Page 1: TPM by Chandan Jha

WELCOMEWELCOMETO THE WORLD OFTO THE WORLD OF

TPMTPMTPMTPM

11

Prepared by : Chandan jha

Page 2: TPM by Chandan Jha

TPMTPM

2

Prepared by : Chandan jha

Page 3: TPM by Chandan Jha

ContentsContents--Definition

History and origin,

List of TPM certified company.

Objective

Benefits of TPM

Why TPM,

TPM GoalTPM Goal

TPM Participants

TPM Strategies

Pillars of TPM

Op/Maint partnership

Autonomous maintenance

Slogans

Conclusion3

Prepared by : Chandan jha

Page 4: TPM by Chandan Jha

DefinitionDefinition

“TPM is a management

process developed for

improving productivity

by making processes

more reliable and

less wasteful.”

4

Prepared by : Chandan jha

Page 5: TPM by Chandan Jha

HISTORY AND ORIGIN HISTORY AND ORIGIN

United States

Henry Ford

Preventive

FROM

Japan -

Nippon

Denso

TO

Preventive

Maintenance

Denso

Productive

Maintenance

5

Prepared by : Chandan jha

Page 6: TPM by Chandan Jha

HISTORY HISTORY CONT’D…CONT’D…

�Preventive maintenance along with Maintenance prevention and Maintainability Improvement gave birth to Productive maintenance.

�By then Nippon Denso had made quality circles, �By then Nippon Denso had made quality circles, involving the employees participation. Thus all employees took part in implementing Productive maintenance.

6

Prepared by : Chandan jha

Page 7: TPM by Chandan Jha

HISTORY HISTORY CONT’D…CONT’D…

�TPM is a innovative Japanese concept which can be traced back to 1951.

�However the concept of preventive maintenance was taken from USA. Nippondenso was the first was taken from USA. Nippondenso was the first company to introduce plant wide preventive maintenance in 1960.

�Nippondenso which already followed preventive maintenance also added Autonomous maintenance done by production operators.

7

Prepared by : Chandan jha

Page 8: TPM by Chandan Jha

HISTORY HISTORY CONT’D…CONT’D…

Whereas in most production settings the

operators are not viewed as a member of

the maintenance team, in TPM the the maintenance team, in TPM the

machine operators are trained to perform

many of the day-to-day tasks of simple

maintenance and fault-finding.

8

Prepared by : Chandan jha

Page 9: TPM by Chandan Jha

List of TPM certified List of TPM certified

company.company.�Electrosteel Castings Limited

�Exide Industries Limited

� Indian Oil Corporation Limited

�Jamshedpur Utilities and Services Company �Jamshedpur Utilities and Services Company

Limited

�MRF Limited

�Munjal Showa Limited

�National Engineering Industries Limited

�Brakes India Ltd. Pad 9

Prepared by : Chandan jha

Page 10: TPM by Chandan Jha

List of TPM certified List of TPM certified

CONT’D…CONT’D…�Brakes India Ltd. Foundry Div., Sholinghur

�Galaxy Surfactants Ltd. Taloja and Tarapur

�Hindustan Unilever Ltd. Khamgaon

�Shriram Pistons & Rings Ltd.�Shriram Pistons & Rings Ltd.

�Sundram Fasteners Ltd. Hosur

�Sundram Fasteners Ltd. Pondicherry

�Brakes India Ltd. Nanjangud

�Hindustan Unilever Ltd.Haldia

10

Prepared by : Chandan jha

Page 11: TPM by Chandan Jha

OBJECTIVEOBJECTIVETo restructure the corporate culture

through behavioral changes and

equipment improvements.

11

Prepared by : Chandan jha

Page 12: TPM by Chandan Jha

Similarities and differences

between TQM and TPM Total commitment to the program by upper level management is required in both programsEmployees must be empowered to initiate corrective

12

Employees must be empowered to initiate corrective action.A long range outlook must be accepted as TPM may take a year or more to implement and is an on-going process Changes in employee mind-set toward their job responsibilities must take place as well.

Prepared by : Chandan jha

Page 13: TPM by Chandan Jha

WHY TPM?WHY TPM?

� Safe Work Environment

� Job Security

� Quality

� Increased Productivity

� Improved Skills13

Prepared by : Chandan jha

Page 14: TPM by Chandan Jha

WHY TPM?CONT’D…WHY TPM?CONT’D…

�Avoid wastage in a quickly changing economic

environment.

�Produce goods without reducing product

quality.quality.

�Reduce cost.

�Produce a batch quantity at the earliest possible

time.

14

Prepared by : Chandan jha

Page 15: TPM by Chandan Jha

WHY TPM?CONT’D…WHY TPM?CONT’D…

�Creating company culture for maximum efficiency.

�Striving to prevent losses with minimum cost

�The essence of team work (small group �The essence of team work (small group activity) focused on condition and performance of facilities to achieve zero loss.

�Goods send to the customers must be non defective.

15

Prepared by : Chandan jha

Page 16: TPM by Chandan Jha

GOAL OF TPMGOAL OF TPM

ZeroProduct

Defects

Zero Accidents s

Zero Equipment Failures

16

Prepared by : Chandan jha

Page 17: TPM by Chandan Jha

Team of TPMTeam of TPMTPM involves everyone in the

organization from operators to

senior management

In equipment

improvement. It

encompasses all

most all departments. 17

Prepared by : Chandan jha

Page 18: TPM by Chandan Jha

CONT’D…CONT’D…

The departments including:�Maintenance

�Operations/production

�Tool Room

�Design Engineering �Design Engineering

�Project Engineering

�Construction Engineering

�Inventory and Stores

�Purchase

�Accounting and Finance

,etc

18

Prepared by : Chandan jha

Page 19: TPM by Chandan Jha

TPM STRATEGIESTPM STRATEGIES�Conduct more frequent and thorough

inspection and cleaning of machines to discover

minor discrepancies before they become

failures.

�Enhance PMs to correct

minor defects and

prevent failures.

19

Prepared by : Chandan jha

Page 20: TPM by Chandan Jha

TPM STRAIT. TPM STRAIT. CONT’D…CONT’D…

Modify Operations to reduce need for maintenance.

Elevate all employees’ knowledge, skill and role in Elevate all employees’ knowledge, skill and role in

improving equipment performance.

– Engineers, Line Leaders, maintenance

technicians, and especially production operators.

20

Prepared by : Chandan jha

Page 21: TPM by Chandan Jha

TPM STRAIT. TPM STRAIT. CONT’D…CONT’D…

Only clean machines and equipment

problems visually apparent!!!

Cleaning is Inspection.

TPM

Cleaning is Inspection.

CLEANING IS CHECKING ! CLEANING IS CHECKING !

21

Prepared by : Chandan jha

Page 22: TPM by Chandan Jha

TPM STRAIT. TPM STRAIT. CONT’D…CONT’D…

The starting point for

TPM is implementing

routine inspections by

production operators.

“Autonomous maintenance” –Users/operators

perform continuous inspection for minor defects as

well as continuous cleaning, adjustment, and

tidying up the loosen parts.22

Prepared by : Chandan jha

Page 23: TPM by Chandan Jha

TPM STRAIT. TPM STRAIT. CONT’D…CONT’D…

�Outline a detailed master deployment plan.

�Improve the effectiveness of each piece of

equipment and concern person. equipment and concern person.

�Develop an autonomous maintenance program

for operators.

23

Prepared by : Chandan jha

Page 24: TPM by Chandan Jha

TPM STRAIT. TPM STRAIT. CONT’D…CONT’D…

�Conduct training to improve operation and

maintenance skills.

�Develop an early equipment management

24

�Develop an early equipment management

program.

�Continuous improvement.

�Develop a planned for preventive

maintenance program.

Prepared by : Chandan jha

Page 25: TPM by Chandan Jha

PILLER OF TPM� Autonomous Maintenance� 5-S� Jishu Hozen � Kaizen� Planned Maintenance � Planned Maintenance � Quality Maintenance � Office TPM � Education & Training � Safety, Health & Environment � Development Management 25

Prepared by : Chandan jha

Page 26: TPM by Chandan Jha

Autonomous Maintenance

Activities where each

operator performs timely

inspection, lubrication,

consumable parts

T P M

26

consumable parts

replacement, repair,

troubleshooting, accuracy

checks, etc, of their own

equipment.

Prepared by : Chandan jha

OIL

Page 27: TPM by Chandan Jha

5-SYou can’t see problems clearly when the workplace is in disarrayCleaning and organizing the workplace helps the team to uncover problemsMaking problems visibleis the first step of improvement

27

is the first step of improvementClean machines and workplace create pride & Safety

TPM is the only tool to win the race, Keeping 5-S as its base.

Prepared by : Chandan jha

Page 28: TPM by Chandan Jha

JISHU HOZEN

Policy-�Uninterrupted operation of equipments.� Flexible operators to operate and maintain other equipments.�Eliminating the defects at source through active employee participation.

28

active employee participation.�Stepwise implementation of JH activities.

JISHU HOZEN Targets-�Prevent the occurrence of 1A/1B because of JH.�Reduce oil consumption by 50%.�Reduce process time by 50%.�Increase use of JH by 50%.

Prepared by : Chandan jha

Page 29: TPM by Chandan Jha

JISHU HOZEN CONT’D…CONT’D…

Steps in JISHU HOZEN-

�Preparation of employees.

�Initial cleanup of machines.

�Take counter measures.

29

�Take counter measures.

�Fix tentative JH standards.

�General inspection.

�Autonomous inspection.

�Standardization.

�Autonomous management.

Prepared by : Chandan jha

Page 30: TPM by Chandan Jha

KAIZENKai means change and Zen means goodThe principle behind is a very large number of small improvements are move effective in an organizational environment than a few improvements of large value.

Policy- Practice concepts of zero losses in every activity- To achieve cost reduction targets in all resources

30

- To achieve cost reduction targets in all resources- To improve over all plant equipment effectiveness- Focus of easy handling of operators

Target- Achieve and sustain zero loses with respect to minor

stops, measurement and adjustments- It also aims to achieve 30% manufacturing cost

reduction

Prepared by : Chandan jha

Page 31: TPM by Chandan Jha

PLANNED MAINTENANACE

It is aimed to have trouble free machines and equipments producing defect free products for total customer satisfaction.

Break down into 4 categories.�Preventive Maintenance

31

�Preventive Maintenance�Breakdown Maintenance�Corrective Maintenance�Maintenance Prevention

Target�Zero equipment failure and break down.�Improve reliability and maintainability by 50%.

Prepared by : Chandan jha

Page 32: TPM by Chandan Jha

PMPM--CONT’D…CONT’D…

Reduce maintenance cost by 20%

- Ensure availability of spares all the time

Six steps in planned maintenance

1. Equipment evaluation and recoding present

status

32

status

2. Restore deterioration and improve weakness

3. Building up information management

system

4. Prepare time based information system

5. Prepare predictive maintenance

6. Evaluation of planned maintenance

Prepared by : Chandan jha

Page 33: TPM by Chandan Jha

QUALITY MAINTENANCE

It is aimed towards customer delight through highest quality through defect free manufacturing.

QM activity is to set equipment conditions that preclude quality defects, based on the basic concept of maintaining perfect equipment to maintain perfect quality of products.

Policyo Defect free conditions and control of equipmentso QM activities to support quality assurance

o Focus of prevention of defects at sourceo Focus on poka-yoka (full proof system)

33

Prepared by : Chandan jha

Page 34: TPM by Chandan Jha

QMQM--CONT’D…CONT’D…In-line detection and segregation of defects

- Effective implementation of operator

quality assurance

Target- Achieve and sustain customer complaints

34

- Achieve and sustain customer complaints

at zero

- Reduce in-process defects by 50%

- Reduce cost of quality by 50%

Quality defects are classified as customer

end defects and in house defects.Prepared by : Chandan jha

Page 35: TPM by Chandan Jha

QMQM--CONT’D…CONT’D…

Target- Achieve and sustain downtime due to want men at

zero on critical machines.- Achieve and sustain zero losses due to lack of

knowledge/skills/techniques.- Aim at 100% participation in suggestion scheme.

35

- Aim at 100% participation in suggestion scheme.

Steps in education and training activities- Setting policies and priorities and checking present

status of education and training- Establish a training system for skill upgrading- Preparation of training calendar- Evaluation of activities and study of future approach

Prepared by : Chandan jha

Page 36: TPM by Chandan Jha

OFFICE TPMOffice TPM should be started after activating four other pillars of TPM (JH,KK,QM,PM).

Office TPM addresses 12 major losses- Processing loss- Cost loss in areas like accounts, marketing and sales- Communication loss

36

- Communication loss- Idle loss- Set-up loss- Accuracy loss- Office equipment breakdown, telephones and fax- Communication channel breakdown- Time spent on retrieval of information- Non availability of correct on line stock status

Prepared by : Chandan jha

Page 37: TPM by Chandan Jha

OFFICE TPM CONT’D…CONT’D…

Customer complaints due to logistics- Expenses on emergency dispatches/purchases

Benefits- Involvement of all people in support functions for focusing on better plant performance.

37

focusing on better plant performance.- Better utilized work area- Reduce repetitive work- Reduce administrative costs- Reduction in number of files- Reduction in office equipment- Reduce customer complaints- Reduce manpower- Clean and pleasant work environment

Prepared by : Chandan jha

Page 38: TPM by Chandan Jha

Education & TrainingIt is aimed to have multi skilled employees whose morale is high and who has eager to come to work and perform all required functions effectively and independently.

They are trained to achieve 4 phases of skillsPhase 1 : Do not knowPhase 2 : Know the theory but cannot do

38

Phase 2 : Know the theory but cannot doPhase 3 : Can do but cannot teachPhase 4 : Can do and also teach

Policy- Focus on improvement of knowledge and skills- Create a training environment for self learning- Training to remove employee fatigue and make

work enjoyablePrepared by : Chandan jha

Page 39: TPM by Chandan Jha

SAFETY,HEALTH AND ENVIRONMENT

Target- Zero accident- Zero Health damage- Zero fires

It helps to create a safe workplace and a surrounding area that

39

It helps to create a safe workplace and a surrounding area that is not damaged by our process or procedures.

It plays an active role in each of the other pillars on a regular basis.

To create awareness among employees various competitions like safety slogans ,posters etc can be organized at regular intervals.

Prepared by : Chandan jha

Page 40: TPM by Chandan Jha

OMP - OPERATOR

MAINTENANCE PARTNERSHIP

�Operator training in TPM

�Operator basic equip inspection & tooling checks

TPM

inspection & tooling checks

�Operator basic cleaning

�Operator lubrication check

�One point lessons (capture knowledge)

40

Prepared by : Chandan jha

Page 41: TPM by Chandan Jha

CONT’D…CONT’D…

The Ethics of operator is to operate the equipment with high skills level,

The Ethics of Maintenance team is to high skills level,

in order to reduce the down time.

e team is to upgrade the equipment to perform it better.

41

Prepared by : Chandan jha

Page 42: TPM by Chandan Jha

CONT’D…CONT’D…

Mother and baby

Operator and Equipment

42

Prepared by : Chandan jha

Page 43: TPM by Chandan Jha

SEE THE BELOW

IMAGES…..

43

Prepared by : Chandan jha

Page 44: TPM by Chandan Jha

44

Prepared by : Chandan jha

Page 45: TPM by Chandan Jha

45

Prepared by : Chandan jha

Page 46: TPM by Chandan Jha

46

Prepared by : Chandan jha

Page 47: TPM by Chandan Jha

47

Prepared by : Chandan jha

Page 48: TPM by Chandan Jha

WHAT WAS

COMMON

IN ABOVE IMAGES ?

48

Prepared by : Chandan jha

Page 49: TPM by Chandan Jha

LACK OF KNOWLEDGE ?LACK OF KNOWLEDGE ?

49

Prepared by : Chandan jha

Page 50: TPM by Chandan Jha

LACK OF AWARENESS ?LACK OF AWARENESS ?

50

Prepared by : Chandan jha

Page 51: TPM by Chandan Jha

LACK OF TRAINING?

51

Prepared by : Chandan jha

Page 52: TPM by Chandan Jha

THE ANSWER IS :

“LACK OF OWNERSHIP”“LACK OF OWNERSHIP”

THAT IS ATTITUDE PROBLEM.

52

Prepared by : Chandan jha

Page 53: TPM by Chandan Jha

ATTITUDE /

THOUGHTTHOUGHT

53

Prepared by : Chandan jha

Page 54: TPM by Chandan Jha

THOUGHT CHANGE

I operate the I operate the

Old concept New concept

I operate the machine and I maintain it.

I operate the machine and some body maintains it.

54

Prepared by : Chandan jha

Page 55: TPM by Chandan Jha

SEE THE BELOW IMAGES…..SEE THE BELOW IMAGES…..

55

Prepared by : Chandan jha

Page 56: TPM by Chandan Jha

56

Prepared by : Chandan jha

Page 57: TPM by Chandan Jha

57

Prepared by : Chandan jha

Page 58: TPM by Chandan Jha

58

Prepared by : Chandan jha

Page 59: TPM by Chandan Jha

59

Prepared by : Chandan jha

Page 60: TPM by Chandan Jha

What was common

in above picturesin above pictures

60

Prepared by : Chandan jha

Page 61: TPM by Chandan Jha

THE ANSWER IS…

61

Prepared by : Chandan jha

Page 62: TPM by Chandan Jha

WHAT IS THE GOAL OF OPERATOR

AUTONOMOUSMAINTENANCE?

“Keeping one's

own equipment own equipment

in good

condition by

oneself ”.

62

Prepared by : Chandan jha

Page 63: TPM by Chandan Jha

SLOGANS�TPM In, Losses Out.

�Machine not tight, job not right.

�Organization without TPM; Building without

foundation.

�Farmer is the backbone of a country; TPM is �Farmer is the backbone of a country; TPM is

the backbone of industry.

�Accept TPM with a Positive Attitude

Achieve Success of high Magnitude.

63

Prepared by : Chandan jha

Page 64: TPM by Chandan Jha

SLOGANS�TPM is the foundation of factory.

�Invest minutes for TPM; Gain hours for production.

Your future is bright, when the TPM �Your future is bright, when the TPM you practice is right.

�Don’t be a fool, use TPM tool.

64

Prepared by : Chandan jha

Page 65: TPM by Chandan Jha

AT LAST

“TPM is a Lean

tool for Quality and tool for Quality and

Productivity”

65

Prepared by : Chandan jha

Page 66: TPM by Chandan Jha

CONSLUSIONCONSLUSIONToday, with competition in industry is high.

TPM may be the only tools that stands us

success. It has been proven to be a program

that works.

Employees must be educated and convinced Employees must be educated and convinced

that TPM is not just another "program of

the month" .

If everyone involved in a TPM program, an

unusually high rate of return compared to

resources invested may be expected. 66

Prepared by : Chandan jha

Page 67: TPM by Chandan Jha

THANK YOU,

I sincerely thank you for your co-operation and

consideration for the growth of TPM.

Presented by:

CHANDAN JHA

[email protected]

67