TowerCrane 85 EC-B5 i · D D 4,17 1,37 1,20 20 1 Hydraulic system B B 0,85 0, 35 1,15 95 1450 2892...
Transcript of TowerCrane 85 EC-B5 i · D D 4,17 1,37 1,20 20 1 Hydraulic system B B 0,85 0, 35 1,15 95 1450 2892...
12,0
m
0,17 m
46,2 m
1 kg300
50,0 m
1,2 m
83,9
x m
5,8
5 m
1,2 m
93,9
x m
44,0 m
0,25 m
85 LC
85 LC
85EC-B5TowerCrane
i
B-
Sectio
n
m3,9
3,9
m
LN 303
2
12,6 m
11,31 m 9,85 m 5,0 m10,0 m 2,5 m 7,5 m 5,0 m
0,92 m1,0
2 m
2,4 m
1,8 m
1,6 m
1,08 m
1300 kg / 1150 kg50,0 m
r
0,47 m1,3 m
0,32m0, m23
10,0 m
32,5 m2500 kg / 2650 kg
1450 kg / 1300 kg47,5 m
45,0 m
1600 kg / 1450 kg
1800 kg / 1650 kg42,5 m
40,0 m
2000 kg / 1850 kg
37,5 m
2250 kg / 2100 kg
35,0 m
2500 kg / 2350 kg
30,0 m2500 kg / 3000 kg
27,5 m
2500 kg / 3450 kg
2 m5,0
2500 kg / 4000 kg
2 m2,5
2500 kg / 3450 kg
2 m0,0
2500 kg / 4000 kg
EC-B585 i
3,9
m
a)
a) Tower Section or climbing tower section
3
Radius and capacity
EC-B585 i
m r
m r
m/kg
m/kg
m/kg
m/kg
50 51 5,0 (r= , )
47,5 49,0(r= )
45 46 5,0 (r= , )
42,5 44 0(r= , )
40 41 5,0 (r= , )
37,5 39,0(r= )
35 36 5,0 (r= , )
32 5 34,0, (r= )
30,0 31 5(r= , )
27,5 29,0(r= )
25 26 5,0 (r= , )
22 5 24 0, (r= , )
20 21 5,0 (r= , )
50 51 5,0 (r= , )
47,5 49,0(r= )
45 46 5,0 (r= , )
42,5 44 0(r= , )
40 41 5,0 (r= , )
37,5 39,0(r= )
35 36 5,0 (r= , )
32 5 34,0, (r= )
30,0 31 5(r= , )
27,5 29,0(r= )
25 26 5,0 (r= , )
22 5 24 0, (r= , )
20 21 5,0 (r= , )
2, –4 29,22500
2, –4 27,52500
2, –14 5,25000
2, –4 30,22500
2, –4 28,52500
2, –4 15,75000
2, –4 31,02500
2, –4 29,32500
2, –14 6,15000
2, –4 32,22500
2, –4 30,52500
2, –4 16,85000
2, –4 33,12500
2, –4 31,42500
2, –14 7,25000
2, –4 34,32500
2, –4 32,52500
2, –4 17,85000
2, –4 35,02500
2, –4 33,32500
2, –4 18,25000
2, –0 32,52500
2, –4 32,52500
2, –4 18,75000
2, –4 30,02500
2, –4 30,02500
2, –14 9,25000
2, –4 27,52500
2, –4 27,52500
2, –4 19,85000
2, –4 25,02500
2, –4 25,02500
2, –4 20,55000
2, –5 22,52500
2, –4 22,52500
2, –4 16,25000
2, –5 20,02500
2, –4 20,02500
2, –14 6,45000
2500
2500
2500
2500
2500
2500
2500
2500
2500
2500
2500
2500
2500
4270
4440
4560
4770
4910
5000
5000
5000
5000
5000
5000
4590
4650
17,5
17,5
2500
2500
2500
2500
2500
2500
2500
2500
2500
2500
2500
2500
2500
3670
3810
3920
4100
4230
4400
4510
4640
4770
4950
5000
3950
4000
20,0
20,0
2500
2500
2500
2500
2500
2500
2500
2500
2500
2500
2500
2500
3200
3330
3430
3590
3700
3850
3950
4060
4180
4340
4500
3450
22,5
22,5
2500
2500
2500
2500
2500
2500
2500
2500
2500
2500
2500
2830
2940
3030
3170
3280
3410
3500
3600
3710
3850
4000
25,0
25,0
2500
2500
2500
2500
2500
2500
2500
2500
2500
2500
2520
2630
2710
2840
2930
3060
3140
3230
3320
3450
27,5
27,5
2420
2500
2500
2500
2500
2500
2500
2500
2500
2270
2360
2440
2560
2640
2760
2830
2920
3000
30,0
30,0
2210
2300
2360
2470
2500
2500
2500
2500
2050
2140
2210
2320
2400
2500
2570
2650
32,5
32,5
2020
2100
2170
2270
2340
2440
2500
1870
1950
2010
2120
2190
2290
2350
35,0
35,0
1860
1940
2000
2090
2160
2250
1710
1790
1850
1940
2010
2100
37,5
37,5
1720
1790
1850
1940
2000
1570
1640
1700
1790
1850
40,0
40,0
1600
1670
1720
1800
1450
1510
1570
1650
42,5
42,5
1490
1 505
1600
1340
1400
1450
45,0
45,0
1390
1450
1240
1300
47,5
47,5
1300
1150
50,0
50,0
4
85 LC
Radius and heighthook
Internal climbing
1,9
5 m
1,95 m
EC-B585 i
3,9
m
he
D
B
5,8
5m
1,2 m
3,9
m3
,9m
1,2 m
5,8
5m
3,9
m3
,9m
D
B
he
5,8
5m
3,9
m
he
1,2 m
B
D
n(pcs) hook height
76543
n7,5 – 8,57,0 – 8,55,5 – 8,55,5 – 8,0
9,5 – 12,58,0 – 12,58,0 – 11,58,0 – 9,50
n
11,0 – 15,511,0 – 13,5
nnnm
hook heights for tower configuration on foundation anchors. For erection on climbing frame substract a height of 1,15 m to
calculate the hook height in relation to the lower edge of the lowermost internal climbing frame.
n = not valid
For Details please refer to the operating manual.
he (min. – max.)
m
36,2532,3528,4524,5520,65
3)
3)
3)
3)
3)
3)
Hoisting height
=2)
Without cabin
9876543210
3,9m LC85
m m m
0,2
5 m
0,2
5 m
5,8
5m
B-S
ection
–46,242,338,434,530,626,722,818,915,0
38,234,330,426,522,618,714,8
–––
44,040,236,332,428,524,620,716,812,9
–
0,
m1
7
12,0
m
1)
1)
1)
1) 1)
1) 2)
1)All hoisting heights inclusive climbing tower section.
3,9
m
LN 303
5
1,60
0,78
1,28
0,66
0,78
1,25
171
35
11 1
12 1 Maintenance cage
Trolley
2,342,342,34
0,511,040,65
1,361,311,36
125135120
11,40 1,39 0,66 2210
1,35 2,38 2,28 875
3,30 0,71 1,35 1306 1
3 1
4 1
5 1 Counter-jib
Platforms
Cabin
Counter-jib platforms
2,42 2,77 2,52 3685
2,42 2,00 2,52 34302 1
1 1 Slewing platform cpl.
Erection weights: see instruction manual.
Packing List
Item Qty.
Upper part of crane L (m) B (m) H (m) kg5)
Slewing platform
1,24
10,06
10,235,212,697,685,17
10,20
1,11
1,30
1,101,101,101,101,10
1,10
0,44
1,93
1,841,841,251,241,23
1,83
� 60
1920�
1120470160390210
�
�
�
�
�
740
7 1
8 1
9 1
10 1 Jib head section
Jib heel section
Intermediate jib section
Intermediate jib section
EC-B585 i
Driving units
kg m/min
123
500050002 080
3,716,4
,033
123
250025001 040
7,433,066,0
3,8 /18,5 /22,0kWWIW230MZ413
239,0 m/120,0 m
Layers7
max.278/139m4)
Step
4)Further hoist load data: see instruction manual.
0,8 / 2,7 / 3, kW5
5,0 kW FU0 0,8U/minsl./mintr./min
8,0 / 30,0 / 60,0 m/min
3 ,05
22,0 kW
kVA
6
Printed in Germany.
6
12 P – • DIN 15018 • BGL C.0. 0.00 • . /0 7131 LN 303 – -H1/B3 1 80 07 16 (i)
This information is supplied without liability.Subject to alterations!
L (m) B (m) H (m) kg5)
Item Qty.
Liebherr India Private LimitedHead OfficeKesar Solitaire, 25th & 26th floor, Plot no. 5, Sector 19, SanpadaNavi Mumbai, 400 705, India.www.liebherr.com, [email protected]
LIEBHERR CMCtec India Pvt. Ltd.Gat No. 196-199, Dhaygudewadi,NH-9 Pune Solapur Road,Tal- DaundMaharashtra Pune – 412203Telefon: +91 (0)2117 305 300 Telefax: +91 (0)2117 305 301,www.liebherr.com [email protected],
4,17
12,00
14 1
15 1
16 1
17 1
13 1
Hydraulic unit, supporting and climbing cross members
Single weights.5)
Tower
External climbing
Base tower section
Tower section
Guide section cpl.
Climbing tower section
2,00
8,74
4, 71
0,90
1,20
1,66
1,66
1,42
0, 08
1,20
1,75
1,66
1,42
1152
5 03
3642
Internal climbing
6,12 1,20 1,20
119
121
Climbing section (D-section)
Climbing section (B-section)
4,17 1,37 1,20DD
120 Hydraulic system
BB
0,85 950, 35 1,15
1450
2892
2137
2052
EC-B585 i
18 1 Building anchorage frame 2,07 1,82 0, 03 725
122 Guide frame 1,92 690 (3x)1,92 0,80
123 Climbing ladders 5,50 440 (2x)0,17 0,15