TP Ajmer Distribution Ltd
Transcript of TP Ajmer Distribution Ltd
![Page 1: TP Ajmer Distribution Ltd](https://reader034.fdocuments.us/reader034/viewer/2022051922/628551d8f8dfae6a352da425/html5/thumbnails/1.jpg)
TP Ajmer Distribution Ltd
![Page 2: TP Ajmer Distribution Ltd](https://reader034.fdocuments.us/reader034/viewer/2022051922/628551d8f8dfae6a352da425/html5/thumbnails/2.jpg)
Ajmer City -DF at a glance
• DF Area: 190 Sq Km
• Consumer Base: 1.48 Lac’s
• No of Sub-Division: 7 No’s
• AT&C Losses (March-19): 11.21%
• Consumer Service Centre :5 No’s
• Call Centre:1 No’s
• Cash Collection Centre: 9 No’s
• No Supply Service Centre:7 No’s
• 33 KV Grids
• 24 No's
• 260 MVA Installed Capacity
• 11 KV Sub-Stations
• 2596 No's
• 342 MVA Installed Capacity
![Page 3: TP Ajmer Distribution Ltd](https://reader034.fdocuments.us/reader034/viewer/2022051922/628551d8f8dfae6a352da425/html5/thumbnails/3.jpg)
Technology Intervention
KEY
INITIATIVES
SAP- ERP Implementation- Integration
of Billing, material management and
financial
GIS : Geographical Mapping of all
distribution assets
Implementation of Meter Reading by
Smart Meter Reading Mobile
Application
Remote Operation of Grids-SCADA
Integrated Mobile Application for
Consumer Services
![Page 4: TP Ajmer Distribution Ltd](https://reader034.fdocuments.us/reader034/viewer/2022051922/628551d8f8dfae6a352da425/html5/thumbnails/4.jpg)
AT&C Loss Trajectory
17.2%16.0%
13.2%14.2%
17.6%
22.0%
17.3%
11.2%
FY12 FY13 FY14 FY15 FY16 FY17 FY18 FY19
TPADL OPERATION
![Page 5: TP Ajmer Distribution Ltd](https://reader034.fdocuments.us/reader034/viewer/2022051922/628551d8f8dfae6a352da425/html5/thumbnails/5.jpg)
Work done on AT&C Reduction
Before
After
1. Conversion of Hanging type theft prone network into Underground in Dargah main bazaar.
2. Network cleaning done in Congested areas to remove double supply points.
3. All tampered service lines and old energy meters replaced.
4. Identified few energy meters locked in old buildings for revenue recovery .
![Page 6: TP Ajmer Distribution Ltd](https://reader034.fdocuments.us/reader034/viewer/2022051922/628551d8f8dfae6a352da425/html5/thumbnails/6.jpg)
Work done on AT&C Reduction
1. Closing of Open joints through installation of Pole top boxes.
2. Till FY19 , we have installed more than 4000 nos of pole top boxes and more than 52 km cables.
3. In Some areas, we took help of animals for material lifting & transfer.
4. In parallel with network cleaning drive , we also changed energy meters along with service lines.
![Page 7: TP Ajmer Distribution Ltd](https://reader034.fdocuments.us/reader034/viewer/2022051922/628551d8f8dfae6a352da425/html5/thumbnails/7.jpg)
SCADA Operation: Remote Operation
20 Grids Connected through SCADA Implementation
73.69
79.1
91.9
June-18 Aug-18 March-19
% Success Rate -Remote Operation
![Page 8: TP Ajmer Distribution Ltd](https://reader034.fdocuments.us/reader034/viewer/2022051922/628551d8f8dfae6a352da425/html5/thumbnails/8.jpg)
Reliable Power: Thermo scanning
Thermo-scanning of
Distribution transformer
and RMU done in Ajmer
city area in order to
protect the failure of DT
and RMU
Collection of the data for
schedule maintenance
has been done through
Thermo scanning
![Page 9: TP Ajmer Distribution Ltd](https://reader034.fdocuments.us/reader034/viewer/2022051922/628551d8f8dfae6a352da425/html5/thumbnails/9.jpg)
Quick Resolution of NO POWER Complaints
12.4 12.9
9.28
6.4 7.1 6.6 6 5.57.25 7.2
8.5
2.7 1.8 1.3 1.1 1.4 1.6 1.2 1.1 0.9 0.8 0.93 1.4
July Aug Sep Oct Nov Dec Jan Feb March April May June
Average Resolution Time (Hrs)
Before DF
After DF
1.31.0 1.1
0.9 0.8 0.8 0.90.6 0.7
Jul-18 Aug-18 Sep-18 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19
Average Resolution Time (Hrs)
DF Operation
![Page 10: TP Ajmer Distribution Ltd](https://reader034.fdocuments.us/reader034/viewer/2022051922/628551d8f8dfae6a352da425/html5/thumbnails/10.jpg)
Reliable Power : 11 KV Feeder Tripping Reduction
7.3
4.9 5.14.8
3.02.7 2.8 3.2
4.4
4.2 4.23.6 3.2
2.3 1.9 2.4 2.1
3.6
July Aug Sept Oct Nov Dec Jan Feb March
11kv Tripping Per Fdr Comparison
11kv Tripping Per Fdr FY18 11kv Tripping Per Fdr FY19
• 11 KV & 33 KV Tripping reduced by 31.69% & 48.70 % respectively
• 83% 11 KV tripping restored within 10 minutes.
![Page 11: TP Ajmer Distribution Ltd](https://reader034.fdocuments.us/reader034/viewer/2022051922/628551d8f8dfae6a352da425/html5/thumbnails/11.jpg)
Reliable Power: 11 KV S/s RevampingBefore After
![Page 12: TP Ajmer Distribution Ltd](https://reader034.fdocuments.us/reader034/viewer/2022051922/628551d8f8dfae6a352da425/html5/thumbnails/12.jpg)
Reliable Power: Installation of Closed Fuse Box
Before
After
![Page 13: TP Ajmer Distribution Ltd](https://reader034.fdocuments.us/reader034/viewer/2022051922/628551d8f8dfae6a352da425/html5/thumbnails/13.jpg)
Before
After
Before
After
Reliable Power : Network Improvements
![Page 14: TP Ajmer Distribution Ltd](https://reader034.fdocuments.us/reader034/viewer/2022051922/628551d8f8dfae6a352da425/html5/thumbnails/14.jpg)
Reliable Power : Network Improvements
Before
After
![Page 15: TP Ajmer Distribution Ltd](https://reader034.fdocuments.us/reader034/viewer/2022051922/628551d8f8dfae6a352da425/html5/thumbnails/15.jpg)
Before
After
Reliable Power : Network Improvements
![Page 16: TP Ajmer Distribution Ltd](https://reader034.fdocuments.us/reader034/viewer/2022051922/628551d8f8dfae6a352da425/html5/thumbnails/16.jpg)
Before
After
Reliable Power : Network Improvements
![Page 17: TP Ajmer Distribution Ltd](https://reader034.fdocuments.us/reader034/viewer/2022051922/628551d8f8dfae6a352da425/html5/thumbnails/17.jpg)
Reliable Power : Tree Trimming of HT Lines Before After
![Page 18: TP Ajmer Distribution Ltd](https://reader034.fdocuments.us/reader034/viewer/2022051922/628551d8f8dfae6a352da425/html5/thumbnails/18.jpg)
Commercial Operation
991412084
24081
Before DF (One-year)
FY-18 FY-19
OLD & Faulty Meter Replacement activity 9.06
4.47
2.95
1.61
July-17(Takeover)
Oct-17 March-18 March-19
July-17 (Takeover) Oct-17 March-18 March-19
Average Cycle time for Releasing
New Connection after DN Deposit
5.38
3.4
-37%Provisional Bills
FY18 FY19 % Change
Overall Provisional Billing
![Page 19: TP Ajmer Distribution Ltd](https://reader034.fdocuments.us/reader034/viewer/2022051922/628551d8f8dfae6a352da425/html5/thumbnails/19.jpg)
Public Safety: Current Leakage Checking DrivesZonal teams regularly conducted the current
leakage checking drives in urban and rural areas
for public safety.
No of Targeted
Potential Identified
Points
No of points
checked
Points :leakage
found
85000 82379 14
Total Points Checked
(25th July 2018 to April ’2019)
![Page 20: TP Ajmer Distribution Ltd](https://reader034.fdocuments.us/reader034/viewer/2022051922/628551d8f8dfae6a352da425/html5/thumbnails/20.jpg)
“Jansanmad“ at Panchayat & Atal Seva Kendra with
School Children
Location Covered : 6 Locations
Total Public and Students Covered:1090
•“Safety Awareness campaign for School children at
Govt and Pvt Schools for kite flying
•12 Schools Covered and 1240 Students attend the
program
Safety Jansamvad
Safety Awareness Campaign
Public Safety Awareness Drive
![Page 21: TP Ajmer Distribution Ltd](https://reader034.fdocuments.us/reader034/viewer/2022051922/628551d8f8dfae6a352da425/html5/thumbnails/21.jpg)
Total 7 incidents, 5 LWDC, 1 MTC & 1 High potential
near miss were shared.
Respective Zonal Managers presented the incident
along with Team consisting of team working at the
time of incident which included ZSO, B A Supervisor,
foreman, Engineer, Lineman, Helper, B A
Representatives and Person injured.
Mega Seek Session
![Page 22: TP Ajmer Distribution Ltd](https://reader034.fdocuments.us/reader034/viewer/2022051922/628551d8f8dfae6a352da425/html5/thumbnails/22.jpg)
Consumer Delight Initiative
Instant New Connection Camp in High Losses Areas
Total Comp Conducted : 10 No's
Instant New Connection Released : 415 No's
![Page 23: TP Ajmer Distribution Ltd](https://reader034.fdocuments.us/reader034/viewer/2022051922/628551d8f8dfae6a352da425/html5/thumbnails/23.jpg)
Consumer Delight Initiative
5 Fully Air Conditioned Consumer Care Centre Established with Single window consumer
service concept in Ajmer DF city Area.
Before After
![Page 24: TP Ajmer Distribution Ltd](https://reader034.fdocuments.us/reader034/viewer/2022051922/628551d8f8dfae6a352da425/html5/thumbnails/24.jpg)
Consumer Delight Initiative
• Independent Call center developed for Distribution Franchisee area Consumers at Hathi-
bhata , started working from 05th Oct17
Conversion of Store Room
into Call Centre
![Page 25: TP Ajmer Distribution Ltd](https://reader034.fdocuments.us/reader034/viewer/2022051922/628551d8f8dfae6a352da425/html5/thumbnails/25.jpg)
• Dedicated customer care E-mail ID
• Instant delivery of bills on e-mail as well.
• NO Supply Complaint Registration at Call Centre & Complaint Centre
• Complaint through SMS, Reading & bill distribution complaints can be registered at call centre
• Drop Box for Cheque and complaint registration
Channel for Communication
• More than 3000+ feedback from consumer has been captured.
• Happy Calling for Consumer after resolution of Complaints
Feedback From Consumers
• Separate Binder Created for Tower Connection to give the ease to consumer for payment and proper bill delivery
• Instant Connection for Government and Festival & Seasonal Connection.
• Separate New connection desk at Hathibhata customer service centre
Ease in Connection
Consumer Delight Initiative
![Page 26: TP Ajmer Distribution Ltd](https://reader034.fdocuments.us/reader034/viewer/2022051922/628551d8f8dfae6a352da425/html5/thumbnails/26.jpg)
Consumer Delight Initiative
Parshad Meetings: Monthly Parshad
Meeting conducted in every sub-division“Eminent Citizen Meet”
![Page 27: TP Ajmer Distribution Ltd](https://reader034.fdocuments.us/reader034/viewer/2022051922/628551d8f8dfae6a352da425/html5/thumbnails/27.jpg)
Reduction Trend in consumer footfall at CHF
100 % complaints resolved
Public Hearing Forum(PHF)
Consumer Delight Initiative
![Page 28: TP Ajmer Distribution Ltd](https://reader034.fdocuments.us/reader034/viewer/2022051922/628551d8f8dfae6a352da425/html5/thumbnails/28.jpg)
CSR
Energy Club, a nation-wide movement of Tata Power,
has been undertaking numerous initiatives to spread
awareness on energy conservation among school
children and communities at large. TPADL has also
started Energy Club sessions at Ajmer.
On the occasion of 179th Birth Anniversary of Shri
J N Tata, TPADL has organized a blood donation
camp in association with Indian Red Cross Society
![Page 29: TP Ajmer Distribution Ltd](https://reader034.fdocuments.us/reader034/viewer/2022051922/628551d8f8dfae6a352da425/html5/thumbnails/29.jpg)
CSR : Drug de-addiction Camp
![Page 30: TP Ajmer Distribution Ltd](https://reader034.fdocuments.us/reader034/viewer/2022051922/628551d8f8dfae6a352da425/html5/thumbnails/30.jpg)
Women Empowerment
Self Defence Training for Women Colleague for all
TPADL & AVVNL Employees Women’s day
Celebration
![Page 31: TP Ajmer Distribution Ltd](https://reader034.fdocuments.us/reader034/viewer/2022051922/628551d8f8dfae6a352da425/html5/thumbnails/31.jpg)
Thank You!Website: www.tatapower.com
Email Id: [email protected]
Contact: (+91) 022 – xxxx xxxx