the method for excaviation

Transcript of top-down method

  • SLOPE STABILIZATIONSLOPE STABILIZATION

    Modified Top-Down MethodModified Top Down MethodSelf Stabilized Structure

    P t d bPresented by:

    Massoud Moghaddaspourg pM.Sc Structural/Geotechnical Engineering

    2013 (1392)

  • TOP DOWN CONSTRUCTIONTOP-DOWN CONSTRUCTION

    1- Soldier Piles ) (2- Sheet Piles ) (3- Diaphragm Walls ) (4- Self Stabilized Structure ) (

  • SELIP REIDLOSSELIP REIDLOS

    51

  • SELIP TEEHSSELIP TEEHS

    01

  • SLLAW MGARHPAIDSLLAW MGARHPAID

    02

  • SELF STABILIZED STRUCTURESELF STABILIZED STRUCTURE

    6

  • Step 0: Initial Condition

  • Step 1: Drilling Wells Under Columns

  • Step 2: Reinforcing and First Stage Concreting of Piles

  • Step 3: Installing Main Columns and Second Stage Concreting of Piles

  • Step 4: Filling Wells with Gravel

  • Step 5: First Stage of Excavating

  • Step 6: First Stage of Composite Wall

  • Step 7: Second Stage of Excavating and Composite Wall

  • Step 8: Third Stage of Excavating and Composite Wall

  • Step 9: Installing Main Beams of Ground Floor

  • Step 10: Continuing Excavation and Composite Wall

  • Step 11: Continuing Excavation and Composite Wall

  • Step 12: Continuing Excavation and Composite Wall

  • Step 13: Installing First Basement Main Beams

  • Step 14: Continuing Procedure to Bottom of Foundation Level

  • Step 15: Constructing Foundation

  • Water Proofing Detail

  • Foundation Connection Detail

  • PLAXIS OUTPUT (DEFLECTION)PLAXIS OUTPUT (DEFLECTION)

  • PLAXIS OUTPUT (DEFLECTION)PLAXIS OUTPUT (DEFLECTION)

  • FACTOR OF SAFETYFACTOR OF SAFETY

  • SAP2000 MODELSAP2000 MODEL

  • (5 )

  • COLUMN INSIDE THE WELLCOLUMN INSIDE THE WELL

  • INSTALLING ALL OF COLUMNSINSTALLING ALL OF COLUMNS

  • COMPOSITE WALLS AND EXCAVATIONCOMPOSITE WALLS AND EXCAVATION

  • CONTINUINGCONTINUING

  • COMPLETE CONSTRUCTIONCOMPLETE CONSTRUCTION

  • MATERIAL TAKEOFFMATERIAL TAKEOFF