Towards a Unified Guideline for Renewable Energy Planning in the Arab Region
Fifth International Forum on Energy for Sustainable Development
November 6th 2014
![Page 2: Towards a Unified Guideline for Renewable Energy Planning ......Oman--- ---Palestine 10% of electricity generation --- ... Quality insurance schemes . 12 9. Access to and operation](https://reader034.fdocuments.us/reader034/viewer/2022051916/60085ce5942fce22771a8c3a/html5/thumbnails/2.jpg)
2
RCREEE: Who We Are
Independent regional inter-governmental organization
16 member states
National Focal Point in Every Country
In operation since 2008
Headquartered in Cairo, Egypt
Funded by member states and donor grants
![Page 3: Towards a Unified Guideline for Renewable Energy Planning ......Oman--- ---Palestine 10% of electricity generation --- ... Quality insurance schemes . 12 9. Access to and operation](https://reader034.fdocuments.us/reader034/viewer/2022051916/60085ce5942fce22771a8c3a/html5/thumbnails/3.jpg)
3
RE targets Country 2020 Target 2030 Target Algeria 6% of electricity generation 40% of electricity generation
Bahrain --- 5% of electricity generation*
Comoros --- --- Djibouti 100% renewable energy --- Egypt 20% of electricity generation --- Iraq 10% of electricity generation --- Jordan 10 % of primary energy --- Kuwait 5% of electricity generation 10% of electricity generation
Lebanon --- 12% of electrical and thermal energy
Libya 7% of electricity generation 10% of electricity generation**
Mauritania 20% of primary energy (excluding biomass) ---
Morocco 42% of installed capacity --- Oman --- --- Palestine 10% of electricity generation --- Qatar 6% of electricity generation* 20% of electricity generation*
Saudi Arabia --- 30% of electricity generation***
Somalia --- ---
Sudan --- 11% of installed capacity (excluding large-scale hydro)****
Syria --- 4.3% of primary energy
Tunisia --- 30% of electricity generation
UAE Dubai: 1% of installed capacity Dubai: 5% of installed capacity
Abu Dhabi: 7% of electricity generation ---
Yemen --- 15% of installed capacity**
* Unofficial targets ** 2025 target *** 2032 target **** 2031 target
![Page 4: Towards a Unified Guideline for Renewable Energy Planning ......Oman--- ---Palestine 10% of electricity generation --- ... Quality insurance schemes . 12 9. Access to and operation](https://reader034.fdocuments.us/reader034/viewer/2022051916/60085ce5942fce22771a8c3a/html5/thumbnails/4.jpg)
4
Cumulative targets for 2030
75 GW
![Page 5: Towards a Unified Guideline for Renewable Energy Planning ......Oman--- ---Palestine 10% of electricity generation --- ... Quality insurance schemes . 12 9. Access to and operation](https://reader034.fdocuments.us/reader034/viewer/2022051916/60085ce5942fce22771a8c3a/html5/thumbnails/5.jpg)
5
• Successful implementation of the Strategy requires Arab states to engage in short- to medium-term national RE planning, reporting and evaluation
NREAP is an implementation tools for the Pan-Arab RE Strategy
![Page 6: Towards a Unified Guideline for Renewable Energy Planning ......Oman--- ---Palestine 10% of electricity generation --- ... Quality insurance schemes . 12 9. Access to and operation](https://reader034.fdocuments.us/reader034/viewer/2022051916/60085ce5942fce22771a8c3a/html5/thumbnails/6.jpg)
6
NREAP Template
Part I: Renewable Energy Indicators
Part II: Policies and Mechanisms
Part III: NREAP Progress
Assessment
![Page 7: Towards a Unified Guideline for Renewable Energy Planning ......Oman--- ---Palestine 10% of electricity generation --- ... Quality insurance schemes . 12 9. Access to and operation](https://reader034.fdocuments.us/reader034/viewer/2022051916/60085ce5942fce22771a8c3a/html5/thumbnails/7.jpg)
7
Part I: Renewable Energy Indicators
Baseline Definition 2010
Expectations of the non-renewable energy until 2020 and 2030
Renewable energy targets and growth paths
![Page 8: Towards a Unified Guideline for Renewable Energy Planning ......Oman--- ---Palestine 10% of electricity generation --- ... Quality insurance schemes . 12 9. Access to and operation](https://reader034.fdocuments.us/reader034/viewer/2022051916/60085ce5942fce22771a8c3a/html5/thumbnails/8.jpg)
8
Part II: Policies and mechanisms
Regulated targets and obligations
RE support schemes Administrative
procedures
Technical specifications and
installers’ certification schemes
Policies for RE’s integration in
buildings
Access to and operation of the grids
Joint projects with other Arab States, foreign countries
or/and third parties
Heating and cooling measures
Awareness raising campaigns
![Page 9: Towards a Unified Guideline for Renewable Energy Planning ......Oman--- ---Palestine 10% of electricity generation --- ... Quality insurance schemes . 12 9. Access to and operation](https://reader034.fdocuments.us/reader034/viewer/2022051916/60085ce5942fce22771a8c3a/html5/thumbnails/9.jpg)
9
6. Administrative procedures
This is where the procedures for new RE project starts getting
a little complicated ! Source: http://www.ehealthinformationsolutions.com
![Page 10: Towards a Unified Guideline for Renewable Energy Planning ......Oman--- ---Palestine 10% of electricity generation --- ... Quality insurance schemes . 12 9. Access to and operation](https://reader034.fdocuments.us/reader034/viewer/2022051916/60085ce5942fce22771a8c3a/html5/thumbnails/10.jpg)
10
6. Administrative procedures
Local legislations concerning authorization, certification and licensing procedures
Responsible bodies
Land allocation responsibilities
Administrative coordination schemes
Assistance schemes
Technology and size specificities
Resource assessment data measurements
Delivery mechanisms for implementing the NREAP
National and local rules concerning the authorization, certification and licensing procedures of RE plants
![Page 11: Towards a Unified Guideline for Renewable Energy Planning ......Oman--- ---Palestine 10% of electricity generation --- ... Quality insurance schemes . 12 9. Access to and operation](https://reader034.fdocuments.us/reader034/viewer/2022051916/60085ce5942fce22771a8c3a/html5/thumbnails/11.jpg)
11
7. Technical specifications & installers’ certification schemes
Already in place or planed
Name of the specification
Specification equivalencies
Responsible body
Already in place or planed
Name of the certification
Certification equivalencies
Responsible body
Local and international equipment technical specifications
Local and international installers’ certification scheme
Quality insurance schemes
![Page 12: Towards a Unified Guideline for Renewable Energy Planning ......Oman--- ---Palestine 10% of electricity generation --- ... Quality insurance schemes . 12 9. Access to and operation](https://reader034.fdocuments.us/reader034/viewer/2022051916/60085ce5942fce22771a8c3a/html5/thumbnails/12.jpg)
12
9. Access to and operation of the grid
Energy grids’ legislations
RE grid integration measures
Smart grids, IT tools, storage facilities
Existing or planed interconnection capacity with neighboring countries
RE connection privileges
Cost sharing procedures
RE dispatching priorities
RE projects integration to the electrical network grids
Current and planned rules and regulations AREF article 6
Grids
!!!!
![Page 13: Towards a Unified Guideline for Renewable Energy Planning ......Oman--- ---Palestine 10% of electricity generation --- ... Quality insurance schemes . 12 9. Access to and operation](https://reader034.fdocuments.us/reader034/viewer/2022051916/60085ce5942fce22771a8c3a/html5/thumbnails/13.jpg)
13
NREAP implementation: The way forward
Q1, 2014: Workshop on AREF and
NREAP back to back with LAS RE&EE Expert
Committee meeting.
Q3, 2014: Endorsement and
communication of final AREF and NREAP template
through LAS official channels.
Q4, 2014: Agreement with
several Arab countries to develop NREAP
Q4, 2014: Capacity development workshop for national authority or body
responsible for the development and follow-
up of the NREAP
Q2, 2015: Template for progress
monitoring and evaluation finalised
Q3, 2015: Completed NREAP
communicated to LAS.
Q4, 2015: First regional report on
NREAP development in Arab region published.
Q3, 2016: Progress report submitted by
countries.
Q4, 2016: First monitoring and
evaluation report published.
![Page 14: Towards a Unified Guideline for Renewable Energy Planning ......Oman--- ---Palestine 10% of electricity generation --- ... Quality insurance schemes . 12 9. Access to and operation](https://reader034.fdocuments.us/reader034/viewer/2022051916/60085ce5942fce22771a8c3a/html5/thumbnails/14.jpg)
14
Improving Framework Conditions
Concrete Projects
![Page 15: Towards a Unified Guideline for Renewable Energy Planning ......Oman--- ---Palestine 10% of electricity generation --- ... Quality insurance schemes . 12 9. Access to and operation](https://reader034.fdocuments.us/reader034/viewer/2022051916/60085ce5942fce22771a8c3a/html5/thumbnails/15.jpg)
15
Attractive PBP and IRR
Do not need fiscal or financial
incentives
Require minimal policy,
regulatory, legal, or
administrative adjustments
Regionally relevant
Defining “investment-ready” Opportunities
![Page 16: Towards a Unified Guideline for Renewable Energy Planning ......Oman--- ---Palestine 10% of electricity generation --- ... Quality insurance schemes . 12 9. Access to and operation](https://reader034.fdocuments.us/reader034/viewer/2022051916/60085ce5942fce22771a8c3a/html5/thumbnails/16.jpg)
16
Utility-Scale Wind and Solar Projects
![Page 17: Towards a Unified Guideline for Renewable Energy Planning ......Oman--- ---Palestine 10% of electricity generation --- ... Quality insurance schemes . 12 9. Access to and operation](https://reader034.fdocuments.us/reader034/viewer/2022051916/60085ce5942fce22771a8c3a/html5/thumbnails/17.jpg)
17
Sou
rce:
Mu
stak
bb
al C
lean
Te
ch
On-grid Residential and Houses of Worship PV Solar Rooftop
![Page 18: Towards a Unified Guideline for Renewable Energy Planning ......Oman--- ---Palestine 10% of electricity generation --- ... Quality insurance schemes . 12 9. Access to and operation](https://reader034.fdocuments.us/reader034/viewer/2022051916/60085ce5942fce22771a8c3a/html5/thumbnails/18.jpg)
18
RE Self Consumption in Industrial and Commercial Sectors (On-Grid and Off-Grid)
![Page 19: Towards a Unified Guideline for Renewable Energy Planning ......Oman--- ---Palestine 10% of electricity generation --- ... Quality insurance schemes . 12 9. Access to and operation](https://reader034.fdocuments.us/reader034/viewer/2022051916/60085ce5942fce22771a8c3a/html5/thumbnails/19.jpg)
19
Sou
rce:
Azu
ri S
olu
tio
ns
Off-grid Rural and Peri-Urban Electrification
![Page 20: Towards a Unified Guideline for Renewable Energy Planning ......Oman--- ---Palestine 10% of electricity generation --- ... Quality insurance schemes . 12 9. Access to and operation](https://reader034.fdocuments.us/reader034/viewer/2022051916/60085ce5942fce22771a8c3a/html5/thumbnails/20.jpg)
20
Sou
rce:
Lo
ren
tz S
ola
r P
um
ps
Solar PV Pumping
![Page 21: Towards a Unified Guideline for Renewable Energy Planning ......Oman--- ---Palestine 10% of electricity generation --- ... Quality insurance schemes . 12 9. Access to and operation](https://reader034.fdocuments.us/reader034/viewer/2022051916/60085ce5942fce22771a8c3a/html5/thumbnails/21.jpg)
21
Although there are many opportunities for concrete projects in sustainable energy in Arab countries, they
remain largely untapped
![Page 22: Towards a Unified Guideline for Renewable Energy Planning ......Oman--- ---Palestine 10% of electricity generation --- ... Quality insurance schemes . 12 9. Access to and operation](https://reader034.fdocuments.us/reader034/viewer/2022051916/60085ce5942fce22771a8c3a/html5/thumbnails/22.jpg)
22
Barriers to Scale Up of Investment
• At all levels of the existence of these commercially viable opportunities
Low awareness
• To demonstrate the potential of these opportunities
Few success stories
• About the risk profiles and potential benefits of these technologies
Insufficient information
• That meet the three A’s (Appropriate, accessible, affordable)
Few financing options
• To assess markets and create business models
Weak local capacity
![Page 23: Towards a Unified Guideline for Renewable Energy Planning ......Oman--- ---Palestine 10% of electricity generation --- ... Quality insurance schemes . 12 9. Access to and operation](https://reader034.fdocuments.us/reader034/viewer/2022051916/60085ce5942fce22771a8c3a/html5/thumbnails/23.jpg)
23
The Way Forward: The Integrated Approach
![Page 24: Towards a Unified Guideline for Renewable Energy Planning ......Oman--- ---Palestine 10% of electricity generation --- ... Quality insurance schemes . 12 9. Access to and operation](https://reader034.fdocuments.us/reader034/viewer/2022051916/60085ce5942fce22771a8c3a/html5/thumbnails/24.jpg)
24
The Integrated Approach
• To identify concrete, commercially viable opportunities in sustainable energy in the region
• To promote these opportunities with the public and private sectors through targeted awareness building campaigns in order to stimulate investment in these opportunities
• To support the development of bankable demonstration projects
• To facilitate access to appropriate and affordable financing options for concrete project
![Page 25: Towards a Unified Guideline for Renewable Energy Planning ......Oman--- ---Palestine 10% of electricity generation --- ... Quality insurance schemes . 12 9. Access to and operation](https://reader034.fdocuments.us/reader034/viewer/2022051916/60085ce5942fce22771a8c3a/html5/thumbnails/25.jpg)
25
The Diesel To Solar (D2S) Initiative
• Millions of households and economic actors in the MENA region rely on diesel for their non-transport energy needs
• Diesel technologies are used for lighting, irrigation and pumping, heating and cooling, agro-processing, as well as powering domestic and industrial electrical appliances.
• Solar/Diesel hybrid systems are the lowest-cost, long-term option for off-grid power generation
![Page 26: Towards a Unified Guideline for Renewable Energy Planning ......Oman--- ---Palestine 10% of electricity generation --- ... Quality insurance schemes . 12 9. Access to and operation](https://reader034.fdocuments.us/reader034/viewer/2022051916/60085ce5942fce22771a8c3a/html5/thumbnails/26.jpg)
26
D2S Strategy
Market assessment
Business Model
Mapping and Design
Partnership Building and
Business Model Piloting
Mainstreaming of Successful
Business Models
Three- to five-year program to scale the market of diesel to solar retrofits through the creation and promotion of scalable, sustainable business models suitable for the region.
![Page 27: Towards a Unified Guideline for Renewable Energy Planning ......Oman--- ---Palestine 10% of electricity generation --- ... Quality insurance schemes . 12 9. Access to and operation](https://reader034.fdocuments.us/reader034/viewer/2022051916/60085ce5942fce22771a8c3a/html5/thumbnails/27.jpg)
Thank you
www.rcreee.org