1 United Republic of Tanzania Toolkit No.2: Technical Options for School WASH Part 2 of 2 Designs and Bills of Quantities First Draft for Pre-testing and Piloting Oct 2010

Transcript of Toolkit No.2: Technical Options for School WASH Part 2 of...

1

United Republic of Tanzania

Toolkit No.2: Technical Options for School WASH

Part 2 of 2

Designs and Bills of Quantities

First Draft for Pre-testing and Piloting

Oct 2010

2

3

Toolkit No.2: Technical Options for School WASH

Part 2 of 2

Designs and Bills of Quantities

Oct 2010

4

5

Table of Contents

Table of Contents ......................................................................................... 5

Section A - Rainwater harvesting .................................................................. 8

RW1(a) - Bag made of Mariakani cloth for building a 3 cum jar of ferrocement (ASAL Consultants drawing) ............................................................................... 9

RW1(b) - Standard design of a 3 cu.m ferrocement jar (below ground collection) (ASAL Consultants drawing) ........................................................... 10

RW1-BQ - Bill of quantities for a 3 cu.m ferrocement jar (ASAL Consultants drawing) ........................................................................................................... 11

RW2 - Standard design for a 5 cu.m tank built of concrete in situ (below ground collection) (ASAL Consultants drawing) .............................................. 12

RW2-BQ - Bill of quantities and cost for a 5 cu.m tank of concrete in situ (ASAL Consultants) ........................................................................................... 13

RW3 - Standard design of a 10 cu.m tank built of burnt bricks (below ground collection) (ASAL Consultants drawing) ........................................................... 14

RW3-BQ - Bill of quantities and cost of a 10 cu.m tank built of burnt bricks (ASAL Consultants drawing) ............................................................................. 15

RW4 - Standard design of a 23 cu.m ferrocement tank (below ground collection) (ASAL Consultants drawing) ........................................................... 16

RW4-BQ - Bill of quantities of a 23 cu.m ferrocement tank (below ground collection)......................................................................................................... 17

RW5 - Standard design of a 46 cu.m ferrocement tank (below ground collection) (ASAL Consultants drawing) ........................................................... 19

RW5-BQ - Bill of quantities of a 46 cu.m ferrocement tank (below ground collection) (ASAL Consultants) ......................................................................... 20

RW6 - Standard design of water storage tank for 10 cu.m of burnt bricks (above ground collection) (ARU based on ASAL drawing) ............................... 22

RW6-BQ - Bill of quantities for a storage tank for 10 cu.m made of burnt bricks (above ground collection) (ARU adapted from an ASAL drawing) ........ 23

RW7 - Standard design of water storage tank for 30 cu.m of ferrocement (above ground collection) (ARU based on ASAL drawing) ............................... 24

RW7-BQ - Bill of quantities for a water storage tank for 30 cu.m of ferrocement (above ground collection) (ARU adapted from an ASAL drawing).......................................................................................................................... 25

Section B – Improved pit latrines ................................................................ 26

6

PL1 - Cement block (girls) – below ground – fully lined (adapted from WEDC drawing) ........................................................................................................... 27

PL2 - Cement block (boys) – below ground – partially lined (adapted from WEDC drawing) ................................................................................................ 28

PL3 - Burnt brick (boys) – below ground – fully lined (adapted from WEDC drawing) ........................................................................................................... 29

PL4 - Burnt brick (boys) – below ground – partially lined (adapted from WEDC drawing) ........................................................................................................... 30

PL5 - Cement block (boys) – floor construction (adapted from WEDC drawing).......................................................................................................................... 31

PL6 - Cement block (girls) – floor construction (adapted from WEDC drawing).......................................................................................................................... 32

PL7 - Mud superstructure (boys) (adapted from WEDC drawing) .................. 33

PL8 - Burnt brick superstructure (boys) (adapted from WEDC drawing) ........ 37

PL8-BQ - Bill of quantity – for burnt brick superstructure (boys) with fully / partially lined pit .............................................................................................. 38

PL9 - Burnt brick superstructure (girls) (adapted from WEDC drawing) ......... 41

PL9-BQ - Bill of quantity – for burnt brick superstructure (girls) with fully / partially lined pit .............................................................................................. 42

PL10 - Cement block superstructure (girls) (adapted from WEDC drawing) ... 45

PL10-BQ - Bill of quantity – for cement block superstructure (girls) with fully / partially lined pit .............................................................................................. 46

PL11 - Urinal (boys) (adapted from WEDC drawing) ....................................... 49

PL12 - Pit latrine floor plan and sections – girls (WEDC design; ARU drawing).......................................................................................................................... 50

PL13 - Pit latrine floor plan and sections – boys (WEDC design; ARU drawing).......................................................................................................................... 51

Section C – Pour Flush Latrines ................................................................... 52

PFL1 - Pour flush latrine, floor plan and elevation (girls) (EEPCO drawing) .... 53

PFL1-BQ - Bill of quantities - pour flush latrine (girls) ..................................... 55

PFL2 - Pour flush latrine, floor plan and elevation (boys) (EEPCO drawing) ... 56

PFL2-BQ - Bill of quantities - pour flush latrine (boys) .................................... 58

Section D – Double Vault Ventilated Improved Pit Latrine ............................. 59

DVVIP1 - Double Vault VIP latrine (boys) (EEPCO drawing) ............................ 60

DVVIP1-BQ - Bill of quantities – double VIP latrine (boys) .............................. 63

DVVIP2 - Double Vault VIP latrine (girls) (EEPCO drawing) ............................. 64

7

DVVIP2-BQ - Bill of quantities – double VIP latrine (girls) ............................... 67

Section E – Ventilated Improved Pit Latrines ............................................... 68

VIP1 - VIP latrine (boys) - (no disabled access) (MOEVT drawing) .................. 69

VIP2 - VIP latrine (girls) – (no disabled access) (MOEVT drawing) .................. 70

WC1 - Water closet latrine block (boys and girls with disabled access) (MOEVT drawing) ........................................................................................................... 71

Section F – Hand-washing facilities ............................................................. 72

HW1 - Tippy tap plus soap holder.................................................................... 73

HW2 - Ferrocement jar fed from rainwater harvesting (ARU drawing) .......... 74

HW3 - Three unit pedestal sink with concrete surround (ARU drawing) ........ 75

Annex I - Material price estimates – 2010 ................................................... 76

IMPORTANT NOTE – The prices here in some cases vary significantly. A process will be undertaken to verify the accuracy of the prices in the final guidelines and toolkits across the three areas. ............................................... 76

8

Section A - Rainwater harvesting

9

RW1(a) - Bag made of Mariakani cloth for building a 3 cum jar of ferrocement (ASAL Consultants drawing)

10

RW1(b) - Standard design of a 3 cu.m ferrocement jar (below ground collection) (ASAL Consultants drawing)

with Nil on the inner wall

300300560140

1,660

800

3 CUBIC METRE WATER JAR BUILT OF FERROCEMENT

PLAN (mm)

AA

Drain pipe

1,300

50

1,660

1,56040 40

600 50

700

3"4 G.I outlet pipe with a tap

1,5001,220

750

1,1

00

50

2,0

00

100

300

300

100

SECTION A - A (mm)

11"2 G.I overflow pipe

GLGL

Drain pipe

Gutter

600700

with weld mesh

Concrete 1:3:6 reinforced

G.I wire and chicken mesh reinforcements

Mesh40 mm thick mortar (1:3)

11

RW1-BQ - Bill of quantities for a 3 cu.m ferrocement jar (ASAL Consultants drawing)

IMPORTANT NOTE – Please check the BofQ before ordering the materials and inform SNV/UNICEF of any omissions or errors

DESCRIPTION QTY UNIT

Labour cost

LLaabboouurreerrss

This including wages for construction 1 X 7days Labourers

FFoorreemmaann

Supervision of the work by a technical Engineer 1 X 7days Labourers

Cost of labour

Materials

Cement, 50Kg bag 6 No.

River sand 3 tonnes

Crushed stones 0.5'' to 1'' 1 Tonnes

Hardcore 2'' to 6'' 1 Tonnes

Burnt bricks 4'' x 6'' x 10'' 50 No.

Chicken mesh 25mm thick, 0.9m wide 18 m

GGaallvvaanniisseedd cceeiilliinngg nnaaiillss.. 22'''' 5 Kg

uuPPVVCC 22'''' sseewwaaggee ppiippee 66mm lloonngg 1 No.

GG II ppiippee,, 11..55'''' 1 m

GG II ppiippee,, 33//44'''' 1 m

GG II ffiittttiinngg 2200mmmm ttaapp,, eellbbooww 1 set

GG II wwiirree 33mmmm iirroonn sstteeeell ((bbiinnddiinngg wwiirree)) 5 kg

GGaallvvaanniisseedd ccooffffeeee mmeesshh 1188,, 00..99mm wwiiddee 1 Sq.m

MMoossqquuiittoo mmeesshh 1144,, 00..99mm wwiiddee 1 Sq.m

CCaannvvaass 11..22mm 15 m

LLiimmee,, 2255KKgg bbaagg 2 No.

CCoosstt ooff mmaatteerriiaallss

Total cost of a 3 cu.m ferrocement jar

12

RW2 - Standard design for a 5 cu.m tank built of concrete in situ (below ground collection) (ASAL Consultants drawing)

footing

7001,000

130 mm concrete 1:3:6 with weld mesh g.8

50 mm uPVC pipe drain

Steel door

20

02

00

20

0

GL

1,700

1,0

00

1501,940150

Corner rounded

300 x 300 x 150

iron bars

600mm long

Inlet

Gutter

20 mm (1:3) internal plaster with Nil

Overflow GI 38 mm

13

02

,00

01

00

20

G L

5 CUBIC METRE CONCRETE INSITU TANK

100mm uPVC pipe with concrete mix (1:2:4)

3"4 outlet GI pipe 900mm long

1,940

Barbed wire at 100 mm spacing

AA

Y

GL

50

0

3"4 Pipe GI

Man hole 400 mm Dia.

2 nos Y12

PLAN (mm)

SECTION A-A (mm)

DETAIL Y (mm)

20

60

70

20100150

Barbed wire g. 12.5 spaced 100mm

100mm insitu concrete wall

20mm internal plaster with Nil

13

RW2-BQ - Bill of quantities and cost for a 5 cu.m tank of concrete in situ (ASAL Consultants)

IMPORTANT NOTE – Please check the BofQ before ordering the materials and inform SNV/UNICEF of any omissions or errors

DESCRIPTION QTY UNIT

Labour cost

LLaabboouurreerrss

This including wages for construction 2 X 7days Labourers

FFoorreemmaann

Supervision of the work by a technical Engineer 1 X 7days

Labourers

Cost of labour

Materials

Cement, 50Kg bag 12 No.

River sand 3 tonnes

Crushed stones 0.5'' to 1'' 3 Tonnes

Burnt bricks 4'' x 6'' x 10'' 50 No.

Weld mesh 2.4m long x 1.2m wide 4 Sheet

Barbed wire20kg rolls, g 12.5 1 kg

GGaallvvaanniisseedd NNaaiillss 22'''' 5 Kg

CChhiicckkeenn mmeesshh 33'''' xx 9900'' xx 11'''' 2.0 rolls

uuPPVVCC 22'''' sseewwaaggee ppiippee 66mm lloonngg 1 No.

GG II ppiippee,, 11..55'''' 1 m

GG II ppiippee,, 33//44'''' 1 m

GG II ffiittttiinngg 2200mmmm ttaapp,, eellbbooww 4 set

GGaallvvaanniisseedd ccooffffeeee mmeesshh 1188,, 00..99mm wwiiddee 1 Sq.m

CCiirrccuullaarr bboollttss,, 66mmmm xx 2255mmmm 6 No.

TTiimmbbeerrss 1155 XX 22..55ccmm xx 66mm lloonngg 12 No.

CCiirrccuullaarr mmeettaall rriinngg 220000mmmm xx 2200mmmm 1 cm

GGaallvvaanniisseedd NNaaiillss 33'''' 5 kg

LLiimmee 2255kkgg bbaagg 1 kg

CCoosstt ooff mmaatteerriiaallss

TToottaall ccoosstt

14

RW3 - Standard design of a 10 cu.m tank built of burnt bricks (below ground collection) (ASAL Consultants drawing)

130

50 mm uPVC pipe drain

7001,000

and 100mm on the upper half

g. 12.5 spaced 50mm on the lower half of wall

100mm concrete reinforced with weld mesh200

300

20mm external plaster over of spiral barbed wire

GL

10 CUBIC METRE TANK BUILT OF BRICKS OR BLOCKS

PLAN (mm)

with (1:2:4) concrete mix

concrete footing300x 300x 150

3"4 pipe GI 600mm long

100mm uPVC pipe

with (1:2:4) concrete mix

100 x 150 concrete beam

Manhole cover

A A

400

3,200

150

150150150150 2,600

600

20

100

2,0

00

1501,3001,300

1,700

1,0

00

Ø400

200

200

200

Gutter

Inlet

Steel door

SECTION A - A (mm)

20mm internal plaster with Nil

Bricks or block wall

3"4 outlet GI pipe 900mm long

1 1"4 overflow pipe

GL

15

RW3-BQ - Bill of quantities and cost of a 10 cu.m tank built of burnt bricks (ASAL Consultants drawing)

IMPORTANT NOTE – Please check the BofQ before ordering the materials and inform SNV/UNICEF of any omissions or errors

DESCRIPTION QTY UNIT

Labour cost

Labourers

This including wages for construction 2 X 7days Labourers

FFoorreemmaann

Supervision of the work by a technical Engineer 1 X 7days Labourers

Cost of labour

Materials

Cement, 50Kg bag 21 No.

River sand 4 tonnes

Crushed stones 0.5'' to 1'' 4 Tonnes

Hardcore 2'' to 6'' 1 Tonnes

Burnt bricks 10'' x 12'' x 20'' 700 No.

Weld mesh 2.4 X 1.2m 9 Sheets

BBaarrbbeedd wwiirree 2200kkgg rroollll,, gg1122,,55 30 Kg

TTwwiisstteedd bbaarrss,,YY1122 13.0 m

uuPPVVCC 22'''' sseewwaaggee ppiippee 66mm lloonngg 1 No.

uuPPVVCC 44'''' sseewwaaggee ppiippee 66mm lloonngg 1 No.

GGaallvvaanniisseedd sstteeeell ppiippee 2255mmmm 2 m

GGII PPiippee,, 11..55'''' 0.5 m

GGII PPiippee,, 33//44'''' 1 No.

GG II ttaapp 33//44'''' 1 No.

GG..II SSoocckkeett,, 33//44'''' 1 No.

GG..II eellbbooww,, 33//44'''' 1 No.

TTrreeaatteedd TTiimmbbeerrss 66'''' XX 11'''',, 66mm lloonngg 12 No.

GGaallvvaanniisseedd ccooffffeeee mmeesshh 1 Sq.m

GGaallvvaanniisseedd NNaaiillss 33'''' 8 Kg

CCoosstt ooff mmaatteerriiaallss

TTrraannssppoorrtt ooff mmaatteerriiaallss

HHaarrddwwaarree lloorrrriieess 3tonnes 1load

TTrraaccttoorr ttrraaiilleerr llooaaddss 3tonnes 5load

Cost of transport

Total cost of a 10 cu.m tank built of burnt bricks

16

RW4 - Standard design of a 23 cu.m ferrocement tank (below ground collection) (ASAL Consultants drawing)

200

130mm thick concrete slab

high and 100mm the remaining

GI wire at 50mm spacing for 1m

BRC & Chicken mesh tied with

Mortar 1:3 with Nil on the internal wall

50mm mortar 1:3 with

BRC and chicken mesh

Coffee mesh

Z

100mm uPVC pipe with concrete

(1:2:4) and Y12 iron bars

3,880

450

130

2,0

00

100

DETAIL Z (mm)

2Y12

100mm uPVC pipe

Roof

mesh tied with GI wire.

BRC and chicken wire

60

3"4 GI pipe 600mm long for ladder

300 x 300 x 150 concrete footing

150 60 150603,760

25mm floor screed

BRC joined with vertical BRC

570

220

200

200

250200200200500310

250200200200500310

500

Drain

Steel door

DETAIL X (mm)

reinforced with weld mesh

50mm thick cone shaped roof

AA

SECTION A-A (mm)

PLAN (mm)

DETAIL Y (mm)

23 CUBIC METRE FERROCEMENT TANK

BRC mesh

Overflow

chicken mesh and 3mm GI wire

GL

Inlet

Gutter

Y

GL

60

X

150

840

150

GL

3"4 outlet GI pipe 900mm long

60mm thick wall with BRC mesh,

Man hole 400 mm Dia.

17

RW4-BQ - Bill of quantities of a 23 cu.m ferrocement tank (below ground collection)

IMPORTANT NOTE – Please check the BofQ before ordering the materials and inform SNV/UNICEF of any omissions or errors

DESCRIPTION QTY UNIT

Labour cost

LLaabboouurreerrss

This including wages for construction 2 X 7days Labourers

FFoorreemmaann

Supervision of the work by a technical Engineer 1 X 7days Labourers

Cost of labour

Materials

Cement, 50Kg xbag 30 No.

River sand, 0.5'' to 1'' 7 tonnes

Crushed stones 0.5'' to 1'' 3 Tonnes

Hardcore 4'' to 6'' 1 Tonnes

Burnt bricks 4'' x 6'' x 10'' 50 No.

BRC mesh, N0 65 33 Sheet

NNaaiillss 5500mmmm 5 Kg

TTwwiisstteedd bbaarrss,,YY1122 0.9 m

uuPPVVCC 44'''' sseewwaaggee ppiippee 66mm lloonngg 1 No.

uuPPVVCC 22'''' sseewwaaggee ppiippee 66mm lloonngg 1 No.

GG II ppiippee,, 33//44'''' 1 m

GG II ppiippee,, 11..55'''' 1 m

GG II wwiirree 33mmmm iirroonn sstteeeell ((bbiinnddiinngg wwiirree)) 20 kg

GGaallvvaanniisseedd ccooffffeeee mmeesshh 1188,, 00..99mm wwiiddee 1 Sq.m

MMoossqquuiittoo mmeesshh 1144,, 00..99mm lloonngg 1 Sq.m

TTrreeaatteedd TTiimmbbeerrss 66'''' xx 11'''',, 66mm lloonngg 3 No.

TTrreeaatteedd TTiimmbbeerrss 22'''' xx 33'''',, 66mm lloonngg 5 No.

GGaallvvaanniisseedd NNaaiillss 33'''' 5 kg

LLiimmee 2255kkgg bbaagg 1 kg

CChhiicckkeenn mmeesshh 2255mmmm tthhiicckk,, 00..99mm wwiiddee 50 m

GG II ttaapp,, eellbbooww,, ssoocckkeett,, nniippppllee 77..55mmmm 1 set

WWooooddeenn PPoolleess 33..55'''' xx 66mm lloonngg 12 No.

PPllaassttiicc bbaagg 30 No.

PPllaassttiicc bbaassiinn 1 No.

OOiill ddrruummss,, 2200LL 10 No.

CCoosstt ooff mmaatteerriiaallss

Transport of material

18

Hardware lorries 1load 7tonnes

Tractor trailer loads 10load 7tonnes

Cost of transport

Total cost of a 23 cu.m tank built of ferrocement

19

RW5 - Standard design of a 46 cu.m ferrocement tank (below ground collection) (ASAL Consultants drawing)

Y

on the inner wall on the inner wall on the inner wall on the inner wall on the inner wall on the inner wall on the inner wall on the inner wall on the inner wall on the inner wall on the inner wall on the inner wall on the inner wall on the inner wall

200

X

on the inner wall

Mortar 1:3 with Nil

BRC & Chicken mesh tied with GI wire at 50mm spacing for 1m

high and 100mm the remaining

Z

100

DETAIL Z (mm)

2Y12

100mm uPVC pipe

Roof

50mm mortar 1:3 with

BRC and chicken mesh

mesh tied with GI wire.BRC and chicken wire

60

DETAIL X (mm)

20mm floor screed

60

BRC mesh joined with vertical BRC

130mm thick concrete slab

DETAIL Y (mm)

GL

200

400400

400400

Drain

590

Manhole

1,000280

5,440

140

50

0

2,850

600

5,800

46 CUBIC METRE FERRO-CEMENT TANK

ROOF PLAN (mm)

A

400

Coffee mesh

Inlet

Gutter

Overflow pipe

A

2,5

40

1,9

00

280

2,900

2,700

2,670

5,800

100mm uPVC pipe with concrete

mix (1:2:4) and Y12 iron bars

450

130

2,0

00

3"4 GI pipe 600mm long for ladder

300 x 300 x 150 footing

22

0

1,000Steel door

SECTION A-A (mm)

BRC meshGL

GL

3"4 Outlet GI pipe 900mm long

60mm thick ferro-cement wall

Drain pipe

20

RW5-BQ - Bill of quantities of a 46 cu.m ferrocement tank (below ground collection) (ASAL Consultants)

IMPORTANT NOTE – Please check the BofQ before ordering the materials and inform SNV/UNICEF of any omissions or errors

DESCRIPTION QTY UNIT

Labour costs Labourers

This including wages for construction 2 X 14days Labourers

Foreman

Supervision of the work by a technical Engineer 13X 14days Labourers

Cost of labour

Materials

Cement, 50 Kg bag 50 No.

Lime 25kg bag 2 No.

River sand 10 tonnes

Crushed stones 0.5'' to 1'' 4 Tonnes

Hardcore: 50mm to 150mm 1 Tonnes

Burnt bricks 100 X 150 X 250mm 50 No.

water oil drum, 20L 35 No.

Weld mesh 2.4 x 1.2mm 4 m

BRC mesh, No 65 33 m

Galvanised Nails. 3'' 3 Kg

chicken mesh, 25mm thick, 0.9m wide 80 kg

Twisted bars,Y12 3 m

uPVC 4'' sewage pipe 6m long 1 No.

uPVC 2" sewerage pipe 6m long 1 No.

G I pipe, 0.75" 3.4 m

G I pipe, 1.5" 1.8 m

G I fitting 20mm tap, elbow, socket, nipple 0.75" 2 unit

G I wire 3mm iron steel (binding wire) 25 kg

Galvanised coffee mesh 18, 0.9m wide 1 Sq.m

Mosquito mesh 14, 0.9m wide 0.5 Sq.m

Treated Timbers 6'' x 1'', 6m long 6 No.

Wooden Poles 5m long 12 No.

Bolt 6 x 120mm 12 No.

Oil drums, discharged 29 Free

Plastic bags 50 No.

Plastic basin 1 No.

Sisal twine 5 Kg

TTiimmbbeerr 22'''' xx 33'''' 46 m

CCoosstt ooff mmaatteerriiaallss

21

TTrraannssppoorrtt ooff mmaatteerriiaallss

hhaarrddwwaarree lloorrrriieess 1loads 7tonnes

ttrraaccttoorr ttrraaiilleerr llooaaddss 12loads 3tonnes

CCoosstt ooff ttrraannssppoorrtt

Total cost

22

RW6 - Standard design of water storage tank for 10 cu.m of burnt bricks (above ground collection) (ARU based on ASAL drawing)

23

RW6-BQ - Bill of quantities for a storage tank for 10 cu.m made of burnt bricks (above ground collection) (ARU adapted from an ASAL drawing)

Please use the BofQ for the 10 cu.m ferrocement tank (below ground collection) but the additional materials will need to be added for the raising of the tank and the drainage channel and soakpit.

The following costs will need to be added for:

The raised retaining wall

The hardcore fill

Reinforcement for the slab to the tank

The drainage channel and soakpit

The transport and labour costs

Note:

If you use this design for a rainwater harvesting tank or a modification of it please can you provide the actual Bill of Quantities to SNV / UNICEF for insertion here and if possible the drawing if it is different.

24

RW7 - Standard design of water storage tank for 30 cu.m of ferrocement (above ground collection) (ARU based on ASAL drawing)

25

RW7-BQ - Bill of quantities for a water storage tank for 30 cu.m of ferrocement (above ground collection) (ARU adapted from an ASAL drawing)

Please use the BofQ for the 30 cu.m ferrocement tank (below ground collection) but the additional materials will need to be added for the raising of the tank and the drainage channel and soakpit.

The following costs will need to be added for:

The raised retaining wall

The hardcore fill

Reinforcement for the slab to the tank

The drainage channel and soakpit

The transport and labour costs

Note:

If you use this design for a rainwater harvesting tank or a modification of it please can you provide the actual Bill of Quantities in your feedback to SNV/UNICEF, for insertion here and if possible the drawing if it is different.

26

Section B – Improved pit latrines

27

PL1 - Cement block (girls) – below ground – fully lined (adapted from WEDC drawing)

28

PL2 - Cement block (boys) – below ground – partially lined (adapted from WEDC drawing)

29

PL3 - Burnt brick (boys) – below ground – fully lined (adapted from WEDC drawing)

30

PL4 - Burnt brick (boys) – below ground – partially lined (adapted from WEDC drawing)

31

PL5 - Cement block (boys) – floor construction (adapted from WEDC drawing)

32

PL6 - Cement block (girls) – floor construction (adapted from WEDC drawing)

33

PL7 - Mud superstructure (boys) (adapted from WEDC drawing)

34

PL7-BQ - Bill of quantity – for mud-superstructure (boys) with fully / partially lined pit

IMPORTANT NOTE – Please check the BofQ before ordering the materials and inform SNV/UNICEF of any omissions or errors

ITEM DESCRIPTION QTY Partial

lined pit

QTY Fully

lined pit

UNIT

SUBSTRUCTURE

Excavation and Earthworks

A. CClleeaarr ssiittee ooff ssmmaallll bbuusshh,, rruubbbbiisshh aanndd tthhee lliikkee and grubbing up their roots

32 32 M2

B.

EExxccaavvaattee oovveerr ssiittee ttoo rreemmoovvee vveeggeettaabbllee ssooiill commencing at ground level average depth 150mm; deposit in spoil heaps and cart around the site

32 32 M2

C. Excavate foundations trench commencing at stripped level not exceeding 1.50m deep

9 9 M3

D. Pit excavation 18 18 M3

E. Imported sand filling to sides of foundation wall, well compact and consolidate around

16 16 M3

F. Remove surplus excavated material away from site 65 65 M3

G. EEaarrtthh ffiilllliinngg;; sseelleecctteedd iimmppoorrtteedd ppuurree ssaanndd material compacted in 300mm layers; to make up levels under the floor

16 16 M3

Cost of excavation

FOUNDATION & SLAB

Hardcore:

A. 200mm. Thick bed, leveled compacted 15 15 M2

Concrete, plain In-situ concrete grade C '15'

B. CCoonnccrreettee ffoorr rreeiinnffoorrcceedd ssllaabb ffoouunnddaattiioonnss 9 9 M3

CCoosstt ooff ccoonnccrreettee aanndd hhaarrddccoorree

RReeiinnffoorrcceemmeenntt -- HHiigghh tteennssiillee bbaarrss;; BB..SS44446611;; 11996699 iinncclluuddiinngg

bbeennddss,, hhooookkss,, ttyyiinngg wwiirree,, oorrddiinnaarryy ssppaacceerrss aanndd ddiissttaannccee

bblloocckkss::

A. 1122mmmm DDiiaammeetteerr bbaarr ((iirroonn sstteeeell)) 2 2 mm

B. 66mmmm DDiiaammeetteerr bbaarr ((iirroonn sstteeeell)) 1 1 mm

SSaawwnn ffoorrmmwwoorrkk ttoo::

C. VVeerrttiiccaall ssiiddeess ooff bbeeaamm 3 3 M2

D. Beam bases 1 1 M2

CCoosstt ooff rreeiinnffoorrcceemmeenntt aanndd ffoorrmm wwoorrkk

SSUUBB && SSUUPPEERRSSTTRRUUCCTTUURREE WWAALLLL PPRROOVVIISSIIOONN

CCeemmeenntt,, ssaanndd aanndd bbrriicckkss::

A. CCeemmeenntt,, 5500kkgg bbaagg 70 70 NNoo..

B. RRiivveerr ssaanndd 6 6 TToonnnneess

35

C. 44 '''' xx66''''xx1100'''' MMUUDD BBRRIICCKKSS ffoorr ssuuppeerrssttrruuccttuurree 1,400 1,400 NNoo..

D. 44 '''' xx66''''xx1100'''' bbuurrnntt bbrriicckkss ffoorr lliinniinngg 750 1,500 NNoo..

FFiinniisshhiinnggss::

RReennddeerr;; cceemmeenntt aanndd ssaanndd ((11::33));; ttrroowweelleedd ssmmooootthh::

E. 1122mmmm TThhiicckk;; ttoo pplliinntthh;; ttoo ccoonnccrreettee oorr bblloocckkwwoorrkk bbaassee 1,114 1,114 M2

PPrreeppaarree aanndd aappppllyy ttwwoo ccooaattss ooff bbllaacckk bbiittuummiinnoouuss

F. RReennddeerreedd ccoonnccrreettee//bblloocckk ssuurrffaacceess ttoo pplliinntthh.. 20 20 Lts

CCoosstt ooff ssuuppeerrssttrruuccttuurree aanndd ssuubb--ssttrruuccttuurree wwaallllss aanndd ffiinniisshhiinngg

FFEERRRROOCCEEMMEENNTT RRAAIINNWWAATTEERR HHAARRVVEESSTTIINNGG HHAANNDDWWAASSHHIINNGG

TTAANNKK

Ferro cement jar tank:

A. Cement, 50kg bag 4 4 No.

B. Crushed stones 1 1 tonne

C. River Sand 2 2 tonne

D. Burnt bricks 4''x6''x10'' 30 30 No.

E. Chicken mesh 25 X 0.9m 9 9 M

F. Galvanised ceiling nails 2 2 Kg

G. Lime, 25kg bag 1 1 No.

H. uPVC 3'' sewage pipe, 6m long 1 1 No.

I. G.I pipe 1.5'' 1 1 M

J. G.I pipe 3/4'' 1 1 M

K. G.I fitting, 3/4'' tap 1 1 No.

L. G.I wire 3mm iron steel (binding wire) 3 3 Kg

M. Mosquito mesh 14, 0.9m wide 1 1 Plastic

N. Galvanised coffee mesh 18, 0.9m wide 1 1 Sq.m

O. Canvas 1.2mm thick 7 7 M

SOAKPIT AND DRAINAGE

SSooaakk ppiitt aanndd ddrraaiinnaaggee:: Note that these items below for a lined pit are optional. The soak pit on the isometric drawings is a pit filled with hardcore stones with no lining. If the unlined pit is chosen then the hardcore needs to be added to the BofQ.

A. Burnt bricks 4'' x 6'' x 10'' 435 435 No

B. Cement 50kg bag 2 2 No

C. River sand 1 1 tonne

D. Aggregates 3/4'' 1 1 tonne

Cost of soak pit & drainage

RROOOOFFIINNGG && CCOOVVEERRIINNGGSS::

A. 50 x 100mm. Wall plate. 30 30 M

B. 50 x 50mm. Purlins / battens 6m long 6 6 No.

C. 25 x 150mm. Fescia Board, 6m long 9 9 No.

D. IIrroonn sshheeeett (( ggaauuggee 3300))xx 33mm lloonngg 12 12 NNoo..

E. TTrreeaatteedd TTiimmbbeerr 22'''' xx 22'''',, 66mm lloonngg 14 14 No.

F. TTrreeaatteedd TTiimmbbeerr 22'''' xx 44'''',, 66mm lloonngg 7 7 No.

G. GGaallvvaanniisseedd NNaaiillss 66'''' 8 8 Kg

H. GGaallvvaanniisseedd NNaaiillss 33'''' 5 5 Kg

36

CCoosstt ooff rrooooffiinnggss aanndd ccoovveerriinnggss

DOORS AND WINDOWS

A. Doors, 800mm x 2400mm 4 4 No.

B. Window (Wood ABB-without glass) 500MM X 600MM 4 4 No.

Cost of windows

LABOUR

A. Supervisor ( Engineer) – 1 14 14 Days

BB.. Labourers - 4 16 16 Days

Labour costs

Total costs

Note: Transport costs will need to be added to this BofQ

37

PL8 - Burnt brick superstructure (boys) (adapted from WEDC drawing)

38

PL8-BQ - Bill of quantity – for burnt brick superstructure (boys) with fully / partially lined pit

IMPORTANT NOTE – Please check the BofQ before ordering the materials and inform SNV/UNICEF of any omissions or errors

ITEM DESCRIPTION QTY Partial

lined pit

QTY Fully

lined pit

UNIT

SUBSTRUCTURE

Excavation and Earthworks

A. CClleeaarr ssiittee ooff ssmmaallll bbuusshh,, rruubbbbiisshh aanndd tthhee lliikkee and grubbing up their roots

32 32 M2

B.

EExxccaavvaattee oovveerr ssiittee ttoo rreemmoovvee vveeggeettaabbllee ssooiill commencing at ground level average depth 150mm; deposit in spoil heaps and cart around the site

32 32 M2

C. Excavate foundations trench commencing at stripped level not exceeding 1.50m deep

9 9 M3

D. Pit excavation 18 18 M3

E. Imported sand filling to sides of foundation wall, well compact and consolidate around

16 16 M3

F. Remove surplus excavated material away from site 65 65 M3

G. EEaarrtthh ffiilllliinngg;; sseelleecctteedd iimmppoorrtteedd ppuurree ssaanndd material compacted in 300mm layers; to make up levels under the floor

16 16 M3

Cost of excavation

FOUNDATION & SLAB

Hardcore:

A. 200mm. Thick bed, leveled compacted 15 15 M2

Concrete, plain In-situ concrete grade C '15'

B. CCoonnccrreettee ffoorr rreeiinnffoorrcceedd ssllaabb ffoouunnddaattiioonnss 9 9 M3

CCoosstt ooff ccoonnccrreettee aanndd hhaarrddccoorree

RReeiinnffoorrcceemmeenntt -- HHiigghh tteennssiillee bbaarrss;; BB..SS44446611;; 11996699 iinncclluuddiinngg

bbeennddss,, hhooookkss,, ttyyiinngg wwiirree,, oorrddiinnaarryy ssppaacceerrss aanndd ddiissttaannccee

bblloocckkss::

A. 1122mmmm DDiiaammeetteerr bbaarr ((iirroonn sstteeeell)) 2 2 mm

B. 66mmmm DDiiaammeetteerr bbaarr ((iirroonn sstteeeell)) 1 1 mm

SSaawwnn ffoorrmmwwoorrkk ttoo::

C. VVeerrttiiccaall ssiiddeess ooff bbeeaamm 3 3 M2

D. Beam bases 1 1 M2

CCoosstt ooff rreeiinnffoorrcceemmeenntt aanndd ffoorrmm wwoorrkk

SSUUBB && SSUUPPEERRSSTTRRUUCCTTUURREE WWAALLLL PPRROOVVIISSIIOONN

CCeemmeenntt,, ssaanndd aanndd bbrriicckkss::

39

A. CCeemmeenntt,, 5500kkgg bbaagg 60 70 NNoo..

B. RRiivveerr ssaanndd 5 6 TToonnnneess

C. 44 '''' xx 66''''xx 1100'''' bbuurrnntt bbrriicckkss ffoorr ffoouunnddaattiioonn,, eexxtteerrnnaall wwaallllss,,

ppaarrttiittiioonn aanndd ppiitt 2,000 2,750 NNoo..

FFiinniisshhiinnggss::

RReennddeerr;; cceemmeenntt aanndd ssaanndd ((11::33));; ttrroowweelleedd ssmmooootthh::

D. 1122mmmm TThhiicckk;; ttoo pplliinntthh;; ttoo ccoonnccrreettee oorr bblloocckkwwoorrkk bbaassee 1,114 1,114 M2

PPrreeppaarree aanndd aappppllyy ttwwoo ccooaattss ooff bbllaacckk bbiittuummiinnoouuss

E. RReennddeerreedd ccoonnccrreettee//bblloocckk ssuurrffaacceess ttoo pplliinntthh.. 20 20 Lts

CCoosstt ooff ssuuppeerrssttrruuccttuurree aanndd ssuubb--ssttrruuccttuurree wwaallllss aanndd ffiinniisshhiinngg

FFEERRRROOCCEEMMEENNTT RRAAIINNWWAATTEERR HHAARRVVEESSTTIINNGG HHAANNDDWWAASSHHIINNGG

TTAANNKK

Ferro cement jar tank:

A. Cement, 50kg bag 4 4 No.

B. Crushed stones 1 1 Tonne

C. River Sand 2 2 Tonne

D. Burnt bricks 4''x6''x10'' 30 30 No.

E. Chicken mesh 25 X 0.9m 9 9 M

F. Galvanised ceiling nails 2 2 Kg

G. Lime, 25kg bag 1 1 No.

H. uPVC 3'' sewage pipe, 6m long 1 1 No.

I. G.I pipe 1.5'' 1 1 M

J. G.I pipe 3/4'' 1 1 M

K. G.I fitting, 3/4'' tap 1 1 No.

L. G.I wire 3mm iron steel (binding wire) 3 3 Kg

M. Mosquito mesh 14, 0.9m wide 1 1 Plastic

N. Galvanised coffee mesh 18, 0.9m wide 1 1 Sq.m

O. Canvas 1.2mm thick 7 7 M

SOAKPIT AND DRAINAGE

SSooaakk ppiitt aanndd ddrraaiinnaaggee:: Note that these items below for a lined pit are optional. The soak pit on the isometric drawings is a pit filled with hardcore stones with no lining. If the unlined pit is chosen then the hardcore needs to be added to the BofQ.

A. Burnt bricks 4'' x 6'' x 10'' 435 435 No

B. Cement 50kg bag 2 2 No

C. River sand 1 1 Tonne

D. Aggregates 3/4'' 1 1 Tonne

Cost of soak pit & drainage

RROOOOFFIINNGG && CCOOVVEERRIINNGGSS::

A. 50 x 100mm. Wall plate. 30 30 M

B. 50 x 50mm. Purlins / battens 6m long 6 6 No.

C. 25 x 150mm. Fescia Board, 6m long 9 9 No.

D. IIrroonn sshheeeett (( ggaauuggee 3300))xx 33mm lloonngg 12 12 NNoo..

E. TTrreeaatteedd TTiimmbbeerr 22'''' xx 22'''',, 66mm lloonngg 14 14 No.

F. TTrreeaatteedd TTiimmbbeerr 22'''' xx 44'''',, 66mm lloonngg 7 7 No.

G. GGaallvvaanniisseedd NNaaiillss 66'''' 8 8 Kg

40

H. GGaallvvaanniisseedd NNaaiillss 33'''' 5 5 Kg

CCoosstt ooff rrooooffiinnggss aanndd ccoovveerriinnggss

DOORS AND WINDOWS

A. Doors, 800mm x 2400mm 4 4 No.

B. Window (Wood ABB-without glass) 500mm X 600mm 4 4 No.

Cost of windows

LABOUR

A. Supervisor ( Engineer) – 1 14 14 Days

BB.. Labourers - 4 16 16 Days

Labour costs

Total costs

Note: Transport costs will need to be added to this BofQ

41

PL9 - Burnt brick superstructure (girls) (adapted from WEDC drawing)

42

PL9-BQ - Bill of quantity – for burnt brick superstructure (girls) with fully / partially lined pit

IMPORTANT NOTE – Please check the BofQ before ordering the materials and inform SNV/UNICEF of any omissions or errors

ITEM DESCRIPTION QTY Partial

lined pit

QTY Fully

lined pit

UNIT

SUBSTRUCTURE

Excavation and Earthworks

A. CClleeaarr ssiittee ooff ssmmaallll bbuusshh,, rruubbbbiisshh aanndd tthhee lliikkee and grubbing up their roots

32 32 M2

B.

EExxccaavvaattee oovveerr ssiittee ttoo rreemmoovvee vveeggeettaabbllee ssooiill commencing at ground level average depth 150mm; deposit in spoil heaps and cart around the site

32 32 M2

C. Excavate foundations trench commencing at stripped level not exceeding 1.50m deep

9 9 M3

D. Pit excavation 18 18 M3

E. Imported sand filling to sides of foundation wall, well compact and consolidate around

16 16 M3

F. Remove surplus excavated material away from site 65 65 M3

G. EEaarrtthh ffiilllliinngg;; sseelleecctteedd iimmppoorrtteedd ppuurree ssaanndd material compacted in 300mm layers; to make up levels under the floor

16 16 M3

Cost of excavation

FOUNDATION & SLAB

Hardcore:

A. 200mm. Thick bed, leveled compacted 15 15 M2

Concrete, plain In-situ concrete grade C '15'

B. CCoonnccrreettee ffoorr rreeiinnffoorrcceedd ssllaabb ffoouunnddaattiioonnss 9 9 M3

CCoosstt ooff ccoonnccrreettee aanndd hhaarrddccoorree

RReeiinnffoorrcceemmeenntt -- HHiigghh tteennssiillee bbaarrss;; BB..SS44446611;; 11996699 iinncclluuddiinngg

bbeennddss,, hhooookkss,, ttyyiinngg wwiirree,, oorrddiinnaarryy ssppaacceerrss aanndd ddiissttaannccee

bblloocckkss::

A. 1122mmmm DDiiaammeetteerr bbaarr ((iirroonn sstteeeell)) 2 2 mm

B. 66mmmm DDiiaammeetteerr bbaarr ((iirroonn sstteeeell)) 1 1 mm

SSaawwnn ffoorrmmwwoorrkk ttoo::

C. VVeerrttiiccaall ssiiddeess ooff bbeeaamm 3 3 M2

D. Beam bases 1 1 M2

CCoosstt ooff rreeiinnffoorrcceemmeenntt aanndd ffoorrmm wwoorrkk

SSUUBB && SSUUPPEERRSSTTRRUUCCTTUURREE WWAALLLL PPRROOVVIISSIIOONN

CCeemmeenntt,, ssaanndd aanndd bbrriicckkss::

A. CCeemmeenntt,, 5500kkgg bbaagg 60 70 NNoo..

43

B. RRiivveerr ssaanndd 5 6 TToonnnneess

C. 44 '''' xx 66''''xx 1100'''' bbuurrnntt bbrriicckkss ffoorr ffoouunnddaattiioonn,, eexxtteerrnnaall wwaallllss,,

ppaarrttiittiioonn aanndd ppiitt 2,000 2,750 NNoo..

FFiinniisshhiinnggss::

RReennddeerr;; cceemmeenntt aanndd ssaanndd ((11::33));; ttrroowweelleedd ssmmooootthh::

D. 1122mmmm TThhiicckk;; ttoo pplliinntthh;; ttoo ccoonnccrreettee oorr bblloocckkwwoorrkk bbaassee 1,114 1,114 M2

PPrreeppaarree aanndd aappppllyy ttwwoo ccooaattss ooff bbllaacckk bbiittuummiinnoouuss

E. RReennddeerreedd ccoonnccrreettee//bblloocckk ssuurrffaacceess ttoo pplliinntthh.. 20 20 Lts

CCoosstt ooff ssuuppeerrssttrruuccttuurree aanndd ssuubb--ssttrruuccttuurree wwaallllss aanndd ffiinniisshhiinngg

FFEERRRROOCCEEMMEENNTT RRAAIINNWWAATTEERR HHAARRVVEESSTTIINNGG HHAANNDDWWAASSHHIINNGG

TTAANNKK

Ferro cement jar tank:

A. Cement, 50kg bag 4 4 No.

B. Crushed stones 1 1 Tonne

C. River Sand 2 2 Tonne

D. Burnt bricks 4''x6''x10'' 30 30 No.

E. Chicken mesh 25 X 0.9m 9 9 M

F. Galvanised ceiling nails 2 2 Kg

G. Lime, 25kg bag 1 1 No.

H. uPVC 3'' sewage pipe, 6m long 1 1 No.

I. G.I pipe 1.5'' 1 1 M

J. G.I pipe 3/4'' 1 1 M

K. G.I fitting, 3/4'' tap 1 1 No.

L. G.I wire 3mm iron steel (binding wire) 3 3 Kg

M. Mosquito mesh 14, 0.9m wide 1 1 Plastic

N. Galvanised coffee mesh 18, 0.9m wide 1 1 Sq.m

O. Canvas 1.2mm thick 7 7 M

SOAKPIT AND DRAINAGE

SSooaakk ppiitt aanndd ddrraaiinnaaggee:: Note that these items below for a lined pit are optional. The soak pit on the isometric drawings is a pit filled with hardcore stones with no lining. If the unlined pit is chosen then the hardcore needs to be added to the BofQ.

A. Burnt bricks 4'' x 6'' x 10'' 435 435 No

B. Cement 50kg bag 2 2 No

C. River sand 1 1 Tonne

D. Aggregates 3/4'' 1 1 Tonne

Cost of soak pit & drainage

RROOOOFFIINNGG && CCOOVVEERRIINNGGSS::

A. 50 x 100mm. Wall plate. 30 30 M

B. 50 x 50mm. Purlins / battens 6m long 6 6 No.

C. 25 x 150mm. Fescia Board, 6m long 9 9 No.

D. IIrroonn sshheeeett (( ggaauuggee 3300))xx 33mm lloonngg 12 12 NNoo..

E. TTrreeaatteedd TTiimmbbeerr 22'''' xx 22'''',, 66mm lloonngg 14 14 No.

F. TTrreeaatteedd TTiimmbbeerr 22'''' xx 44'''',, 66mm lloonngg 7 7 No.

G. GGaallvvaanniisseedd NNaaiillss 66'''' 8 8 Kg

H. GGaallvvaanniisseedd NNaaiillss 33'''' 5 5 Kg

44

CCoosstt ooff rrooooffiinnggss aanndd ccoovveerriinnggss

DOORS AND WINDOWS

A. Doors, 800mm x 2400mm 4 4 No.

B. Window (Wood ABB-without glass) 500mm X 600mm 4 4 No.

Cost of windows

LABOUR

A. Supervisor ( Engineer) – 1 14 14 Days

BB.. Labourers - 4 16 16 Days

Labour costs

Total costs

Note: Transport costs will need to be added to this BofQ

45

PL10 - Cement block superstructure (girls) (adapted from WEDC drawing)

46

PL10-BQ - Bill of quantity – for cement block superstructure (girls) with fully / partially lined pit

IMPORTANT NOTE – Please check the BofQ before ordering the materials and inform SNV/UNICEF of any omissions or errors

ITEM DESCRIPTION QTY Partial

lined pit

QTY Fully

lined pit

UNIT

SUBSTRUCTURE

Excavation and Earthworks

A. CClleeaarr ssiittee ooff ssmmaallll bbuusshh,, rruubbbbiisshh aanndd tthhee lliikkee and grubbing up their roots

32 32 M2

B.

EExxccaavvaattee oovveerr ssiittee ttoo rreemmoovvee vveeggeettaabbllee ssooiill commencing at ground level average depth 150mm; deposit in spoil heaps and cart around the site

32 32 M2

C. Excavate foundations trench commencing at stripped level not exceeding 1.50m deep

9 9 M3

D. Pit excavation 18 18 M3

E. Imported sand filling to sides of foundation wall, well compact and consolidate around

16 16 M3

F. Remove surplus excavated material away from site 65 65 M3

G. EEaarrtthh ffiilllliinngg;; sseelleecctteedd iimmppoorrtteedd ppuurree ssaanndd material compacted in 300mm layers; to make up levels under the floor

16 16 M3

Cost of excavation

FOUNDATION & SLAB

Hardcore:

A. 200mm. Thick bed, leveled compacted 15 15 M2

Concrete, plain In-situ concrete grade C '15'

B. CCoonnccrreettee ffoorr rreeiinnffoorrcceedd ssllaabb ffoouunnddaattiioonnss 9 9 M3

CCoosstt ooff ccoonnccrreettee aanndd hhaarrddccoorree

RReeiinnffoorrcceemmeenntt -- HHiigghh tteennssiillee bbaarrss;; BB..SS44446611;; 11996699 iinncclluuddiinngg

bbeennddss,, hhooookkss,, ttyyiinngg wwiirree,, oorrddiinnaarryy ssppaacceerrss aanndd ddiissttaannccee

bblloocckkss::

A. 1122mmmm DDiiaammeetteerr bbaarr ((iirroonn sstteeeell)) 2 2 mm

B. 66mmmm DDiiaammeetteerr bbaarr ((iirroonn sstteeeell)) 1 1 mm

SSaawwnn ffoorrmmwwoorrkk ttoo::

C. VVeerrttiiccaall ssiiddeess ooff bbeeaamm 3 3 M2

D. Beam bases 1 1 M2

CCoosstt ooff rreeiinnffoorrcceemmeenntt aanndd ffoorrmm wwoorrkk

SSUUBB && SSUUPPEERRSSTTRRUUCCTTUURREE WWAALLLL PPRROOVVIISSIIOONN

CCeemmeenntt,, ssaanndd aanndd bbrriicckkss::

A. CCeemmeenntt,, 5500kkgg bbaagg 60 70 NNoo..

47

B. RRiivveerr ssaanndd 5 6 TToonnnneess

C. 44 '''' xx66''''xx1100'''' CCeemmeenntt bblloocckkss ffoorr ffoouunnddaattiioonn,, eexxtteerrnnaall wwaallllss,,

ppaarrttiittiioonn aanndd ppiitt 2,000 2,750 NNoo..

FFiinniisshhiinnggss::

RReennddeerr;; cceemmeenntt aanndd ssaanndd ((11::33));; ttrroowweelleedd ssmmooootthh::

D. 1122mmmm TThhiicckk;; ttoo pplliinntthh;; ttoo ccoonnccrreettee oorr bblloocckkwwoorrkk bbaassee 1,114 1,114 M2

PPrreeppaarree aanndd aappppllyy ttwwoo ccooaattss ooff bbllaacckk bbiittuummiinnoouuss

E. RReennddeerreedd ccoonnccrreettee//bblloocckk ssuurrffaacceess ttoo pplliinntthh.. 20 20 Lts

CCoosstt ooff ssuuppeerrssttrruuccttuurree aanndd ssuubb--ssttrruuccttuurree wwaallllss aanndd ffiinniisshhiinngg

FFEERRRROOCCEEMMEENNTT RRAAIINNWWAATTEERR HHAARRVVEESSTTIINNGG HHAANNDDWWAASSHHIINNGG

TTAANNKK

Ferro cement jar tank:

A. Cement, 50kg bag 4 4 No.

B. Crushed stones 1 1 Tonne

C. River Sand 2 2 Tonne

D. Burnt bricks 4''x6''x10'' 30 30 No.

E. Chicken mesh 25 X 0.9m 9 9 M

F. Galvanised ceiling nails 2 2 Kg

G. Lime, 25kg bag 1 1 No.

H. uPVC 3'' sewage pipe, 6m long 1 1 No.

I. G.I pipe 1.5'' 1 1 M

J. G.I pipe 3/4'' 1 1 M

K. G.I fitting, 3/4'' tap 1 1 No.

L. G.I wire 3mm iron steel (binding wire) 3 3 Kg

M. Mosquito mesh 14, 0.9m wide 1 1 Plastic

N. Galvanised coffee mesh 18, 0.9m wide 1 1 Sq.m

O. Canvas 1.2mm thick 7 7 M

SOAKPIT AND DRAINAGE

SSooaakk ppiitt aanndd ddrraaiinnaaggee:: Note that these items below for a lined pit are optional. The soak pit on the isometric drawings is a pit filled with hardcore stones with no lining. If the unlined pit is chosen then the hardcore needs to be added to the BofQ.

A. Burnt bricks 4'' x 6'' x 10'' 435 435 No

B. Cement 50kg bag 2 2 No

C. River sand 1 1 Tonne

D. Aggregates 3/4'' 1 1 Tonne

Cost of soak pit & drainage

RROOOOFFIINNGG && CCOOVVEERRIINNGGSS::

A. 50 x 100mm. Wall plate. 30 30 M

B. 50 x 50mm. Purlins / battens 6m long 6 6 No.

C. 25 x 150mm. Fescia Board, 6m long 9 9 No.

D. IIrroonn sshheeeett (( ggaauuggee 3300))xx 33mm lloonngg 12 12 NNoo..

E. TTrreeaatteedd TTiimmbbeerr 22'''' xx 22'''',, 66mm lloonngg 14 14 No.

F. TTrreeaatteedd TTiimmbbeerr 22'''' xx 44'''',, 66mm lloonngg 7 7 No.

G. GGaallvvaanniisseedd NNaaiillss 66'''' 8 8 Kg

H. GGaallvvaanniisseedd NNaaiillss 33'''' 5 5 Kg

48

CCoosstt ooff rrooooffiinnggss aanndd ccoovveerriinnggss

DOORS AND WINDOWS

A. Doors, 800mm x 2400mm 4 4 No.

B. Window (Wood ABB-without glass) 500mm X 600mm 4 4 No.

Cost of windows

LABOUR

A. Supervisor ( Engineer) – 1 14 14 Days

BB.. Labourers - 4 16 16 Days

Labour costs

Total costs

Note: Transport costs will need to be added to this BofQ

49

PL11 - Urinal (boys) (adapted from WEDC drawing)

50

PL12 - Pit latrine floor plan and sections – girls (WEDC design; ARU drawing)

51

PL13 - Pit latrine floor plan and sections – boys (WEDC design; ARU drawing)

52

Section C – Pour Flush Latrines

53

PFL1 - Pour flush latrine, floor plan and elevation (girls) (EEPCO drawing)

54

55

PFL1-BQ - Bill of quantities - pour flush latrine (girls)

IMPORTANT NOTE – Please check the BofQ before ordering the materials and inform SNV/UNICEF of any omissions or errors

Materials for 5 stances for girls Item Quantity Unit

1 Cement 57 Bag

2 Sand 8 Cum

3 Aggregates 6 Cum

4 Iron Bars 12mm 28 No

6 Iron rings 6mm 200 No

7 Binding wire 10 Kg

8 Cement blocks 6" 420 No

9 Cement blocks 5" 1060 No

10 Iron sheets G 30 3M 33 Pcs

11 Treated R timber 4"x2" 18 Pcs

12 Treated R timber 2"x2" 24 Pcs

13 Roofing nails 3 Kg

14 Timber nail 10 Kg

15 Timber for form work 40 Pcs

16 WC sink 5 No

17 Hand wash basin - concrete 3 No

18 doors 4 No

19 Door (Disable room) 1 No

20 Hand rails 1 LS

21 Wastewater (pipes & couplings) 1 LS

22 Ventilation blocks 108 No

23 High windows (50cmX50cm) 5 No

24 Water 1 LS

Total Material cost 25 Labour (30% of total Material 26 Material Transport cost TOTAL COST

56

PFL2 - Pour flush latrine, floor plan and elevation (boys) (EEPCO drawing)

57

58

PFL2-BQ - Bill of quantities - pour flush latrine (boys)

IMPORTANT NOTE – Please check the BofQ before ordering the materials and inform SNV/UNICEF of any omissions or errors

Materials for 5 stance boys latrine block

S/N Description Quantity Unit

1 Cement 57 Bag

2 Sand 8 Cum

3 Aggregate 6 Cum

4 Iron Bars 12mm 20 No

6 Iron rings 6mm 200 No

7 Binding wire 10 Kg

8 Cement blocks 6" 420 No

9 Cement blocks 5" 1060 No

10 Iron sheets G 30 3M 33 Pcs

11 Treated timber 4"x2" 18 Pcs

12 Treated timber 2"x2" 24 Pcs

13 Roofing nails 3 Kg

14 Timber nail 10 Kg

15 Timber for form work 40 Pcs

16 WC sink 5 No

17 Hand wash basin - concrete 3 No

18 doors 4 No

19 Door (Disable room) 1 No

20 Hand rails for disable 1 LS

21 Urinal (boys unit) tiles 25 M2

22 Wastewater (pipes & couplings) 1 LS

23 Ventilation blocks 108 No

24 High windows (50cmX50cm) 5 No

25 Water 1 LS

Total Material cost

26 Labour (30% of total Material) 27 Material Transport cost

TOTAL COST

59

Section D – Double Vault Ventilated Improved Pit Latrine

60

DVVIP1 - Double Vault VIP latrine (boys) (EEPCO drawing)

61

62

63

DVVIP1-BQ - Bill of quantities – double VIP latrine (boys)

IMPORTANT NOTE – Please check the BofQ before ordering the materials and inform SNV/UNICEF of any omissions or errors

Materials for 5 stances boys block

Item Quantity Unit

1 Cement 56 Bag

2 Sand 8.29 Cum

3 Stone chips 6.9 Cum

4 Iron Bars 12mm 28 No

5 Iron rings 6mm 260 No

6 Binding wire 20 Kg

7 Burnt bricks 5865 No

8 Water 1 LS

9 Iron sheets G 30 3M 33 Pcs

10 Ridges G30 7 Pcs

11 Treated R timber i 4"x2" 640 ft

ii 2"x2" 160 ft

12 Roofing nails 5 Kg

13 Timber nail 15 Kg

14 Timber for form work 50 Pcs

15 Sanplat slabs 10 No

16 Hand wash basin - concrete 3 no

17 doors 4 No

18 Door (Disable room) 1 No

19 Hand rails for disable 1 LS

20 Urinal (boys unit) tiles 20 M2

21 Wastewater (pipes & couplings)

LS

22 Ventilation blocks 108 No

23 High windows (50cmX50cm) 5 No

Total Material cost

24 Labour (30% of total Material 25 Material Transport cost

TOTAL COST

64

DVVIP2 - Double Vault VIP latrine (girls) (EEPCO drawing)

65

66

67

DVVIP2-BQ - Bill of quantities – double VIP latrine (girls)

IMPORTANT NOTE – Please check the BofQ before ordering the materials and inform SNV/UNICEF of any omissions or errors

Materials for a 5 stance girls latrine block

Item Quantity Unit

1 Cement 56 Bag

2 Sand 8.29 Cum

3 Stone chips 6.9 Cum

4 Iron Bars 12mm 28 No

5 Iron rings 6mm 260 No

6 Binding wire 20 Kg

7 Burnt bricks 5865 No

8 Water 1 LS

9 Iron sheets G 30 3M 33 Pcs

10 Ridges G30 7 Pcs

11 Treated timber i 4"x2" 640 ft

ii 2"x2" 160 ft

12 Roofing nails 5 Kg

13 Timber nail 15 Kg

14 Timber for form work 50 Pcs

15 Sanplat slabs 10 No

16 Hand wash basin - concrete 3 No

17 doors 4 No

18 Door (Disable room) 1 No

19 Hand rails for disable 1 LS

20 Wastewater (pipes & couplings)

LS

21 Ventilation blocks 108 No

22 High windows (50cmX50cm) 5 No

Total Material cost

23 Labour (30% of total Material 24 Material Transport cost

TOTAL COST

68

Section E – Ventilated Improved Pit Latrines

69

VIP1 - VIP latrine (boys) - (no disabled access) (MOEVT drawing)

70

VIP2 - VIP latrine (girls) – (no disabled access) (MOEVT drawing)

71

WC1 - Water closet latrine block (boys and girls with disabled access) (MOEVT drawing)

72

Section F – Hand-washing facilities

73

HW1 - Tippy tap plus soap holder

(WEDC Sanitation for Primary Schools in Africa)

74

HW2 - Ferrocement jar fed from rainwater harvesting (ARU drawing)

75

HW3 - Three unit pedestal sink with concrete surround (ARU drawing)

76

Annex I - Material price estimates – 2010 The following table provides the average prices for the materials includes in various BofQs in this technology toolkit. The prices are averages in three different geographically distinct areas of Tanzania. Although the prices will change over time, they can be used for cost estimates for budgeting purposes.

IMPORTANT NOTE – The prices here in some cases vary significantly. A process will be undertaken to verify the accuracy of the prices in the final guidelines and toolkits across the three areas.

Kibondo Siha Temeke Average

1 Cement (size of bag - 50kg) 1 Bag 19,667 18,000 12,400

2 Cement (size of bag - 50kg) 10 Bag 196,667 180,000 124,000

3 Cement (size of bag - 50kg) 50 Bag 983,333 900,000 620,000

4 Cement (size of bag - 50kg) 100 Bag 1,966,667 1,800,000 1,240,000

5 Lime,c 25 kg Bag 4,167 8,500 7,167

6 Sand (builders sand or river sand) 1 M

3 34,667 50,000 146,667

7 Sand (builders sand or river sand) 10 M

3 247,667 500,000

8 Aggregate (size 3/4 - 1") 1 M3 10,333 62,000

9 Aggregate (size 3/4 - 1") 10 M3 73,333 620,000

10

Stone chippings (aggregates which are smaller size - less than 1/4" and containing multiple size ungraded) 6.9 M

3 125,900 62,000

11 Hardcore (4" x 6") 1 Tonnes 10,333 50,000 113,333

12 Iron Bars 12mm, high tensile steel - length 40 ft (12m) 1 Pc 12,667 16,500 14,000

13 Iron Bars 12mm - high tensile steel - length 40 ft (12m) 10 Pc 126,667 165,000 140,000

14 Iron Bars 6mm HT - high tensile steel - length 40 ft (12m) 1 Pc 5,167 8,500

15 Iron Bars 6mm HT - high tensile steel - length 40 ft (12m) 10 Pc 51,667 85,000

16

Iron rings - 6mm thickness the size for the beam (EEPCO use rectangle size of 4" base, 7" height) 10 Pc 22,667 8,833

17

Iron rings - 6mm thickness the size for the beam (EEPCO use rectangle size of 4" base, 7" height) 100 Pc 226,667 89,333

18 BRC mesh, No 65 33 Sheet 433,333 32,000

19 Chicken mesh (0.9m wide x 25mm thick) M 34,000 4,000 2,667

77

20 Barbed wire, 12.5g (comes in 20 kg rolls) Roll

21 Binding wire (steel, 3mm) 10 Kg 26,667 40,000 28,333

22 Sisal twine 1 Kg 11,333 4,000 3,667

23 Cement blocks 6" (solid) 100 Pc 200,000 123,333

24 Cement blocks 6" (solid) 500 Pc 1,000,000 616,667

25 Cement blocks 5" (solid) 100 Pc 180,000 83,333

26 Cement blocks 5" (solid) 500 Pc 900,000 416,667

27

Burnt bricks, 4' x 6" x 10" (or adapted to the size available in the market - the number needed is likely to change with the size) - these are the larger sizes 100 Pc 10,667

28

Burnt bricks, 4' x 6" x 10" (or adapted to the size available in the market - the number needed is likely to change with the size) - these are the larger sizes 1000 Pc 106,667

29 Mud bricks, 4" x 6" x 10" 100 Pc 5,000

30 Mud bricks, 4" x 6" x 10" 1000 Pc 50,000

31

Cement & sand render (1:3), 12 mm thick to concrete or block work base (cement screed) 1 M2 20,000

32 Iron sheets G30 x 3M 1 Pc 14,000 20,000 14,833

33 Iron sheets G30 x 3M 10 Pc 140,000 200,000 148,333

34 Riges G30 (aluminimum, 2m) 7 Pc 88,667 70,000 45,333

35 Purlins / battens, 50mm x 50mm (treated timber, 2" x 2" x 6m long) Pc 3,500 8,400

36 Treated timber 4"x2" (6m long) 1 Pc 5,000 14,000 1,333

37 Treated timber 4"x2" (6m long) 10 Pc 50,000 140,000 13,333

38 Treated timber 2"x2" (6m long) 1 Pc 4,000 8,400 733

39 Treated timber 2"x2" (6m long) 10 Pc 40,000 84,000 7,333

40 Treated timber, 6" x 1" (6m long) 1 Pc 6,000 15,000

41 Facia board, 25 x 150mm (treated timber, 6m long) 1 Pc 5,000 17,000

78

42 Poles (wooden poles) 1 Pc 3,500 6,000 1,867

43 Wall plate, 50 x 100mm (timber size equal to 2” x 4”) Pc 14,000

44 Roofing nails (galvanised, 3") 1 Kg 3,400 4,000 2,933

45 Timber nails (3", galvanised) 1 Kg 3,000 4,000 2,500

46 Nails, 6" (galvanised) 1 Kg 3,000 4,000 2,500

47 Nails, 3" (galvanised) 1 Kg 3,000 4,000 2,500

48 Nails, 2" (galvinised) 1 Kg 3,000 4,000 2,500

49 Bolt, 6 x 120mm 1 Pc 3,500 2,000

50 Timber for formwork (1" x 6" x 6m long) 10 Pc 43,333 17,000

51 Sanplat slabs 1 Pc 14,500 10,000

52 WC sink 1 Pc 20,000 40,000 41,333

53 Hand wash basin - concrete (to be cast insitu) 1 Pc 150,000

54

Doors with frame (EEPCO use a frame of 80cm x 210cm outer dimension; inner dimension 75cm x 200cm) 1 Pc 42,667 280,000 323,333

55

Door (Disable room) (EEPCO use a frame 90cm x 210cm outer dimension; inner dimension 85cm x 200cm) 1 Pc 42,667 280,000 330,000

56 Door, 800mm x 2400mm and frame Unit 42,667 300,000 340,000

57 Hand rails for disable (thickness 1"; Total length = 40m) 1

Lump sum 600,000

58 Urinal (boys unit) tiles 25 M2 343,750 1,000,000 14,667

59 Wastewater (60m pipes & 4’ couplings) 1

Lump sum 200,000

60 uPVC 2" sewage pipe (6m long) 1 Pc 12,333 30,000 8,500

61 uPVC 3" sewage pipe (6m long) 1 Pc 15,000 30,000 8,333

62 uPVC 4" sewage pipe (6m long) 1 Pc 21,667 25,000 22,333

79

63 GI pipe 0.75" 1 m 21,667 8,000

64 GI pipe 1.5" 1 m 48,333 14,000

65 GI pipe 3/4" 1 m 20,000 8,000 5,833

66 GI socket, 3/4" 1 m 1,667 1,500 400

67 GI elbow, 3/4 " 1 m 1,833 1,500 400

68 G.I fitting 3/4" tap and elbow (a set with tap and elbow) 1 Pc 6,833 30,000 11,167

69 GI tap, elbow, socket, nipple, 7.5mm 1 set 13,833 30,000 1,100

70 Galvanised steel pipe, 25mm (6m long) 1 Pc 50,000 60,000 21,000

71 Ventilation blocks (1 ft x 1 ft or 30cm x 30cm) 1 Pc 1,000 1,200

72 Ventilation blocks (1 ft x 1 ft or 30cm x 30cm) 50 Pc 50,000 41,667

73 Mosquito mesh (0.9m wide / 14 guage) 1 M2 2,667 6,500 3,333

74 Galvanised coffee mesh (0.9m wide / 18 guage) 1 M2 9,167 7,000 4,833

75 Canvas (1.2m thick, for painting) 1 M2

76 High windows – frame only (50cmX50cm) 1 Pc 50,000

77

Window, wood (ABB - window with iron bars and mosquito mesh), 500mm x 600mm 1 Pc 45,000

78 Water 1000 Litres 14,167 5,000 14,167

79 Labour - daily rate for supervisor 1 day 26,667 30,000 16,667

80 Labour - daily rate for labourer 1 day 5,000 7,000 7,333

81 Labour - daily rate for plumber 1 day 10,000 15,000 510,000

82 Labour - daily rate for mason 1 day 10,500 15,000 533,333

83 Cost of hire of lorry per day - 3 tonnes 1 day 196,667 200,000 176,667

84 Cost of delivery of one trip - 3 tonnes 1 trip 46,667 150,000 66,667

85 Cost of delivery of one trip - 7 tonnes 1 trip 81,667 200,000 103,333

86 Earthworks - clearing site, grubbing up roots etc 1 M2 1,000 2,000

87 Excavate topsoil and foundations 1 M2 3,167 3,000

80

88 Dig pit 1 M3 5,667 5,000

89 Remove surplus material away from site 1 M

3 9,167 10,000

90 Labour for concrete 1 M3 54,667 10,000

91 Black bitumous paint 1 litre 15,167 5,000

92 Plastic bucket with lid for menstrual waste 1 Pc 5,000 8,000

93 Plastic basin 1 Pc 4,533 3,000 67,667

94 Empty oil drums for water storage 1 Pc 38,333 40,000

95 Plastic bags 1 Pc 1,167 700