Total Project Cost: $73vmw.pdc.us/.../ccstudy/requestlog/Revised-Project-Funding.pdf · Total...

7
79% Loans 1% Tax Increment Financing 20% Equity 6th & Oak Total Project Cost: $73.6M * 0.5% Marriot Key Money Grant (Private Financing) 1% Public (TIF) 99% Private (Equity, Loans) Public Private

Transcript of Total Project Cost: $73vmw.pdc.us/.../ccstudy/requestlog/Revised-Project-Funding.pdf · Total...

Page 1: Total Project Cost: $73vmw.pdc.us/.../ccstudy/requestlog/Revised-Project-Funding.pdf · Total Project Cost: $103M 2 1 % P o r t l a n d D ev l o p m e n t C o m i s i o n 4 0 % C

79% Loans

1% Tax Increment Financing

20% Equity

6th & OakTotal Project Cost: $73.6M* 0.5% Marriot Key Money Grant

(Private Financing)

1% Public (TIF)99% Private (Equity, Loans)

Public

Private

Page 2: Total Project Cost: $73vmw.pdc.us/.../ccstudy/requestlog/Revised-Project-Funding.pdf · Total Project Cost: $103M 2 1 % P o r t l a n d D ev l o p m e n t C o m i s i o n 4 0 % C

6. A CENTER FOR CHANGE

The new Mercy Corps headquarters will mesh the more-than-century-old Skidmore Building with a visually striking new addition while maintaining financial and environmental responsibility.

THOMAS HACKER ARCHITECTS

44% Equity

17% Loans

12% Tax Increment Financing

9% Historic Tax Credits

Mercy Corps World HeadquartersTotal Project Cost: $37.3M

17% New Markets Tax Credits 2% Business Energy Tax Credit

(Private Financing)

12% Public (TIF)61% Private (Equity, Loans)28% Public/Private (HTC, BETC, NMTC)

Public

Private

Public/Private

Page 3: Total Project Cost: $73vmw.pdc.us/.../ccstudy/requestlog/Revised-Project-Funding.pdf · Total Project Cost: $103M 2 1 % P o r t l a n d D ev l o p m e n t C o m i s i o n 4 0 % C

12% Tax Increment Financing

Meier & FrankTotal Project Cost: $139.9M

49% Loans

12% Tax Increment Financing

9% Equity

10% Historic Tax Credits

19% New Markets Tax Credits* 0.2% Business Energy Tax Credit

(Private Financing)

12% Public (TIF)58% Private (Equity, Loans) 29% Public/Private (HTC, BETC, NMTC)

Public

Private

Public/Private

Page 4: Total Project Cost: $73vmw.pdc.us/.../ccstudy/requestlog/Revised-Project-Funding.pdf · Total Project Cost: $103M 2 1 % P o r t l a n d D ev l o p m e n t C o m i s i o n 4 0 % C

Typical* Housing Preservation ProjectTotal Project Cost: $42M

* Other:4% Deferred Developer Fee2% NOI during Rehab0.2% Business Energy Tax Credit

*Similar to Clay Tower

16% Loans

12% Tax Increment Financing

23% Equity

43% State Bond Financing

6% Oth

er*

(Private Financing)

12% Public (TIF)45% Private (Equity, Loans, Deferred Dev. Fee, NOI)43% Public/Private (Bonds, BETC)

Public

Private

Public/Private

Page 5: Total Project Cost: $73vmw.pdc.us/.../ccstudy/requestlog/Revised-Project-Funding.pdf · Total Project Cost: $103M 2 1 % P o r t l a n d D ev l o p m e n t C o m i s i o n 4 0 % C

Typical* Mixed Use DevelopmentTotal Project Cost: $12M

*Similar to The Jeffrey

23% Equity

12% Tax Increment Financing

16% System Development Charge Waivers

43% Tax Exempt Bonds

6% Other** Other:4% Deferred Developer Fee2% NOI during Rehab0.2% Business Energy Tax Credit

28% Public (TIF, SDCs)29% Private (Equity, Deferred Dev. Fee, NOI)43% Public/Private (Bonds, BETC)

Private

Public/Private

Public

Page 6: Total Project Cost: $73vmw.pdc.us/.../ccstudy/requestlog/Revised-Project-Funding.pdf · Total Project Cost: $103M 2 1 % P o r t l a n d D ev l o p m e n t C o m i s i o n 4 0 % C

Portland StreetcarLegacy Good Samaritan to SW Lowell & Bond

Total Project Cost: $103M

21% Portland Development Commission

40% City of Portland

19% Local Improvement District

18% Grants (State & Federal)2% Miscellaneous

Notes:-City of Portland funding includes: General Fund, Parking Bonds, Parking Fund, Transportation Fund, and Land Sales-Portland Development Commission funding includes Tax Increment Financing from South Parks Blocks and North Macadam Urban Renewal Areas and Land Sales Proceeds-All funding informtion came from the Portland Streetcar website: http://www.portlandstreetcar.org/funding.php

79 % Public (City, PDC, Grants)19% Private (LID)

Public

Private

Page 7: Total Project Cost: $73vmw.pdc.us/.../ccstudy/requestlog/Revised-Project-Funding.pdf · Total Project Cost: $103M 2 1 % P o r t l a n d D ev l o p m e n t C o m i s i o n 4 0 % C

5%

Priv

ate

Fin

an

cing

77

% T

ax In

crem

en

t

Fin

an

cing

1%

Gra

nts

1%

TriM

et

3%

Po

rtlan

d P

ark

s

& R

ecre

atio

n

12

% B

ure

au

of

En

viro

nm

en

tal S

erv

ices

5% Private

95% Public

95 % Public (TIF, Grants, TriMet, PPR, BES)5% Private (Parks Foundation Fundraising and other private financing)

Waterfront ParkTotal Project Cost: $16.1M