TOTAL SWIMMING POOL REFURBISHMENT pool depth reduction.to private leisure centre

8
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS POOL DEPTH REDUCTION TO PRIVATE LEISURE CENTRE

Transcript of TOTAL SWIMMING POOL REFURBISHMENT pool depth reduction.to private leisure centre

Page 1: TOTAL SWIMMING POOL REFURBISHMENT  pool depth reduction.to private leisure centre

TOTAL SWIMMING POOL

REFURBISHMENT SOLUTIONS

POOL DEPTH REDUCTION TO

PRIVATE LEISURE CENTRE

Page 2: TOTAL SWIMMING POOL REFURBISHMENT  pool depth reduction.to private leisure centre

TOTAL SWIMMING POOL

REFURBISHMENT SOLUTIONS

POOL DRAINED –

IN READINESS TO

REDUCE THE

POOL DEPTH.

NICHE CUT IN

EXISTING POOL

FLOOR, SO THAT

NEW TILING CAN

BE TAKEN TO

“INFINITY”

Page 3: TOTAL SWIMMING POOL REFURBISHMENT  pool depth reduction.to private leisure centre

TOTAL SWIMMING POOL

REFURBISHMENT SOLUTIONS

CONSTRUCTING

LIGHTWEIGHT WALLS

TO GIVE FINISHED

HEIGHT AND ACCESS

TO LIGHTWEIGHT

CONCRETE.

30 CUBIC METRES OF

LIGHTWEIGHT

CONCRETE CAN NOW

BE PUMPED IN

Page 4: TOTAL SWIMMING POOL REFURBISHMENT  pool depth reduction.to private leisure centre

TOTAL SWIMMING POOL

REFURBISHMENT SOLUTIONS

AFTER PUMPING -

FINISHED LEVEL

OF NEW

LIGHTWEIGHT

CONCRETE,

SHOWING NEW

OUTLET SUMP

PIPEWORK

Page 5: TOTAL SWIMMING POOL REFURBISHMENT  pool depth reduction.to private leisure centre

TOTAL SWIMMING POOL

REFURBISHMENT SOLUTIONS

SCREED LAID

OVER

LIGHTWEIGHT

CONCRETE TO

GIVE FLAT

SURFACE IN

READINESS FOR

TILING

Page 6: TOTAL SWIMMING POOL REFURBISHMENT  pool depth reduction.to private leisure centre

TOTAL SWIMMING POOL

REFURBISHMENT SOLUTIONS

RE-GROUTING OF

AREAS OF

MISSING GROUT

TO POOL WALLS,

TO IMPROVE THE

AESTHETICS OF

THE FINISHED

POOL

Page 7: TOTAL SWIMMING POOL REFURBISHMENT  pool depth reduction.to private leisure centre

TOTAL SWIMMING POOL

REFURBISHMENT SOLUTIONS

SCREEDED FLOOR

BEING TILED TO

MATCH EXISTING

Page 8: TOTAL SWIMMING POOL REFURBISHMENT  pool depth reduction.to private leisure centre

TOTAL SWIMMING POOL

REFURBISHMENT SOLUTIONS WORKS COMPLETE

BENEFITS GAINED ARE;-

INSTANT ENERGY SAVINGS

WATER AND CHEMICAL SAVINGS

FLATTER SHALLOWER AREA FOR EXTRA

AEROBIC CLASSES

HEALTH AND SAFETY – SHALLOWER POOL

REQUIRES LESS SUPERVISION

IMPROVED ACCESS FOR MAINTENANCE AND

CLEANING

AVERAGE PAYBACK OF CAPITAL OUTLAY IN 3

YEARS OR LESS