LIST OF TOOLS, EQUIPMENT & CONSUMABLES CLIENT : RP Chemicals Malaysia JOB NAME : Vessel Modification 1 (BD-702A and BD-704) DOCUMENT NO : P.O NO : REV. NO. : FI : FOR INFO FR : FOR REVIEW FC : FOR COMMENT FA : FOR APPROVAL ITB : INTENTION TO BID NO LIST OF TOOLS AND EQUIPMENT NO LIST OF CONSUMABLES MATERI 1 Generator set 45kV 1 Gloves 2 Air Compressor 175cfm 2 Grinder Disc 3 Load Loader 3 Cotton Rag 4 Grinder 4 Diesel 5 Hand tools 5 Barricade tape 6 Spanners 6 Canvas 7 Hoarding 7 Shackles 8 Face Shield 8 Sling Belt 9 Fire Extinguisher 10 Plasma Cutter 11 Scoop 12 Ladder 13 Chain block 14 Lever block

description

k

Transcript of Tools Equipment List

Page 1: Tools Equipment List

LIST OF TOOLS, EQUIPMENT & CONSUMABLES

CLIENT : RP Chemicals Malaysia JOB NAME :Vessel Modification 1 (BD-702A and BD-704)

DOCUMENT NO :

P.O NO : REV. NO. :FI : FOR INFO FR : FOR REVIEW FC : FOR COMMENT FA : FOR APPROVAL ITB : INTENTION TO BID

NO LIST OF TOOLS AND EQUIPMENT NO LIST OF CONSUMABLES MATERIALS1 Generator set 45kV 1 Gloves2 Air Compressor 175cfm 2 Grinder Disc3 Load Loader 3 Cotton Rag4 Grinder 4 Diesel5 Hand tools 5 Barricade tape6 Spanners 6 Canvas7 Hoarding 7 Shackles8 Face Shield 8 Sling Belt9 Fire Extinguisher

10 Plasma Cutter11 Scoop12 Ladder13 Chain block14 Lever block

Page 2: Tools Equipment List

LIST OF TOOLS, EQUIPMENT & CONSUMABLES

NEC-14/ML/RPCM-02

0 DATE 12/23/2015PREPARED BY : Fadli

LIST OF CONSUMABLES MATERIALS

Nufa Engineering & Consultancy Sdn Bhd, SD-4 Kompleks Kilang SM E Bank, Jalan Gebeng ½, Kaw. Perindustrian Gebeng 2, 26080 Kuantan, Pahang.

Page 3: Tools Equipment List

PROCESS AIR COMPRESSOR (PAC) CHILLER PROJECT

Mechanical Piping Project Scope 2

ESTIMATED MANHOURS AND MANPOWER LOADING

ROLE / POSITION PAX

A. PROJECT MANAGEMENT TEAM

1 Project Supervisor 1

2 Project Engineer 1

3 Q.C Inspector - DPT 1

4 Safety Officer 1

B. PIPING WORKER

1 Supervisor 1

2 TIG Welder 1

3 Pipe Fitter 2

4 Helper or Semi Skilled 2

5 Fire Watcher 1

C. CIVIL WORKS

1 Foreman 1

2 Skilled worker 2

3 Semi skilled 2

4 Fire Watcher 1

Page 4: Tools Equipment List

NEC-14/ML/RPCM-04

DATE: 19/9/2014

PROCESS AIR COMPRESSOR (PAC) CHILLER PROJECT

Mechanical Piping Project Scope 2

HOURS DAYS TOTAL MANHOURS

8 8 64.00

8 4 32.00

8 6 48.00

8 2 16.00

11 4 44.00

11 4 44.00

11 4 88.00

11 4 88.00

11 4 44.00

11 6 66.00

11 6 132.00

11 5 110.00

11 1 11.00