Tokyo

6
Yuko Nishida Bureau of Environment Tokyo Metropolitan Government 20121206 COP18 ICLEI Tokyo Cap & Trade & International Knowledge exchange

Transcript of Tokyo

Page 1: Tokyo

Yuko Nishida Bureau of Environment Tokyo Metropolitan Government

20121206 COP18 ICLEI

Tokyo Cap & Trade & International Knowledge exchange

Page 2: Tokyo

Tokyo Cap-and-Trade Program (2010-): Outline “The World’s First Urban Cap-and-Trade Program”

Covered gas: energy related CO2 emissions

Coverage: 1300 facilities emitting large amount of CO2

• Mainly buildings in the commercial sector

• Covers 40% of missions from commercial & industrial sector in Tokyo

Cap: 6% reductions for the 1st phase, 17% for the 2nd (two 5yr period)

Compliance Obligation: Covered facilities are required 6 or 8%

reductions over a 5 year period from their own base year emissions

Allowance allocation: Grand-fathering, for free

Emission Trading: Tradable allowances are limited to the excess

reductions over compliance obligations

MRV system has established for the program

Offset system: renewables, emission reductions in small facilities, etc.

Page 3: Tokyo

Excellent Results!

1. First year reports from covered facilities

In total 13% reductions from the base year emissions

64% of facilities reduced more than their compliance

obligations for a year

2. Responding Buildings Sector

Vast investment in “Greening” buildings

3. Great help to overcome the power crisis after

“Fukushima”

Preparedness for the energy scarce situation

Page 4: Tokyo

Cities’ alliance is the key

to share knowledge and experiences in depth

Urban Cap-and-Trade is an effective policy tool

to reduce emissions from a demand side

Page 5: Tokyo

Reference

TMG Website www.kankyo.metro.tokyo.jp/enf

Tokyo Cap& trade www.kankyo.metro.tokyo.jp/en/climate/cap_and_trade.html

www.kankyo.metro.tokyo.jp/en/int/TOP30_English.pdf

Low Emission Building TOP 30 in Tokyo www.kankyo.metro.tokyo.jp/en/int/top30.html

Green Building Program www.kankyo.metro.tokyo.jp/en/climate/build.html

Contact [email protected]

[email protected]

Page 6: Tokyo

Overcome the power crisis

after the Fukushima accident

Demand in 2010

Demand in 2012

1 July 8 July 15 July 22 July 29 July 5 Aug. 12 Aug. 9 Aug. 25 Aug. 31Aug.

Peak load in 2010

59.99 mW

Peak load in 2012

50.78 mW

Peak Load Cut in 2012

15%, 9.25mW (at peak)

7%, 8.78mW (in 2 months ave.)

60mW

50mW

40mW

30mW

20mW

Peak Power Consumption (from 1 July to 31 Aug.)