TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

71
TP48200A V100R008C01 Installation Guide Issue Draft B Date 2014-01-20 HUAWEI TECHNOLOGIES CO., LTD.

description

telecom

Transcript of TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

Page 1: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

TP48200A

V100R008C01

Installation Guide

Issue Draft B

Date 2014-01-20

HUAWEI TECHNOLOGIES CO., LTD.

Page 2: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

Copyright © Huawei Technologies Co., Ltd. 2014. All rights reserved.

No part of this document may be reproduced or transmitted in any form or by any means without prior writtenconsent of Huawei Technologies Co., Ltd. Trademarks and Permissions

and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.All other trademarks and trade names mentioned in this document are the property of their respective holders. NoticeThe purchased products, services and features are stipulated by the contract made between Huawei and thecustomer. All or part of the products, services and features described in this document may not be within thepurchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information,and recommendations in this document are provided "AS IS" without warranties, guarantees or representationsof any kind, either express or implied.

The information in this document is subject to change without notice. Every effort has been made in thepreparation of this document to ensure accuracy of the contents, but all statements, information, andrecommendations in this document do not constitute a warranty of any kind, express or implied.

Huawei Technologies Co., Ltd.Address: Huawei Industrial Base

Bantian, LonggangShenzhen 518129People's Republic of China

Website: http://www.huawei.com

Email: [email protected]

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

i

Page 3: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

About This Document

OverviewThis document describes the procedure for installing the cabinet, boards, modules, and cableswhen a DBS3900 uses a TP48200A cabinet. It also provides a hardware installation checklist.

Product VersionThe following table lists the product versions related to this document.

Product Name Product Version

DBS3900 V100R008C01The mapping single-mode base station versionis:eNodeB: V100R006C01

Intended AudienceThis document is intended for:

l BTS installation personnel

Organization1 Change History

This chapter describes the changes in different document versions.

2 Preparing for Installation

This section describes the tools and meters that need to be available before the installation. Italso describes the skills and qualifications that the installation engineers must possess.

3 Information to Be Known Before the Installation

TP48200AInstallation Guide About This Document

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

ii

Page 4: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

Familiarize yourself with this information as well as the cabinet interior and relevant spacerequirements before installing the cabinets.

4 Installing Procedure

In this scenario, the TP48200A, components in the TP48200A, and related cables must beinstalled onsite. In addition, optional components may be required according to the onsitecondition.

5 Checking Installed Components and Cables

Components and cables in the cabinet have been installed before delivery. You need to checkwhether the components and cables are installed securely.

6 Installing the Cabinet

This section describes the procedures and precautions to be taken for installing the cabinet.

7 Installing a PGND Cable

A PGND cable connects the PGND screws on the cabinet and the ground bar to ensure propergrounding of the cabinet.

8 Installing Components

This section describes the procedure for installing components of the TP48200A.

9 Installing Cables

This section describes how to install cables for the cabinet and other mandatory components.

10 Installation Checklist

After the cabinets and devices are installed, you need to check the installation items, installationenvironment, and cable-related items.

11 Powering On a Base Station

This section describes how to power on a base station and handle power-on failures.

12 Follow-up Operations

This chapter describes the operations that need to be performed after the installation, whichinclude sealing the cable outlets on the cabinet and repainting the cabinet.

ConventionsSymbol Conventions

The symbols that may be found in this document are defined as follows.

Symbol Description

Indicates an imminently hazardous situation which, if notavoided, will result in death or serious injury.

TP48200AInstallation Guide About This Document

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

iii

Page 5: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

Symbol Description

Indicates a potentially hazardous situation which, if notavoided, could result in death or serious injury.

Indicates a potentially hazardous situation which, if notavoided, may result in minor or moderate injury.

Indicates a potentially hazardous situation which, if notavoided, could result in equipment damage, data loss,performance deterioration, or unanticipated results.NOTICE is used to address practices not related to personalinjury.

Calls attention to important information, best practices andtips.NOTE is used to address information not related to personalinjury, equipment damage, and environment deterioration.

General Conventions

The general conventions that may be found in this document are defined as follows.

Convention Description

Times New Roman Normal paragraphs are in Times New Roman.

Boldface Names of files, directories, folders, and users are inboldface. For example, log in as user root.

Italic Book titles are in italics.

Courier New Examples of information displayed on the screen are inCourier New.

Command Conventions

The command conventions that may be found in this document are defined as follows.

Convention Description

Boldface The keywords of a command line are in boldface.

Italic Command arguments are in italics.

[ ] Items (keywords or arguments) in brackets [ ] are optional.

{ x | y | ... } Optional items are grouped in braces and separated byvertical bars. One item is selected.

TP48200AInstallation Guide About This Document

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

iv

Page 6: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

Convention Description

[ x | y | ... ] Optional items are grouped in brackets and separated byvertical bars. One item is selected or no item is selected.

{ x | y | ... }* Optional items are grouped in braces and separated byvertical bars. A minimum of one item or a maximum of allitems can be selected.

[ x | y | ... ]* Optional items are grouped in brackets and separated byvertical bars. Several items or no item can be selected.

GUI Conventions

The GUI conventions that may be found in this document are defined as follows.

Convention Description

Boldface Buttons, menus, parameters, tabs, window, and dialog titlesare in boldface. For example, click OK.

> Multi-level menus are in boldface and separated by the ">"signs. For example, choose File > Create > Folder.

Keyboard Operations

The keyboard operations that may be found in this document are defined as follows.

Format Description

Key Press the key. For example, press Enter and press Tab.

Key 1+Key 2 Press the keys concurrently. For example, pressing Ctrl+Alt+A means the three keys should be pressed concurrently.

Key 1, Key 2 Press the keys in turn. For example, pressing Alt, A meansthe two keys should be pressed in turn.

Mouse Operations

The mouse operations that may be found in this document are defined as follows.

Action Description

Click Select and release the primary mouse button without movingthe pointer.

TP48200AInstallation Guide About This Document

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

v

Page 7: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

Action Description

Double-click Press the primary mouse button twice continuously andquickly without moving the pointer.

Drag Press and hold the primary mouse button and move thepointer to a certain position.

TP48200AInstallation Guide About This Document

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

vi

Page 8: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

Contents

About This Document.....................................................................................................................ii

1 Change History..............................................................................................................................1

2 Preparing for Installation.............................................................................................................22.1 Document Preparations...................................................................................................................................................32.2 Tools and Instruments....................................................................................................................................................32.3 Skills and Requirements for Onsite Personnel...............................................................................................................4

3 Information to Be Known Before the Installation..................................................................53.1 TP48200A Configurations..............................................................................................................................................63.2 Space Requirements.......................................................................................................................................................8

4 Installing Procedure....................................................................................................................10

5 Checking Installed Components and Cables.........................................................................12

6 Installing the Cabinet.................................................................................................................16

7 Installing a PGND Cable...........................................................................................................20

8 Installing Components...............................................................................................................228.1 Installing a Rectifier.....................................................................................................................................................238.2 Installing Storage Batteries...........................................................................................................................................238.3 Installing a BBU...........................................................................................................................................................27

9 Installing Cables..........................................................................................................................309.1 Cabling Requirements..................................................................................................................................................319.2 Cable Outlets................................................................................................................................................................379.3 Installing the AC Input Power Cable............................................................................................................................399.4 Installing BBU Equipotential Cables...........................................................................................................................429.5 Installing BBU Power Cables.......................................................................................................................................449.6 Installing RRU Power Cables.......................................................................................................................................459.7 Installing FE/GE Optical Fibers...................................................................................................................................489.8 Installing Monitoring Signal Cables.............................................................................................................................519.9 Installing CPRI Optical Fibers.....................................................................................................................................52

10 Installation Checklist................................................................................................................55

TP48200AInstallation Guide Contents

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

vii

Page 9: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

11 Powering On a Base Station....................................................................................................58

12 Follow-up Operations...............................................................................................................62

TP48200AInstallation Guide Contents

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

viii

Page 10: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

1 Change History

This chapter describes the changes in different document versions.

Draft B (2014-01-20)This is draft B.

Compared with draft A (2013-12-30), this issue does not include any new information.

Compared with draft A (2013-12-30), this issue includes the following changes.

Topic Description

9.6 Installing RRU Power Cables Modified the installation procedure.

No information in draft A (2013-12-30) is deleted from this issue.

Draft A (2013-12-30)This is draft A.

TP48200AInstallation Guide 1 Change History

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

1

Page 11: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

2 Preparing for Installation

About This Chapter

This section describes the tools and meters that need to be available before the installation. Italso describes the skills and qualifications that the installation engineers must possess.

2.1 Document PreparationsThis section lists the documents that must be obtained before the installation.

2.2 Tools and InstrumentsThis section lists the tools and instruments that must be obtained before installation.

2.3 Skills and Requirements for Onsite PersonnelOnsite personnel must be qualified and trained. Before performing any operation, onsitepersonnel must be familiar with correct operation methods and safety precautions.

TP48200AInstallation Guide 2 Preparing for Installation

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

2

Page 12: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

2.1 Document PreparationsThis section lists the documents that must be obtained before the installation.

Before the installation, familiarize yourself with related information in the following documents:

l Safety Precautionsl Installation Referencel TP48200A Hardware Descriptionl BBU Hardware Description

2.2 Tools and InstrumentsThis section lists the tools and instruments that must be obtained before installation.

Marker Phillips screwdriver (M3 toM6)

Flat-head screwdriver (M3 toM6)

Diagonal pliers

32 mm (1.26 in.)combination wrench

Socket wrench Torque wrench

Power cable crimping tool RJ45 crimping tool Cable cutter

Rubber mallet Soldering iron Wire stripper

Hammer drill (Φ16) Heat gun Level

TP48200AInstallation Guide 2 Preparing for Installation

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

3

Page 13: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

Multimeter Measuring tape Vacuum cleaner

ESD wrist strap ESD gloves Torque screwdriver

Gloves Utility knife Hydraulic pliers

Torx screwdriver - -

2.3 Skills and Requirements for Onsite PersonnelOnsite personnel must be qualified and trained. Before performing any operation, onsitepersonnel must be familiar with correct operation methods and safety precautions.

Before the installation, pay attention to the following items:

l The customer's technical engineers must be trained by Huawei and be familiar with theproper installation and operation methods.

l The number of onsite personnel depends on the engineering schedule and installationenvironment. Generally, only three to five onsite personnel are necessary.

TP48200AInstallation Guide 2 Preparing for Installation

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

4

Page 14: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

3 Information to Be Known Before theInstallation

About This Chapter

Familiarize yourself with this information as well as the cabinet interior and relevant spacerequirements before installing the cabinets.

3.1 TP48200A ConfigurationsThis section describes the hardware configurations in a TP48200A cabinet.

3.2 Space RequirementsThis section describes the space required for maintaining the TP48200A cabinet and routingcables.

TP48200AInstallation Guide 3 Information to Be Known Before the Installation

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

5

Page 15: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

3.1 TP48200A ConfigurationsThis section describes the hardware configurations in a TP48200A cabinet.

The following figure shows the TP48200A interior.

Figure 3-1 Interior of the TP48200A

The following table describes the components in the TP48200A.

TP48200AInstallation Guide 3 Information to Be Known Before the Installation

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

6

Page 16: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

Table 3-1 Components in the TP48200A

No. Component Mandatory orOptional

MaximumNumber ofBoards orModulesConfigured ina SingleCabinet

Remarks

1 DC PDU Mandatory 1 The DC PDUdistributes DCpower tocomponents inthe cabinet.

2 SMU02B Mandatory 1 The SMU02Bmonitorsparametersabout eachrunningcomponent,identifies therunning status,and reportsalarms.

3 Battery switch Mandatory 1 The batteryswitch is used tomanually andtemporarilypower onbatteries.

4 BBU Mandatory 3 The BBUprocesses thebasebandsignals of thebase station.

5 AC PDU Mandatory 1 An AC PDUfeeds externalAC power intothe cabinet.

6 Storagebatteries

Mandatory 4 Storagebatteriesprovide DC loadpower when theinput AC poweris interruptedand the rectifierstops working.

TP48200AInstallation Guide 3 Information to Be Known Before the Installation

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

7

Page 17: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

No. Component Mandatory orOptional

MaximumNumber ofBoards orModulesConfigured ina SingleCabinet

Remarks

7 UIM02C Mandatory 1 The UIM02Csupports eightdry contactoutputs, ninedry contactinputs, and threeanalogparameterinputs.

8 Rectifier Mandatory 1 The rectifierconverts 220 VAC or 380 V ACpower into -48V DC power.

9 MUX Mandatory 1 The MUXconnects CPRIoptical fibers.

10 Power splitter Optional 1 The powersplitter dividesone GPS signalinput intomultiple GPSsignals.

3.2 Space RequirementsThis section describes the space required for maintaining the TP48200A cabinet and routingcables.

The space requirements for installing a TP48200A cabinet are as follows:

l A minimum of 1500 mm clearance in front of the cabinet must be reserved.

l A minimum of 100 mm clearance behind the cabinet must be reserved.

l A minimum of 200 mm clearance on the left of the cabinet must be reserved.

l A minimum of 200 mm clearance on the right of the cabinet must be reserved.

l A minimum of 150 mm clearance on top of the cabinet must be reserved.

The following figure shows the space requirements for installing a TP48200A cabinet.

TP48200AInstallation Guide 3 Information to Be Known Before the Installation

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

8

Page 18: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

Figure 3-2 Space requirements

TP48200AInstallation Guide 3 Information to Be Known Before the Installation

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

9

Page 19: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

4 Installing Procedure

In this scenario, the TP48200A, components in the TP48200A, and related cables must beinstalled onsite. In addition, optional components may be required according to the onsitecondition.

NOTE

When installing components or cables, take proper electrostatic discharge (ESD) protection measures, forexample, wear ESD gloves, to prevent electrostatic damage to the boards or electronic components.

The following flowchart describes the procedure for installing a TP48200A.

TP48200AInstallation Guide 4 Installing Procedure

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

10

Page 20: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

Figure 4-1 Installing procedure

TP48200AInstallation Guide 4 Installing Procedure

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

11

Page 21: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

5 Checking Installed Components and Cables

Components and cables in the cabinet have been installed before delivery. You need to checkwhether the components and cables are installed securely.

Procedure

Step 1 Check whether the component installation is in compliance with the instructions shown in thefollowing figure and table. In addition, check whether the cables are securely installed. Tightenthe screws if necessary.

TP48200AInstallation Guide 5 Checking Installed Components and Cables

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

12

Page 22: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

Figure 5-1 Configuration of internal components in the cabinet

Table 5-1 Description of internal components in the cabinet

No. Component Name

1 DC PDU

2 SMU02B

3 Battery switch

4 AC PDU

5 UIM02C

6 Rectifier

Step 2 Check whether the signal cable connections are in compliance with the instructions shown inthe following figure and table. In addition, check whether the cables are securely installed.

TP48200AInstallation Guide 5 Checking Installed Components and Cables

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

13

Page 23: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

Figure 5-2 Signal cables installed in the cabinet

Table 5-2 Positions for installing signal cables in a cabinet

No. Cable One End The Other End

Connector Connectedto...

Connector Connectedto...

1 Monitoringsignal cablefor thetemperaturesensor

Sensor Fan box 2-pinconnector

TEMP1 porton theUIM02C

2 Monitoringsignal cablefor the doorstatus sensor

- Door statussensor

2-pinconnector

GATE porton theUIM02C

TP48200AInstallation Guide 5 Checking Installed Components and Cables

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

14

Page 24: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

No. Cable One End The Other End

Connector Connectedto...

Connector Connectedto...

3 Monitoringsignal cablefor thebatterycabinet

Sensor Storagebatteries

2-pinconnector

BTEMP onthe UIM02C

----End

TP48200AInstallation Guide 5 Checking Installed Components and Cables

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

15

Page 25: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

6 Installing the Cabinet

This section describes the procedures and precautions to be taken for installing the cabinet.

Prerequisitesl The installation environment is clean and dry.l The concrete pad on which the cabinet is to be installed is flat.

Procedure

Step 1 Remove the cover from the cabinet packaging box and find the hole marking-off template onthe cover interior, as shown in the following figure.

Figure 6-1 Taking the marking-off template

Step 2 Mark the hole positions based on the marking-off template, as shown in Figure 6-2. Figure6-3 shows the cabinet dimensions and mounting holes.

TP48200AInstallation Guide 6 Installing the Cabinet

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

16

Page 26: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

Figure 6-2 Marking hole positions

Figure 6-3 Cabinet dimensions and mounting holes

Step 3 Drill holes at the anchor points, and then install expansion bolt assemblies, as shown in thefollowing figure.

TP48200AInstallation Guide 6 Installing the Cabinet

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

17

Page 27: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

Figure 6-4 Drilling holes and installing expansion bolt assemblies

1. M12x60 bolt 2. Spring washer 3. Plastic pipe 4. Flat washer 5. Expansion sleeve

1. Use a hammer drill with a Ф16 bit to drill holes vertically at the marked anchor points.Ensure that the depth of each hole ranges from 52 mm to 60 mm.

CAUTIONTo avoid inhaling the dust or getting it in your eyes, use protective gear when drilling holes.

2. Use a vacuum cleaner to clean the inside and outside of the holes and measure the distancesbetween the holes. If one or certain holes are not at the proper position, drill a hole or holesagain.

3. Tighten the expansion anchor bolts slightly and place one vertically into each hole.

4. Use a rubber mallet to hammer the expansion bolt until it goes into the hole completely.

5. Remove the M12x60 bolt, spring washer, plastic pipe, and flat washer in sequence.

NOTE

After removing an expansion bolt, discard the plastic pipe.

Step 4 Secure the cabinet, as shown in the following figure.

1. Place the cabinet on the floor, and align the expansion bolt with the holes in the base.

2. Lead the bolts through the spring washers and flat washers.

TP48200AInstallation Guide 6 Installing the Cabinet

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

18

Page 28: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

3. Install the bolts into the expansion sleeves through the holes on the base and tighten thebolts slightly.

4. Use a torque socket to tighten the expansion bolts with a torque of 40.5 N·m to 49.5 N·m.

Figure 6-5 Securing the cabinet

----End

TP48200AInstallation Guide 6 Installing the Cabinet

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

19

Page 29: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

7 Installing a PGND Cable

A PGND cable connects the PGND screws on the cabinet and the ground bar to ensure propergrounding of the cabinet.

ContextThe PGND cable is terminated with an M8 OT terminal and a cross-sectional area of 16 mm2.

ProcedureStep 1 Prepare a PGND cable.

1. Cut the power cable to the required length based on the actual cable route.2. Install an OT terminal to both ends of the cable by referring to Assembling the OT Terminal

and the Power Cable.

Step 2 Install a PGND cable, as shown in Figure 7-2.1. Connect one end of the PGND cable to the site ground bar.2. Route the other end of the cable out of the cable outlet along the bottom left side of the

cabinet, and connect the cable to the ground bar for the TP48200A.

NOTICEWhen installing a PGND cable, ensure that the OT terminals on the PGND cable are orientedcorrectly and that the screws are tightened, as shown in Figure 7-1.

Figure 7-1 Installing an OT terminal

TP48200AInstallation Guide 7 Installing a PGND Cable

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

20

Page 30: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

Figure 7-2 Installing a PGND cable

(1) Ground bar in a cabinet (2) Ground bar in a site

Step 3 Lay out the cables according to the instructions in 9.1 Cabling Requirements and 9.2 CableOutlets.

Step 4 Label the installed cables according to the instructions in Attaching a Sign Plate Label.

----End

TP48200AInstallation Guide 7 Installing a PGND Cable

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

21

Page 31: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

8 Installing Components

About This Chapter

This section describes the procedure for installing components of the TP48200A.

8.1 Installing a RectifierThe rectifier converts the input AC power into the -48 V DC power for output.

8.2 Installing Storage BatteriesIf a site requires power backup, storage batteries must be installed in a TP48200A.

8.3 Installing a BBUThis section describes the procedure and precautions for installing a BBU in a TP48200A whena TP48200A is deployed outdoors.

TP48200AInstallation Guide 8 Installing Components

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

22

Page 32: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

8.1 Installing a RectifierThe rectifier converts the input AC power into the -48 V DC power for output.

Prerequisitesl Rectifiers are found intact after unpacking and check. In case of any discrepancy, contact

your local Huawei office.

l The filler panels on the slot for installing the rectifiers have been removed from the cabinet.

Procedure

Step 1 Push the locking latch towards the left.

Step 2 Draw the handle downwards.

Step 3 Gently push a rectifier into its slot along the guide rail.

Step 4 Push the handle upwards.

Step 5 Push the locking latch towards the right to secure the handle.

Figure 8-1 Installing a rectifier

----End

8.2 Installing Storage BatteriesIf a site requires power backup, storage batteries must be installed in a TP48200A.

Prerequisitesl Verify that all batteries are of the same model and batch from the same manufacturer. The

battery voltages are almost the same.

l Switch off the battery circuit breakers before you install the batteries.

TP48200AInstallation Guide 8 Installing Components

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

23

Page 33: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

DANGERBefore operating batteries, read the safety instructions and master the method of connecting thebatteries.

Context

DANGERl During the installation, avoid any contact between the exposed metal conductors in the power

cables and the metal housing of the cabinet.

l During the installation, avoid short circuits or reverse connections between the positive andnegative poles of the storage batteries.

l All tools used for installation must be insulated to avoid burning of storage batteries and toensure personal safety.

Procedure

Step 1 Verify that the circuit breaker labeled BAT corresponding to the DC PDU is set to OFF.

Step 2 Install the batteries from left to right, as shown in the following figure.

Figure 8-2 Installing storage batteries

Step 3 Install copper bars for connecting storage batteries.

NOTE

Copper bars between batteries are installed in the same way. The following procedure describes how to installa copper bar between battery 1 and battery 2.

1. Remove the insulation covers from battery 1 and battery 2, as shown in the following figure.

TP48200AInstallation Guide 8 Installing Components

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

24

Page 34: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

Figure 8-3 Removing the insulation covers

2. Install a copper bar between battery 1 and battery 2, as shown in the following figure.

Figure 8-4 Installing a copper bar between batteries

3. Reinstall the insulation cover for battery 1, as shown in the following figure.

TP48200AInstallation Guide 8 Installing Components

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

25

Page 35: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

Figure 8-5 Reinstalling the insulation cover

Step 4 Install battery cables, as shown in the following figure.

NOTICEInstall all negative power cables for storage batteries before you install positive power cables.

1. Remove the insulation covers from battery 1 and battery 4.2. Take the negative battery cable from the left side of the battery compartment and install

the cable to the negative battery wiring terminal.3. Take the positive battery cable from the right side of the battery compartment and install

the cable to the positive battery wiring terminal.4. Reinstall the insulation covers for battery 1 and battery 4.

TP48200AInstallation Guide 8 Installing Components

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

26

Page 36: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

Figure 8-6 Installing battery cables

----End

8.3 Installing a BBUThis section describes the procedure and precautions for installing a BBU in a TP48200A whena TP48200A is deployed outdoors.

ContextA maximum of three BBUs can be installed in a TP48200A. The following figure shows theBBU installation positions.

TP48200AInstallation Guide 8 Installing Components

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

27

Page 37: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

Figure 8-7 BBU installation position

(1) BBU

Procedure

Step 1 (Optional) If the BBU mounting ears are reversely installed, skip this step. If the BBU mountingears are installed in standard mode, perform the following operations:1. Remove the four M4 screws from the mounting ear on each side of the BBU.2. Install the mounting ears reversely and tighten the four M4 screws on each of the mounting

ears, with a torque of 1.2 N·m (10.62 lbf·in.).

TP48200AInstallation Guide 8 Installing Components

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

28

Page 38: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

Figure 8-8 Installing mounting ears reversely

Step 2 Slide a BBU along the guide rails into a TP48200A, and then tighten four M6x16 screws on thepanel with a torque of 2 N·m, as shown in the following figure.

Figure 8-9 Installing a BBU

----End

TP48200AInstallation Guide 8 Installing Components

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

29

Page 39: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

9 Installing Cables

About This Chapter

This section describes how to install cables for the cabinet and other mandatory components.

9.1 Cabling RequirementsCables must be laid out according to the specified cabling requirements to prevent signalinterference.

9.2 Cable OutletsThis section describes the cabling direction of the TP48200A over the cable outlets.

9.3 Installing the AC Input Power CableThe AC input power cable for the TP48200A is used to connect the external power equipmentand AC input circuit breakers on the PDU, feeding external power into the TP48200A.

9.4 Installing BBU Equipotential CablesA BBU equipotential cable connects ground bolts on a BBU and a TP48200A to ensure theequipotential bonding between the BBU and TP48200A.

9.5 Installing BBU Power CablesA BBU power cable feeds power into the BBU from the DC power distribution unit (PDU).

9.6 Installing RRU Power CablesAn RRU power cable connects a DC PDU and an RRU, and feeds power into the RRU from theDC PDU.

9.7 Installing FE/GE Optical FibersThis section describes the procedure and precautions for installing FE/GE optical fibers.

9.8 Installing Monitoring Signal CablesThis chapter describes the procedures and precautions for installing monitoring signal cables.

9.9 Installing CPRI Optical FibersA common public radio interface (CPRI) optical fiber transmits CPRI signals between abaseband unit (BBU) and a remote radio unit (RRU).

TP48200AInstallation Guide 9 Installing Cables

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

30

Page 40: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

9.1 Cabling RequirementsCables must be laid out according to the specified cabling requirements to prevent signalinterference.

NOTE

If a cable listed below is not required, skip the cabling requirements of the cable.

General Cabling Requirements

Bending radius requirements

l The bending radius of a 7/8'' feeder must be greater than 250 mm (9.84 in.), and the bendingradius of a 5/4'' feeder must be greater than 380 mm (14.96 in.).

l The bending radius of a 1/4'' jumper must be greater than 35 mm (1.38 in.). The bendingradius of a super-flexible 1/2'' jumper must be greater than 50 mm (1.97 in.), and the bendingradius of an ordinary 1/2'' jumper must be greater than 127 mm (5 in.).

l The bending radius of a power cable or PGND cable must be at least three times its diameter.

l The bending radius of a fiber optic cable is at least 20 times of its diameter, and the bendingradius of a breakout cable is at least 30 mm (1.18 in.).

l The bending radius of an E1/T1 cable must be at least three times its diameter.

l The bending radius of a signal cable must be at least five times its diameter.

Cable binding requirements

l Cables of the same type must be bound together.

l Different types of cables must be separately laid out and bound, with a minimum distanceof 30 mm (1.18 in.) from each other.

l The cables must be bound tightly and neatly. The sheaths of the cables must not be damaged.

l The cable ties must face the same direction, and those at the same horizontal line must bein a straight line.

l The excess of the indoor cable ties is cut off. The excess of 5 mm (0.197 in.) of the outdoorcable ties is reserved, and the cut surfaces are smooth without sharp edges.

l After cables are installed, labels or nameplates must be attached to the cables at their ends,curves, and interconnection positions.

Security requirements

l When routing cables, avoid sharp objects, for example sharp edges on the wall. If necessary,use tubes to protect the cables.

l When routing cables, keep the cables away from heat sources and use heat insulationmaterials to insulate the cables from the heat sources.

l Reserve a proper distance (0.1 m or 3.937 in. is recommended) between equipment andcables especially at the cable curves to protect the cables and equipment.

Indoor cabling requirements

l Route each cable into the room through the feeder window.

TP48200AInstallation Guide 9 Installing Cables

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

31

Page 41: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

l Reserve drip loops for all cables outside the feeder window before routing them into theroom. Ensure that the radiuses of the drip loops are greater than or equal to the minimumbending radiuses of the cables.

l When routing a cable into the room, ensure that a person is assisting you in the room.

l Apply waterproof treatment to the feeder window.

Outdoor Cabling Requirementsl Protect outdoor cables against potential damage. For example, put the cables through tubes.

l The cables to be protected include AC power cables, transmission cables, and cables laidout underground.

l When routing cables through tubes on the ground below the cabinet, put a 30 mm to 50mm (1.18 in. to 1.97 in.) length of the tubes into the base of the cabinet but do not put thetubes into the cabinet. Use waterproof tape or waterproof silicon gel to block both ends ofthe tubes and use sheet metal tabs to secure the tubes to the cable holes in the base.

l When routing cables through tubes along a metal cable trough below the cabinet, do notput the tubes into the base of the cabinet but cover the cable trough and connect the tubesto the cable holes in the base.

l Use clips to secure cables outdoors. For the method of installing a clip, see the installationguide delivered with the clip.

l Arrange cables neatly along the routing direction and use clips to secure the cables.

l Determine the positions where the clips are installed according to the actual situation. Forexample, 7/8" feeders are secured with clips at an interval of 1.5 m to 2 m (4.92 ft to 6.56ft), CPRI fiber optic cables and power cables are secured with clips at an interval of 1 mto 1.5 m (3.28 ft to 4.92 ft). Ensure that the clips are evenly spaced and in the same direction.

l When fastening cables with a clip, ensure that the cables are routed through the holes inthe clip and arranged neatly and straightly. Do not stretch the cables too tightly.

NOTE

There are two types of clips: 3-hole clip and 6-hole clip, which are described as follows:

l A 3-hole clip is shown by illustration a in the following figure. It is often used to fasten feeders.

l A 6-hole clip is shown by illustration b in the following figure. It is often used to fasten power cables andCPRI fiber optic cables.

Figure 9-1 Exterior of the clips

(1) Cable hole for feeders (2) Cable hole for fiber optic cables (3) Cable hole for power cables

TP48200AInstallation Guide 9 Installing Cables

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

32

Page 42: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

The following figure shows the cables secured on a cable tray.

Figure 9-2 Cables secured on a cable tray

(1) 3-hole clip (2) 6-hole clip

The following figure shows the cables secured on a tower.

TP48200AInstallation Guide 9 Installing Cables

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

33

Page 43: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

Figure 9-3 Cables secured on a tower

(1) 3-hole clip (2) 6-hole clip

Special Cabling Requirements

Cabling of power cables

l Power cables must be installed in the position specified in engineering design documents.

l If the length of power cables is insufficient, replace the cables rather than adding connectorsor soldering joints to lengthen the cables.

l Cables can only be laid out under well-planned instructions. The cabling activities of fiberoptic cables are allowed only when qualified personnel and communication facilities areavailable.

l Do not circle and twist cables.

TP48200AInstallation Guide 9 Installing Cables

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

34

Page 44: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

l After routing a DC power cable onto the platform on a tower, route it along the shortestpath to the rails surrounding the platform, and route it along the inside of the rails.

l After routing a DC power cable close to the equipment on a tower, use clips to secure thepower cable onto a pole or the rails surrounding the platform. Ensure that there is noexcessively long distance between the equipment and the position where the power cableis secured.

Cabling of PGND cablesl PGND cables for a base station must be connected to the same group of ground bars.

l PGND cables must be buried in the ground or routed indoors.

l The external conductor of the coaxial wire and the shield layer of the shielded cable musthave proper electrical contact with the metal surface of the equipment to which they areconnected.

l PGND cables and signal cables must be installed separately. A certain distance must bereserved between them to prevent interference from each other.

l Switches or fuses must not be installed on the PGND cables.

l Other devices must not be used for electrical connections of the PGND cables.

l All the metal parts in the housing of the equipment must be reliably connected to the groundterminal.

Cabling of E1 cablesl E1 cables must not cross power cables, PGND cables, or RF cables when laid out. If

transmission cables are laid out with power cables, PGND cables, or RF cables in parallel,the spacing between them must be greater than 30 mm (1.18 in.).

l E1 cables are laid out straightly and bound neatly with cable ties.

l Sufficient slack is provided for E1 cables at turns.

l E1 cables must not be pressed by the door of the cabinet when routed, as shown in thefollowing figure.

Figure 9-4 E1 cables routed in the cabinet

Cabling of fiber optic cablesl At least three persons are required for laying out fiber optic cables. The cabling activities

of fiber optic cables are allowed only when qualified personnel and communicationfacilities are available.

TP48200AInstallation Guide 9 Installing Cables

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

35

Page 45: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

l The operating temperature of fiber optic cables ranges from -40ºC to +60ºC (-40ºF to+140ºF). If the actual temperature is beyond this range, take protective measures or selectanother route.

l Do not circle and twist cables.l Do not bind a fiber optic cable at the position where it bends.l Do not stretch, step on, or place heavy objects on fiber optic cables. Keep the fiber optic

cables away from sharp objects.l When fiber optic cables are routed, the excess of the fiber optic cables must be coiled around

special devices, such as a fiber coiler.l An unarmored fiber optic cable must be bound using binding straps. If a fiber optic patch

cord needs to be secured in a cabinet or a piece of equipment, use binding straps to bind itand then use cable ties to secure the binding straps to the cabinet or equipment. Ensure thatthe fiber optic cables can flexibly move in the cable ties. Do not bend the fiber optic cablessharply. The following figure shows how to bind the fiber optic cables correctly.

Figure 9-5 Binding fiber optic cables

l When coiling fiber optic cables, apply even strength. Do not bend the fiber optic cables

with force.l Unused optical connectors must be covered with dustproof caps.l The fiber optic cables must not be pressed by the door of the cabinet when routed, as shown

in the following figures.

Figure 9-6 CPRI fiber optic cables routed in the cabinet (1)

TP48200AInstallation Guide 9 Installing Cables

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

36

Page 46: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

Figure 9-7 CPRI fiber optic cables routed in the cabinet (2)

Figure 9-8 FE/GE fiber optic cables routed in the cabinet

l After routing a fiber optic cable onto the platform on a tower, route it along the shortest

path to the rails surrounding the platform, and route it along the inside of the rails.l After routing a fiber optic cable close to the equipment on a tower, use clips to secure the

fiber optic cable onto a pole or the rails surrounding the platform. Ensure that there is noexcessively long distance between the equipment and the position where the cable issecured.

l Coil the excess of the fiber optic cables near the equipment on the tower before securingthe cables on the tower.

9.2 Cable OutletsThis section describes the cabling direction of the TP48200A over the cable outlets.

The following figure shows the cable outlets of the TP48200A.

TP48200AInstallation Guide 9 Installing Cables

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

37

Page 47: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

Figure 9-9 Cable outlets in a TP48200A

(1) Left cable outlet (2) Right cable outlet

The following table describes the cable routing over the cable outlets in a TP48200A.

Table 9-1 TP48200A cable routing over cable outlets

Cable Outlet No. Description

1, 2 Used for routing the PGND cable andTP48200A input power cable. You can usecable outlet 1 or 2 and reserve the other one.

3, 4 Used for routing RRU power cables.

NOTE

Other cable outlets are used for routing optical fibers, including CPRI optical fibers and FE/GE optical fibers,and GPS signal cables. The cabling outlets are allocated based on the number of onsite optical fibers.

l Optical fibers are routed from the left cable outlets by default. If the left cable outlets are insufficient, theright cable outlets are used.

l If the top BBU is connected to 24 optical fibers, it is recommended that the optical fibers are routed fromthe right cable outlets.

l The GPS signal cables and optical fibers are routed from the same cable outlet preferentially. If the cableoutlets are insufficient to route both the optical fibers and GPS signal cables, optical fibers are routedpreferentially. The GPS signal cables are routed from the RRU power cable outlets.

TP48200AInstallation Guide 9 Installing Cables

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

38

Page 48: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

9.3 Installing the AC Input Power CableThe AC input power cable for the TP48200A is used to connect the external power equipmentand AC input circuit breakers on the PDU, feeding external power into the TP48200A.

Context

The following table lists the specifications of an AC input power cable for the TP48200A.

Table 9-2 Power cable specifications

Cable One End The OtherEnd

Color

220 V AC or380 V AC three-phase inputpower cablewith four corewires

L1 Cord endterminal

Prepared tomatch theexternalequipment

Brown

L2 Cord endterminal

Black

L3 Cord endterminal

Gray

N Cord endterminal

Blue

220 V ACsingle-phaseinput powercable

L OT terminal(M6, 25 mm2)

Prepared tomatch theexternalequipment

Brown

N Cord endterminal

Blue

PE OT terminal(M6, 25 mm2)

Green andyellow

Procedure

Step 1 Prepare the AC input power cable for the TP48200A.

1. Cut the cable to the length suitable for the actual cable route.

2. Prepare a cord end terminal and an OT terminal for one end of the cable. For details abouthow to prepare cord end terminals and OT terminals, see Assembling the Cord EndTerminal and the Power Cable and Assembling the OT Terminal and the Power Cable.

Step 2 Install AC input power cables for the TP48200A, as shown in Figure 9-10 and Figure 9-11.

1. Use a Phillips screwdriver to remove an M3 screw from the protective cover for the ACinput terminals, and open the protective cover.

2. Optional: Remove the short-circuiting copper bars on the L1, L2, and L3 AC inputterminals. If single-phase 220 V AC input power is supplied, skip this step.

TP48200AInstallation Guide 9 Installing Cables

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

39

Page 49: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

Step 3 Route the AC input power cable out of the cable outlet on the bottom left side of the cabinet.

Step 4 Connect the AC input cable to the corresponding AC input terminals and circuit breakers andsecure them, as shown in the following figure.

Figure 9-10 Installing the 220 V or 380 V AC input power cable

(1) AC power distribution box

TP48200AInstallation Guide 9 Installing Cables

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

40

Page 50: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

Figure 9-11 Installing the 220 V AC input power cable

(1) AC power distribution box

Step 5 Optional: Secure the insulation cover to the short-circuiting copper bar, as shown in thefollowing figure. If single-phase 220 V AC input power is supplied, skip this step.

TP48200AInstallation Guide 9 Installing Cables

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

41

Page 51: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

Figure 9-12 Securing the insulation cover to the short-circuiting copper bar

Step 6 Install the removed cover plate on the AC PDU.

Step 7 Lay out the cables according to the instructions in 9.1 Cabling Requirements and 9.2 CableOutlets.

Step 8 Label the installed cables according to the instructions in Attaching a Sign Plate Label.

----End

9.4 Installing BBU Equipotential CablesA BBU equipotential cable connects ground bolts on a BBU and a TP48200A to ensure theequipotential bonding between the BBU and TP48200A.

Context

The following table lists the specifications of a BBU power cable.

Table 9-3 Specifications of a BBU power cable

Cable One End The Other End

Connector Connectedto...

Connector Connectedto...

BBUequipotentialcable

OT terminal(M4, 6 mm2)

BBU groundscrew

OT terminal(M6, 6 mm2)

Ground screw inthe cabinet

TP48200AInstallation Guide 9 Installing Cables

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

42

Page 52: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

Procedure

Step 1 Prepare the BBU equipotential cable.

1. Cut the power cable to the required length based on the actual cable route.

2. Install an OT terminal to both ends of the cable by referring to Assembling the OT Terminaland the Power Cable.

Step 2 Install the equipotential cable between the BBU and TP48200A, as shown in the followingfigure.

Figure 9-13 Installing BBU Equipotential Cables

Step 3 Route the cable by referring to Cabling Requirements. Then use cable ties to bind the cable.

TP48200AInstallation Guide 9 Installing Cables

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

43

Page 53: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

Step 4 Label the installed cables according to the instructions in Attaching a Sign Plate Label.

----End

9.5 Installing BBU Power CablesA BBU power cable feeds power into the BBU from the DC power distribution unit (PDU).

ContextThe following table lists the specifications of BBU power cables.

Table 9-4 Specifications of BBU power cables

Cable One End The Other End

BBU power cable 3V3 connector l Cord end terminall OT terminal (M4)

Procedure

Step 1 Prepare the BBU power cable.1. Cut the cable to the length suitable for the actual cable route.2. Prepare a cord end terminal and an OT terminal for one end of the cable. For details about

how to prepare cord end terminals and OT terminals, see Assembling the Cord EndTerminal and the Power Cable and Assembling the OT Terminal and the Power Cable.

Step 2 Connect the 3V3 connector at one end of the BBU power cable to the -48V port on the UPEUin the BBU. Then tighten the screws on the connector with a torque of 0.25 N·m.

Step 3 Connect the cord end terminal at one end of the blue core wire to the F13 BLVD circuit breakerfor the DC PDU, and connect the OT terminal at one end of the black core wire to the DC outputpositive bus bar (RTN+).

Step 4 The following figure shows the BBU power cable connections.

NOTE

If three BBUs or less are installed in a cabinet, the cord end termials at one end of the BBU power cables areconnected to BLVD circuit breakers from F13 to F15.

TP48200AInstallation Guide 9 Installing Cables

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

44

Page 54: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

Figure 9-14 BBU power cable connections

Step 5 Lay out the cables according to the instructions in 9.1 Cabling Requirements and 9.2 CableOutlets.

Step 6 Label the installed cables according to the instructions in Attaching a Cable-Tying Label.

----End

9.6 Installing RRU Power CablesAn RRU power cable connects a DC PDU and an RRU, and feeds power into the RRU from theDC PDU.

ContextThe following table lists the specifications of RRU power cables.

TP48200AInstallation Guide 9 Installing Cables

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

45

Page 55: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

Table 9-5 RRU power cable specifications

Cable One End The OtherEnd

Color Remarks

Powercable ofan RRU

RTN(+)

OT terminal Depends on theRRU model

Black Dual-corecable with across-sectionalarea of 4 mm2,a black sheath,and a shieldlayer

NEG(-)

Cord endterminal

Blue

NOTE

l The colors and structures of cables vary according to countries and regions. If cables are purchasedlocally, the cables must comply with local rules and regulations.

l The type of connector connecting to the power port on the RRU depends on the type of the RRU. Fordetails about how to add a connector to an RRU power cable, see the related RRU installation guide.

Procedure

Step 1 Route the RRU power cable to the cabinet through the cable outlet.

Step 2 Install the ground clip, as shown in Figure 9-16.

1. Strip the specified length of the sheath off the RRU power cable at the position 300 mmaway from the cable outlet of the cabinet to expose the shield layer.

2. Strip the shield layer at the position 350 mm away from the cable outlet of the cabinet toexpose the two wires.

3. Route the RRU power cable through the ground clip and ensure that the shield layer securelycontacts with the ground clip. Then tighten the M4 screw on the ground clip to 1.2 N·m(10.62 lbf·in.).

NOTE

When installing a ground clip for the RRU power cables, comply with the following rules:

l When one to three RRU power cables are installed, put all the RRU power cables on one side of theground screw, as shown by illustration 1 in the following figure.

l When four or six RRU power cables are installed, put two or three RRU power cables on each side ofthe ground screw, as shown by illustration 2 in the following figure.

l When five RRU power cables are installed, two ground clips are required. You can thread three cablesthrough one ground clip and two cables through the other group clip, or thread four cables throughone ground clip or one cable through the other ground clip, as shown by illustration 3 in the followingfigure.

l When seven to ten RRU power cables or twelve RRU power cables are installed, use two ground clipsand comply with the preceding rules.

l When eleven RRU power cables are installed, two ground clips are required. You can thread fivecables through one ground clip and six cables through the other ground clip, as shown by illustration4 in the following figure.

TP48200AInstallation Guide 9 Installing Cables

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

46

Page 56: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

Figure 9-15 Installing the ground clips (side elevation view)

Figure 9-16 Installing the ground clip

Step 3 Connect one end of the RRU power cable to the power port on the RRU.

CAUTIONEnsure that the RRU power cable for an RRU added to a running base station must be connectedto the RRU first and then to the power equipment. The operations in the reverse sequence maycause component damage or personal injury.

TP48200AInstallation Guide 9 Installing Cables

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

47

Page 57: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

Step 4 Connect the connector on the RRU power cable to the power equipment on the power equipmentside. Connect the cord end terminals at one end of the blue core wires to F3 to F10 LLVD circuitbreakers for the DC PDU, connect the OT terminals at one end of the black core wires to theDC output positive bus bar (RTN(+)), and secure the cord end terminals and OT terminals, asshown in the following figure.

Figure 9-17 Installing RRU power cables

Step 5 Lay out the cables according to the instructions in 9.1 Cabling Requirements and 9.2 CableOutlets.

Step 6 Label the installed cables according to the instructions in Attaching a Cable-Tying Label.

----End

9.7 Installing FE/GE Optical FibersThis section describes the procedure and precautions for installing FE/GE optical fibers.

TP48200AInstallation Guide 9 Installing Cables

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

48

Page 58: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

Prerequisites

NOTICEl Wear electrostatic discharge (ESD) gloves or an ESD wrist strap during operation to avoid

module damage.l Long-time exposure to the air causes performance exceptions on the optical module.

Therefore, the optical module must be connected to optical fibers within 20 minutes afterbeing unpacked.

Contextl Single-mode optical modules are labeled SM, and multi-mode optical modules are labeled

MM.l The puller of a single-mode optical module is blue and the puller of a multi-mode optical

module is black or gray.l An optical module to be installed must match the rate of its corresponding port.

Procedure

Step 1 Install an optical module, as shown in Figure 9-18 and Figure 9-19.1. Remove the dustproof cap from the corresponding FE/GE optical port on the corresponding

board in the BBU.2. Remove the dustproof cap from the optical module.3. Lower the puller of the optical module.4. Insert the optical module into the FE/GE optical port.5. Raise the puller of the optical module.

Figure 9-18 Removing the dustproof cap from the port

TP48200AInstallation Guide 9 Installing Cables

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

49

Page 59: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

Figure 9-19 Installing the optical module

Step 2 Install the optical fibers, as shown in Figure 9-20 and Figure 9-21.1. Remove the dust-proof caps from the connectors at the end labeled 2A and 2B on the optical

fibers, and insert the connectors into the optical modules in the BBU.2. Route the optical fibers out from the cable outlet on the bottom right side of the cabinet.3. Connect the other end of the optical fibers to a transmission device.

NOTICEThe TX and RX ports on the BBU boards must be connected to the RX and TX ports on thetransmission equipment, respectively.

Figure 9-20 Removing the dust-proof cap from the optical fiber

TP48200AInstallation Guide 9 Installing Cables

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

50

Page 60: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

Figure 9-21 Installing optical fibers

Step 3 Lay out the cables according to the instructions in 9.1 Cabling Requirements and 9.2 CableOutlets.

Step 4 Attach labels to the installed cables by referring to Attaching an L-Shaped Label.

----End

9.8 Installing Monitoring Signal CablesThis chapter describes the procedures and precautions for installing monitoring signal cables.

Procedure

Step 1 Connect one end of the monitoring signal cable to ALM1 to ALM4 ports on the UIM02C.

TP48200AInstallation Guide 9 Installing Cables

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

51

Page 61: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

NOTE

l If one to four ports are available for dry contact alarms, connect one end of the monitoring signal cable toALM1 to ALM4 ports on the UIM02C. Only one monitoring signal cable is required.

l If five to eight ports are available for dry contact alarms, connect one end of a monitoring signal cable toALM1 to ALM4 ports and connect one end of a monitoring signal cable to ALM5 to ALM8 ports on theUIM02C. Two monitoring signal cable are required.

Step 2 Connect the other end of the monitoring signal cable to the EXT_ALM0 or EXT_ALM1 porton the UPEU or UEIU, as shown in the following figure.

Figure 9-22 Installing monitoring signal cables

Step 3 Lay out the cables according to the instructions in 9.1 Cabling Requirements and 9.2 CableOutlets.

Step 4 Label the installed cables according to the instructions in Attaching an L-Shaped Label.

----End

9.9 Installing CPRI Optical FibersA common public radio interface (CPRI) optical fiber transmits CPRI signals between abaseband unit (BBU) and a remote radio unit (RRU).

TP48200AInstallation Guide 9 Installing Cables

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

52

Page 62: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

ContextNOTE

l Single-mode optical modules are labeled SM, and multi-mode optical modules are labeled MM.

l The puller of a single-mode optical module is blue and the puller of a multi-mode optical module isblack or gray.

l An optical module to be installed must match the rate of its corresponding port.

l For details about CPRI optical fiber connections, see section "CPRI Cable Connections" in 3900Series Base Station Cables.

NOTICEl Wear electrostatic discharge (ESD) gloves or an ESD wrist strap during operation to avoid

module damage.

l Long-time exposure to the air causes performance exceptions on the optical module.Therefore, the optical module must be connected to optical fibers within 20 minutes afterbeing unpacked.

Procedure

Step 1 Install an optical module, as shown in the following figure.

1. Lower the puller on the optical module.

2. Insert the optical module into the CPRI port on an LBBP, and then insert the optical moduleof the same type into the CPRI_W, CPRI0, or CPRI0/IR0 port on an RRU.

NOTE

Optical modules with the same labels are of the same type.

3. Raise the puller on the optical module.

Figure 9-23 Installing an optical module

Step 2 Install CPRI fiber optic cables, as shown in the following figure.

1. Remove the dustproof cap from the connectors on the fiber optic cables.

TP48200AInstallation Guide 9 Installing Cables

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

53

Page 63: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

2. Insert the DLC connectors labeled 2A and 2B at one end of the CPRI optical fibers into theoptical module in the LBBP, and then insert the DLC connectors labeled 1A and 1B at theother end into the optical module in the RF module.

NOTICEl When a CPRI optical fiber connects a BBU and an RRU, the breakout cables on the

BBU side and on the RRU side are 0.34 m and 0.03 m, respectively.l If an LC-LC optical fiber is used, the TX and RX ports on the BBU must be connected

to the TX and RX ports on the RF module, respectively.

Figure 9-24 Installing CPRI optical fibers

Step 3 Lay out the cables according to the instructions in 9.1 Cabling Requirements and 9.2 CableOutlets.

Step 4 Attach labels to the installed cables by referring to Attaching an L-Shaped Label.

----End

TP48200AInstallation Guide 9 Installing Cables

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

54

Page 64: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

10 Installation Checklist

After the cabinets and devices are installed, you need to check the installation items, installationenvironment, and cable-related items.

Cabinet Installation Checklist

The following table lists the items to be checked for the cabinet installation.

Table 10-1 Cabinet installation checklist

No. Item

1 The installation position of the cabinet strictly complies with the engineeringdesign.

2 The base is securely installed.

3 All the bolts, including those for electrical connections, are tightened. The springwashers and the flat washers are installed in the correct sequence.

4 The cabinet is neat and clean.

5 The paint on the surface is intact. The damaged paint is repaired. For details, seeApplying Touch-Up Paint.

6 Labels, tags, and nameplates are correct, legible, and complete.

Installation Environment Checklist

The following table lists the items to be checked for the installation environment.

Table 10-2 Installation environment checklist

No. Item

1 No excessive straps or adhesive tapes are left on the cables.

TP48200AInstallation Guide 10 Installation Checklist

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

55

Page 65: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

No. Item

2 No tapes, tails of cable ties, paper, or packing bags are left around the cabinet.

3 Antirust powder on the door of the cabinet is cleared.

Electrical Connection ChecklistThe following table lists the items to be checked for electrical connections.

Table 10-3 Electrical connection checklist

No. Item

1 All self-made PGND cables are copper-based with proper core diameters. Thereshould not be any switch or fuse in the grounding system. No short circuit is allowed.

2 The PGND cable is securely connected and the AC input power cable and cablesin the cabinet are correctly connected according to the electrical design of the powersystem. The screws are tightened. In addition, the inputs or outputs are not short-circuited.

3 The redundant part of the power cable or PGND cable is cut off rather than coiled.

4 The terminals at both ends of the power cable or PGND cable are securely solderedor crimped.

5 The bare wires and the terminal handles at the wiring terminals are coated with heatshrink tubing.

6 The flat washers and the spring washers are well mounted on all OT terminals.

7 The exterior of the storage battery is intact without any scratch, dent, or crack.

8 The shell of the storage battery is clean without any leakage trace.

9 The wiring terminal on the storage battery stands properly without any damage, andthe post is not covered with any acid substances.

10 The pressure relief valve of the battery is not deformed, and no liquid leaks.

11 The power cables for the storage batteries are correctly connected to the positiveand negative poles.

12 The voltage of the storage battery is normal.l The voltage of a 2 V storage battery ranges from 1.8 V to 2.35 V.l The voltage of a 12 V storage battery ranges from 10.8 V to 14.1 V.l The total voltage of the storage batteries ranges from 43.2 V to 56.4 V.

13 The circuit breakers for the storage batteries are set to OFF.

TP48200AInstallation Guide 10 Installation Checklist

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

56

Page 66: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

Cable Installation ChecklistThe following table lists the items to be checked for the cable installation.

Table 10-4 Cable installation checklist

No. Item

1 All cables, especially the Ethernet cables for communication, are securelyconnected. All cable connectors at the bottom of the cabinet are securely installed.

2 The cables are neatly and tightly bound. The cable ties are evenly spaced and facethe same direction.

3 Different types of cables, such as the power cable, PGND cable, feeder, fiber opticcable, E1/T1, and FE/GE signal cable are separately bound.

4 The layout of all cables facilitates the maintenance and capacity expansion. Forexample, the maintenance transfer cable is bound to the outside of the BBU cableclaw, as shown in the following figure.

5 All the labels at both ends of the cables are legible.

6 The extra length of the indoor cable ties is cut off, and the cut surfaces are smoothwithout sharp edges. The extra length of 3 mm (0.11 in.) to 5 mm (0.19 in.) of theoutdoor cable ties is reserved when the cable ties are cut.

7 The port that no cable is connected to is properly protected.

8 The connectors of the RF cables are secured to avoid false connection that will causean abnormal voltage standing wave ratio (VSWR).

Figure 10-1 Checking the maintenance transfer cable

TP48200AInstallation Guide 10 Installation Checklist

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

57

Page 67: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

11 Powering On a Base Station

This section describes how to power on a base station and handle power-on failures.

Prerequisitesl Components in the TP48200A are securely installed and the cable connections are correct.

l The power supply to the TP48200A meets the power system requirements.

l The external power supply to the TP48200A is disconnected and all circuit breakers are setto OFF.

Context

DANGERA power-on check involves high-voltage. Be cautious when conducting the power-on check. Donot use you hand or damp objects to touch the device with input voltage. This might be fatal.

NOTICEl Power on a TP48200A or BBU within 7 days after unpacking it. If you power off a TP48200A

or BBU for maintenance, restore power to the cabinet or BBU within 48 hours.

l After you unpack an RRU, power on it within 24 hours. If you power off the RRU formaintenance, restore power to the RRU within 24 hours.

Power-on Process

The following figure shows the power-on process.

TP48200AInstallation Guide 11 Powering On a Base Station

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

58

Page 68: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

Figure 11-1 Power-on process

Procedure

Step 1 Use a multimeter to measure the resistance between the external power supply and the groundto ensure that there is no short circuit.

Step 2 Turn on the external power circuit breaker to power on the TP48200A.

Step 3 Set the circuit breaker on the DC PDU to ON.

Step 4 Set the power circuit breaker on the UPEU in the BBU to ON, and check the power supply tocomponents in the cabinet according to the following table.

TP48200AInstallation Guide 11 Powering On a Base Station

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

59

Page 69: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

Table 11-1 Normal status of the components

Component Indication of Normal Power Supply

Rectifier l Power indicator: steady greenl Fault indicator: steady off

BBU l UPEU: The RUN indicator is steady on.l FAN: The STATE indicator blinks 1s on

and 1s off.l Other boards: The RUN indicator blinks

(on for 1s and off for 1s).

RRU l RUN indicator: blinking 1s on and 1s offl ALM indicator: steady off

Step 5 Optional: If the power supply to a component fails after the cabinet is powered on, handle thefault according to the instructions in the following table.

Table 11-2 Troubleshooting

Failure Type Handling Measure

Failure in the powersupply to all componentsin the cabinet

Check whether the power cables are reversely connected.l If the cables are incorrectly connected, set all the circuit

breakers to OFF, and then reconnect the power cables.l If the cables are correctly connected, replace the power units.

Failure in the powersupply to a board in theBBU

Check as follows:1. Remove the board, and check whether any pin of the slot on

the backplane is bent, broken, or missing. Replace the subrackif necessary.

2. Insert the board into the subrack, and check the status ofindicators on the board.

3. If the indicators indicate an exception, remove the board, insertit into a vacant slot holding the boards of the same type, andcheck the status of the indicators.l If the board works properly, the original slot is faulty. In

this case, replace the subrack.l If the fault persists, the board is faulty. In this case, replace

the board.

TP48200AInstallation Guide 11 Powering On a Base Station

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

60

Page 70: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

Failure Type Handling Measure

Failure in the powersupply to othercomponents in thecabinet

Check as follows:1. Check whether the indicator on the fuse terminal block that

connects power supply to the component is on. Skip this stepand go to 5.2 if this component does not use any fuse terminalblock.l If the indicator on the fuse terminal block is on, the fuse is

faulty. In this case, replace the fuse according to theinstructions in Replacing a Fuse.

l If the indicator on the fuse terminal block is off, go to 5.2.2. Use a multimeter to measure the input power to the component.l If the input power is normal, replace the component.l If the input power is abnormal, check whether the power

cable for the component is connected securely. If the powercable is not securely connected, turn off the circuit breakerfor the component (if there is no circuit breaker for thecomponent, remove the connector from the power unit) andreconnect the power cable. If the power cable is securelyconnected, the protector (such as circuit breaker or fuse) onthe component may be damaged. In this case, replace thedamaged protector. If the protector cannot be replaced,replace the upper-level power distribution component.

----End

TP48200AInstallation Guide 11 Powering On a Base Station

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

61

Page 71: TP48200A Installation Guide(V100R008C01_Draft B)(PDF)-En

12 Follow-up Operations

This chapter describes the operations that need to be performed after the installation, whichinclude sealing the cable outlets on the cabinet and repainting the cabinet.

Procedure

Step 1 Install the removed plane into the original position.

Step 2 Take fireproof mud out of the accessory package to seal the cable outlets that have cables routedout, and use plugs or covers to seal the cable outlets that have no cables routed out.

Step 3 The paint on the surface of the cabinet should be kept intact. Therefore, any damaged paint mustbe repaired. For details, see Applying Touch-Up Paint.

----End

TP48200AInstallation Guide 12 Follow-up Operations

Issue Draft B (2014-01-20) Huawei Proprietary and ConfidentialCopyright © Huawei Technologies Co., Ltd.

62