Comply not considered
Vendor to Comply not considered
Vendor to Comply
Vendor to ComplyVendor to Comply
Sq. Cage Induction Motor yes
Vendor to Comply yes
Vendor to Comply yesVendor to Comply E200LVendor to Comply yesVendor to Comply yesVendor to Comply yes
75Kw 20.4Vendor to Comply 26.8Vendor to Comply 2940Vendor to Comply laterVendor to Comply laterVendor to Comply yesVendor to Comply 50HzVendor to Comply laterVendor to Comply yesVendor to Comply 1.15
Vendor to Comply yes
Vendor to Comply IS-2148
Vendor to Comply yesVendor to Comply laterVendor to Comply laterVendor to Comply later
as per Flowserve std
Vendor to Comply motor is energy
Efficient
Vendor to Comply laterVendor to Comply IP 55
Vendor to Comply yes
Vendor to Comply DOLVendor to Comply okVendor to Comply laterVendor to Comply laterVendor to Comply CCW from cpgVendor to Comply couplingVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply laterVendor to Comply later
Vendor to Comply
Vendor to Comply later
Vendor to Comply later
Vendor to Comply ok
Vendor to Comply
Vendor to Comply
Vendor to Comply
Vendor to Comply
Vendor to Comply
Vendor to Comply
Vendor to Comply ok
Vendor to Comply
Vendor to Comply
canopy not considered
as per motor vendor's std
as per motor vendor's std
as per motor vendor's std
as per motor vendor's std
as per motor vendor's std
as per motor vendor's std
as per motor vendor's std
as per motor vendor's std
Vendor to Comply ok
Vendor to Comply ok
Vendor to Comply ok
Vendor to Comply okVendor to Comply okVendor to Comply okVendor to Comply NAVendor to Comply ok
Vendor to Comply Not in our scope
Vendor to Comply Not in our scope
Vendor to Comply ok
Vendor to Comply NAVendor to Comply okVendor to Comply okVendor to Comply okVendor to Comply okVendor to Comply ok
Vendor to Comply okVendor to Comply okVendor to Comply okVendor to Comply laterVendor to Comply NAVendor to Comply ok