TPA COMPANY PROFILE - 2016

80
TPA ENGINEERING CONSULTANCY (I) PVT. LTD. 112, KAILASH HILLS, NEW DELHI - 110065 011-41623940, 011-41624519 [email protected] [email protected] COMPANY PROFILE 2015-16

Transcript of TPA COMPANY PROFILE - 2016

Page 1: TPA COMPANY PROFILE - 2016

TPA ENGINEERING CONSULTANCY (I) PVT. LTD.

112, KAILASH HILLS, NEW DELHI - 110065

011-41623940, 011-41624519

[email protected]

[email protected]

COMPANY PROFILE 2015-16

Page 2: TPA COMPANY PROFILE - 2016

INTRODUCTION

The opening up of Indian Economy has necessitated development of road infrastructure of global

standards to meet the ever-increasing demand of travel by roads. The challenges thrown up by

development needs of our country beckons a fresh look at needs of people and of our esteemed

clients. At TPA Engineering Consultancy Services (I) Pvt. Ltd. (TPAEC), we attempt to

provide quality services by channelize our resources and technical expertise to meet these needs.

Our rich experience as an organization as well as the collective technical expertise of professionals

associated with TPAEC in the field of Transportation Infrastructure development and Project

Management ensures that our clients get excellent services at a reasonable price in a Time bound

manner. TPAEC is fully geared up to participate in this capacity building exercise and meet these

challenges.

TPAEC, a company with rich professional experience of 21 years, was initially established in year

1992 as Partnership firm named Transport Planners Associates. We have grown from strength to

strength, scaling new frontiers, gaining experience and confidence of our esteemed clients. We

modified our status as a Private Limited Firm in year 1999.

� Mission Statement

To provide a highly professional Project Management service to satisfy client’s requirements

within the agreed time frame and cost without compromising on quality.

Page 3: TPA COMPANY PROFILE - 2016

How is our approach different?

Value Propositions: Our methodology will deliver sustained and continued value to Clients in:-

• Improved quality of services (a notch higher than competition and Client expectation)

• Reduced Cost (Lowest cost of acquisition and ownership by Client)

• Reduced risk (Assured project inputs, through-puts and outcomes)

• On-time delivery (Time is costliest resource)

• Reduced Time to Market (The report based on our methodology shall empower client to

reach and realize market potential immediately)

• Improved return on investment (The best option that maximizes the return on

investment from among many scenarios will be suggested to Client)

“Do-it-right-first-time attitude”: The methodology is crucial in ensuring that all the studies,

findings, recommendations and actions are done always the Right way in first time itself. The

methodology ensures that no wasteful or repetitive activities are allowed. This is the culture

inculcated across our Organization and among our Professional Associates.

Knowledge pooling & Management: Projects of this sort depend to a large extent on

knowledge already pooled and available. Additional knowledge is imported from experience of

executing similar projects in other geographic regions. The knowledge already available and

brought-in as new inputs is collated and made available for easy retrieval for effective decision

making in this project as well as future projects.

Think-Global-Act-Local: Though global inputs are essential for making the project decisions

effective, the impacts and stakeholders are local. The methodology ensures delivering maximum

benefit to Local people affected by the project through global inputs.

Process orientation: The methodology is Process driven. The processes are defined to last detail

to ensure predictable and repeatable outcomes.

Effective Organization: Ours is a small, nimble and responsive organization with total focus on

Client and Delivery. Spot decision making capability and lack of bureaucracy ensures timely results.

Page 4: TPA COMPANY PROFILE - 2016

Project Management: Latest tools and technologies are incorporated in the methodology for

managing complex, inter-related activities and resources of the project.

Define-Measure-Control: The project is broken down to element level of Tasks. Each Task is

defined precisely by inputs, throughputs and outcomes envisaged. Each Task at element level is

measurable on various parameters such as time, cost and quality and decision-support ability.

These measured Tasks are controlled if they are observed to deviate from project plan and set right

at the earliest stage itself.

Review-Report-Feedback: The Tasks are reviewed regularly at frequent intervals and reports

generated as per formats defined in the process. These reports, even at much lower activity levels,

as required by Client, are discussed internally among Professional support pool and also with Client.

Task parallel + dovetailing: The Tasks at element level are related to other Task elements and

these inter-related activities are planned and scheduled parallel and dovetailed perfectly for timely

and effective completion, strictly on budgeted resources.

Page 5: TPA COMPANY PROFILE - 2016

Esteemed Clients

• Ministry of Road Transport and Highways, (MORTH) • National Highway Authority of India, (NHAI) • RITES Ltd, New Delhi • NOIDA Industrial Development Authority • Greater NOIDA Industrial Development Authority • Public Works Department in Delhi, Haryana, Himachal Pradesh

In addition to above clients, TPAEC is providing services to other National/ International Private Consultancy/ Construction/ BOT concessionaires. A detailed list is given below.

OUR PRESTIGIOUS CLIENT

GOVERNMENT/ SEMI GOVERNMENT ORGANIZATION SUB CONSULTANTS/SUB CONTRACTORS

1 UTTIPEC 1 T&TS ENGINEERING CONSULTANCY (I) PVT. LTD.

2 PWD DELHI 2 SUPREME HIGHWAY ENGINEER

3 NOIDA AUTHORITY 3 BALAJI SURVEYORS PVT LTD

4 GREATER NOIDA AUTHORITY 4 LKT ENGINEERING CONSULTANT

5 MUNICIPAL CORPORATION OF JALLANDHAR 5 DHEERAYAN & DHEERAYAN ENGINEERS

6 YAMUNA EXPRESSWAY DEVELOPMENT AUTHORITY 6 SARFARAAZ AHMAD- CONSULTANT

7 NATIONAL HIGHWAY AUTHORITY OF INDIA 7 JADE CONSULTANTS

8 DELHI METRO RAIL CORPORATION LTD. 8 PIYALI KUNDU DAS

9 MUNICIPAL CORPORATION HISAR 9 AIM SOFTECH

10 RITES LTD

PRIVATE SECTOR ORGANIZATION

1 GIFFORD INDIA PVT. LTD 1 TRANSFIC PVT. LTD.

2 TOPWORTH INDIA PVT. LTD 2 ANAND SHAH

3 UTTARAKHAND INFRASTRUCTURE DEVELOPMENT CO.LTD. 3 ARNAV COMPUTERS

4 JAI PRAKASH ASSOCIATES 4 CROSS ROADS

5 GHERZI CONSULTING ENGINEERS PVT. LTD. 5 UNIVERSAL SURVEYING

6 AFCONS LTD. 6 ARTS & CRAFTS

7 MEINHARDT SINGAPORE PTE. LTD. 7 RAO ENGINEERING ENTERPRISES

8 ASC GEOSCIENCES 8 ALLIED ENGINEERS

9 SATRA I –MAN PVT LTD 9 SHWETA TECHNOPHILE

10 LOGIX GROUP 10 NUTECH GROUP

11 STUPS CONSULTANTS PVT. LTD. 11 HARCO MARKET RESEARCH

12 ERA GROUP ENGINEERING LTD. 12 CYCLOPEAN CONSULTING PVT LTD (NAMIT JAIN)

13 J. KUMAR INFRA PROJECT LTD. 13 HEMC

14 MAHAGUN REAL ESTATE 14 DESIGN AID

15 LARSEN AND TURBO INFRA 15 SAI KRISHAN CONSULTANT

16 UPPAL HOSPITALITY PVT. LTD. 16 T & T CONSULTANT

17 SAMARTH INFRAENGG TECHNOCRATE PVT. LTD. 17 SARFARAZ AHMAD

18 HINDUSTAN CONSTRUCTION COMPANY LTD. 18 PRADEEP KAPLA_INFRASTRUCTURE TECHNOLOGY

19 KOTHARI ASSOCIATES 19 SHARAD' MAHENDRU’

Page 6: TPA COMPANY PROFILE - 2016

20 ITALIAN THAI DEVELOPMENT PUBLIC CO LTD. (ITD-ITD JV) 20 ARUP KHAN

21 DELHI INTEGRATED MULTI-MODAL TRANSIT SYSTEM LTD. 21 VINOD KUMAR GAUTAM

22 HOLTEC CONSULTING PVT.LTD. 22 RAMESH DHAR

23 AMRAPALI DREAM VALLYE PVT. LTD. 23 AIM SOFTECH

24 GIAN P. MATHUR AND ASSOCIATES 24 HIGHBRIDGE ENGINEERING

25 HOLTEC CONSULTING PVT. LTD.

26 SADBHAV ENGINEERING LTD.

27 EMERGENT VENTURES (EVI)

28 ISOLUX CORSAN

29 SA INFRASTRUCTURE PVT. LTD/UPHAM

30 DEFINITI DESIGN

31 UMTC

Structure and Organization

TPAEC is a registered Private Limited Company under Companies Act 1956, managed by a

qualified Transport Planner having basic qualification as civil Engineer and specializing as Traffic

Engineer/ Transport Planner. . TPAEC has on its rolls several qualified and experienced

professionals working on Full Time/ Retainer ship basis.

TPAEC has In House infrastructure as well as associated arrangements for providing Consultancy

services in the field of Transportation Planning, Traffic Engineering and Management, Highway

Engineering, Bridge Engineering, Structural Design and for providing allied services like field

investigations and surveys.

TPAEC has acquired many State of Art Instruments for providing services in areas mentioned

above. Besides, we have also entered into strategic alliances with other organizations to

complement our services. An excellent Computer division having latest Hardware and software ably

supports the services of TPAEC.

Page 7: TPA COMPANY PROFILE - 2016

HUMAN SOURCES

We are a team of experienced and qualified personnel whose prime concern is delivering best

possible design solutions. The team members are as under:

1. Mr. RAJEEV ROY – MANAGING DIRECTOR

B. E (Civil), 1984 Planning/ Transport, 1986

Traffic Engineering Cum Transport Planning

Mr. Rajeev Roy is the founding member of TPA Engineering Consultancy (I) Pvt. Ltd. and is

the Director of Firm. He is a Graduate Civil Engineer and has postgraduate degree of

Transport Planning from prestigious School of Planning and Architecture, New Delhi. At

present, he is working on various projects as an expert Traffic Engineer cum Transport

Planner for past Twenty Seven years. He has contributed his expertise for many

prestigious project related to capacity augmentation, design of roads and its components

safety augmentation etc. for many other prestigious projects. He has Hands on Expertise

related to using software for highway design like AutoCAD, MS office etc. He also can

independently handle topographic surveys using state of Art equipment and can prepare

quantity estimates.

2 Mr Prakash Narain – Advisor

Mr Prakash Narain is our senior advisor in field of Transport Planning, Traffic Engineering

and Architecture. He is an alumini of IIT Roorkee in year 1969 and did a post Graduate

diploma in Transport Planning in year 1971. He has subsequently served as a urban planner

in many Government Departments and served in important positions prior to retiring as

Assistant Commissioner, Planning, Delhi Development Authority.He is presently associated

with TPAEC and guided the planning/design teams to provide quality service to the client.

3. Mr. Ambar Anand- Transport Planner

B. Planning 2012,

Mr. Amber Anand is an Urban Planner by profession. He did his Bachelors, Planning- from

School of Planning and Architecture, Vijayawada and has good experience of working on

Highway and Traffic Engineering/ Transportation Planning Projects. Mr Anand also has

received training at Adapt Technologies and Consultancy services India Pvt.Ltd.

Secunderabad (India), an agency involved in a project of slum free City planning programe

for Warangal City under RAY scheme. His Research Project Experience of Study of public

transport system accessibility Parameters; case: Kanur City and Semester wise planning and

Design studio projects has helped the company enormously. .

Page 8: TPA COMPANY PROFILE - 2016

4. Mr. Anshul Chaudhary

B.Tech (Civil), 2014

Anshul Chaudhary is a Civil Engineer by Profession. He did his B. Tech (Civil) by He has

received training on AUTO CAD and MS Office. His strength is in civil Engineering design,

drainage design and cost estimates. He also has received training on Transport projects His

Research Project Experience on Flexible pavement design under the guidance of HOD (Civil

department and On Energy Conservation in Buildings

TOPOGRAPHIC SURVEY DIVISION.

1. VINOD KUMAR – Surveyor

ITI (Diploma in Land Survey)

Mr. Vinod Kumar is a Survey Engineer having experience of about 15 years in the field of

Topographic Surveys. He has working experience in India. He has worked on the State of

Art equipment and international practices of road survey. He is employed full time with our

firm and is responsible for planning, coordinating and execution of surveys. Mr. Vinod is

capable of using AutoCAD for preparing inputs for Highway Engineering design and using

site data to prepare drawings.

2. BAL KRISHAN – DIPLOMA IN LAND SURVEY, 1987-

Mr. Bal Krishan is a senior survey Engineer having experience of about 15 years in the field

of Topographic Surveys. He has working experience in India and in Middle East countries

like Saudi Arabia and Bahrain. He is exposed to the State of Art equipment and international

practices of road survey and construction supervision. He is employed on retainer ship basis

with our firm and is responsible for planning and coordinating topographic surveys.

3. MR. Krishan Saini-SR. SURVEY ENGINEER –

Mr. Krishan Saini is the Senior Survey Engineer associated with TPAEC on full time basis. He

has a rick experience of nearly 40 years in carrying out as well as coordination the

topographic survey projects. He retired from Survey of India about 8 years back and is

associated with TPAEC on retainer ship basis. He is responsible for planning, coordinating

and execution of surveys Mr. Krishan Saini is well versed with State of Art survey

equipment’s. Being associated with Survey of India for about 35 years and having retired in

a senior position, Mr. Krishan Saini is well versed with the requirements of Survey of India

towards project works and quality control aspects related to Topographic Surveys.

Page 9: TPA COMPANY PROFILE - 2016

HIGHWAY ENGINEERING CUM QUANTITY ESTIMATION DIVISION

1. Mr. Prashant Joshi

B. E (Civil), 1986, M.Tech (Highway & Traffic), 1988

Mr. Prashant Joshi is a qualified Civil Engineer having 21 years of experience in various

aspects of Highways. He has acquired expertise in highway engineering and pavement

design while pursuing his career as a Highway Engineer. He has rich experience in various

consultancy services organization including CRRI He has got extensive experience in

Planning, Design and construction of Highways. He is associated with us on Retainer ship

basis.

PAVEMENT DESIGN CUM MATERIAL ENGINEERING DIVISION

1. MR. NARENDRA SINGH L.N

BE (Civil), 1984, M.E (Highway Engg.), Bangalore University, 1986

Mr. Narendra Sing is a graduate Civil (Transportation) Engineer having a rich experience of

about 20 years. He has specialized in pavement design and is advocating use of Bituminous

emulsions for highway construction and maintenance. He has been faculty member at REC

Tiruchirapalli, Tamil Nadu as Lecturer in Highway Department. He is associated with us on

retainer-ship basis.

BRIDGE CUM STRUCTURAL ENGINEERING DIVISION

1. MR. LOKESH TYAGI

PG. (Structural Engg.), 1989

Mr. Lokesh Tyagi is a Post Graduate in Structural Engineering from the prestigious Thapar

Institute of Engineering and Technology Patiala in the State of Punjab, Member – Institution

of Engineers India and – Indian Roads Congress, has over the years built a distinct

reputation in this field for himself and for the firm. He is associated with us on retainer-ship

basis.

Page 10: TPA COMPANY PROFILE - 2016

PLANNING AND ARCHITECTURAL DIVISION CUM ENVIRONMENTAL CUM

RESETTLEMENT DIVISION

1. MR. Vinod Gautam

B. Arch (Hons.) 1969, P G Dip. TCP, 1973.

Mr. Vinod Gautam has over 30 years’ experience in the fields of environmental planning,

architecture and rendering Consultancy services to various government, semi-government and

private organizations as well as individual clients. This included detailed planning, preparation

of layout plans, functional planning, up gradation of services, preparation of detailed working

drawings, cost estimates, material specifications, landscaping, construction management etc.

development of research laboratories, public utilities, public and semi-public buildings,

academic, residential, commercial and industrial buildings etc. Mr. Vinod Gautam has notable

experience in assessment of Environment Impacts due to Highway and other Infrastructure

projects. He has been involved in numerous town planning projects including site planning,

framing of development control guidelines, environmental planning, preparation of study

report on solid waste management He is a leading Environmental activist and is extending

voluntary support to NGO based activities in the environment sector. He is the Technical

Director of `ECO-GROUP, an NGO working in the field of Water Restoration. Mr. Gautam is

associated with TPAEC on retainer ship basis.

Page 11: TPA COMPANY PROFILE - 2016

GEO-TECHNICAL CUM FOUNDATION ENGINEERING DIVISION

1. MR. G.R RAO

M. Tech. In Soil Mechanics and Foundation Engineering

Mr. G. Ranga Rao has Post Graduate qualification (M. Tech. In Soil Mechanics and

Foundation Engineering) with 18 years experience in planning, coordination and execution of

Geo – Technical Investigation for roads, Bridge, Industrial Structures, Group Housing

Complex, School, Office, and Shopping Complexes, Substations, Power Plants, Overhead &

Under Ground Tanks etc. Mr. Ranga Rao has more than 1000 Projects to his Credit and has

extensive experience in analysis of field and laboratory data, recommending safe bearing

pressure of substrata/ foundations in all type of soil for various structures including Bridges

pavements, in slope stability analysis and Preparation of report. He is associated with us on

project basis.

2 Mr. R.S. Kesharwani

B. Tech. (Civil), 1986, ME (Soil Mechanic & Foundation Engg.)

Mr. R.S. Kesharwani is Post Graduate, ME (Soil Mechanic & Foundation Engineering). He has

15 years of experience in the field of Geo-technical Investigation for more than 540 projects

in Civil Engineering Structures in Delhi and all other parts of India. He was involved in

investigation for ROB’s, RUB’s and Viaduct Structures in North East for National Highway

Authority of India. He is associated with us on project basis.

Page 12: TPA COMPANY PROFILE - 2016

SUPPORTING STAFF:-

A. PLANNING AND DESIGN DIVISION

1 Rakesh

Mathur

ITI Certificates in Draught man

Civil Civil Engineer

2 Anshul

Chaudhary

Bachelor's Degree in Civil

Engineering Highway Engineer

B. DRAFTING DIVISION

1. Gautam Garg Diploma in Auto CAD Computer Aided Design cum Geographic Information

System Div.

2 Vijay Kumar Certificate Course in Auto CAD Computer Aided Design cum Geographic Information

System Div.

C. TRAFFIC SURVEY DIVISION

1. Manoj Kumar BSC Agr. Engg. Traffic Survey Division.

2 Dheeraj Kumar Diploma in Computer Application Traffic Survey Division.

D. TOPOGAPHIC SURVEY DIVISION.

1 Vinod Diploma in Land Surveying Topographical Surveying Div.

2 Bal Krishan Diploma in Land Surveying Topographical Surveying Div.

3 Mahesh Certificate course in land survey Topographic Surveying Div.

4 Shiv Certificate course in land survey Topographic Surveying Div.

E. PROCUREMENT DIVISION

1. Ram Janak Diploma in Computer Application Procurement Division

2 Rakesh Kumar Diploma in Computer Application Procurement Division

F. DESKTOP PUBLICATION AND DATA ANALYSIS DIVISON

1 Jyoti Diploma in Computer Application

2 Raj Dev Diploma in Computer Application

3 Manju Verma Diploma in Computer Application

G. DRIVER/PEON

1 Ashok 12th Standard

2 Subhash 12th Standard

Page 13: TPA COMPANY PROFILE - 2016

AREAS OF EXPERTISE

1) TRANSPORTATION PLANNING

� Urban Transport Planning solutions

� Regional Transport solutions

� Rural Road Network Planning

� Travel Demand Forecast

� Transport Demand Modeling using software

2) TRAFFIC ENGINEERING AND MANAGEMENT

� Traffic System Management

� Core Area Traffic Improvement schemes

� Corridor level Traffic Management schemes

� Area wide Traffic Management schemes

� Planning and Design of pedestrian facilities

� Planning and design of street Furniture

� Design of Signage and marking schemes

� Design of Traffic control/ signal system

� Traffic Impact Assessment Studies

� Road safety

� Accident Analysis

� Road Safety Audit

� Educational programmes for safety training

� Intersection Design

� Design of At Grade Intersections at Rural/ Urban Locations

� Design of Grade separators at intersections in Rural/ Urban Locations

� Design of Road Over Bridge/ Road Under Bridge

Page 14: TPA COMPANY PROFILE - 2016

� Parking/ Terminal Studies

� Parking Studies

� Terminal/ Off street Parking Planning and Design

� Parking Regulation and Management schemes

3) HIGHWAY AND BRIDGE ENGINEERING

� Highways Design

� Feasibility Studies

� Detailed Engineering Design

� Detailed Project Report preparation

� Project planning and Scheduling

� Design Management, Technical audit and Value Engineering

� Pavement Design

� Flexible Pavement Design (New and Overlay)

� Rigid Pavement Design (New and Overlay)

� Estimation

� Quantity Estimation and Rate Analysis

� Cost Estimation

� Bridge and Structural engineering

� Site Identification for Major/ Minor Bridges

� Topographic Surveys for Bridges

� Preparation of General Arrangement Drawings (GAD) of structures

� Preparation of Detailed Design Drawings of structures

� Preparation of Construction Drawings of structures

Page 15: TPA COMPANY PROFILE - 2016

� Tender Documentation

� Proof Consultancy services

� Preparation of Tender Documents (NCB/ ICB)

� Evaluation of Tender Documents

� Economic and Financial Analysis

� Economic analysis

� Financial analysis

� Estimation of Toll Rates

� Project Financing Mechanisms

� Impact Assessment Studies

� Environment Impact Assessment

� Environment Impact Statement

� Environment Management Plan

� Social Impact Assessment

� Rehabilitation and Resettlement Programmes

4) ALLIED SERVICES

� Topographic surveys

� Final Location/ Ground Tracing Surveys

� Triangulation surveys

� Alignment surveys

� Transport Planning surveys

� Household surveys

� Workplace surveys

� User opinion surveys

� Operator surveys

Page 16: TPA COMPANY PROFILE - 2016

� Traffic surveys

� Mid Block/ Screen Line/ Outer Cordon surveys

� Intersection Counts

� Origin- Destination surveys

� Occupancy surveys

� Pedestrian counts

� Speed and Delay surveys

� Land use Surveys

� Parking Surveys

� Preparation of AUTO CAD Drawings

� Highways

� Buildings/ Structures

� Traffic Engineering Design Drawings

� Geographic Information System applications

� Database Management

Page 17: TPA COMPANY PROFILE - 2016

SERVICES OFFERED TO CLIENTS

� Preliminary and Detailed site investigations

� Concept Studies

� Feasibility Studies

� Detailed Project Reports

� Economic and Financial analysis

� Environmental studies\

� Quantity surveying

� Project Planning and Scheduling

� Construction Supervision / Independent Engineers

� Preparation of Traffic Diversion Schemes

� Safety Audit

� Topographic Surveys

� Traffic Engineering Surveys

� Transportation Planning Surveys

� Highway Engineering Surveys

Page 18: TPA COMPANY PROFILE - 2016

OFFICE

INFRASTRUCTURE

Page 19: TPA COMPANY PROFILE - 2016

INFRASTRUCTURE

OFFICE: VEHICLES

112, KAILASH HILLS, EAST OF KAILASH

NEW DELHI-110065. Swift Desire

Maruti Alto-LADEL00013641746

OFFICE EQUIPMENTS

Our Use of Latest Computers and ancillary office equipments ensure satisfactory of your design

needs.

Operating System : Windows XP

Computers:

1. Desktop : 8 Nos.

2. Core I-3 Processor : 8 Nos

3. Laptop Pentium IV Processor : 3 Nos.

Printers: -

1. Samsung SCX-4200 : A-4 size B/W Printer, Copy & Scan Machine-1

No.

2. Canon LBP2900 : A-4 size B/W printer – 1 No.

3 HP Desk-jet D2300 SERIES : A4 size colour printer-1 No.

4. Canon D-500 Series : A4 size B/W Printer, Scan & Copy Machine-1

No.

5. Epson Stylus Office T1100 : A3 size and a4 size color print – 1 No.

6. HP Desk-jet 2515 : A4 size colour, Scan & Copy Machiner-1 No.

Page 20: TPA COMPANY PROFILE - 2016

Scanner:

1. Canon D-500 : A-4 Size colour scanner- 1 No

Other Equipments:

1. Fax Machines : Panasonic

CD WRITER:

1. HP CD Writer Plus : 2 Nos.

The firm has associated arrangements with M/s Tipsy Topsy in East of Kailash for

printing larger size (A-1,A-0,A-3,A-2 etc.) drawings on laser printer at very shot notice.

Page 21: TPA COMPANY PROFILE - 2016

OFFICE

SOFTWARE

Page 22: TPA COMPANY PROFILE - 2016

SOFTWARES:

We have several indigenously made soft wares, which are useful for providing simple solutions to

complex problems.

1) General Applications Software:

• MS Office Basic-2003 – 1 user – Licensed

• MS Office Professional-2003-1 user.-Licensed

• Windows XP Home Edition-6 user - Licensed

• Kaspersky Antivirus 2013- users-Licensed

• AUTO CAD – 2014 – Licensed

• AUTO CAD – Civil CAD 2014 – Licensed

• AUTO CAD – 3Ds Max 2014 – Licensed

• AUTO CAD- Utilities Design 2014 – Licensed

• AUTO CAD – Revit Structure 2014 – Licensed

• AUTO CAD – Map 3D 2014 – Licensed

2) Highway Engineering Applications (associated arrangements)

♦ CIVIL CAD Infrastructure Suite package 2014

♦ STADD – III

♦ HDM – IV

The software developed by and/or available with TPAEC provides full capabilities for designing of

highways, bridge superstructures, pile, well or open foundations, design of flexible pavements,

geometrical designs of roadways, traffic analysis and projections, project management and

scheduling.

Page 23: TPA COMPANY PROFILE - 2016

ii) Traffic Engineering and Transportation Planning Applications

(associated arrangements)

Computer programmes for the conventional Four Stages Transport Planning Process

(UTPS) have been developed in FORTRAN and Turbo C.

♦ Sophisticated programs have been developed to generate O-D matrix of any size in

Visual FoxPro, FORTRAN and C++.

♦ In FoxPro and C++, TPAEC has developed computer programs to estimate Parking

Duration, Accumulation and other quantitative/ qualitative estimates, both for On-

Street and Off-Street parking

♦ To forecast the traffic from the historical data and socio-economic information,

software programmes have been developed in Excel and Statgraf.

♦ User-friendly computer programmes have been developed to calculate corridor wise

Journey and travel time, running speeds and also to develop Travel Time Isochrones.

♦ User-friendly packages have been developed to carry out economic analysis and

financial analysis for Transportation projects.

♦ SIDRA

♦ Transyt -9

iii) Topographic Surveys and Data Analysis

♦ Completion of Maps in Office with the help of Satellite Imagery and Ariel Maps.

♦ Processing of Ariel Photographs through Photogrammetric machines.

♦ Verification of updated map in the field.

Page 24: TPA COMPANY PROFILE - 2016

SURVEY

EQUIPMENTS

Page 25: TPA COMPANY PROFILE - 2016

SURVEYING EQUIPMENTS:

TPAEC has all necessary surveying instruments to carry out topographical surveys.

Following are the list of instrument available with TPAEC.

(ES-105)

TOPCON REFLECTORLESS ELECTRONIC

TOTAL STATION

(GTS-720)

TOPCON TOTAL STATION

(C4.1)

SOKKIA AUTO LEVEL

(CAS RW)

15P WHEEL WEIGHING DIGITAL SCALE

(GPS-60)

GARMIN

BENKELMAN BEAM

SOKIA CX-105/SS

Page 26: TPA COMPANY PROFILE - 2016

ADDRESS FOR COMMUNICATIONS

TPA Engineering Consultancy (I) Pvt. Ltd.

112, Kailash Hills, New Delhi – 110065

MOBILE NO:

Mr. Rajeev Roy : 91+9811124721

Telephone : +91-11-41623940,

Telefax : +91-11-41624519

E-mail : [email protected]

: [email protected]

CIN No : U74140DL1999PTC101138

Page 27: TPA COMPANY PROFILE - 2016

FINANCIAL

TURNOVER

Page 28: TPA COMPANY PROFILE - 2016

� FINANCIAL STATUS:

ANNUAL TURNOVER FOR PAST 6 YEARS

S. No

(1)

Financial

Year

(2)

Annual Income

(Rs.)

(3)

01 2013-2014 1,44,77,000

02 2012-2013 81,27,892

03 2011-2012 1,29,53,897

04 2010-2011 81,36,337

05 2009-2010 79,77,259

06 2008-2009 93,34,751

(Bankers)

AXIS Bank Ltd.

B-6, Lajpat Nagar - II

New Delhi

HDFC Bank

Kailash Hills, East of Kailash

New Delhi.

(Chartered Accountant)

Aditya Aggarwal

M/s ASA Services

165, Sukhdev Vihar

New Delhi 110024, India

�: +91-11-29830165, 29831449

Page 29: TPA COMPANY PROFILE - 2016

PROJECTS

EXPERIENCE

Page 30: TPA COMPANY PROFILE - 2016

TRAFFIC ENGINEERING

FOR

HOUSING PROJECTS/

TOWNSHIPS

Page 31: TPA COMPANY PROFILE - 2016

TRAFFIC ENGINEERING FOR HOUSING /TOWNSHIP PROJECTS.

YEAR CLIENTS PROJECT NAME CATEGORY

1 BASANT PROJECTS LTD

TRANSPORTATION PLAN FOR UPCOMING RESIDENTIAL PROJECTS AT GAUSHALA ROAD, SARAI ROHILLA’DELHI

TRANSPORT PLANNING

2 UNITY BUILDWELL LTD.

TRANSPORTATION PLAN FOR MALL AT ROHINI. TRANSPORT PLANNING

3 AMRAPALI GROUP

TRANSPORT CONSULTANT FOR AMRAPALI DREAM VALLEY PROJECT AT GH-09, SECTOR TECH ZONE IV GREATER NOIDA

TRANSPORT PLANNING

4 AMRAPALI GROUP

TRAFFIC CIRCULATION PARKING AND MANAGEMENT PLAN FOR VERONA HEIGHTS, NOIDA EXTENSION (WEST)

TRANSPORT PLANNING

5 AMRAPALI GROUP

TRANSPORT CONSULTANT FOR AMRAPALI CENTURION PARK PROJECT AT GH-05, SECTOR – TECH ZONE IV GREATER NOIDA

TRANSPORT PLANNING

6 AMRAPALI GROUP

TRAFFIC CIRCULATION PARKING PLAN FOR AMRAPALI GOLF HOMES HOUSING COMPLEX GR. NOIDA

TRANSPORT PLANNING

7 DEFINITI DESIGN

CONSULTANCY SERVICES FOR TRAFFIC CIRCULATION SCHEME OF RAMPRASTHA SARE REALTY PVT. LTD.

ENGINEERING DESIGN

Page 32: TPA COMPANY PROFILE - 2016

DELHI METRO

PROJECT

LIST

Page 33: TPA COMPANY PROFILE - 2016

TRAFFIC DIVERSION METRO WORKS CARRIED OUT BY CONSULTANT

YEAR CLIENTS PROJECT NAME CATEGORY

2014 LARSEN AND

TOURBO

CONSTRUCTION OF ELEVATED VIADUCT, 8 ELEVATED STATIONS VIZ.

TRANSPORT NAGAR, KRISHNA NAGAR SINGAR NAGAR, ALAMBAGH,

ALAMBAGH BUS STATION, MAVIAYA, DURGAPURI AND CHARBAGH RAILWAY

STATION FROM CHAINAGE 687.140 M TO 9171.440 M AND CONNECTING

ELEVATED VIADUCT AND RAMP TO DEPOT AT PAC GROUND TRANSPORT

NAGAR ON NORTH - SOUTH CORRIDOR OF LUCKNOW METRO AT LUCKNOW,

UTTAR PRADESH.

TRANSPORT

PLANNING

2014 HCC LTD CC-66 PREPARATION OF TRAFFIC DIVERSION PLANS FOR TWO METRO

STATIONS I.E. PALAM AND I.G.D. AIRPORT FOR CC-32 CONTRACT ON

JANAKPURI WEST-KALINDI KUNJ CORRIDOR UNDER DELHI MRTS PROJECT

OF PHASE –III

TRAFFIC

DIVERSION

SCHEME

2013 ITD ITD CEM JV CC-32 PREPARATION OF TRAFFIC DIVERSION PLANS FOR TWO METRO

STATIONS I.E. PALAM AND I.G.D. AIRPORT FOR CC-32 CONTRACT ON

JANAKPURI WEST-KALINDI KUNJ CORRIDOR UNDER DELHI MRTS PROJECT

OF PHASE-III.

TRAFFIC

DIVERSION

SCHEME

2013 ITD ITD CEM JV TRAFFIC DIVERSION WORK FOR DMRC CC26R PROJECT: PART DESIGN AND

CONSTRUCTION OF ELEVATED VIADUCT INCLUDING ENTRY EXIT LINE, RAMP

TO DEPOT, AND 8 ELEVATED STATIONS VIZ MAYUR VIHAR-1, MAYUR VIHAR

PKT-1, TRILOKPURI, VINOD NAGAR EAST, VINOD NAGAR, IP EXTENSION,

ANAND VIHAR, AND KARKARDUMA STATIONS INCLUDING ARCHITECTURAL

FINISHING, WATER SUPPLY, SANITARY INSTALLATION AND DRAINAGE

WORKS OF STATIONS FROM CHAINAGE 37179.000 TO 46214.787 OF LINE 7

MUKUNDPUR-YAMUNA VIHAR CORRIDOR OF PHASE-III DELHI MRTS

TRAFFIC

DIVERSION

SCHEME

2013 HCC LTD. CC-34 PREPARATION OF TRAFFIC MANAGEMENT SCHEME AT DMRC PROJECT

AT DASHRATH PURI STATION NEW DELHI.

TRAFFIC

DIVERSION

SCHEME

2013 HCC LTD. CC-30 PREPARATION OF PROPOSAL FOR TRAFFIC CIRCULATION SCHEME AS

PER THE REQUIREMENT OF DMRC FOR PROPOSED NETAJI SUBHASH PLACE

AREA IN DMRC CC-30 PROJECT OF DMRC PH-III. – 2ND WORK

TRAFFIC

DIVERSION

SCHEME

2013 L & T CC-27 PREPARATION OF TRAFFIC DIVERSION SCHEME FOR PROPOSED HAUZ

KHAS STATION AND OTHER STATIONS ALONG LANE 8 OF DMRC PHASE III

TRAFFIC

DIVERSION

SCHEME

2012 L & T CC-05 DESIGN AND CONSTRUCTION OF TUNNEL BY SHIELD TBM AND ITO,

DELHI GATE AND JAMA MASJID STATIONS BY CUT AND COVER METHOD

BETWEEN MANDI HOUSE AND JAMA MASJID FOR UNDERGROUND WORKS

UNDER DELHI MRTS PROJECT OF PHASE-III

TRAFFIC

DIVERSION

SCHEME

2012 ERA DESIGN AND CONSTRUCTION OF TUNNEL BY SHIELD TBM AND LAL QILA

AND KASHMERE GATE STATIONS BY CUT AND COVER METHOD BETWEEN

JAMA MASJID AND KASHMERE GATE FOR UNDERGROUND WORKS UNDER

DELHI MRTS PROJECT OF PHASE III..

TRAFFIC

DIVERSION

SCHEME

2012 DMRC TRAFFIC VOLUME SURVEY AND TRAFFIC MANAGEMENT PLANNING TO

DEVELOP THE PROPER TRAFFIC DIVERSION SCHEMES IN THE STRETCH

STARTING FROM BHIKAJI CAMA PLACE AND ENDING AT H. NIZAMUDDIN OF

LINE-7 OF DELHI MRTS PHASE-III.

TRAFFIC

DIVERSION

SCHEME

Page 34: TPA COMPANY PROFILE - 2016

2011 DMRC PLANNING OF TRAFFIC DIVERSION SCHEMES ALONG RING ROAD CORRIDOR

FROM BHIKHAJI CAMA PLACE TO SHALIMAR BAGH FOR LINE 7 OF DELHI

MRTS PROJECT PHASE-III.

TRANSPORT

PLANNING

2011

AFCONS

CONTRACT CC-05: DELHI AND CONSTRUCTION OF TUNNEL BY SHIELD TBM,

AND ITO, DELHI GATE AND JAMA MASJID STATION BY CUT & COVER

METHOD BETWEEN MANDI HOUSE & JAMA MASJID FOR UNDERGROUND

WORKS UNDER DELHI MRTS PROJECT OF PHASE-III.(PRE- BID ADVISORY)

PRE BID

ADVISORY

CONTRACT CC-07: DESIGN AND CONSTRUCTION OF TUNNEL BY SHIELD TBM

AND LAL QILA AND KASHMERE GATE STATIONS BY CUT AND COVER METHOD

BETWEEN JAMA MASJID AND KASHMERE GATE FOR UNDERGROUND WORKS

UNDER DELHI MRTS PROJECT OF PHASE-III..

PRE BID

ADVISORY

2010 RITES LTD STATION AREA DESIGN ALONG WITH DIVERSION SCHEMES AND TRAFFIC

INTEGRATION SCHEMES FOR FOUR METRO STATIONS ALONG MAHIM-BKC

AIRPORT-KANJUR MARG METRO CORRIDOR

TRANSPORT

PLANNING

2009 RITES LTD PROJECT REPORTS FOR THREE METRO CORRIDORS KOLKATA- FINANCIAL

PROPOSAL FOR CARRYING OUT PREPARATION OF TRAFFIC DISPERSAL AND

INTER-MODAL INTEGRATION PLANS.

TRANSPORT

PLANNING

2009 RITES LTD PREPARATION OF FEASIBILITY REPORT FOR ELEVATED SUB-URBAN RAIL

CORRIDOR (CHURCHGATE TO VIRAR) IN MUMBAI.

TRANSPORT

PLANNING

2009 RITES LTD PREPARATION OF TRAFFIC CIRCULATION SCHEMES FOR INFLUENCE AREA

AFTER REDEVELOPMENT OF NEW DELHI RAILWAY STATION.

TRANSPORT

PLANNING

2007 METRO

TUNNELING

GROUP

TRAFFIC DIVERSION SCHEME FOR HAUZ KHAS METRO STATION TRAFFIC

DIVERSION

SCHEME

2007 L & T TRAFFIC MANAGEMENT PLAN DURING CONSTRUCTION OF TERMINAL T-3

DIAL PROJECT

TRAFFIC

DIVERSION

SCHEME

2007 RITES LTD TRANSPORT DEMAND FORECAST STUDY AND DEVELOPMENT OF AN

INTEGRATED ROAD CUM MULTI MODAL PUBLIC NETWORK FOR NCT DELHI-

HOUSEHOLD SURVEYS

TRAFFIC

DIVERSION

SCHEME

2007 RITES LTD BUS RAPID TRANSIT SYSTEM FOR OUTER RING ROAD IN BANGALORE –

CARRYING OUT DESIGN AND DETAILED DRAWINGS WORK

TRANSPORT

PLANNING

2007 RITES LTD DESIGN OF BUS RAPID TRANSIT CORRIDORS IN DELHI JAMIA-TILAK NAGAR

& NIZAMUDDIN BRIDGE NAND NAGRI CORRIDOR- CARRYING OUT DESIGN &

DETAILED DRAWING WORK

TRAFFIC

ENGINEERING

2006 L & T TRAFFIC STUDIES FOR ESTIMATION OF DIVERSION AT MRTS STATION NEAR

UDYOG MARG AND PREPARATION OF TRAFFIC DIVERSION PLANS FOR

STATION DURING CONSTRUCTION

TRAFFIC

DIVERSION

SCHEME

2006 RITES LTD DESIGN OF BUS RAPID TRANSIT CORRIDORS IN DELHI JAMIA –TILAK NAGR

CORRIDOR – CARRYING OUT TRAFFIC SURVEYS

TRAFFIC

ENGINEERING

2005 RITES LTD CONDUCTING HOUSEHOLD INTERVIEW SURVEY FOR BANGALORE

METROPOLITAN AREA FOR CTTP FOR BANGAORE

TRANSPORT

PLANNING

Page 35: TPA COMPANY PROFILE - 2016

FOOT OVER BRIDGE

PROJECT LIST

Page 36: TPA COMPANY PROFILE - 2016

FOOT OVER BRIDGES (FOB’S) WORKS CARRIED OUT BY CONSULTANT

YEAR CLIENTS PROJECT NAME CATEGORY

2014 PWD DELHI FEASIBILITY STUDY FOR TWO FOB’S NEAR MULTAN NAGAR NH-10 AND EAST PUNJABI BAGH METRO STATION DELHI

FEASIBILITY STUDY

2014 PWD DELHI FEASIBILTY STUDY FOR FOOT OVER BRIDGE AT INDERCHAND SHASTRI

MARG NEAR RUB AT SINDHORA KALAN VILLAGE

FEASIBILITY

STUDY

2014 PWD DELHI FEASIBILITY STUDY FOR FOOT OVER BRIDGES AT TEWATIA MARG RED

LIGHT NEAR SATYAWATI COLLEGE AND WAZIRPUR VILLAGE OPP. DJB

OFFICE/WATER TANK ON GULAB SINGH MARG

FEASIBILITY

STUDY

2014 PWD DELHI DESIGN OF FEASIBILITY STUDY OF FOB AT MAYAPURI OPPOSITE

PRATIBHA SCHOOL

FEASIBILITY

STUDY

2014 PWD DELHI PEDESTRIAN COUNTS AT EXISTING FOOT OVER BRIDGE FOR PERIOD OF

3 DAYS

FEASIBILITY

STUDY

2014 PWD DELHI FEASIBILITY STUDY FOR FOOT OVER BRIDGE NEAR KHAMPUR VILLAGE

NH-44 DELHI

FEASIBILITY

STUDY

2014 PWD DELHI FEASIBILITY STUDY FOR A FOOT OVER BRIDGE AT ACROSS RING ROAD

NEAR BHIKAJI CAMA PLACE NEW DELHI

FEASIBILITY

STUDY

2013 PWD DELHI FEASIBILITY STUDY FOR FOOT OVER BRIDGE FROM RTR MARG FEASIBILITY

STUDY

2013 PWD DELHI FEASIBILITY STUDY FOR FOOT OVER BRIDGE NEAR METCALF HOUSE

MALL ROAD DELHI

FEASIBILITY

STUDY

2013 PWD DELHI PREPARATION OF FEASIBILITY STUDY FOR ONE FOB ALONG PATEL ROAD

NEAR KIRTI NAGAR METRO STATION

FEASIBILITY

STUDY

2013 PWD DELHI PREPARATION OF FEASIBILITY STUDY FOR FOUR FOB IN DELHI FEASIBILITY

STUDY

2012 PWD DELHI FEASIBILITY STUDY FOR FOB ALONG GT ROAD FEASIBILITY

STUDY

2012 PWD DELHI FEASIBILITY STUDY FOR FOB ACROSS RING ROAD NEAR HANUMAN

MANDIR OPPOSITE VISHWANATH SANYASH ASHRAM AT BELA ROAD

CIVIL LINE DELHI

FEASIBILITY

STUDY

2012 PWD DELHI DESIGN OF FOOT OVER BRIDGE AT ISBT KASHMIRI GATE FEASIBILITY

STUDY

2011 NOIDA AUTHORITY

DETAILED DESIGN OF FOOT OVER BRIDGE AT SECTOR 41 & 50 NOIDA FEASIBILITY STUDY

2011 PWD DELHI PROVIDING SURVEY PLAN OF AUROBINDO MARG BETWEEN AIIMS FOB AND IIT JUNCTIONS

FEASIBILITY STUDY

2011 PWD DELHI FEASIBILITY STUDY FOR FOOT OVER BRIDGE ACROSS RING ROAD AT MODEL TOWN

FEASIBILITY STUDY

2011 PWD DELHI FEASIBILITY STUDY FOR FOOT OVER BRIDGES ALONG OUTER RING ROAD AT 2 LOCATIONS IN DELHI

FEASIBILITY STUDY

2011 PWD DELHI FEASIBILITY STUDY FOR FOB ACROSS RING ROAD AT PUNJABI BAGH CLUB FLYOVER IN DELHI

FEASIBILITY STUDY

2010 NOIDA

DEVELOPMENT

FEASIBILITY SUPPLY FOR TWO FOOT OVER BRIDGES (FOB) ACROSS DSC

ROAD AT BAROLA AND BHANGEL VILLAGE,NOIDA

FEASIBILITY

STUDY

Page 37: TPA COMPANY PROFILE - 2016

AUTHORITY

2010 NOIDA AUTHORITY

FEASIBILITY STUDY FOR TWO FOB’S ALONG DSC ROAD AT BAROLA AND BHANGEL VILLAGE

FEASIBILITY

STUDY

2008 NOIDA

AUTHORITY

DEIGN OF STRUCTURAL PEDESTRIAN BRIDGE ACROSS DRAIN IN SEC 49-

50 NOIDA

FEASIBILITY

STUDY

2007 PWD DELHI FEASIBILITY STUDIES FOR 3 FOOT OVER BRIDGE ALONG RING ROAD AT

BRITANNIA CHOWK, ASHOK VIHAR AND SHALIMAR BAGH

FEASIBILITY

STUDY

2007 PWD DELHI FEASIBILITY STUDY FOR FOOT OVER BRIDGE AT MOTI NAGAR T-POINT ON

RING ROAD, NEW DELHI

FEASIBILITY

STUDY

2006 PWD DELHI FEASIBILITY STUDY FOR PROVISION OF FOB ACROSS ROAD NO 43 NEAR

RAM MANDIR SHAKURPUR DELHI

FEASIBILITY

STUDY

Page 38: TPA COMPANY PROFILE - 2016

CURRENT

ASSIGNMENTS

Page 39: TPA COMPANY PROFILE - 2016

PROJECTS IN PIPELINES- 2016

S. NO

CLIENTS PROJECT NAME CATEGORY

1 MMR GROUP TRAFFIC MANAGEMENT AND PARKING PLAN FOR MMR COMPLEX AT SECTOR 52, NOIDA

ENGINEERING DESIGN

2 PWD DELHI A/R AND M/O ROADS UNDER PWD DIVN. M-113, NEW DELHI DURING 2014-15. (TOPOGRAPHIC SURVEY OF PROPOSED ROADS UNDER SUB DIVISION M-1133)

FEASIBILITY STUDY

3 PWD DELHI CONSTRUCTION OF RUB AT RAILWAY KM 0/7-8 NEAR MANSAROVER PARK METRO STATION ON DELHI-SHAHDARA SHAMLI SAHARANPUR SECTION INCLUDING APPROACHES.

ENGINEERNG DESIGN

4 GR. NOIDA DESIGN OF KISAN CHOWK ALONG 130M WIDE ROAD GR NOIDA ENGINEERING DESIGN

5 PAC GHAZIABAD LAND ACQUISION AT CRPF CAMP, GHAZIABAD FEASIBILITY STUDY

6 PWD DELHI DESIGN OF PARKING BELOW SHAHDARA FLYOVER ENGINEERING DESIGN

Page 40: TPA COMPANY PROFILE - 2016

CURRENT ASSIGNMENTS

YEAR 2016.

S. NO

CLIENTS PROJECT NAME CATEGORY

1 GR. NOIDA AUTHORITY

TOPOGRAPHIC SURVEY AND DESIGN OF 60M ROAD BETWEEN KISAN CHOWK AND OVAL ROTARY OPPOSITE AMRAPALI DREAM VALLEY TOWNSHIP IN GR. NOIDA

ENGINEERING DESIGN

2 PWD DELHI PREPARATION OF DETAILED PROJECT REPORT FOR PEDESTRIAN UNDERPASS AT DILSHAD GARDEN METRO STATION

DETAILED PROJECT REPORT

3 JAI SHIVA INFRA PROJECT

GEOMETRIC DESIGN OF VARIOUS INTERSECTIONS IN SECTOR 150 NOIDA ENGINEERING DESIGN

4 MC HISAR COMPREHENSIVE TRAFFIC AND TRANSPORT STUDY AND FORMULATION OF CMP FOR THE HISAR URBAN AREA

TRANSPORT PLANNING

5 NOIDA AUTHORITY TOPOGRAPHIC SURVEY AND DRAINAGE DESIGN OF SECTOR 100 NOIDA ENGINEERING DESIGN

6 NOIDA AUTHORITY DESIGN OF ACCESS ROAD FROM EXPRESSWAY NEAR SECTOR 108 NOIDA ENGINEERING DESIGN

7 NOIDA AUTHORITY DESIGN OF INTERSECTIONS BETWEEN THE SLIP ROAD OF MAHAMAYA FLYOVER IN THE SOUTH WESTERN QUADRANT AND 30M ROAD FROM SECTOR 94, NOIDA.

ENGINEERING DESIGN

8 GR. NOIDA AUTHORITY

LAYOUT OF IMPROVEMENT PROPOSALS BETWEEN 80M WIDE S.K. ROAD AND 60M WIDE SECTOR ROAD SEPARATING ALPHA AND BEETA SECTORS, AS WELL AS 24M WIDE SECTOR ROAD IN KNOWLEDGE PARK-1.

TRANSPORT PLANNING

9 PWD DELHI CROSS SECTION INVENTORY OF ROADS IN DIVISION M -112, PWD DELHI. FEASIBILITY STUDY

10 ICT ONLINE COST ESTIMATES FOR IRF PROJECT-IMPROVEMENT PROPOSALS FOR 5 INTERSECTIONS.

FEASIBILITY STUDY

11 L & T- LUCKNOW TRAFFIC DIVERSION SCHEME FOR PHASE-II OF LUCKNOW METRO RAIL BETWEEN HUSAIN GANJ AND HAZRAT GANJ.

TRANSPORT PLANNING

12 GR NOIDA. DESIGN OF INTERSECTION BETWEEN NH-91 AND 60M WIDE ROAD AT DADRI ENGINEERING DESIGN

13 NOIDA AUTHORITY RE-DESIGN OF EXPRESS HIGHWAY BETWEEN DELHI NOIDA BORDER AND DND FLYWAY NOIDA

ENGINEERING DESIGN

14 CENTRAL PARK-II PROJECT

PREPARATION OF TRAFFIC MANAGEMENT PLAN FOR CENTRAL PARK II BASEMENT PARKING

TRAFFIC SURVEY

Page 41: TPA COMPANY PROFILE - 2016

MAJOR PROJECTS

COMPLETED

Page 42: TPA COMPANY PROFILE - 2016

PROJECT COMPLETED FOR THE YEAR 2016

S.

NO

CLIENTS PROJECT NAME CATEGORY

1 NOIDA AUTHORITY TOPOGRAPHIC SURVEY OF PLOT IN SECTOR 139A AND 139 B. TOPOGRAPHIC SURVEY

2 DEFINITI DESIGN CONSULTANCY SERVICES FOR TRAFFIC CIRCULATION SCHEME OF RAMPRASTHA SARE REALTY PVT. LTD.

ENGINEERING DESIGN

Page 43: TPA COMPANY PROFILE - 2016

PROJECT COMPLETED FOR THE YEAR 2015

S. NO

CLIENTS PROJECT NAME CATEGORY

1 INDIAN TECHNOCRAT LTD.

PREPARATION OF FEASIBILITY REPORT FOR TWO LANING OF STATE HIGHWAYS 2 AND 6 (PACKAGE-15)

FEASIBILITY STUDY

2 INDIAN TECHNOCRAT LTD.

PREPARATION OF FEASIBILITY REPORT FOR TWO LANING OF STATE HIGHWAYS 3 AND 4 (PACKAGE-15)

FEASIBILITY STUDY

3 PWD DELHI FEASIBILITY STUDY FOR FOOT OVER BRIDGE AT INDERCHAND SHASTRI MARG NEAR RUB AT SINDHORA KALAN VILLAGE

FEASIBILITY STUDY

4 PWD DELHI TOPOGRAPHIC SURVEY OF RING ROAD BETWEEN DND AND SARAI KALE KHAN TOPOGRAPHIC SURVEY

5 PWD DELHI ARCHITECTURAL AND STRUCTURAL DESIGN OF FOOT OVER BRIDGE AT KHAMUR VILLAGE ACROSS NH-1

ENGINEERING DESIGN

6 PWD DELHI PREPARATION OF GENERAL ARRANGEMENT DRAWINGS OF PEDESTRIAN UNDERPASS(PUP) ACROSS NH-24 AT DILSHAD GARDEN

ENGINEERING DESIGN

7 PWD DELHI CONSTRUCTION OF APPROACH ROADS TO THE RUB ACROSS RAILWAY LINE AT MANSAROVAR PARK ON NH-24.

TOPOGRAPHIC SURVEY

8 PWD DELHI DESIGN OF PUNJABI BAGH INTERSECTION ENGINEERING DESIGN

9 PWD DELHI TOPOGRAPHIC SURVEY OF ROAD BETWEEN KHERA MODE TO JHULJULI MODE IN NAJAFGARH

TOPOGRAPHIC SURVEY

10 PWD DELHI FEASIBILITY STUDY OF TWO FOB’S NEAR MULTAN NAGAR NH-10 AND EAST PUNJABI BAGH METRO STATION, DELHI

FEASIBILITY STUDY

11 PWD DELHI DESIGN OF LEFT TURN FROM NH-8 TO RING ROAD AT DHAULA KUAN INTERSECTION

ENGINEERING DESIGN

12 PWD DELHI TOPOGRAPHICAL SURVEY OF RING ROAD FROM NIGAMBODH GHAT SUBWAY TO AZADPUR

TOPOGRAPHIC SURVEY

13 PWD DELHI FEASIBILITY STUDY FOR FOOT OVER BRIDGE AT MAUJPUR YAMUNA VIHAR. FEASIBILITY STUDY

14 PWD DELHI TOPOGRAPHICAL SURVEY PLAN I/C DESIGN OF ROAD LAYOUT PLAN, STORM WATER DRAIN AND OTHER DETAILS ETC. AT TRIPOLIA GATE NR JAIN COLONY ON G.T. ROAD

TOPOGRAPHIC SURVEY

15 PWD DELHI FEASIBILITY STUDY FOR FOOT OVER BRIDGE AND IMPROVEMENT PROPOSAL FOR NH-10 AROUND TIKRI BORDER

FEASIBILITY STUDY

16 PWD DELHI DESIGN OF FOUR INTERSECTION ALONG DEV PRAKASH SHASTRI MARG & DR. GIRDHARI LAL MARG.

ENGINEEERING DESIGN

17 PWD DELHI PREPARATION OF GENERAL ARRANGEMENT DRAWING OF PEDESTRIAN UNDERPASS ACROSS GT ROAD AT DILSHAD GARDEN METRO STATION

ENGINEERING DESIGN

18 PWD DELHI TOPOGRAPHIC SURVEY FOR VUP RAMP AT MANSAROVAR PARK AND DESIGN RAMP RUB AT MANSAROVAR PARK

TOPOGRAPHIC SURVEY

19 PWD DELHI TOPOGRAPHIC SURVEY FOR VUP RAMP AT EAST RAM NAGAR AND DESIGN RAMP RUB AT EAST RAM NAGAR

TOPOGRAPHIC SURVEY

20 PWD DELHI PRE FEASIBILITY STUDY FOR EIGHT FOB’S LOCATIONS IN EAST DELHI. FEASIBILITY STUDY

21 PWD DELHI DRAIN DESIGN AND ROAD IMPROVEMENT ALONG IT PARK UPTO RIVER YAMUNA FOR LENGTH OF 1.3 KM.

ENGINEERING DESIGN

22 PWD DELHI IMPROVEMENT PROPOSAL FOR RING ROAD BETWEEN COD POINT- DHAULA KUAN AND START OF NARAINA FLYOVER NEAR BRO HQ.

ENGINEERING DESIGN

23 PWD DELHI TOPOGRAPHIC SURVEY OF MAHRAULI MAHIPAL PUR ROAD BETWEEN MAHIPALPUR NH-8 INTERSECTION AND ARUNA ASAF ALI MARG

TOPOGRAPHIC SURVEY

24 PWD DELHI DRAIN DESIGN AND ROAD IMPROVEMENT ALONG IT PARK AT SHASTRI PARK UPTO RIVER YAMUNA FOR LENGTH OF 1.3 KM

ENGINEERING DESIGN

25 PWD DELHI DESIGN OF INTERSECTION BETWEEN RING ROAD AND PRINCE ROAD – PAMBRI MARG

ENGINEERING DESIGN

Page 44: TPA COMPANY PROFILE - 2016

26 PWD DELHI CORRIDOR IMPROVEMENT OF MAJOR ASHWANI KANWA MARG IN PASCHIM VIHAR NEW DELHI

ENGINEERING DESIGN

27 PWD DELHI TRAFFIC IMPACT ASSESSMENT OF NEW COURT COMPLEX AT DDU MARG, DELHI TRAFFIC SURVEY

28 NOIDA AUTHORITY CLASSIFIED TRAFFIC COUNT AT ONE LOCATION FOR A PERIOD OF 24 HOURS ALONG NOIDA –EXPRESSWAY NEAR FILM CITY FLYOVER

TRAFFIC SURVEY

29 NOIDA AUTHORITY LAYOUT OF ONE INTERSECTION ALONG 75M ROAD BETWEEN 75M ROAD, 45M ROAD AND SERVICE ROAD AT SECTOR 105 AND ALONG EXPRESSWAY NOIDA.

ENGINEERING DESIGN

30 NOIDA AUTHORITY DESIGN OF DRAINAGE SYSTEM FOR SURFACE WATER RUNOFF AT SADARPUR VILLAGE IN NOIDA

ENGINEERING DESIGN

31 NOIDA AUTHORITY TOPOGRAPHIC SURVEY OF SADAR PUR VILLAGE IN NOIDA. TOPOGRAPHIC SURVEY

32 NOIDA AUTHORITY DESIGN OF 1 INTERSECTION AT CONFLUENCE OF IN SECTORS (67,65,69,68) IN NOIDA.

ENGINEERING DESIGN

33 NOIDA AUTHORITY DESIGN OF DRAIN ALONG ROAD CONNECTING DSC ROAD AND NOIDA- GREATER NOIDA EXPRESSWAY

ENGINEERING DESIGN

34 NOIDA AUTHROTIY DESIGN OF DRAIN AND CULVERTS BETWEEN SECTOR 145 AND 149 ALONG 45M ROAD ADJOINING THE NOIDA GR. NOIDA EXPRESSWAY

ENGINEERING DESIGN

35 NOIDA AUTHORITY TOPOGRAPHIC SURVEY OF FOUR PLOTS IN SECTOR 51 NOIDA TOPOGRAPHIC SURVEY

36 NOIDA AUTHORITY IMPROVEMENT PROPOSAL FOR ADDITIONAL LANES FOR TRAFFIC AT SECTOR 14A AND FOR TRAFFIC DIVERSION AT SECTOR 15A.

TOPOGRAPHIC SURVEY

37 NOIDA AUTHORITY DESIGN OF U TURN ALONG AGHAPUR ROAD IN SECTOR 39-50-41 NOIDA ENGINEERING DESIGN

38 NOIDA AUTHORITY DESIGN OF ONE INTERSECTION BETWEEN 45M AND 45M ROAD IN SECTOR 137. ENGINEERING DESIGN

39 NOIDA AUTHORITY DESIGN OF 2 ROADS IN NOIDA:- 1. ABOVE DRAIN BETWEEN DELHI BORDER AND NARMADA MARG 2. CORRIDOR IMPROVEMENT OF NARMADA MARG IN SECTOR 11 NOIDA.

ENGINEEING DESING

40 NOIDA AUTHORITY CORRIDOR IMPROVEMENT PROPOSAL FOR MASTER PLAN ROAD NO.1 NOIDA TOPOGRAPHIC SURVEY

41 NOIDA AUTHORITY TOPOGRAPHIC SURVEY OF OPEN PLOT IN CHELLERA VILLAGE, NOIDA. TOPOGRAPHIC SURVEY

42 NOIDA AUTHORITY CORRIDOR IMPROVEMENT O UDHAYAN MARG SEPARATING BETWEEN SECTOR 33 AND 34 NOIDA

FEASIBILITY STUDY

43 NOIDA AUTHORITY DESIGN OF FOUR U TURNS ALONG 75M ROAD BETWEEN MASTER PLAN ROAD NO 3 AND ITS INTERSECTIONS WITH DSC ROAD IN NOIDA

ENGINEERING DESIGN

44 NOIDA AUTHORITY TOPOGRAPHIC SURVEY OF DRAINAGE SCHEME IN BLOCK A AND B, SECTOR 51 NOIDA.

TOPOGRAPHIC SURVEY

45 NOIDA AUTHORITY T POINTS JUNCTION ADJACENT TO MOTHER DAIRY IN SECTOR 48 NOIDA. TOPOGRAPHIC SURVEY

46 NOIDA AUTHORITY GEOMETRIC DESIGN, COST ESTIMATION AND LAYOUT OF DESIGN OF 3 INTERSECTION AND PLOT SUB DIVISION IN SECTOR 62 NOIDA

ENGINEERING DESIGN

47 NOIDA AUTHORITY TOPOGRAPHIC SURVEY OF YAKUDPUR IN SECTOR 83 NOIDA. TOPOGRAPHIC SUREY

48 NOIDA AUTHORITY TOPOGRAPHIC SURVEY OF DSC ROAD OPPOSITE NEPZ BETWEEN T JUNCTION AND U TURN.

TOPOGRAPHIC SURVEY

49 NOIDA AUTHORITY TOPOGRAPHIC SURVEY OF SELECTED PLOTS IN SECTOR 62, NOIDA. TOPOGRAPHIC SURVEY

50 NOIDA AUTHORITY TOPOGRAPHIC SURVEY OF SLUMS AREA IN SECTOR 46, NOIDA. TOPOGRAPHIC SURVEY

51 NOIDA AUTHORITY TOPOGRAPHIC SURVEY OF PLOT NO. F-14, SECTOR 50, NOIDA TOPOGRAPHIC SURVEY

Page 45: TPA COMPANY PROFILE - 2016

52 GR. NOIDA AUTHORITY

DESIGN OF ONE ROTARY INTERSECTION BETWEEN 80M WIDE S.K. ROAD AND 60M WIDE SECTOR ROAD BETWEEN ALPHA AND BEETA SECTORS, AS WELL AS 24M WIDE SECTOR ROAD IN KNOWLEDGE PARK-1.

ENGINEERING DESIGN

53 GR. NOIDA AUTHORITY

RE DESIGN OF ALIGNMENT AND LONGITUDINAL PROFILE OF EASTERN APPROACH OF PROPOSED HINDON BRIDGE AT BISRAKH IN GREATER NOIDA.

ENGINEERING DESIGN

54 GR. NOIDA AUTHORITY

PROPOSAL FOR IMPROVING CONNECTING OF 130M ROAD WITH 80M ROAD AT SIRSA VILLAGE GREATER NOIDA.

ENGINEERING DESIGN

55 GR NOIDA AUTHORITY

GEOMETRIC DESIGN FOR THREE INTERSECTION ALONG IN GREATER NOIDA ENGINEERING DESIGN

56 GR. NOIDA AUTHORITY

DESIGN OF INTERSECTION BETWEEN 60M ROADS IN SECTOR DELTA AND SECTOR ZETA IN GR. NOIDA.

ENGINEERING DESIGN

57 GR. NOIDA AUTHORITY

AREAWIDE IMPROVEMENT PROPOSAL FOR ROAD NETWORK AROUND KASNA VILLAGE

FEASIBILITY STUDY

58 GR. NOIDA

AUTHORITY

TOPOGRAPHIC SURVEY, GEOMETRIC DESIGN OF INTERSECTION AND CORRIDOR IMPROVEMENT OF ROAD NETWORK IN VILLAGE KASNA, GREATER NOIDA

ENGINEERING DESIGN

59 GR. NOIDA AUTHORITY

DESIGN OF INTERSECTION BETWEEN 60M ROADS AND 130M ROAD SECTOR OMICRON-III NOIDA GREATER NOIDA LINK ROAD.

ENGINEERING DESIGN

60 GR. NOIDA

AUTHORITY

DESIGN OF ONE INTERSECTION IN SECTOR 12 GR. NOIDA BETWEEN 80M ROAD NAD 60M ROAD NEAR SAINI VILLAGE

ENGINEERING DESIGN

61 GR. NOIDA

AUTHORITY

DESIGN OF INTERSECTION BETWEEN 30M ROAD AND SERVICE ROAD AT TECH ZONE-IV.

ENGINEERING DESIGN

62 GR. NOIDA

AUTHORITY

DESIGN OF TWO INTERSECTIONS IN ECOTECH-8 GREATER NOIDA. ENGINEERING DESIGN

63 GR. NOIDA

AUTHORITY

TOPOGRAPHIC SURVEY AND GEOMETRIC DESIGN OF ONE INTERSECTION AND ITS APPROACH ROADS NEAR MAINCHA VILLAGE GR. NOIDA.

TOPOGRAPHIC SURVEY

64 GR. NOIDA

AUTHORITY

LAYOUT OF IMPROVEMENT PROPOSALS AROUND KASNA VILLAGE, GR. NOIDA ENGINEERING DESIGN

65 GR. NOIDA AUTHORITY

GEOMETRIC DESIGN FOR ONE INTERSECTION OF 60 AND 45 M WIDE ROAD NEAR DISTRICT JAIL IN SECTOR ECOTECH VII, GR .NOIDA

ENGINEERING DESIGN

66 GR. NOIDA AUTHORITY

CORRIDOR IMPROVEMENT PLAN FOR 60M MASTER PLAN ROAD BETWEEN UNDERPASS BELOW NOIDA GR NOIDA EXPRESSWAY AND CHI PHI ROTARY IN SECTOR CHI GR. NOIDA

ENGINEERING DESIGN

67 YEIDA-GR. NOIDA

GEOMETRIC DESIGN OF DIVERSION ROUTE OF 24M WIDE ROAD AROUND SALARPUR VILLAGE SECTOR 22 A PLOT NO GH-05 AND GH-06 YEIDA

ENGINEERING DESIGN

68 ANUPAM CONSTRUCTION CO.

TOPOGRAPHIC SURVEY AND DESIGN OF INTERSECTION AND ITS LAYOUT IN GR. NOIDA

TOPOGRAPHIC SURVEY

69 SA INFRA CORRIDOR IMPROVEMENT PROPOSALS FOR WARDHA ROAD, BETWEEN AIRPORT AND RADDISON BLU HOTEL, NAGPUR.

FEASIBILITY STUDY

70 SA INFRA TRAFFIC SURVEY AT FOUR INTERSECTIONS ALONG WARDHA ROAD BETWEEN AIRPORT AND RADDISON BLUE HOTEL,NAGPUR.

TRAFFIC SURVEY

71 SA INFRA TOPOGRAPHIC SURVEY OF WARDHA ROAD BETWEEN ZERO MILESTONE AND AJNI ROAD AND ROAD BETWEEN WARDHA ROAD AND UJJWAL NAGAR IN NAGPUR

TOPOGRAPHIC SURVEY

72 SA INFRASTRUCTURE PREPARATION OF FEASIBILITY REPORT CUM PRELIMINARY DESIGN FOR ALTERNATIVE HIGHWAY TO GANGTOK IN SIKKIM VIA BAGRAKOT-CHUIKHIM-NIMBONG-KAFER-BAKHIM-ALGARAH-RHENOK IN THE STATE OF WEST BENGAL AND FROM RHENOK-RORATHANG-PAKYONG ALONGWITH SPUR FROM ARITAR-ROLEP-MENLA IN THE STATE OF SIKKIM – TRAFFIC SURVEYS AND DEMAND ASSESSMENT

FEASIBILITY STUDY

73 ITL PREPARATION OF DETAILED PROJECT REPORT FOR UPGRADATION OF NH 344A BETWEEN ROOP NAGAR AND PHAGWARA IN PUNJAB.

DETAILED PROJECT REPORT

74 CEC INTERNATIONAL CORPORATION INDIA PVT. LTD.

TASKS FOR TRAFFIC MANAGEMENT CONSULTANT FOR PREPARATION OF TRAFFIC DIVERSION PLANS FOR 21 STATIONS ALONG THE NOIDA- GREATER NOIDA CORRIDOR OF NOIDA METRO RAIL CORPORATION.- NC-02, NC-03

TRAFFIC SURVEY

75 NBCC LTD. TRAFFIC CONSULTANCY FOR PARKING SURVEYS AT CGO COMPLEX, NEW DELHI. TRAFFIC SURVEY

Page 46: TPA COMPANY PROFILE - 2016

PROJECT COMPLETED FOR THE YEAR 2014

S.

NO

CLIENTS PROJECT NAME CATEGORY

1 HINDUSTAN CONSTRUCTION COMPANY LTD

DMRC-CC-66: PREPARATION OF TRAFFIC DIVERSION SCHEME FOR PROPOSED EXTENSION OF BLUE LINE FROM DWARKA UPTO NAJAFGARH TOWN

TRAFFIC DIVERSION SCHEME

2 INSTITUTE OF

URBAN TRANSPORT

CONDUCTING ROAD NETWORK INVENTORY AND TRAFFIC STUDIES FOR PREPARATION OF IMPACT ASSESSMENT OF NEW ROAD CORRIDOR IN GHAZIABAD

TRAFFIC ENGINEERING

3 ITD CEM JOINT VENTURE

TRAFFIC DIVERSION AT TERMINAL-1 OF INDIRA GANDHI INTERNATIONAL AIRPORT, NEW DELHI

TRAFFIC DIVERSION SCHEME

4 PWD DELHI DESIGN OF FEASIBILITY STUDY OF FOB AT MAYAPURI OPPOSITE PRATIBHA SCHOOL

ENGINEERING DESIGN

5 PWD DELHI PREPARATION OF PLAN FOR BUS TERMINAL AT SARAI KALE KHAN TRANSPORT PLANNING

6 PWD DELHI FEASIBILITY STUDY FOR FOOT OVER BRIDGE AT TEWATIA MARG RED LIGHT NEAR SATYAWATI COILLEGE COLLEGE AND WAZIRPUR VILLAGE OPP. DJB OFFICE/WATER TANK IN GULAB SINGH MARG

FEASIBILITY STUDY

7 PWD DELHI DESIGN OF TWO INTERSECTION ALONG RAM NATH MARG ENGINEERING DESIGN

9 PWD DELHI DESIGN OF DRAINAGE SYSTEM FOR PROPOSED INTERCITY BUS PARKING AT SARAI KALE KHAN

ENGINEERING DESIGN

10 PWD DELHI DESIGN OF SELECTED INTERSECTION AND CORRIDORS WITHIN THE JURISDICTION OF M-111 (GANGA RAM HOSPITAL, SHANKAR ROAD, ROHTAK ROAD, FAIZ ROAD, MILITARY ROAD AND FOB)

FEASIBILITY STUDY

11 PWD DELHI FEASIBILITY STUDY FOR A FOOT OVER BRIDGE ACROSS RING ROAD NEAR BHIKAJI CAMA PLACE NEW DELHI

FEASIBILITY STUDY

12 PWD DELHI TOPOGRAPHIC SURVEY OF VARIOUS ROAD CORRIDORS IN DELHI TOPOGRAPHIC SURVEYS

13 PWD DELHI SURVEY OF DRAIN ALONG NH-10 BETWEEN HIRAN KUDNA BALLA AND DELHI BORDER AT TIKRI

DRAINAGE DESIGN

14 PWD DELHI FEASIBILITY STUDY FOR FOOT OVER BRIDGE NEAR KHAMPUR VILLAGE NH-44

FEASIBILITY STUDY

15 PWD DELHI DESIGN OF DRAINAGE SYSTEM ALONG WEST AVNUE ROAD AT PUNJABI BAGH AND PREPARATION OF MAP FOR M-112 (N) DIVISION

DRAINAGE DESIGN

16 PWD DELHI PROVISION OF U TURN FACILITIES ON WAZIRABAD ROAD IN BETWEEN BHAJANPURA CROSSING AND TRAFFIC RED LIGHT OF YAMUNA VIHAR

TRAFFIC ENGINEERING

17 PWD DELHI CORRIDOR IMPROVEMENT BETWEEN OUTER RING ROAD AND JANAKPURI WEST METRO STATION ALONG NAJAFGARH ROAD

TRAFFIC ENGINEERING

18 PWD DELHI DESIGN OF ACCESS TO SLIP ROAD FROM SERVICE ROAD ALONG MAYAPURI ROB.

ENGINEERING DESIGN

19 PWD DELHI SURVEY AND DESIGN OF DRAIN ALONG LONI FLYOVER DRAINAGE DESIGN

20 PWD DELHI DESIGN OF INTERSECTION BETWEEN ROAD TODAPUR VILLAGE AND DEV PRAKASH SHASTRI MARG

TRAFFIC ENGINEERING

21 PWD DELHI DESIGN OF SLIP ROAD FRUOPKHAJURI KHAS INTERSECTION TRAFFIC ENGINEERING

22 NOIDA AUTHORITY DESIGN OF ONE INTERSECTION BELOW UNDERPASS TO IMPROVE CONNECTIVITY BETWEEN SECTOR 91 AND 135 NOIDA

TRAFFIC ENGINEERING

Page 47: TPA COMPANY PROFILE - 2016

23 NOIDA AUTHORITY DESIGN OF INTERSECTION BETWEEN 45M ROAD AND BUND ROAD AT SECTOR 135 NOIDA

TRAFFIC ENGINEERING

24 NOIDA AUTHORITY GEOMETRIC DESIGN OF 1 INTERSECTION ALONG 75M ROAD BETWEEN DSC ROAD TO EXPRESSWAY IN BETWEEN SECTOR 105, 98 AND NOIDA EXPRESSWAY IN NOIDA

TRAFFIC ENGINEERING

25 NOIDA AUTHORITY GEOMETRIC DESIGN OF 1 INTERSECTION ALONG 75M ROAD BETWEEN DSC ROAD TO EXPRESSWAY IN BETWEEN SECTOR 100, 98 AND HAZIPUR VILLAGE IN NOIDA

TRAFFIC ENGINEERING

26 NOIDA AUTHORITY GEOMETRIC DESIGN OF 1 INTERSECTION ALONG 75M ROAD BETWEEN DSC ROAD TO EXPRESSWAY IN BETWEEN SECTOR 47, 10 AND 107 IN NOIDA

TRAFFIC ENGINEERING

27 NOIDA AUTHORITY DRAINAGE SCHEME FOR FNG CORRIDOR BETWEEN CHHAJARSI VILLAGE AND MASTER PLAN ROAD NO 3 NOIDA

DRAINAGE DESIGN

28 NOIDA AUTHORITY TOPOGRAPHIC SURVEY OF ADMINISTRATIVE OFFICE OF NOIDA AUTHORITY AT SECTOR 06, NOIDA

TOPOGRAPHIC SURVEYS

29 NOIDA AUTHORITY ADDITIONAL TOPOGRAPHIC SURVEY OF SECTOR 44 AND DRAINAGE IMPROVEMENT PROPOSAL AT NOIDA

TOPOGRAPHIC SURVEYS

30 NOIDA AUTHORITY DRAINAGE IMPROVEMENT PROPOSAL FOR SADAR PUR VILALGE NOIDA DRAINAGE DESIGN

31 NOIDA AUTHORITY RE-DESIGN OF ALIGNMENT OF DSC ROAD BETWEEN GOLF COURSE CHOWK AND U TURN AT SECTOR 42 NOIDA

TOPOGRAPHIC SURVEYS

32 NOIDA AUTHORITY TRAFFIC CIRCULATION SCHEME FOR SECTOR 18, NOIDA TRAFFIC ENGINEERING

33 NOIDA AUTHORITY TOPOGRAPHIC SURVEY OF BUILD UP AREA IN SECTOR 45 NOIDA TOPOGRAPHIC SURVEY

34 NOIDA AUTHORITY DESIGN OF NEW ROAD CORRIDOR IN SECTOR 148 AND 150 NOIDA ENGINEERING DESIGN

35 NOIDA AUTHORITY DESIGN OF 3 INTERSECTION NEAR VILLAGE KONDLI IN SECTOR 150 NOIDA

TRAFFIC ENGINEERING

36 NOIDA AUTHORITY GEOMETRIC DESIGN AND COST ESTIMATION FOR 4 INTERSECTION ALONG ROAD BETWEEN SECTOR 42-43, 42-46 & 47-48 (DSC ROAD TO KESHAR GARDEN U TURN)

ENGINEERING DESIGN

37 NOIDA AUTHORITY PREPARATION OF MASTER PLAN OF DRAINAGE SYSTEM ALONG DRAIN ADJACENT TO SALARPUR VILLAGE, NOIDA

TRANSPORT PLANNING

38 NOIDA AUTHORITY DESIGN OF ATTA CHOWK INTERSECTION AT CONFLUENCE OF SECTORS 18, 27, 28, 38A. NOIDA

ENGINEERING DESIGN

39 NOIDA AUTHORITY DESIGN OF INTERSECTION PROVIDING CONNECTIVITY TO THE UNDERPASS AT KM 19.4 ALONG NOIDA-GR. NOIDA EXPRESSWAY FROM NEWLY DEVELOPED 45M ROAD AT SECTOR 152.

ENGINEERING DESIGN

40 NOIDA AUTHORITY RE-DESIGN OF U TURN ALONG MP-3 IN VICINITY OF BUS TERMINAL AT MORNA NOIDA

ENGINEERING DESIGN

41 NOIDA AUTHORITY LAYOUT OF ONE INTERSECTION AT CONFLUENCE OF IN SECTOR- 67, 68, 70,122 IN NOIDA

FEASIBILITY STUDY

42 NOIDA AUTHORITY TOPOGRAPHIC SURVEY AND DESIGN OF ROAD NETWORK AROUND SHANI MANDIR ON BOTH SIDES OF NOIDA. GR. NOIDA EXPRESSWAY

TOPOGRAHIC SURVEY

42 GREATER NOIDA DEVELOPMENT AUTHORITY

DESIGN OF ALIGNMENT AND INTERSECTION OF 2 NOS OF 60M ROAD AND ONE 24M WIDE ROAD ALONG APPROACH TO NEW BRIDGE OVER HINDON RIVER, GR. NOIDA

ENGINEERING DESIGN

43 GREATER NOIDA DEVELOPMENT AUTHORITY

DESIGN OF 105 M CORRIDOR AND ITS INTERSECTION WITH NH-91 NEAR BORAKI VILLAGE, GREATER NOIDA

TRAFFIC ENGINEERING

Page 48: TPA COMPANY PROFILE - 2016

44 GREATER NOIDA DEVELOPMENT AUTHORITY

DESIGN OF U TURN ALONG SURAJPUR- KASNA ROAD IN GREATER NOIDA

TRAFFIC ENGINEERING

45 GREATER NOIDA DEVELOPMENT AUTHORITY

PROPOSAL FOR IMPROVING CONNECTIVITY OF 45M SERVICE ROAD IN TECH ZONE (I.T. CITY)

TRAFFIC ENGINEERING

46 GREATER NOIDA DEVELOPMENT AUTHORITY

DESIGN OF INTERSECTION ALONG DSC ROAD OPP. CRPF CAMP, GR. NOIDA

ENGINEERING DESIGN

47 GREATER NOIDA DEVELOPMENT AUTHORITY

GEOMETRIC DESIGN OF TWO INTERSECTION OF SECTOR ECOTECH-I(EXT.)AND ONE INTERSECTION IN SECTOR XU-III, GREATER NOIDA.

ENGINEERING DESIGN

48 YEIDA – GR NOIDA DESIGN OF INTERSECTION OF 120M WIDE ROAD AND 60M WIDE ROAD AT CH. 13.600 KM ALONG YAMUNA EXPRFESSWAY

ENGINEERING DESIGN

49 YEIDA – GR NOIDA GEOMETRIC DESIGN OF TWO INTERSECTION IN SECTOR 22D YEIDA ENGINEERING DESIGN

50 KCC BUILDCOM LAYOUT OF MM ROAD BETWEEN ANDHERIA MODE AND FORTIS HOSPITAL

TRANSPORT PLANNING

51 INDIAN TECHNOCRAT LTD.

PREPARATION OF FEASIBILITY REPORT FOR TWO LANING OF STATE HIGHWAYS 1 AND 6 (PACKAGE-15)

FEASIBILITY STUDY

52 DMRC LTD. PLANNING OF TRAFFIC CIRCULATION SCHEME TO DECONGEST ITO JUNCTION

ENGINEERING DESIGN

53 LARSEN AND TOURBO

CONSTRUCTION OF ELEVATED VIADUCT, 8 ELEVATED STATIONS VIZ. TRANSPORT NAGAR, KRISHNA NAGAR SINGAR NAGAR, ALAMBAGH, ALAMBAGH BUS STATION, MAVIAYA, DURGAPURI AND CHARBAGH RAILWAY STATION FROM CHAINAGE 687.140 M TO 9171.440 M AND CONNECTING ELEVATED VIADUCT AND RAMP TO DEPOT AT PAC GROUND TRANSPORT NAGAR ON NORTH - SOUTH CORRIDOR OF LUCKNOW METRO AT LUCKNOW, UTTAR PRADESH.

TRANSPORT PLANNING

Page 49: TPA COMPANY PROFILE - 2016

PROJECT COMPLETED FOR THE YEAR 2013

S. NO

CLIENTS PROJECT NAME CATEGORY

1 DELHI METRO RAIL CORPORATION (DMRC)

PREPARATION OF TRAFFIC MANAGEMENT PLAN DURING CONSTRUCTION OF METRO STATION NEAR NAJAFRGARH DELHI GATE JUNCTION OF DWARKA-NAJAFGARH EXTENSION OF DMRTS, PHASE III

TRAFFIC DIVERSION SCHEME

2 MEINHARDT-DEFINITI DESIGN

TRAFFIC STUDIES, DATA ANALYSIS, TRAFFIC FORECAST, SOCIAL IMPACT ASSESSMENT AND MITIGATION MEASURES, ECONOMIC ANALYSIS, SAFETY ENHANCEMENT FOR INTEGRATED ROAD AND GRADE SEPARATORS SYSTEM IN DIMAPUR

ENGINEERING DESIGN

3 HINDUSTAN CONSTRUCTION CO. LTD.

PREPARATION OF TRAFFIC CIRCULATION SCHEME FOR NETAJI SUBHASH PLACE AREA

TRAFFIC ENGINEERING

4 HINDUSTAN CONSTRUCTION CO. LTD.

TRAFFIC MANAGEMENT SERVICES FOR RING ROAD AND ARTERIAL ROADS FOR DMRC CC-30 PROJECT AROUND NETAJI SUBHASH PLACE (NSP) STATION ALONG LINE 7 OF DMRC PH-III SCHEME.

TRAFFIC DIVERSION SCHEME

5 HINDUSTAN CONSTRUCTION CO. LTD.

CC-34 PREPARATION OF TRAFFIC MANAGEMENT SCHEME AT DMRC PROJECT AT DASHRATH PURI STATION NEW DELHI.

TRAFFIC DIVERSION SCHEME

6 LARSEN & TURBO CC-17 DESIGN AND CONSTRUCTION OF ELEVATED VIADUCT ABOVE GROUND RAMP ON BOTH SITE AND 3 ELEVATED STATION VIZ MOTI BAGH, DHAUL KUAN AND DELHI CANTT INCLUDING ARCHITECTURAL FINISHING WORKS OF STATIONS ON MUKUNDPUR-YAMUNA VIHAR CORRIDOR LINE 7 UNDER DELHI MRTS PROJECT OF PH-III.

(BHIKAJI CAMA PLACE TO MOTI BAGH)

TRAFFIC DIVERSION SCHEME

7 J. KUMAR INFRA PROJECTS LTD

CARRYING OUT OF SPEED SURVEY AT DMRC PROJECT CC-24

(DESIGN AND CONSTRUCTION OF TUNNEL BY SHIELD TBM, TUNNELS, STATIONS AND RAMP BY CUT AND COVER METHOD BETWEEN LAJPAT NAGAR AND HAZRAT NIZAMUDDIN STATIONS FOR UNDERGROUND WORKS ON MUKUNDPUR – YAMUNA VIHAR CORRIDOR OF DELHI MRTS PROJECT OF PHASE III.

TRAFFIC ENGINEERING

8 ITD ITD CEM JV PREPARATION AND SUBMISSION OF TRAFFIC DIVERSION PLANS FOR 2 NOS. STATIONS (ALONG PALAM VILLAGE AND INDIRA GANDHI DOMESTIC AIRPORT INCLUDING ALL SIGNAGE SCHEMES FOR CC-32 DMRC SITE.

TRAFFIC DIVERSION SCHEME

9 ITD-ITD CEM JV TRAFFIC DIVERSION WORK FOR DMRC CC26-R PROJECT: PART DESIGN AND CONSTRUCTION OF ELEVATED VIADUCT INCLUDING ENTRY EXIT LINE, RAMP TO DEPOT, AND 8 ELEVATED STATIONS VIZ MAYUR VIHAR-1, MAYUR VIHAR PKT-1, TRILOKPUTI, VINOD NAGAR EAST, VINOD NAGAR, IP EXTENSION, ANAND VIHAR, AND KARKARDUMA STATIONS INCLUDING ARCHITECTURAL FINISHING, WATER SUPPLY, SANITARY INSTALLATION AND DRAINAGE WORKS OF STATIONS FROM CHAINAGE 37179.000 TO 46214.787 OF LINE 7 MUKUNDPUR-YAMUNA VIHAR CORRIDOR OF PHASE-III DELHI MRTS.

TRAFFIC DIVERSION SCHEME

10 ITD CEMENTATION INDIA LTD.

PREPARATION AND SUBMISSION OF TRAFFIC MANAGEMENT/DIVERSION PLAN FOR DMRC CC-50 PROJECT - PART DESIGN AND CONSTRUCTION OF ELEVATED VIADUCT AND 2 ELEVATED STATIONS VIZ. DWARKA AND NAJAFGARH DEPOT INCLUDING ARCHITECTURAL FINISHING, WATER SUPPLY, SANITARY INSTALLATION AND DRAINAGE WORKS ON DWARKA - NAJAFGARH CORRIDOR OF PHASE-III DELHI MRTS.

TRAFFIC DIVERSION SCHEME

Page 50: TPA COMPANY PROFILE - 2016

11 HOLTEC CONSULTING PVT. LTD.

FEASIBILITY STUDY FOR AN ELEVATED ROAD FROM KUTCHERY ROAD TO MARTINDLE BRIDGE VIA KUTCHERY ROAD, GANDHI BHAWAN CHORAHA AND RAILWAY STATION AT AJMER-

FEASIBILITY STUDY

12 HOLTEC CONSULTING LTD.

TRAFFIC STUDY FOR PREPARATION OF DPR FOR HINDON ELEVATED ROAD IN GHAZIABAD ON TOD BASIS.

TRAFFIC ENGINEERING

13 NOIDA AUTHORITY LAYOUT OF PLOTS IN SECTOR 42 NOIDA TOPOGRAPHIC SURVEYS

14 NOIDA AUTHORITY RE-DESIGN OF U TURN ADJACENT TO SECTOR 49 POLICE STATION. ENGINEERING DESIGN

15 NOIDA AUTHORITY TOPOGRAPHIC SURVEY OF SECTOR 39 POLICE STATION NOIDA TOPOGRAPHIC SURVEYS

16 NOIDA AUTHORITY PREPARATION OF IMPROVEMENT PLAN OF 30M WIDE MASTER PLAN ROAD BETWEEN SECTOR 66 & 67 IN NOIDA

TRAFFIC ENGINEERING

17 NOIDA AUTHORITY DESIGN OF INTERSECTION BETWEEN 30M AND 45M ROAD AT SECTORS 64,65,66,67 & SECTORS 65,67,68,69 IN NOIDA

TRAFFIC ENGINEERING

18 NOIDA AUTHORITY DESIGN OF INTERSECTION OF TULSI MARG WITH KAMAL MARG AT SECTOR 54 NOIDA

TRAFFIC ENGINEERING

19 NOIDA AUTHORITY DESIGN OF 3 INTERSECTION AT SECTOR 94,124, 125 IN VICINITY OF MAHAMAYA INTERSECTION NOIDA

TRAFFIC ENGINEERING

20 NOIDA AUTHORITY DESIGN OF INTERSECTION BETWEEN DSC ROAD AND UDYOG MARG NEAR INDIAN OIL BUILDING

TRAFFIC ENGINEERING

21 NOIDA AUTHORITY DESIGN OF T POINT BETWEEN DSC ROAD AND SECTOR ROAD AT SECTOR 82 AND 110 NOIDA

TRAFFIC ENGINEERING

22 NOIDA AUTHORITY SURVEY DESIGN WORK (DRAINAGE AND DESIGN WORK IN SECTOR-48) NOIDA

ENGINERING DESIGN

23 NOIDA AUTHORITY DESIGN OF HAROLA INTERSECTION IN NOIDA TRAFFIC ENGINEERING

24 NOIDA AUTHORITY DESIGN OF ACCESS BETWEEN NOIDA-GREATER NOIDA EXPRESSWAY (ALONG EASTERN SIDE OF EXPRESSWAY), DESIGN OF INTERSECTIONS ALONG APPROACH ROADS TO NOIDA-GREATER NOIDA EXPRESSWAY (ALONG WESTERN SIDE OF EXPRESSWAY) AND TOPOGRAPHIC SURVEY OF FNG ALIGNMENT ADJACENT TO SECTOR 168 NOIDA.

TRAFFIC ENGINEERING

25 NOIDA AUTHORITY TOPOGRAPHIC SURVEY OF PLOTS IN SECTOR 8 AND 9 NOIDA TOPOGRAPHIC SURVEYS

26 NOIDA AUTHORITY DESIGN OF INTERSECTION BETWEEN MASTER PLAN ROAD NO 3 AND ROAD FROM SECTOR 125,127.

TRAFFIC ENGINEERING

27 NOIDA AUTHORITY PRELIMINARY SURVEY AND LISTING OF VACANT PLOT IN DIFFERENT

SECTORS IN NOIDA.

TOPOGRAPHIC SURVEY

29 NOIDA AUTHORITY CORRIDOR IMPROVEMENT PROPOSAL FOR SHIVALIK MARG BETWEEN NOIDA CITY CENTRE (MASTER PLAN ROAD NO 3) AND MAHARAJA AGRESEN CHOWK (MASTER PLAN ROAD NO. 2)

TRAFFIC ENGINEERING

30 NOIDA AUTHORITY M/O ROAD (IMPROVEMENT OF 4 ARM INTERSECTIONS ON AGHAPUR ROAD BETWEEN SECTOR – 50,51,39 & 41 FOR SIGNAL FREE MOVEMENT) NOIDA

TRAFFIC ENGINEERING

31 NOIDA AUTHORITY TOPOGRAPHIC SURVEY OF PARK IN SECTOR 91 TOPOGRAPHIC SURVEYS

Page 51: TPA COMPANY PROFILE - 2016

32 NOIDA AUTHORITY LAYOUT OF INTERSECTION BETWEEN 75M ROAD AND 24M ROAD IN SECTOR 105 NOIDA – 1ST

ENGINEERING DESIGN

33 NOIDA AUTHORITY DESIGN OF TWO OPENINGS FROM EXPRESS HIGHWAY NEAR SECTOR 132 AND SECTOR 128 NOIDA

TRAFFIC ENGINEERING

34 NOIDA AUTHORITY DESIGN OF SLIP ROAD WITHIN CLOVER LEAF TRAFFIC ENGINEERING

35 NOIDA AUTHORITY PROPOSED LAYOUT PLAN OF RESIDENTIAL PLOTS IN SADAR PUR VILLAGE AT SECTOR 45 NOIDA

TOPOGRAPHIC SURVEYS

36 NOIDA AUTHORITY RE- DESIGN OF SLIP ROAD CONFIGURATION AT MAHAMAYA FLYOVER IN SECTOR 44 NOIDA

TRAFFIC

ENGINEERING

37 NOIDA AUTHORITY DESIGN OF 4 INTERSECTION AT CONFLUENCE OF IN SECTORS (50,51,72,75), (93A,93B EXPRESSWAY), (93A,93B, 93,92) AND (93,92,82,83) IN NOIDA.

TRAFFIC

ENGINEERING

38 NOIDA AUTHORITY DESIGN OF INTERSECTION PROVIDING CONNECTIVITY TO THE UNDERPASS AT KM 19.4 ALONG NOIDA-GR. NOIDA EXPRESSWAY FROM NEWLY DEVELOPED 45M ROAD.

TRAFFIC

ENGINEERING

39 NOIDA AUTHORITY DRAINAGE DESIGN FOR SECTOR 44 DRAINAGE SURVEY, NOIDA FOR DEVELOPED SECTOR 44 NOIDA

DRAINAGE DESIGN

40 NOIDA AUTHORITY TOPOGRAPHIC SURVEY OF BHAWANI COLLEGE AT SECTOR 46, NOIDA TOPOGRAPHIC SURVEYS

41 NOIDA AUTHORITY INTERSECTION DESIGN OF 4 ARMS INTERSECTION ALONG THE RASHTRIYA SAHARA ROAD AT SECTOR 11 NOIDA

TRAFFIC ENGINEERING

42 NOIDA AUTHORITY TOPOGRAPHIC SURVEY OF A LAND PARCEL IN THE SECTOR 48 NOIDA TOPOGRAPHIC SURVEYS

43 NOIDA AUTHORITY DESIGN OF OPENING TO THE NOIDA-GR. NOIDA EXPRESSWAY FROM MAYUR SCHOOL AT SECTOR 125 NOIDA

TRAFFIC ENGINEERING

44 NOIDA AUTHORITY DESIGN OF INTERSECTION AT RAIPUR VILLAGE NOIDA TRAFFIC ENGINEERING

45 NOIDA AUTHORITY DESIGN AND LAYOUT OF ALIGNMENT OF FNG NEAR BAHLOLPUR NOIDA

TRAFFIC ENGINEERING

46 NOIDA AUTHORITY CORRIDOR IMPROVEMENT PROPOSAL FOR TWO ROADS CORRIDORS:

1. BETWEEN LABOUR CHOWK AND KHODA INTERSECTION

2. KHODA INTERSECTION TO ROAD NO 6

TRAFFIC ENGINEERING

47 NOIDA AUTHORITY TOPOGRAPHIC SURVEY AND DRAINAGE DESIGN FOR SECTOR 80 DRAINAGE DESIGN

48 NOIDA AUTHORITY DESIGN OF INTEGRATION SCHEME BETWEEN THE NEW BRIDGE ACROSS SHADARA DRAIN AND MASTER PLAN ROAD NO 2 NOIDA

TRAFFIC ENGINEERING

49 NOIDA AUTHORITY M/O ROADS (DESIGNING OF ALL PEER CHOWK ON DSC ROAD) NOIDA TRAFFIC ENGINEERING

50 NOIDA AUTHORITY DESIGN OF INTERSECTION ALONG PROPOSED FNG EXPRESSWAY NEAR BEHLOLPUR NOIDA

TRAFFIC ENGINEERING

51 NOIDA AUTHORITY DESIGN OF INTERSECTION AS ASHOK NAGAR BORDER WITH DELHI TRAFFIC ENGINEERING

52 NOIDA AUTHORITY DESIGN AND LAYOUT OF FNG ALIGNMENT BETWEEN HINDON BUND AND SECTOR 112 NOIDA

TRAFFIC ENGINEERING

Page 52: TPA COMPANY PROFILE - 2016

53 NOIDA AUTHORITY DESIGN OF 2 INTERSECTION AT SECTOR 132 AND SECTOR 94 AT NOIDA

TRAFFIC ENGINEERING

54 NOIDA AUTHORITY RE-DESIGN OF ROTARY AT INTERSECTION OF MASTER PLAN ROAD NO 3 AND FNG EXPRESSWAY NEAR SECTOR 121 NOIDA

TRAFFIC ENGINEERING

55 NOIDA AUTHORITY DESIGN OF 2 INTERSECTION AT HOISERY COMPLEX IN SECTORS 83,87 AND 88 AND ANOTHER INTERSECTION IN SECTORS 83, 84 IN NOIDA

TRAFFIC ENGINEERING

56 GR. NOIDA AUTHORITY

DESIGN OF SEVEN INTERSECTION BETWEEN SECTOR KP-V TO SECTOR 4 AT 60M WIDE NH-24 LINK ROAD, GR. NOIDA

TRAFFIC ENGINEERING

57 UP PWD - NH DIV. REVIEW OF DRAWINGS FOR NH-24 UNDERPASS BETWEEN KM 8.000 (UPGATE) AND KM. 23.000 (DIAMOND PHATAK).

TRAFFIC ENGINEERING

58 UP PWD GZB TOPOGRAPHIC SURVEY OF PAC LAND AND ITS SURROUNDING AREAS TO ESTABLISH THE BOUNDARY OF PAC LAND

TOPOGRAPHIC SURVEY

59 PWD, DELHI CORRIDOR IMPROVEMENT PROPOSAL FOR A SECTION OF AUROBINDO MARG BETWEEN GREEN PARK AND IIT CROSSING.

TRAFFIC ENGINEERING

60 PWD, DELHI FEASIBILITY STUDY FOR FOB AT 4 LOCATIONS IN DELHI TRAFFIC ENGINEERING

61 PWD DELHI DESIGN OF TWO INTERSECTIONS IN DELHI- 1. AT LOHA MANDI T JUNCTION BETWEEN GIRDHARI LAL MARG AND DEV PRAKASH SHASTRI MARG 2. AT INTERSECTION OF PARADE ROAD AND NH-8

TRAFFIC ENGINEERING

62 PWD, DELHI PREPARATION OF MASTER PLAN OF DRAINAGE OF NCT DELHI (SURVEYING OF DRAIN UNDER PWD DIV M-413) – CENTRE DELHI

DRAINAGE SURVEYS

63 PWD, DELHI PREPARATION OF MASTER PLAN OF DRAINAGE OF NCT DELHI (SURVEYING OF DRAIN UNDER PWD DIV M-412) - SOUTH DELHI

DRAINAGE SURVEYS

64 PWD, DELHI PREPARATION OF MASTER PLAN OF DRAINAGE OF NCT DELHI (SURVEYING OF DRAIN UNDER PWD DIV M-113) - SOUTH WEST DELHI

DRAINAGE SURVEYS

65 PWD, DELHI TOPOGRAPHIC SURVEY OF TWO ROADS IN GHITORNI AREA TOPOGRAPHIC SURVEYS

66 PWD, DELHI FEASIBILITY STUDY FOR FOOT OVER BRIDGE NEAR METCALF HOUSE, MALL ROAD DELHI

FEASIBILITY STUDY

67 PWD DELHI CORRIDOR IMPROVEMENT PROPOSAL FOR NH-8 BETWEEN DHAULA KUAN AND PARADE ROAD INTERSECTION WITH NH-8 IN THE STATE OF DELHI

TRAFFIC ENGINEERING

69 PWD DELHI FEASIBILITY STUDY FOR FOOT OVER BRIDGE FROM RTR MARG FEASIBILITY STUDY

70 PWD DELHI DESIGN OF LEFT TURN FROM OUTER RING ROAD TO RAO TULA ROA MARG DELHI

TRAFFIC ENGINEERING

71 BASANT PROJECTS LTD

TRANSPORTATION PLAN FOR UPCOMING RESIDENTIAL PROJECTS AT GAUSHALA ROAD, SARAI ROHILLA’DELHI

TRANSPORT PLANNING

72 UNITY BUILDWELL LTD.

TRANSPORTATION PLAN FOR MALL AT ROHINI. TRANSPORT PLANNING

73 AMRAPALI GROUP TRANSPORT CONSULTANT FOR AMRAPALI DREAM VALLEY PROJECT AT GH-09, SECTOR TECH ZONE IV GREATER NOIDA

TRANSPORT PLANNING

74 AMRAPALI GROUP TRAFFIC CIRCULATION PARKING AND MANAGEMENT PLAN FOR VERONA HEIGHTS, NOIDA EXTENSION (WEST)

TRANSPORT PLANNING

Page 53: TPA COMPANY PROFILE - 2016

75 AMRAPALI GROUP TRANSPORT CONSULTANT FOR AMRAPALI CENTURION PARK PROJECT AT GH-05, SECTOR – TECH ZONE IV GREATER NOIDA

TRANSPORT PLANNING

76 AMRAPALI GROUP TRAFFIC CIRCULATION PARKING PLAN FOR AMRAPALI GOLF HOMES HOUSING COMPLEX GR. NOIDA

TRANSPORT PLANNING

77 DIMTS LTD. DETAILED PROJECT REPORT PREPARATION FOR CONSTRUCTION OF UNDERPASS BY BOX PUSHING TECHNOLOGY UNDER NH-24 BYPASS BETWEEN SECTOR 62 & SECTOR 63 NOIDA.

ENGINEERING DESIGN

78 DIMTS LTD. CONVERSION OF FIVE MINOR UNDERPASSES ON NOIDA-GREATER NOIDA EXPRESSWAY TO MAJOR UNDERPASSES THROUGH PUSH BOX TECHNOLOGY.

ENGINEERING DESIGN

79 EMERGENT VENTURE

ESTIMATION OF GREENHOUSE GAS EMISSIONS AND ENERGY CONSUMPTION AND CO-BENEFITS FOR SUSTAINABLE URBAN TRANSPORT PROJECT - 1.HUBLI DHARWAD 2. PIMPRI CHINCHWAD 3. MYSORE

TRAFFIC ENGINEERING

80 UPHAM INTERNATINAL CORPORATION PVT. LTD

TRAFFIC STUDIES AND FORECAST FOR PREPARATION OF FEASIBILITY-CUM-PRELIMINARY DESIGN FOR CONSTRUCTION OF STANDALONE RING ROAD/BYPASS FOR NAGPUR CITY IN THE STATE OF MAHARASHTRA UNDER NHDP PHASE-VII

TRANSPORT PLANNING

81 UPHAM INTERNATINAL CORPORATION PVT. LTD

PROPOSAL FOR NEEMRANA-MEETHIYAS ROAD PROJECT TRANSPORT PLANNING

82 SADBHAV ENGINEERING LTD.

CONTRACT CC-43: PART DESIGN AND CONSTRUCTION OF ELEVATED VIADUCT AND THREE ELEVATED STATONS VIZ. MIE, BUS STAND AND CITY PARK INCLUDING ARCHITECTURAL FINISHING, WATER SUPPLY, SANITARY INSTALLATION, DRAINAGE WORKS AND ROOFING WORKS OF STATIONS ON MUNDKA-BAHADURGARH CORRIDOR OF PHASE-III OF DELHI MRTS –

TRAFFIC DIVERSION SCHEME

83 SADBHAV ENGINEERING LTD.

CONTRACT CC-47: PART DESIGN AND CONSTRUCTION OF ELEVATED VIADUCT FROM MUNDKA TO TIKRI BORDER INCLUDING ARCHITECTURAL FINISHING, WATER SUPPLY, SANITARY INSTALLATION, DRAINAGE AND CIVIL WORKS OF STATIONS ON MUNDKA-BAHADURGARH CORRIDOR OF PHASE-III OF DELHI MRTS.

TRAFFIC DIVERSION SCHEME

84 ISOLUX CORSAN CONTACT CC-47- DESIGN OF TRAFFIC DIVERSION SCHEMES ALONG VIADUCT PORTION (EXCLUDING STATIONS) OF DMRC CONSTRUCTION PACKAGE CC-47.

CONTACT CC-43- DESIGN OF TRAFFIC DIVERSION SCHEMES ALONG VIADUCT PORTION (EXCLUDING STATIONS) OF DMRC CONSTRUCTION PACKAGE CC-43.

TRAFFIC DIVERSION SCHEME

85 RITES LTD. DPR OF MRTS/PPTS CONNECTIVITY BETWEEN AHMEDABAD AND DHOLERA SIR-CONDUCTING TRAFFIC AND TRANSPORTATION SURVEYS.

TRANSPORT PLANNING

Page 54: TPA COMPANY PROFILE - 2016

PROJECT COMPLETED FOR THE YEAR 2012

S. NO

CLIENTS PROJECT NAME CATEGORY

1 SATRA I MAN PVT.

LTD.

TRAFFIC SURVEYS, ANALYSIS AND REPORT PREPARATION FOR

PREBID SERVICES OF FOUR LINING OF OBEDULLAGANJ BETUL

SECTION OF NH-69 FROM KM 2.800 AND 8.300 AND FROM KM 20.700

TO KM 137.00 IN THE STATE OF MP TO BE EXECUTED AS BOT

PROJECT ON DBFOT PATTERN UNDER NHDP PHASE-III.

PRE BID

ADVISORY

2 STUP CONSUTANT TRAFFIC SURVEYS FOR MATHURA-BHARATPUR-BAYANA-HINDAUN-

GANGAPUR-BHADOTI ROAD IN RAJASTHAN

FEASIBILITY

STUDY

3 STUP CONSUTANT TRAFFIC SURVEY FOR PREPARATION OF DETAILED PROJECT REPORT

FOR KOTTAYAM CITY ROAD IMPROVEMENT PROJECT.

TRANSPORT

PLANNING

4 MAHAGUN REAL

ESTATE PVT. LTD

TRAFFIC CIRCULATION PLAN FOR GH PROJECT OF MAHAGUN

MODERNE SECTOR 78 NOIDA

TRANSPORT

PLANNING

5 LARSEN AND

TURBO

CC-28 PART DESIGN AND CONSTRUCTION OF ELEVATED VIADUCT

ELEVATED RAMP AND 5 ELEVATED STATIONS VIZ. SHANKAR PUR,

PUNJABI BAGH, ESI HOSPITAL, RAJOURI GARDEN AND MAYAPURI

STATIONS INCLUDING ARCHITECTURAL FINISHING WORKS FROM

CHAINAGE 5675.94 M TO 15562.00 M OF MUKUNDPUR – YAMUNA

VIHAR CORRIDOR LINE 7 OF DELHI MRTS.

TRAFFIC

DIVERSION

SCHEME

6 LARSEN AND

TURBO

CC-17 DESIGN AND CONSTRUCTION OF ELEVATED VIADUCT ABOVE

GROUND RAMP ON BOTH SIDE AND 3 ELEVATED STATIONS VIZ.

MOTI BAGH, DHAULA KUAN AND DELHI CANTT. INCLUDING

ARCHITECTURAL FINISHING WORKS AT STATIONS ON MUKUNDPUR –

YAMUNA VIHAR CORRIDOR LINE 7 UNDER DELHI MRTS PROJECT OF

PHASE-III.

TRAFFIC

DIVERSION

SCHEME

7 LARSEN AND

TURBO

CC-05 DESIGN AND CONSTRUCTION OF TUNNEL BY SHIELD TBM AND

ITO, DELHI GATE AND JAMA MASJID STATIONS BY CUT AND COVER

METHOD BETWEEN MANDI HOUSE AND JAMA MASJID FOR

UNDERGROUND WORKS UNDER DELHI MRTS PROJECT OF PHASE-III

TRAFFIC

DIVERSION

SCHEME

8 LARSEN & TURBO CC-27 PREPARATION OF TRAFFIC DIVERSION SCHEME FOR

PROPOSED HAUZ KHAS STATION AND OTHER STATIONS ALONG LANE

8 OF DMRC PHASE III

TRAFFIC

DIVERSION

SCHEME

9 J. KUMAR INFRA

PROJECT LTD.

TRAFFIC MANAGEMENT SCHEME FOR PROJECT CORRIDOR CC-02

(JAHANGIRPURI TO BADLI)

TRAFFIC

DIVERSION

SCHEME

10 J. KUMAR INFRA CC-24 TRAFFIC MANAGEMENT SCHEME FOR DMRC (DESIGN AND

CONSTRUCTION OF TUNNEL BY SHIELD TBM, TUNNELS, STATIONS

AND RAMP BY CUT AND COVER METHOD BETWEEN LAJPAT NAGAR

AND HAZRAT NIZAMUDDIN STATIONS FOR UNDERGROUND WORKS

ON MUKUNDPUR – YAMUNA VIHAR CORRIDOR OF DELHI MRTS

PROJECT OF PHASE III.

TRAFFIC

DIVERSION

SCHEME

11 J. KUMAR INFRA TRAFFIC MANAGEMENT SCHEME FOR DMRC PROJECT CONTRACT

CC-20 SECTION OF LINE 7 OF DMRC PHASE III.

TRAFFIC

DIVERSION

SCHEME

12 DESIGN

ASSOCIATES

PREPARATION OF FEASIBILITY REPORT AND DPR FOR MULTI STOREY

PARKING AT 3 METRO STATIONS AT JAIPUR

TRAFFIC

DIVERSION

SCHEME

13 UPPAL

HOSPITALITY PVT.

DESIGN OF ACCESS FROM AT 5 STAR HOTEL AT SIKHOPUR, NH-8,

GURGAON, HARYANA

TRAFFIC

ENGINEERING

Page 55: TPA COMPANY PROFILE - 2016

LTD.

14

AFCONS LTD.

CC-15 PART DESIGN AND CONSTRUCTION OF ELEVATED VIADUCT

FROM CH. KM 26.739 TO KM 34.34 INCLUDING ENTRY EXIST LINE TO

DEPOT, ELEVATED RAMP AT KALKAJI AND SPECIAL SPANS AND

CONSTRUCTION OF SIX ELEVATED STATIONS INCLUDING

ARCHITECTURAL FINISHING, WATER SUPPLY, SANITARY

INSTALLATION AND EXTERNAL DEVELOPMENT WORK ETC. AT OKHLA

VIHAR PH-III, ISHWAR NAGAR, JAMIA NAGAR, OKHLA VIHAR, JASOLA

VIHAR AND KALANDI KUNJ ON JANAK PURI WEST-BOTANICAL

GARDEN CORRIDOR OF PH-III OF DELHI MRTS.

TRAFFIC

DIVERSION

SCHEME

15 AFCONS CC-29 PART DESIGN AND CONSTRUCTION OF ELEVATED VIADUCT

AND RAMP OF LENGTH 2653.44 RM. STRUCTURAL AND

ARCHITECTURAL WORKS OF 2 ELEVATED STATIONS (SADAR BAZAR

AND SHANKAR VIHAR) ON PALAM TO SHANKAR VIHAR STRETCH OF

LINE-8 OF PHASE-3 OF DELHI MRTS.

TRAFFIC

DIVERSION

SCHEME

16 KOTHARI

ASSOCIATES

TRAFFIC IMPACT ASSESSMENT OF NEW PATIALA HOUSE COURT

BUILDING ALONG DDU MARG, NEW DELHI

TRANSPORT

PLANNING

17 GIFFORD PRE TENDER TRAFFIC STUDIES FOR DEVELOPMENT AND OPERATION

OF NAGAUR-BIKANER SECTION OF NH-89 (KM 180/500 OF NH-65 TO

KM 267/325 VIA KM 171/0 OF NH-89) THROUGH PUBLIC PRIVATE

PARTNERSHIP (PPP) ON DESIGN, BUILD, FINANCE, OPERATE AND

TRANSFER BASIS.

PRE-BID

ADVISORY

18 ERA INFRA DESIGN AND CONSTRUCTION OF TUNNEL BY SHIELD TBM AND LAL

QILA AND KASHMERE GATE STATIONS BY CUT AND COVER METHOD

BETWEEN JAMA MASJID AND KASHMERE GATE FOR UNDERGROUND

WORKS UNDER DELHI MRTS PROJECT OF PHASE III.

TRAFFIC

DIVERSION

SCHEME

19 RITES LTD. TRAFFIC ESTIMATION ON NOIDA GR. NOIDA EXPRESSWAY NEAR

MAHAMAYA FLYOVER BASS ON CLASSIFIED TRAFFIC COUNTS FOR 7

CONSECUTIVE DAYS AND 24 HOURS OF EACH DAY.

TRAFFIC

DIVERSION

SCHEME

20 RITES LTD. TRAFFIC ESTIMATION ON NOIDA GR. NOIDA EXPRESSWAY BASED ON

CLASSIFIED TRAFFIC COUNTS FOR 7 CONSECUTIVE DAYS AND 24

HOURS OF EACH DAY.

TRAFFIC

DIVERSION

SCHEME

21 RITES LTD. PET SURVEY FOR NEW METRO CORRIDOR IN AND AROUND THE

METROPOLITAN CITY OF KOLKATA

ENGINEERING

DESIGN

22 DMRC TRAFFIC VOLUME SURVEY AND TRAFFIC MANAGEMENT PLANNING TO

DEVELOP THE PROPER TRAFFIC DIVERSION SCHEMES IN THE

STRETCH STARTING FROM BHIKAJI CAMA PLACE AND ENDING AT H.

NIZAMUDDIN OF LINE-7 OF DELHI MRTS PHASE-III.

TRAFFIC

ENGINEERING

23 PWD DELHI STUDY FOR CORRIDOR IMPROVEMENT AND PROVIDING PARKING

FACILITY AT ARUNA ASAF ALI MARG.

TRAFFIC

ENGINEERING

24 PWD DELHI FEASIBILITY STUDY FOR FOB ACROSS RING ROAD NEAR HANUMAN

MANDIR OPPOSITE VISHWANATH SANYASH ASHRAM AT BELA ROAD

CIVIL LINE DELHI

FEASIBILITY

STUDY

25 PWD DELHI FEASIBILITY STUDY FOR FOB ACROSS GT ROAD AT GURUDWARA

NANAK PAO AND JAIN MAHVIRA SCHOOL.

FEASIBILITY

STUDY

26 PWD DELHI DESIGN OF CULVERT AND DRAIN ALONG ROAD NO 63 AND

STRUCTURE DESIGN OF CULVERT AND DRAIN ALONG ROAD NO 62

FROM KALYAN HOSPITAL AND J & K PKT DILSHAND GARDEN DELHI

ENGINEERING

DESIGN

27 PWD DELHI IMPROVEMENT OF INTERSECTION BETWEEN RING ROAD AND

KARAMPURA ROAD (MOTI NAGR “T” POINT)

ENGINEERING

DESIGN

Page 56: TPA COMPANY PROFILE - 2016

28 NOIDA

AUTHORITY

DESIGN AND ESTIMATION OF 5 INTERSECTIONS ALONG THE 45.00M

WIDE SERVICE ROAD IN VICINITY OF NOIDA-GREATER NOIDA

EXPRESSWAY

TRAFFIC

ENGINEERING

29 NOIDA

AUTHORITY

PREPARATION OF GENERAL ARRANGEMENT DRAWING FOR

UNDERPASS BETWEEN SECTOR 16A AND SECTOR 16B NOIDA

TRAFFIC

ENGINEERING

30 NOIDA

AUTHORITY

TOPOGRAPHIC SURVEY OF INFLUENCE AREA AND GEOMETRIC

DESIGN OF 2 INTERSECTIONS ALONG 45M MASTER ROAD SECTOR 44

NOIDA.

TOPOGRAPHIC

SURVEYS

31 NOIDA

AUTHORITY

DESIGN OF ALIGNMENT OF FARIDABAD-NOIDA-GHAZIABD NEAR

CHAJJARSI VILLAGE IN NOIDA

ENGINEERING

DESIGN

32 NOIDA

AUTHORITY

DESIGN OF U TURNS ALONG UDYOG MARG BETWEEN SECTOR 14 AND

SECTOR 15 NOIDA

TRAFFIC

ENGINEERING

33 NOIDA

AUTHORITY

TOPOGRAPHIC SURVEY OF BLOCK F SECTOR 50 NOIDA TOPOGRAPHIC

SURVEYS

34 NOIDA

AUTHORITY

DESIGN OF U TURN ALONG MASTER PLAN ROAD NO 3 BETWEEN

SECTOR 35 AND SECTOR 50 NOIDA TRAFFIC

ENGINEERING

35 NOIDA

AUTHORITY

SURVEY AND DESIGN OF U TURN AT EXPRESSWAY OPPOSITE SECTOR

15A NOIDA TRAFFIC

ENGINEERING

36 NOIDA

AUTHORITY

DESIGN OF U TURN ALONG DSC ROAD BETWEEN SEC 106 AND SEC 82

NOIDA TRAFFIC

ENGINEERING

37 NOIDA

AUTHORITY

ESTIMATION AND DESIGN OF SLUICE GATE AT SECTOR 168

IRRIGATION DRAIN NOIDA.

ENGINEERING

DESIGN

38 NOIDA

AUTHORITY

CORRIDOR IMPROVEMENTPROPOSAL FOR ROAD NO 06 FROM

MAMURA CHOWK TO NH-24 NOIDA

TRAFFIC

ENGINEERING

39 NOIDA

AUTHORITY

SURVEYING AND DESIGN OF NEW ROAD UNDER FLYOVER AT

SECTOR-108 UPTO UNDERPASS OF SECTOR 105 ALONG NOIDA-

GREATER NOIDA EXPRESSWAY), NOIDA

TRAFFIC

ENGINEERING

40 HINDUSTAN

CONSTRUCTION

CO. LTD.

CC-30 TRAFFIC MANAGEMENT SERVICES IN DMRC CC-30 PROJECT AT

PROPOSED SHALIMAR BAGH STATIONS ALONG LINE 7 DMRC PHASE

III.

TRAFFIC

DIVERSION

SCHEME

41 SAMARTH

INFRAENGG

TECHNOCRATE

PVT. LTD.

TRAFFIC ANALYSIS AND REPORT PREPARATION FOR PRE BID

ENGINEERING STUDIES FOR TWO LANING WITH PAVED SHOULDERS

OF BIJAPUR-GULBARGA-HOMNABAD SECTION OF NH-218 FROM KM.

195+000 TO KM 418+000 IN THE STATE OF KARNATAKA UNDER

NHDP PH IV ON DBFOT BASIS.

TRANSPORT

PLANNING

Page 57: TPA COMPANY PROFILE - 2016

PROJECT COMPLETED FOR THE YEAR 2011

S. NO

CLIENTS PROJECT NAME CATEGORY

1 ASC GEOSCIENCES CONSULTANCY GROUP PVT. LTD

PRE-BID TRAFFIC FORECAST AND REVENUE PROJECTION FOR

FOUR LANING OF LUCKNOW-SULTANPUR SECTION OF NH-56 IN

UTTAR PRADESH UNDER NHDP IV THROUGH PPP ON DBFOT

BASIS.

PRE BID ADVISORY

2 MEINHARDT DESIGN OF ROTARY BETWEEN 30M ROAD AND 120M ROAD

ALONG ROAD NETWORK IN YEIDA AREA AT CHAINAGE 13+650 OF

YAMUNA EXPRESSWAY.

TRAFFIC ENGINEERING

3 GIFFORD INDIA PVT. LTD

TRAFFIC STUDIES AND FORECAST FOR FOUR LANING OF

SHIVPURI-DEWAS SECTION OF NH-3 FROM KM 236.00 TO KM

566.45 IN THE STATE OF MADHYA PRADESH UNDER NHDP PHASE

IV ON BOT (DBFOT PATTERN).

PRE BID ADVISORY

4 GIFFORD INDIA PVT. LTD

FEASIBILITY STUDY AND PREPARATION OF DETAILED PROJECT

REPORT FOR IMPROVEMENT IN TRAFFIC FLOW IN SERVICE ROAD

BETWEEN AMBIENCE MALL & IFFCO CHOWK IN DELHI-GURGAON

SECTION OF NH-8 INCLUDING PROPOSAL FOR TOLL PLAZA

EXTENSION.

TRAFFIC ENGINEERING

5 GIFFORD INDIA LTD. TRAFFIC STUDIES AND FORECAST FOR DETAILED ENGINEERING

FOR FOUR LANNING OF PATNA-BAKHTIYARPUR SECTION OF NH-

30 FROM KM 181.300 TO KM 231.950 IN THE STATE OF BIHAR

UNDER NHDP III ON DBFOT TOLL BASIS.

TRAFFIC ENGINEERING

6 RITES LTD TRAFFIC IMPACT ASSESSMENT STUDY FOR ‘DLF-MALL OF INDIA-

NOIDA IN SECTOR 18.

TRANSPORT PLANNING

7 PWD DELHI DESIGN OF A NEW ROAD CORRIDOR ROAD NO 37 ALONG HAIDER

PUR CANAL FROM OUTER RING ROAD TO RING ROAD.

(GEOMETRIC DESIGN AND VERIFICATION OF OLD TOPOGRAPHIC

PLAN)

TRAFFIC ENGINEERING

8 PWD DELHI PROVIDING SURVEY PLAN OF AUROBINDO MARG BETWEEN AIIMS

FOB AND IIT JUNCTIONS

TOPOGRAPHIC SURVEYS

9 JAYPEE ASSOCIATES LTD ( DESIGN AID)

TRAFFIC ESTIMATION ON NOIDA-GREATER NOIDA EXPRESSWAY TRANSPORT PLANNING

10 JAYPEE INFRASTRUCTURES LTD (DESIGN AID)

TRAFFIC ESTIMATION ON ZIRAKPUR-PARWANOO ROAD PROJECT TRANSPORT PLANNING

11 LOGIX GROUP PROJECT REPORT FOR TRAFFIC CONSULTANCY SERVICES FOR

LOGIX CITY CENTER PLOT NO BW-58 SECTOR 32 NOIDA

ENGINEERING DESIGN

12 SATRA I-MAN PVT. LTD TRAFFIC SURVEYS, ANALYSIS AND REPORT PREPARATION FOR

DETAILED PROJECT REPORT FOR 4 LANE LADDOWAL BYPASS

NH-95 WITH NH-1 VIA LADDOWAL SEED FARM AT LUDHIANA.

FEASIBILITY STUDY

13 NOIDA AUTHORITY IMPROVEMENT PROPOSALS FOR ROAD NETWORK IN & AROUND

SECTOR 94 NOIDA. ON EXPRESS HIGHWAY.

TRAFFIC ENGINEERING

14 NOIDA AUTHORITY DETAILED DESIGN OF FOOT OVER BRIDGE AT SECTOR 41 & 50

NOIDA

ENGINEERING DESIGN

15 NOIDA AUTHORITY CARRYING OUT TRAFFIC IMPACT ASSESSMENT FOR NOIDA PARK

SEC 95, NOIDA

TRANSPORT PLANNING

16 NOIDA AUTHORITY M/O ROAD (PLANNING & DESIGNING OF SECTOR 94, 124 AREA)

NOIDA.

ENGINEERING DESIGN

Page 58: TPA COMPANY PROFILE - 2016

17 NOIDA AUTHORITY DESIGN OF U TURNS ALONG EXP. HIGHWAY WAY OPP. SEC 15 A

NOIDA

TRAFFIC ENGINEERING

18 NOIDA AUTHORITY DESIGN OF GRADE SEPARATED FACILITIES FOR ARTERIAL AND

SUB ARTERIAL ROAD SYSTEM NEAR SECTOR 18 & NITHARI

VILLAGE,

TRAFFIC ENGINEERING

19 NOIDA AUTHORITY TOPOGRAPHIC DETAILS SURVEY IN NOIDA VILLAGE & DRAINAGE

WATER FLOW AND DESIGN IN NOIDA VILLAGE. (GEJHA,

TILAPATABAD, KAKRALA, HAZRATPUR, WAZIDPUR, YAKUTPUR,

MOHIYAPUR) NOIDA

TOPOGRAHIC SURVEY

20 AFCONS CONTRACT CC-05: DESIGN AND CONSTRUCTION OF TUNNEL BY

SHIELD TBM,AND ITO, DELHI GATE AND JAMA MASJID STATION

BY CUT AND COVER METHOD BETWEEN MANDI HOUSE AND JAMA

MASJID FOR UNDERGROUND WORKS UNDER DELHI MRTS

PROJECT OF PHASE-III

CONTRACT CC-07: DESIGN AND CONSTRUCTION OF TUNNEL BY

SHIELD TBM,AND LAL QILA AND KASHMERE GTAE STATIONS BY

CUT AND COVER METHOD BETWEEN JAMA MASJID AND

KASHMERE GATE FOR UNDERGROUND WORKS UNDER DELHI

MRTS PROJECT OF PHASE-III.

PRE BID ADVISORY

21 AFCONS DESIGN CONSULTANCY SERVICES FOR TRAFFIC DIVERSION PLAN

FOR CONTRACT BC-45 DELHI METRO

TRAFFIC DIVERSION SCHEME

22 UMTC PREPARATION OF DESIGN OF INTERSECTIONS AS PART OF

SHORT TERM TRAFFIC ENGINEERING MEASURES FOR AGRA,

ALLAHABAD AND MATHURA.

TRAFFIC ENGINEERING

23 DMRC PLANNING OF TRAFFIC DIVERSION SCHEMES ALONG RING ROAD

CORRIDOR FROM BHIKHAJI CAMA PLACE TO SHALIMAR BAGH FOR

LINE 7 OF DELHI MRTS PROJECT PHASE-III

TRAFFIC DIVERSION SCHEME

24 GR. NOIDA PROVIDING INTERSECTION IMPROVEMENT IN SECTOR 16B

GREATER NOIDA.

TRAFFIC ENGINEERING

25 DEFINITI DESIGN FOUR LANING OF VIJAYWADA-MACHHILIPATNAM SECTION OF NH-

9 FROM KM 0.000 TO KM 63.800 (APPROX LENGTH-64.611 KMS)

IN THE STATE OF ANDHRA PRADESH TO BE EXECUTED ON DBFOT

(TOLL) BASIS UNDER NHDP PHASE-III.

PRE BID ADVISORY

26 DEFINITI DESIGN PREBID ADVISORY SERVICES - RAMPUR KATHGODAM ROAD NH-

87.

PRE BID ADVISORY

27 DEFINITI DESIGN PREBID ADVISORY SERVICES FOR UPGRADATION OF 38

INTERSTATE CHECK POSTS IN PUNJAB.

PRE BID ADVISORY

28 DEFINITI DESIGN SIX LINING OF JAIPUR RING ROAD FROM AJMER ROAD TO AGRA

ROAD SECTION AT JAIPUR IN THE STATE OF RAJASTHAN

PRE BID ADVISORY

Page 59: TPA COMPANY PROFILE - 2016

PROJECTS COMPLETED IN YEAR 2010

S. NO

CLIENTS PROJECT NAME CATEGORY

1 TOPWORTH INFRA

PVT. LTD.

PRE-BID TRAFFIC ADVISORY STUDIES FOR UPGRADATION OF SATNA

– CHITRAKOOT HIGHWAY ON BOT BASIS IN MADHYA PRADESH &

UJJAIN-UNHEL-NAGDA-JAORA ROAD ON BOT BASIS IN MADHYA

PRADESH

PRE BID

ADVISORY

2 TOPWORTH INFRA

PVT. LTD.

DEVELOPMENT OF THE LEBAD TO MANPUR PROJECT OF MPRDC PRE BID

ADVISORY

3 SA INFRASTRUCTURE

CONSULTANTS PVT.

LTD.

PREPARATION OF FEASIBILITY-CUM PRELIMINARY DESIGN FOR

CONSTRUCTION OF STATE ALONG RING ROAD/BYPASS IN JAIPUR CITY

IN THE STATE OF RAJASTHAN UNDER NHDP PH-VII.

PRE BID

ADVISORY

4 WAVE SILVER TOWER

PVT. LTD.

AXLE LOAD SURVEY FOR KANPUR TO KABRAI NH-86 PROJECT TRANSPORT

PLANNING

5 MEINHARDT

SINGAPORE PTE. LTD.

ADDITIONAL TRAFFIC SURVEY FOR PREPARATION OF FEASIBILITY

CUM PRELIMINARY DESIGN FOR REHABILITATION AND UPGRADATION

OF EXISTING 2 LANE ROAD TO 4/6 LINING OF AMBALA KAITHAL

SECTION OF NH-65 TO BE EXECUTED AS BOT PROJECT ON DBFO

PATTERN UNDER NHDP PHASE III IN THE STATE OF HARYANA

TRANSPORT

PLANNING

6 GIFFORD INDIA PVT.

LTD.

PREPARATION OF DETAILED PROJECT REPORT FOR UPGRADATION OF

CANAL ROADS (4 NOS) IN PUNJAB STATE FOR TRAFFIC FEASIBILITY

STUDY

TRANSPORT

PLANNING

7 GIFFORD INDIA PVT.

LTD.

PREPARATION OF DETAILED PROJECT REPORT FOR UPGRADATION OF

CANAL ROADS IN PUNJAB STAGE FOR TRAFFIC FEASIBILITY STUDY

FOR RAYYA – KHARA ROAD

TRANSPORT

PLANNING

8 RITES LTD. DETAILED PROJECT REPORT FOR MUMBAI METRO RAIL PROJECT

MAHIM-BKC AIRPORT-KANJUR MARG METRO CORRIDOR

TRANSPORT

PLANNING

9 DEFINITI DESIGN PRE-BID ADVISORY SERVICES FOR SWAROOPGANJ-PINDWADA

SECTION OF NH-14 AND PINDWADA-UDAIPUR SECTION OF NH-76 IN

THE STATE OF RAJASTHAN ON BEHALF OF C&C CONSTRUCTION LTD.

PRE BID

ADVISORY

10 DEFINITY DESIGN

(C&C

CONSTRUCTIONS)

TRAFFIC STUDIES FOR BARAN SHIVPURI SECTION OF NH-76 IN THE

STATE OF RAJASTHAN AND MADHYA PRADESH AND SHIVPURI-JHANSI

SECTION OF NH-25 IN THE STATE OF MADHYA PRADESH AND UTTAR

PRADESH HAVING 3 TOLL PLAZA ON BEHALF OF C&C CONSTRUCTION

LTD.

PRE BID

ADVISORY

11 DEFINITY DESIGN

(C&C

CONSTRUCTIONS)

TRAFFIC STUDIES OF KOTA-BARAN SECTION (KM 388.263 TO KM

492.322, HAVING 2 TOLL PLAZAS) OF NH 76 IN STATE OF RAJASTHAN

ON BEHALF OF C & C CONSTRUCTION LTD.

PRE BID

ADVISORY

12 NOIDA AUTHORITY M/O ROADS (MINOR IMPROVEMENT OF EIGHT INTERSECTIONS IN

SECTOR 18) NOIDA

ENGINEERING

DESIGN

Page 60: TPA COMPANY PROFILE - 2016

13 NOIDA AUTHORITY IMPROVEMENT PROPOSAL FOR LABOUR CHOWK SECTOR 58 AND

DESIGN OF INTERSECTION IN SECTOR 62 NOIDA.

ENGINEERING

DESIGN

14 NOIDA AUTHORITY TRAFFIC CIRCULATION SCHEME AND PREPARATION OF PARKING PLAN

AROUND INTERSECTION OF 30.00M WIDE MASTER PLAN ROAD AND

DND EXPRESSWAY IN NOIDA

ENGINEERING

DESIGN

15 NOIDA AUTHORITY DEVELOPMENT OF SECTOR 75 & 76 (DESIGN OF INTER SECTION)

NOIDA

ENGINEERING

DESIGN

16 PWD DELHI PROVIDING GEOMETRIC CONNECTION OF AUROBINDO MARG. FOR

NON MOTORIZED VEHICLE AND PEDESTRIAN FACILITY.

ENGINEERING

DESIGN

17 PWD DELHI CORRIDOR IMPROVEMENT PROPOSAL FOR RING ROAD BETWEEN

VIJAYGHAT AND HANUMAN SETU IN CONTEXT OF RAJGHAT BYPASS

ENGINEERING

DESIGN

18 PWD DELHI WIDENING OF ROAD NO 51 FROM AZADPUR INTERSECTION TO

MUKUNDPUR CHOWK DELHI.

ENGINEERING

DESIGN

19 PWD DELHI PLANNING AND DESIGN OF NON-MOTORIZED BETWEEN MUKARBA

CHOWK AND PEERAGARHI CHOWK ALONG OUTER RING ROAD

ENGINERING

DESIGN

20 NOIDA DEVELOPMENT

AUTHORITY

FEASIBILITY SUPPLY FOR TWO FOOT OVER BRIDGES (FOB) ACROSS

DSC ROAD AT BAROLA AND BHANGEL VILLAGE,NOIDA

FEASIBILITY

STUDY

Page 61: TPA COMPANY PROFILE - 2016

PROJECT COMPLETED FOR THE YEAR 2009

S. NO

CLIENTS PROJECT NAME CATEGORY

1 NOIDA AUTHORITY PREPARATION OF MAP FOR DESIGN OF AREA DRAINAGE FOR SEC

84,86,87 & 89. NOIDA.

ENGINEERING

DESIGN

2 NOIDA AUTHORITY FOB DESIGN AT MP-2 AT BET. SECTOR 18 AND GREAT INDIA PALACE. ENGINEERING

DESIGN

3 NOIDA AUTHORITY M/O ROAD (MINOR IMPROVEMENT OF THREE INTERSECTION AT MP-2

ROAD) NOIDA.

ENGINEERING

DESIGN

4 NOIDA AUTHORITY DESIGN OF ROAD SIDE DRAINAGE ALONG DSC ROAD IN BHANGEL

AREA OF NOIDA.

ENGINEERING

DESIGN

5 NOIDA AUTHORITY DESIGN OF ACCESS ROADS TO NEWLY ACQUIRED LAND ALONG

MATHURA ROAD IN DELHI

ENGINEERING

DESIGN

6 MEINHARDT

SINGAPORE PTE. LTD.

TRAFFIC SURVEY AND ANALYSIS FOR PATNA BAKHTIYARUR PROJECT TRANSPORT

PLANNING

7 UTTARAKHAND

INFRASTRUCTURE

DEVELOPMENT

COMPANY LTD.

PREPARATION OF PRELIMINARY PROJECT REPORT FOR PARKING OF

ROAD IMPROVEMENT PROJECTS IN NAINITAL, UTTARAKHAND

ENGINEERING

DESIGN

8 GHERZI EASTERN

LTD.

TRAFFIC MANAGEMENT PLAN FOR 2 CITIES IN RAJASTHAN NAMELY

ALWAR AND SAWARI MADHOPUR.

TRANSPORT

PLANNING

9 PWD DELHI STRENGTHENING OF OUTER RING ROAD NO 26 AND RAISING OF

FOOTPATH FROM JUNCTION OF GTK ROAD TO ROAD NO 41

MADHUBAN CHOWK.

TRANSPORT

PLANNING

10 PWD DELHI EXTENSION OF RTR FLYOVER UPTO SANGAM VIHAR TRANSPORT

PLANNING

11 GR. NOIDA

AUTHORITY

DESIGN OF INTERSECTION OF 130.0M WIDE ROAD KP-V TO HINDON

BRIDGE, GR. NOIDA.

ENGINEERING

DESIGN

12 RITES LTD. DETAILED PROJECT REPORT FOR THREE METRO CORRIDORS

KOLKATA- FOR CARRYING OUT PREPARATION OF TRAFFIC DISPERSAL

AND INTER-MODAL INTEGRATION PLANS

TRANSPORT

PLANNING

13 RITES LTD TRAFFIC CIRCULATION AND TRANSPORT INFRASTRUCTURE PLAN FOR

CONNAUGHT PLACE IN THE CONTEXT OF THE PROPOSED

REDEVELOPMENT OF NEW DELHI RAILWAY STATION

TRANSPORT

PLANNING

14 RITES LTD. PREPARATION OF FEASIBILITY REPORT FOR ELEVATED SUB-URBAN

RAIL CORRIDOR (CHURCHGATE TO VIRAR) IN MUMBAI.

TRANSPORT

PLANNING

15 NOIDA DEVELOPMENT

AUTHORITY

DESIGN OF U TURN ALONG DSC ROAD NOIDA ENGINERING

DESIGN

Page 62: TPA COMPANY PROFILE - 2016

PROJECT COMPLETED FOR THE YEAR 2008

S. NO

CLIENTS PROJECT NAME CATEGORY

1 MEINHARDT

SINGAPORE PTE.LTD

TRANSPORT PLAN FOR INTEGRATED TOWNSHIP ALONG TAJ

EXPRESSWAY

TRANSPORT

PLANNING

2 MEINHARDT

SINGAPORE

TRAFFIC AND TRANSPORT SURVEY FOR FEASIBILITY REPORT OF NH-

65 BETWEEN AMBALA AND KAITHAL.

FEASIBILITY

STUDY

3 RAO ENGINEERING

ENTERPRISES

BENKELMAN BEAM SURVEY WORK FOR PROPOSED PROJECT AT

GURGOAN, HARYANA

PRE BID

ADVISORY

4 WSP ENGINEERING

SERVICES LTD.

DETAILED PROJECT REPORT FOR SELECTED ROAD IN GURGOAN DETAILED

PROJECT

REPORT

5 ZOOM DEVELOPERS TRAFFIC SURVEY FOR PROPOSED INDORE-UJJAIN ROAD PRE BID

ADVISORY

6 ZOOM DEVELOPERS TRAFFIC SURVEY FOR PROPOSED HPWD-GURGAON FARIDABAD

ROAD AND BALLABHGARH SOHANA ROAD ON BOT BASIS IN

HARYANA

PRE BID

ADVISORY

7 ZOOM DEVELOPERS TRAFFIC SURVEY FOR PROPOSED BHOPAL BY PASS ROAD PRE BID

ADVISORY

8 LEA ASSOCIATES

SOUTH ASIA PVT. LTD.

DATA COLLECTION ON STATE ROAD NETWORK IN GUJARAT –

PACKAGE 1

PRE BID

ADVISORY

9 THE FOUNDATION SUB CAR PARKING SURVEY TRANSPORT

PLANNING

10 RITES LTD COMPREHENSIVE MOBILITY PLAN FOR LUDHIANA – TRAFFIC AND

TRAVEL SURVEYS

TRANSPORT

PLANNING

11 RITES LTD ROB NEAR VILLAGE ROOPVAS- TRAFFIC SURVEY AND JUNCTION

DESIGN WORK

ENGINEERING

DESIGN

12 RITES LTD GEOMETRIC DESGIN FOR BRT ROAD NETWORK SYSTEM IN

BHUBANESWAR.

ENGINEERING

DESIGN

13 NOIDA AUTHORITY GEOMETRIC DESIGN OF 3 INTERSECTIONS AT FRONT OF FORTIS

HOSPITAL CHAJARSI, HINDON BAUNDH & UNDERPASS SEC 62 ON

NH-24 NOIDA

ENGINEERING

DESIGN

14 NOIDA DELHI DEIGN OF STRUCTURAL PEDESTRIAN BRIDGE ACROSS DRAIN IN SEC

49-50 NOIDA

ENGINEERING

DESIGN

15 LOUIS BERGER

CONSULTING PVT.

LTD.

TRAFFIC SURVEY WORK FOR THE DESIGN CONSULTANCY SERVICES

FOR SIX-LANING OF THE GURGOAN-KOTPUTLI-JAIPUR SECTION OF

FROM KM 107/000 TO KM 219/000 AT NH-8 IN THE STATE OF

HARYANA & RAJASTHAN.

PRE BID

ADVISORY

16 PWD DELHI CORRIDOR IMPROVEMENT OF OUTER RING ROAD FROM IIT GATE TO

NH-8 INTERSECTION NEW DELHI

ENGINEERING

DESIGN

17 PWD DELHI PREPARATION OF DETAILE3D PROJECT REPORT FOR THE PROPOSED

ROB/RUB ON RAILWAY CROSSSING OF CHANDAN NAGAR/BRIJ

NAGAR

FEASIBILITY

STUDY

Page 63: TPA COMPANY PROFILE - 2016

PROJECT COMPLETED FOR THE YEAR 2007

S.

NO

CLIENTS PROJECT NAME CATEGORY

1 NAVYUGA

ENGINEERING CO.

LTD.

TRAFFIC MANAGEMENT PLAN DURING CONSTRUCTION OF FLYOVER

AT NARAINA IN DELHI

TRAFFIC

DIVERSION

SCHEME

2 NAVYUGA

ENGINEERING CO.

LTD.

TRAFFIC MANAGEMENT PLAN DURING CONSTRUCTION OF FLYOVER

AT 14A CROSSING IN NOIDA

TRAFFIC

DIVERSION

SCHEME

3 LARSEN & TOUBRO

LTD.

APPROACH ROAD INTERSECTION DESIGN FOR TERMINAL-2

BUILDING AT IGI AIRPORT IN DELHI

TRAFFIC

DIVERSION

SCHEME

4 INDIAN

TECHNOCRAT LTD.

AXLE LOAD SURVEY FOR AGRA-BHARATPUT BOT PROJECT (NH-11) TRANSPORT

PLANNING

5 BECOM INDIA PVT.

LTD.

AXLE LOAD SURVEY FOR GURGAON-JAIPUR SECTION OF NH-8 AND

PANIPAT TO JALANDHAR SECTION OF NH-1 AND RAJKOT-VADINAR

SECTION OF SH-25

TRANSPORT

PLANNING

6 JAIPRAKASH

ASSOCIATES LTD

CONSULTANCY SERVICES FOR TRAFFIC ESTIMATION ON TAJ

EXPRESSWAY AND EASTERN PERIPHERAL EXPRESSWAY

TRANSPORT

PLANNING

7 METRO

TUNNELING

GROUP

TRAFFIC DIVERSION SCHEME FOR HAUZ KHAS METRO STATION TRAFFIC

DIVERSION

SCHEME

8 LARSEN & TOUBRO

LTD

PROPOSAL FOR PREPARATION OF TRAFFIC MANAGEMENT PLAN

DURING CONSTRUCTION OF DELHI AIRPORT TERMINAL NO , 3

TRAFFIC

DIVERSION

SCHEME

9 RITES LTD TRAFFIC IMPACT ASSESSMENT STUDY FOR DLF MALL OF INDIA AT

NH-8 ALONG DELHI GURGAON BORDER

TRANSPORT

PLANNING

10 RITES LTD CONSULTANCY SERVICES FOR GEOMETRIC DESIGN OF ALIGNMENT

OF BUS RAPID TRANSIT SYSTEM FOR OUTER RING ROAD IN

BANGALORE

ENGINEERING

DESIGN

11 RITES LTD CONSULTANCY SERVICES FOR GEOMETRIC DESIGN OF BUS RAPID

TRANSIT CORRIDOR ALONG JAMIA TILAK NAGAR & NIZAMUDDIN

BRIDGE – NAND NAGRI CORRIDORS.

ENGINEERING

DESIGN

12 RITES LTD TRANSPORT DEMAND FORECAST STUDY AND DEVELOPMENT OF AN

INTEGRATED ROAD CUM MULTI MODAL PUBLIC TRANSPORT

NETWORK FOR NCT OF DELHI-CARRYING OUT HOUSEHOLD

INTERVIEW SURVEY FOR DELHI

ENGINEERING

DESIGN

Page 64: TPA COMPANY PROFILE - 2016

13 RITES LTD TRAFFIC IMPACT ASSESSMENT STUDY FOR DLF TOWN SQUARE

MALL IN SECTOR 18 NOIDA

TRANSPORT

PLANNING

14 DMRC LTD TRAFFIC DIVERSION SCHEME AT AZADPUR ALONG GT ROAD

DURING CONSTRUCTION OF METRO ALIGNMENT.

ENGINEERING

DESIGN

15 HUDA ROHTAK WIDENING OF NH-71 FROM RD 0 KM TO RD 5.50 KM PROVIDING

CONSULTANCY SERVICES FOR PREPARATION DESIGN OF

INTERSECTIONS AT THE JUNCTION OF BSB CANAL AND JLM CANAL

WITH ROHTAK DELHI ROAD ROHTAK SONEPAT ROAD AND

JUNCTION OF ROADS OF SEC 1 ROHTAK JOINING WITH NH NO 71A

ENGINEERING

DESIGN

16 PWD DELHI CONSTRUCTION OF RAILWAY UNDERPASS S AT RAILWAY CROSSING

BETWEEN SHALIMAR BAGH AND AZADPUR FRUIT MANDI –

PROVIDING CONSULTANCY SERVICES FOR GEOMETRIC DESIGN OF

ALL ROACHES FOR UNDERPASS

ENGINEERING

DESIGN

17 CPWD DELHI PLANNING AND DESIGN OF TRAFFIC CIRCULATIOIN IN

UNDERGROUND PARKING AT NORTH BLOCK AND ROU OF SOUTH

BLOCK NEW DELHI

ENGINEERING

DESIGN

18 PWD DELHI CONSULTANCY FOR WIDENING OF APPROACHES FOR ROB AT

KESHAV PURAM, ROAD NO 37. DELHI

ENGINEERING

DESIGN

19 PWD DELHI FEASIBILITY STUDIES FOR 3 FOOT OVER BRIDGE ALONG RING

ROAD AT BRITANNIA CHOWK, ASHOK VIHAR AND SHALIMAR BAGH

ENGINEERING

DESIGN

Page 65: TPA COMPANY PROFILE - 2016

PROJECT COMPLETED FOR THE YEAR 2006

S.

NO

CLIENTS PROJECT NAME CATEGORY

1 IL & FS PLANNING OF BUS ROUTES FOR PROPOSED CITY BUS SERVICES IN

AMRITSAR, LUDHIANA AND JALANDHAR UNDER JNURM SCHEME

TRANSPORT

PLANNING

2 RITES LTD TRAFFIC IMPACT ASSESSMENT STUDY FOR SAKET DISTRICT CENTRE

DELHI

TRANSPORT

PLANNING

3 RITES LTD FEASIBILITY STUDY FOR DEVELOPMENT OF URBAN ARTERIALS IN

NOIDA FOR UNINTERRUPTED TRAFFIC FLOW

TRANSPORT

PLANNING

4 RITES LTD GEOMETRIC DESIGN OF BUS RAPID TRANSIT CORRIDORS IN DELHI

ALONG JAMIA-TILAK NAGAR CORRIDOR.

TRAFFIC

ENGINEERING

5 IRPPL

AMUSEMENT

PARK PVT.

LTD.

TRAFFIC IMPACT ASSESSMENT FOR MASTER PLAN ROAD NO 2 ON

TRAFFIC DUE TO AMUSEMENT PARK IN SECTOR 38, NOIDA

TRANSPORT

PLANNING

6 PWD DELHI FEASIBILITY OF CONSTRUCTION OF ROAD NO 38 AND REALIGNMENT

OF ROAD

ENGINEERING

DESIGN

Page 66: TPA COMPANY PROFILE - 2016

PROJECT COMPLETED FOR THE YEAR 2005

S.

NO

CLIENTS PROJECT NAME CATEGORY

1 RITES LTD CONDUCTING HOUSEHOLD INTERVIEW SURVEY FOR BANGALORE

METROPOLITAN AREA FOR PREPARATION OF COMPREHENSIVE

TRAFFIC AND TRANSPORT PLAN FOR BANGALORE METROPOLITAN

AREA

TRANSPORT

PLANNING

2 RITES LTD TRAFFIC AND ENGINEERING STUDY FOR GRADE SEPARATED

INTERCHANGES AT FOUR IDENTIFIED INTERSECTIONS ON DSC

ROAD IN NOIDA

TRANSPORT

PLANNING

3 RITES LTD FEASIBILITY STUDY FOR DEVELOPMENT OF TWO NEW ROAD LINKS

BETWEEN DELHI AND GURGAON - CARRYING OUT TRAFFIC SURVEYS

TRANSPORT

PLANNING

4 RITES LTD TRAFFIC STUDIES FOR DEVELOPMENT OF INFRASTRUCTURE AT

INTEGRATED BORDER CHECK POST AT NAXALBARI KAKRABITTA

ALONG INDO NEPAL BORDER

FEASIBILITY

STUDY

5 RITES LTD CARRYING OUT TRAFFIC AND TRANSPORTATION STUDIES FOR

PREPARATION OF TRANSPORT PLAN FOR NOIDA

TRANSPORT

PLANNING

6 NHAI FEASIBILITY STUDY AND DETAILED PROJECT REPORT PREPARATION

FOR FOUR/SIX LINING OF NH-4 FROM BANGALORE- HOSKOTE TO -

KOLAR-MUDBAGAL IN THE STATE OF KARNATAKA UNDER NHDP

PH III PROGRAMME

TRANSPORT

PLANNING

7 TCI

INFRASTRUCTURE

FINANCE LTD.

FEASIBILITY STUDY FOR A TOLL BRIDGE AT BATA CHOWK,

FARIDABAD

TRANSPORT

PLANNING

8 L & T RAMBOLL

CONSULTING

ENGINEERS LTD.

JALANDHAR-AMRITSAR ROAD TRAFFIC SURVEY TRANSPORT

PLANNING

Page 67: TPA COMPANY PROFILE - 2016

PROJECT COMPLETED FOR THE YEAR 2004

S.

NO

CLIENTS PROJECT NAME CATEGORY

1 PWD DELHI CARRYING OUT THE TRAFFIC AND TRANSPORTATION STUDIES,

PHYSICAL SURVEY AND PREPARATION OF FEASIBILITY REPORT

FOR GRADE SEPARATOR FOR TRAFFIC AND PEDESTRIAN AT ISBT

ANAND VIHAR CROSSING ON ROAD NO 56

TRANSPORT

PLANNING

2 CONSULTING

ENGINEERING

SERVICES PVT. LTD.

TRAFFIC STUDIES FOR KUNDLI-MANESAR-PALWAL EXPRESSWAY TRANSPORT

PLANNING

Page 68: TPA COMPANY PROFILE - 2016

MAJOR PROJECT COMPLETED IN YEAR 2002

S.

NO

CLIENTS PROJECT NAME CATEGORY

1 PWD DELHI FEASIBILITY STUDY FOR GRADE SEPARATOR ON VARIOUS ROAD SUNDER

DIVISION CRMD M-312.,DELHI.

TRANSPORT

PLANNING

Page 69: TPA COMPANY PROFILE - 2016

MINOR PROJECTS

COMPLETED

Page 70: TPA COMPANY PROFILE - 2016

MINOR PROJECTS COMPLETED IN THE YEAR 2015

S.NO CLIENT PROJECT NAME CATEGORY

1 SADBHAV ENGINEERING LTD.

TRAFFIC SURVEY AT GHEWRA INTERSECTION ALONG NH-10 TRAFFIC ENGINEERING

2 NOIDA AUTHORITY

TOPOGRAPHIC SURVEY OF OPEN LAND IN SECTOR 83 YAKUDPUR VILLAGE, NOIDA

TOPOGRAPHIC

SURVEY

3 DMRC TRAFFIC CIRCULATION PLAN FOR NEW OFFICE BLOCK TRAFFIC

ENGINEERING

4 PWD DELHI PRESENTATION ON TRAFFIC MANAGEMENT FOR ROAD NETWROK ALONG GTB HOSPITAL SHAHDARA

FEASIBILITY STUDY

5 GR. NOIDA GEOMETRIC DESIGN FOR ONE INTERSECTION IN BUILDERS AREA IN GREATER NOIDA

ENGINEERING DESIGN

6 ARVIND TECHNO GLOBE (JV) DMRC CC-41

CONSTRUCTION OF ELEVATED VIADUCT AND ELEVATED STATIONS BETWEEN JOHRI ENCLAVE AND SHIV VIHAR (PILLAR 21 TO PILLAR 72) AS PART OF DELHI METRO RAILWAY PHASE-3.

TOPOGRAPHIC SURVEY

7 PWD DELHI SURVEY OF CORDINATES OF UNIPOLES IN JURISDICTION OF PWD M-313.

TRAFFIC ENGINEERING

8 PWD DELHI SURVEY OF CORDINATES OF 177 UNIPOLES IN JURISDICTION OF PWD M-1132.

TRAFFIC ENGINEERING

9 PWD DELHI PARKING SURVEY AT SANJAY GANDHI MEMORIAL HOSPITAL MANGOL PURI.

TRAFFIC ENGINEERING

10 NOIDA AUTHORITY

IMPROVEMENT PROPOSAL FOR 30M ROAD ALONG SECTOR 18 NOIDA ENGINEERING DESIGN

11 NOIDA AUTHORITY

DESIGN OF U TURN AT ONE LOCATION ALONG MASTER PLAN ROAD NO 2 OPPOSITE SHOPRIX MALL IN NOIDA

ENGINEERING DESIGN

12 NOIDA WC -10 DESIGN OF ALIGNMENT OF 45M MASTER PLAN ROAD ALONG NOIDA EXPRESSWAY BETWEEN SECTOR 145 AND 146 NOIDA

ENGINEERING DESIGN

Page 71: TPA COMPANY PROFILE - 2016

MINOR PROJECTS COMPLETED IN THE YEAR 2014

S.NO CLIENT PROJECT NAME CATEGORY

1 NOIDA AUTHORITY

TOPOGRAPHIC SURVEY OF ONE PLOT IN SECTOR 51 BLOCK A NOIDA TOPOGRAPHIC SURVEY

2 NOIDA AUTHORITY

TOPOGRAPHIC SURVEY OF GOVT. POST GRADUATE COLLEGE AT SECTOR 39 NOIDA

TOPOGRAPHIC

SURVEY

3 PWD DELHI TOPOGRAPHIC SURVEY OF MATHURA ROAD TOPOGRAPHIC

SURVEY

4 PWD DEHI DESIGN OF ALIGNMENT OF KUNDAN LAL MARG IN DELHI ENGINEERING

DESIGN

5 NOIDA AUTHORITY

SURVEY OF DESIGN (TOPOGRAPHIC SURVEY OF NOIDA LAND, KHASRA VILLAGE ALONG 75M WIDE ROAD BETWEEN BAROLA AND SALARPUR VILLAGE) NOIDA.

TOPOGRAPHIC SURVEY

6 PWD DELHI PREPARATION OF MAP SHOWING ROADS UNDER PWD DIVISION M-3114 AND PWD M-311.

TOPOGRAPHIC SURVEY

7 PWD DELHI PEDESTRIAN COUNT AT THREE LOCATIONS FOR PERIOD OF 3 DAYS AT EACH LOCATIONS IN EAST DELHI

TRAFFIC ENGINEERING

8 NOIDA AUTHORITY

TOPOGRAPHIC SURVEY AT B BLOCK AT SECTOR 44 NOIDA TOPOGRAPHIC SURVEY

9 L AND T PROPOSED TRAFFIC DIVERSION SCHEME DURING MAINTANCE OF CC-05 LINE NEAR GOLCHA CINEMA ALONG NETAJI SUBHASH MARG

TRAFFIC ENGINEERING

10 NOIDA AUTHORITY

PREPARATION OF PLAN OF DRAINAGE SYSTEM ALONG DRAIN ADJACENT TO BHANGEL VILLAGE NOIDA

TRAFFIC ENGINEERING

11 NOIDA AUTHORITY

TOPOGRAPHIC SURVEY OF FIVE PLOTS IN SECTOR 51 NOIDA TOPOGRAPHIC SURVEY

Page 72: TPA COMPANY PROFILE - 2016

MINOR PROJECTS COMPLETED IN THE YEAR 2013

S.NO CLIENT PROJECT NAME CATEGORY

1 NOIDA

AUTHORITY

TOPOGRAPHIC SURVEY OF THE ENCROACHMENT LAND IN SECTOR

46-47-99-100 NEAR TAPO BHUMI DHAM, TEMPLE NOIDA

TOPOGRAPHIC

SURVEY

2 NOIDA

AUTHORITY

PREPARATION OF TRAFFIC DIVERSION PLAN FOR NEW BRIDGE

ACROSS SHAHDARA DRAIN NOIDA

TRAFFIC

DIVERSION

SCHEME

3 NOIDA

AUTHORITY

DESIGN OF ONE INTERSECTION BETWEEN 75M ROAD AND 24 M

ROAD IN SECTOR 105, NOIDA

TOPOGRAPHIC

SURVEY

4 NOIDA

AUTHORITY

TOPOGRAPHIC SURVEY OF MIG FLATS IN SECTOR 100, NOIDA TOPOGRAPHIC

SURVEYS

5 NOIDA

AUTHORITY

DESIGN OF U TURN ALONG DSC ROAD NOIDA ENGINEERING

DESIGN

6 ERA INFRA

ENGINEERING

PREPARATION OF DIVERSION PLAN FOR YAMUNA MARG AND ALIPUR

ROAD DURING CONSTURCTION OF EXTENSION LINE

TRAFFIC

DIVERSION

SCHEME

7 NOIDA

AUTHORITY

TOPOGRAPHIC SURVEY OF DSC ROAD FROM UPTO SECTOR 16

METRO STATION NOIDA

TOPOGRAPHIC

SURVEY

8 NOIDA AUTHORITY

DESIGN OF ONE U TURN ALONG 75M ROAD AT SECTOR 105 NOIDA ENGINEEING DESIGN

Page 73: TPA COMPANY PROFILE - 2016

MINOR PROJECTS COMPLETED IN THE YEAR 2012

S.

NO

CLIENTS PROJECT NAME CATEGORY

1 NOIDA AUTHORITY

TOPOGRAPHIC SURVEY AND PREPARATION OF GENERAL ARRANGEMENT DRAWINGS OF THE BUND ROAD ALONG HINDON RIVER.

ENGINERING DESIGN

2 NOIDA

AUTHORITY

DESIGN OF INTERSECTION BETWEEN DSC ROAD AND 75 M WIDE ROAD FROM

KESAR GARDEN

ENGINEERING

DESIGN

3 NOIDA

AUTHORITY

IMPROVEMENT PROPOSAL FOR U TURN ALONG DSC ROAD BETWEEN GOLF

COURSE CHOWK AT SECTOR 37 AND SECTOR 42 IN NOIDA

ENGINEERING

DESIGN

4 NOIDA

AUTHORITY

DESIGN OF ONE 4 ARM INTERSECTION AT CONFLUENCE OF SECTORS

50-51-72-74 IN NOIDA

ENGINEERING

DESIGN

5 NOIDA AUTHORITY

PREPARATION OF MODEL OF U TURN AT UDYOG MARG, NOIDA MISCELLANEOUS

6 NOIDA AUTHORITY

DESIGN OF ROTARY ALONG 45M ROAD NEAR SECTOR 37 NOIDA ENGINEERING DESIGN

7 NOIDA

AUTHORITY

DESIGN OF U TURN ALONG EXPRESSWAY HIGHWAY BETWEEN MAHAMAYA

CHOWK AND SECTOR 94,NOIDA

ENGINEERING

DESIGN

8 NOIDA

AUTHORITY

DESIGN OF ROTARY INTERSECTION ADJACENT TO PANCHSHEEL BALAK

MAHAVIDYALAYA (NEAR UNDERPASS) IN SECTOR 91, NOIDA.

ENGINEERING

DESIGN

9 NOIDA

AUTHORITY

LAYOUT OF IMPROVEMENT OF CROSSING PROPOSAL AT INDIAN OIL

INTERSECTION SECTOR 1,2,14 AND 15 NOIDA

ENGINEERING

DESIGN

10 PWD DELHI PREPARATION OF COST ESTIMATE FOR THE SAMALKHA INTERSECTION ENGINEERING

DESIGN

Page 74: TPA COMPANY PROFILE - 2016

MINOR PROJECTS COMPLETED IN THE YEAR 2011

S.

NO

CLIENTS PROJECT NAME CATEGORY

1 PWD DELHI FEASIBILITY STUDY FOR FOOT OVER BRIDGE ACROSS RING ROAD AT MODEL TOWN

FEASIBILITY STUDY

2 PWD DELHI TOPOGRAPHIC SURVEY AND GEOMETRIC DESIGN FOR WIDENING AND STRENGTHENING OF ROAD NO 48 BETWEEN MALL ROAD AND GTK ROAD FOR DEVELOPING A 4 LANE ROAD

ENGINERING DESIGN

3 PWD DELHI TOPOGRAPHICAL SURVEY PLAN I/C DESIGN OF ROAD LAYOUT PLAN STORM WATER DRAIN AND OTHER DETAILING ETC.

ENGINERING DESIGN

4 PWD DELHI FEASIBILITY STUDY FOR FOOT OVER BRIDGES ALONG OUTER RING ROAD AT 2 LOCATIONS IN DELHI

FEASIBILITY STUDY

5 PWD DELHI IMPROVEMENT PROPOSAL FOR POORVI MARG WITH OUTER RING ROAD AT VASANT VIHAR NEW DELHI

FEASIBILITY STUDY

6 PWD DELHI TOPOGRAPHIC SURVEY , DESIGN AND COST ESTIMATION OF SAMALKHA INTERSECTION IN DELHI

ENGINERING DESIGN

7 PWD DELHI FEASIBILITY STUDY FOR FOB ACROSS RING ROAD AT PUNJABI BAGH CLUB FLYOVER IN DELHI

FEASIBILITY STUDY

8 PWD DELHI DESIGN OF INTERSECTION AT MOTI NAGAR FLYOVER IN DELHI ENGINERING DESIGN

9 NOIDA AUTHORITY

CORRIDOR IMPROVEMENT PLAN FOR ROAD LINKING MASTER PLAN ROAD II WITH MASTER PLAN ROAD-I OPPOSITE KAILASH HOSPITAL, NOIDA

ENGINERING DESIGN

10 NOIDA AUTHORITY

IMPROVEMENT OF INTERSECTION AT HAROLA ,SECTOR 5 , NOIDA ENGINERING DESIGN

11 NOIDA AUTHORITY

DESIGN OF U TURN AT SECTOR 44 BELOW MAHAMAYA FLYOVER AND SECTOR 37 NOIDA

ENGINERING DESIGN

12 NOIDA AUTHORITY

DESIGN AND DRAWING OF U TURN UNDER MAHAMAYA FLYOVER AND SECTOR 37 NOIDA

ENGINEERING DESIGN

13 NOIDA AUTHORITY

PRE-FEASIBILITY STUDY FOR INTERCONNECTIVITY BET. SEC 44 AND SEC 124/94 AND IMPROVEMENT OF ROAD NETWORK AROUND SEC 124 NOIDA

FEASIBILITY STUDY

14 NOIDA AUTHORITY

SURVEYING AND DESIGN OF INTERSECTION AT SEC 100-104 AND SEC 107 NOIDA

ENGINEERING DESIGN

15 GR. NOIDA AUTHORITY

DESIGN OF 45 X 60M WIDE INTERSECTION AT VILLAGE BADALPUR, GREATER NOIDA

ENGINERING DESIGN

16 NOIDA AUTHORITY

SURVEY AND DESIGN WORK (CORRIDOR IMPROVEMENT OF 30.00M WIDE ROAD AT CONFLUENCE OF SECTORS 20,21 & 25, 26 IN NOIDA

ENGINERING DESIGN

17 NOIDA AUTHORITY

DESIGN OF DRAIN IN NAYA BANS SEC 15 NOIDA ENGINERING DESIGN

Page 75: TPA COMPANY PROFILE - 2016

MINOR PROJECTS COMPLETED IN THE YEAR 2010

S.

NO CLIENTS PROJECT NAME CATEGORY

1 NOIDA AUTHORITY FEASIBILITY STUDY FOR TWO FOB’S ALONG DSC ROAD AT BAROLA AND BHANGEL VILLAGE

FEASIBILITY STUDY

2 NOIDA

DEVELOPMENT AUTHORITY

DESIGN OF 3 U TURNS ALONG MASTER PLAN ROAD NO 3 NOIDA ENGINERING DESIGN

3 NOIDA DEVELOPMENT AUTHORITY

TOPOGRAPHIC SURVEY FOR DRAIN IN SEC 15 NOIDA FEASIBILITY STUDY

4 NOIDA DEVELOPMENT AUTHORITY

IMPROVEMENT OF INTERSECTION AT INDIAN OIL CROSSING TO IMPROVE CAPACITY OF INTERSECTION AT CONFLUENCE OF SECTORS 1,14,15,2 NOIDA

ENGINERING DESIGN

5 NOIDA DEVELOPMENT AUTHORITY

PARKING DESIGN OF 2 PLOTS FOR COMMONWEALTH GAMES 2010 AT SEC 44, NOIDA

ENGINERING DESIGN

6 NOIDA DEVELOPMENT AUTHORITY

DESIGN OF TWO INTERSECTION IN SEC 142 NOIDA ENGINERING DESIGN

7 NOIDA DEVELOPMENT AUTHORITY

DESIGN OF ONE INTERSECTION IN SECTOR 137 NOIDA ENGINERING DESIGN

8 NOIDA DEVELOPMENT AUTHORITY

TOPOGRAPHIC SURVEY OF PARLLEL ROAD MP-1 ROAD, KONDLY XING, NOIDA

FEASIBILITY STUDY

9 NOIDA DEVELOPMENT AUTHORITY

EXTENSION OF CORRIDOR BETWEEN SHAHDARA DRAIN AND EXPRESS HIGHWAY IN NOIDA

ENGINERING DESIGN

10 NOIDA DEVELOPMENT AUTHORITY

DESIGN OF ONE INTERSECTION ALONG MASTER PLAN ROAD NO 3 SEC 66 NOIDA

ENGINERING DESIGN

11 NOIDA DEVELOPMENT AUTHORITY

DESIGN OF INTERSECTION ALONG MASTER PLAN ROAD NO 3 NEAR SEC 121,122 & 123 NOIDA

ENGINERING DESIGN

12 NOIDA DEVELOPMENT AUTHORITY

CORRIDOR IMPROVEMENT BET. ATTA CHOWK AND VISHWA BHARTI SCHOOL IN NOIDA

ENGINERING DESIGN

13 GREATER NOIDA

DEVELOPMENT AUTHORITY

DESIGN OF 80X60 MTR. WIDE ROTARY AND LAYOUT PLAN OF 80 MTR. WIDE ROAD FROM ASIAN PAINTS TO SIRSA GREATER NOIDA

ENGINERING DESIGN

14 GREATER NOIDA

DEVELOPMENT AUTHORITY

DESIGN OF T JUNCTION FOR 45.0M ROAD WITH 60.0 M ROAD AND 45.0M ROAD WITH 30.0M ROAD FOR SEC-TECH-ZONE IV GREATER NOIDA

ENGINERING DESIGN

15 PWD DELHI IMPROVEMENTAND BEAUTIFICATION ON FLYOVERS AT 3 INTERSECTIONS ALONG RING ROAD BETWEEN BRITANNIA CHOWK MOTI NAGAR T POINT AND PUNJABI BAGH CLUB FLYOVER

ENGINERING DESIGN

16 PWD DELHI IMPROVEMENT PROPOSAL FOR SOUTH-EAST QUADRANT OF BRITANNIA CHOWK

ENGINERING DESIGN

Page 76: TPA COMPANY PROFILE - 2016

MINOR PROJECTS COMPLETED IN THE YEAR 2009

S.

NO

CLIENTS PROJECT NAME CATEGORY

1 GREATER NOIDA

DEVELOPMENT

AUTHORITY

DESIGN OF INTERSECTION BETWEEN SK ROAD AND 80MTR ROAD

LINKING TAJ EXPRESSWAY WITH KASNA VILLAGE AT GREATER

NOIDA

ENGINERING

DESIGN

2 GREATER NOIDA

DEVELOPMENT

AUTHORITY

ENGINEERING DESIGN OF 2 INTERSECTIONS ALONG S.K. ROAD

APPROACH TO GAUTAM BUDH UNIVERSITY GREATER NOIDA

ENGINERING

DESIGN

3 GREATER NOIDA

DEVELOPMENT

AUTHORITY

DESIGN OF INTERSECTIONS BETWEEN 130X60M ROTARY NEAR

SIGMA IV GREATER NOIDA

ENGINERING

DESIGN

4 NOIDA DEVELOPMENT

AUTHORITY

DESIGN OF ROTARY AT SECTOR-127 NEAR SHANI MANDIR

,NOIDA)

ENGINERING

DESIGN

5 NOIDA DEVELOPMENT

AUTHORITY

DESIGN OF INTERSECTIONS AT SECTOR -94,NOIDA ). ENGINERING

DESIGN

6 NOIDA DEVELOPMENT

AUTHORITY

DESIGN AND LAYOUT OF ACCESS ROAD TO D.N.D FLYWAY FROM

SECTOR 16A, NOIDA

ENGINERING

DESIGN

7 NOIDA DEVELOPMENT

AUTHORITY

DESIGN OF PARKING AREA AT TWO PLOTS IN SEC 18, NOIDA ENGINERING

DESIGN

8 NOIDA DEVELOMENT

AUTHORITY

DESIGN OF U TURN ALONG DSC ROAD NOIDA ENGINEERING

DESIGN

Page 77: TPA COMPANY PROFILE - 2016

MINOR PROJECTS COMPLETED IN THE YEAR 2008

S.

NO

CLIENTS PROJECT NAME CATEGORY

1 GREATER NOIDA

DEVELOPMENT

AUTHORITY

DESIGN OF TWO INTERSECTIONS BETWEEN 130X45 M AND 60X45

M ROADS IN SEC KP-V, GREATER NOIDA

ENGINERING

DESIGN

2 GREATER NOIDA

DEVELOPMENT

AUTHORITY

DESIGN OF 2 NOS INTERSECTIONS FOR FOUR LANE ROAD FROM

SEC CHI-4 TO GAUTAM .BUDDHA . UNIVERSITY, GRETAER NOIDA

ENGINERING

DESIGN

3 GREATER NOIDA

DEVELOPMENT

AUTHORITY

DESIGN OF ROTARY FOR 130M X 60M. WIDE ROADS IN SECTOR

ZETA & UPSIDC , GREATER NOIDA

ENGINERING

DESIGN

4 GREATER NOIDA

DEVELOPMENT

AUTHORITY

DESIGN OF 2 NOS. INTERSECTION FOR 24M X 60M ROADS IN

ECOTECH-III, GR. NOIDA

ENGINERING

DESIGN

5 NOIDA DEVELOPMENT

AUTHORITY

DESIGN OF INTERSECTION NEAR KENDRIYA VIHAR SEC 50 & 51 IN

NOIDA.

ENGINERING

DESIGN

6 PWD DELHI CONSTRUCTION OF VEHICULAR UNDERPASS AT RING ROAD,

SHANTI PATH-RAO TULA RAM MARG INTERSECTION UNDER MOTI

BAGH FLYOVER DELHI

FEASIBILITY

STUDY

7 PWD DELHI ECONOMIC ANALYSIS FOR WIDENING OF ROAD OF NH-10 FROM

KM 4/500 UPTO KM 29/200 ON BOTH SIDES

FEASIBILITY

STUDY

8 PWD DELHI MODEL PREPARATION OF CONSTRUCTION OF RAILWAY

UNDERPASS AT RAILWAY CROSSING BETWEEN SHALIMAR BAGH

AND AZADPUR FRUIT MANDI DELHI

ENGINEERING

DESIGN

Page 78: TPA COMPANY PROFILE - 2016

MINOR PROJECTS COMPLETED IN THE YEAR 2007

S. NO

CLIENTS PROJECT NAME CATEGORY

1 METRO TUNNELING

GROUP (MTG)

DELHI METRO CORRIDOR CONTRACT BC 18 FOR TRAFFIC

MANAGEMENT PLAN DURING CONSTRUCTION OF HAUZ KHAS

STATION

TRAFFIC

DIVERSION

SCHEME

2 PWD DELHI FEASIBILITY STUDY FOR FOOT OVER BRIDGE AT MOTI NAGAR

T-POINT ON RING ROAD, NEW DELHI

FEASIBILITY

STUDY

3 PWD DELHI TOPOGRAPHICAL SURVEY OF NH-8 BETWEEN LINK ROAD

TOWARDS RAJOKARI BORDER UNDER PWD DELHI

ENGINERING

DESIGN

4 LARSEN & TOUBRO LTD APPROACH ROAD INTERSECTION DESIGN FOR TERMINAL-2

BUILDING AT IGI AIRPORT DELHI

ENGINERING

DESIGN

5 NAVAYUGA

ENGINEERING COMPANY

LTD

TRAFFIC MANAGEMENT PLAN DURING CONSTRUCTION OF

FLYOVER AT 14 A CROSSING IN NOIDA

TRAFFIC

DIVERSION

SCHEME

6 NAVAYUGA

ENGINEERING COMPANY

LTD

TRAFFIC MANAGEMENT PLAN DURING CONSTRUCTION OF

FLYOVER AT NARAINA IN DELHI

TRAFFIC

DIVERSION

SCHEME

Page 79: TPA COMPANY PROFILE - 2016

MINOR PROJECTS COMPLETED IN THE YEAR 2006

S.

NO

CLIENTS PROJECT NAME CATEGORY

1 INTERNATIONAL METRO CIVIL

CONTRACTORS (IMCC)

DELHI METRO CORRIDOR CONTRACT BC 18 FOR TENDER

STAGE TRAFFIC MANAGEMENT PLAN

PRE-BID

ADVISORY

2 L & T ECC STUDY FOR TRAFFIC DIVERSION UDYOG MARG PRE-BID

ADVISORY

3 PWD DELHI DESIGN OF GRADE SEPARATED PEDESTRIAN FACILITIES

FOUR LOCATION ALONG NH-24 MB ROAD & ITO LAXMI

NAGAR CHUNGI

ENGINERING

DESIGN

4 PWD DELHI FEASIBILITY STUDY FOR PROVISION OF FOB ACROSS ROAD

NO 43 NEAR RAM MANDIR SHAKURPUR DELHI

FEASIBILITY

STUDY

5 AMUSEMENT PARK COMPANY TRAFFIC MANAGEMENT SCHEME FOR PRAGATI MAIDAN

METRO STATION

FEASIBILITY

STUDY

6 HAPUR PILAKHUA

DEVELOPMENT AUTHORITY

PLANNING OF TRUCK TERMINAL AT HAPUR FEASIBILITY

STUDY

Page 80: TPA COMPANY PROFILE - 2016

MINOR PROJECTS COMPLETED IN THE YEAR 2004

S.

NO

CLIENTS PROJECT NAME CATEGORY

1 CONSULTING ENGINEERING

SERVICES PVT LTD

TRAFFIC STUDIES FOR KUNDLI-MANESAR-PALWAL

EXPRESSWAY

TRANSPORT

PLANNING