The Wolves and Moose on Isle Royal. Isle Royale images from: .
To, The Member Secretary (Infrastructure and Miscellaneous...
Transcript of To, The Member Secretary (Infrastructure and Miscellaneous...
-
Date: 4.5.2017 To, The Member Secretary (Infrastructure and Miscellaneous projects + CRZ/ /New Construction Projects and Industrial Estate) Ministry of Environment, Forests and Climate Change Indira Paryavaran Bhawan, Jor Bagh Road, New Delhi – 110 003 Sub: Submission of required documents of Expansion of Residential, Retail, IT & Commercial Project at Plot bearing on CTS. Nos. 117A, 117A/1, & 117B & 117C Village Tungwa, Saki Vihar Road, Powai, Mumbai – 400 072 Proposed By M/s. Larsen & Toubro Realty Ltd.addressed by 15th EAC meeting Reference: MoM of 15th EAC Respected Sir, With reference to above subject this is an application for Environmental Clearance to the Ministry of Environment, Forest and Climate change, Government of India, as per provisions of EIA Notification, amended till date; for Expansion of Residential, Retail, IT & Commercial Project at Plot bearing on CTS. Nos. 117A, 117A/1, & 117B & 117C Village Tungwa, Saki Vihar Road, Powai, Mumbai – 400 072 Proposed By M/s. Larsen & Toubro Realty Ltd. This is a Residential project, thus seeking prior environmental clearance under Schedule 8(b), Category B. Project was appraised in 15th EAC and as per MoM PP has asked to submit following documents
-
Kindly do the needful at earliest about Environmental Clearance. Yours sincerely,
-
Point No. 1 Tabular statement indicating details of (a) existing facilities as per existing EC obtained; (b) proposed additional facilities. Reply: attached as annexure 1 Point No. 2 Give a conformity status to conditions stipulated in Annexure XIV of the amended EIA Notification vide S.O. 3999 (E) dated 09.12.2016. Reply: attached as annexure 2 Point No. 3 Notarized affidavit of undertaking by Board of Director(s) that there is no violation with regards to the provisions as made in the amended EIA notification of 14.03.2017. Reply: attached as annexure 3 Point No. 4 The committee noted that the certified compliance report mentions compliance as ‘complied’, ‘Not complied’, ‘partly complied’ or ‘agreed to comply with’. The project proponents give an affidavit that all the conditions have been actually complied. Reply: attached as annexure 4 Point No. 5 Details energy conservation measures to be taken. All points mentioned in the proposal such as orientation to support reduced heat gain, use of ASHRAE 90.1, use of ECBC compliant envelope measures to be supported through drawings and details in the proposal. Reply: attached as annexure 5
-
Sr. No. Item
1 RWH
T1 & T2 100KLD 90 KLD T 9 to T 16T3, T4, T5 260 KLD 251 KLD TC 4T6, T7 & T8 170 KLD 142 KLD Health & Medical Center TC 3 & TC 4 130 KLD 140 KLD on Ground 30733.00 sq. mts RG on Groundon Podium 9698.46 sq. mts RG on PodiumAOS land 12355.00 sq. mts AOS LandMD 9905 KW 11538 KW MDConnected Load 15747 KW 18074 KM Connected Load
Service
5 Solar Energy 40% of the External lighting is proposed on Solar More than 50% Street Lights is on Solar + 4 KW for each tower of Solar
% Energy Savings due to Solar PV on Terrace on Total Common area Load
6 DG sets T1 750 KVA 750 KVA T9 to T16T2-T8 1500 KVA x 1 750 KVA x 3 Nos TC 4
750 KVA x 2 Medical Center
Comercial Building 2000 KVA x 2500 KVA x 2 Nos 150 KVA x 1 No 1500 KVA x 1 No
7 EMP cost Setting up Cost EMP 660 Lakhs 643.14 Lakhs Setting Up Cost
O & M cost EMP 76.3 Lakhs O & M Cost EMP
4 ElectricalService TATA Power
Provided Facilites w.r.t. EC obtained
Service TATA Power
TABULAR STATEMENT INDICATING DETAILS OF FACILITIES
STP2
3 RG
Existing facilities as per existing EC obtained ( 16.09.2014)
RWH --- for 1.5 day capacities
Proposd additional Facilities
2 day's capacities
Annexure 1
-
Tower 1 & 2 – 100 KLD, Tower 3, 4 & 5 – 260 KLD, Tower 6, 7 & 8 – 170 KLDT9, T10, T13-T16: 605 KLDT11-T12: 87 KLD
TC-IV:- 80 KLDHealth and Welfare Center = 30 KLD
9379.53 Sq.m5068.53 Sq.m9000 Sq.m22,686 kW45,552 kWTATA
15
·For T9 to T16 - 2 Nos. of DG Set of750 KW `·1 No. of 1500 kVA·1 No. of 750 KVA
629 Lakhs 105.9 Lakhs/per year
-
Annexure - 2
-
Annexure 3
-
Annexure 4
-
Sustainability
Implementation
ECBC Compliance Report
L&T Emerald Isle, Powai
-
L&T Emerald Isle, Powai ECBC Compliance Report
Confidential and Proprietary: Any use of this material without specific permission of TRANSVEN is strictly prohibited 2
CONTENTS
EXECUTIVE SUMMARY ................................................................................................................................... 4
METHODOLOGY ............................................................................................................................................. 5
CLIMATE ANALYSIS for Mumbai, India .......................................................................................................... 5
Solar Radiation Chart ................................................................................................................................. 6
Psychrometric Chart .................................................................................................................................. 6
Sun Path ..................................................................................................................................................... 6
BENCHMARK - ECBC Performance ................................................................................................................ 6
ECBC benchmarks for Residential Buildings .............................................................................................. 6
ECBC benchmarks for Commercial and Health care Building ................................................................... 7
Energy Use Estimation of Project Using ECBC Benchmark Design Features ............................................. 7
Proposed Building – Design performance ..................................................................................................... 7
Design Comparative for with ECBC Standards .......................................................................................... 8
Wall Construction .......................................................................................................................................... 9
Wall Assembly W1 – Residential ............................................................................................................... 9
Wall Assembly W2 – Commercial and Healthcare .................................................................................. 10
Roof Construction ........................................................................................................................................ 10
Roof Assembly R1– Residential ............................................................................................................... 10
Roof Assembly R2– Commercial .............................................................................................................. 11
Roof Assembly R3– Health Care .............................................................................................................. 11
Glazing ..................................................................................................................................................... 12
Glazing G1 & G2– Residential .................................................................................................................. 12
Glazing G3 – Commercial & HealthCare .................................................................................................. 12
Additional Trade off’s .................................................................................................................................. 13
Energy Model .............................................................................................................................................. 13
Tower 1 ........................................................................................................................................................ 13
Tower 2 and 6 .......................................................................................................................................... 13
Tower 3, 4 and 5 ...................................................................................................................................... 14
Tower 7 and 8 .......................................................................................................................................... 14
Tower 9, 11 and13 ................................................................................................................................... 14
Tower 10, 12 and 14 ................................................................................................................................ 15
Tower 15 .................................................................................................................................................. 15
Tower 16 .................................................................................................................................................. 15
-
L&T Emerald Isle, Powai ECBC Compliance Report
Confidential and Proprietary: Any use of this material without specific permission of TRANSVEN is strictly prohibited 3
TC III ......................................................................................................................................................... 16
TC IV ......................................................................................................................................................... 16
Health care center ................................................................................................................................... 16
Results and Comparative ............................................................................................................................. 17
Segment 1 - Residential Buildings – Tower 1 to Tower 8 ........................................................................ 19
Segment 2 - Residential Buildings – Tower 9 to Tower 16 ...................................................................... 19
Segment 3 – Commercial and Healthcare building ................................................................................. 20
ANNEXURE 1 – Simulation Results .............................................................................................................. 21
Tower 1 .................................................................................................................................................... 21
Tower 2 .................................................................................................................................................... 21
Tower 3 .................................................................................................................................................... 21
Tower 4 .................................................................................................................................................... 22
Tower 5 .................................................................................................................................................... 22
Tower 6 .................................................................................................................................................... 22
Tower 7 .................................................................................................................................................... 23
Tower 8 .................................................................................................................................................... 23
Tower 9 .................................................................................................................................................... 23
Tower 10 .................................................................................................................................................. 24
Tower 11 .................................................................................................................................................. 24
Tower 12 .................................................................................................................................................. 24
Tower 13 .................................................................................................................................................. 25
Tower 14 .................................................................................................................................................. 25
Tower 15 .................................................................................................................................................. 25
Tower 16 .................................................................................................................................................. 26
TC III ......................................................................................................................................................... 26
TC IV ......................................................................................................................................................... 26
Healthcare ............................................................................................................................................... 27
ANNEXURE 2 – WWR ................................................................................................................................... 27
-
L&T Emerald Isle, Powai ECBC Compliance Report
Confidential and Proprietary: Any use of this material without specific permission of TRANSVEN is strictly prohibited 4
EXECUTIVE SUMMARY
L&T realty is underway to develop one of most
prestigious projects in the rapidly developing area of
Powai, Mumbai. It is a gated complex situated across
the road from Powai Lake and garden and adjacent to
L&T Business Park. It is well connected to various
business hubs, hotels, high street & fine dining where
essential services like schools, railway stations and
hospitals can be all found in the vicinity. The project
comprises of residential towers (T1-T16) named as
Emerald Isle and commercial offices buildings (TC III,
TC IV and Welfare/Health center). The residential
towers T1-T6 and IT building TC III are constructed
and occupied by tenants. Buildings T7 to T8 are
nearing the end of construction, while the others are
to be constructed in the next phase which is to begin
very soon. As a part of their sustainability and
environment responsibility L&T realty intends to
achieve energy efficiency and resource conservation
from their all upcoming and ongoing projects.
As a part of this endeavor the scope of this study is to
examine the influence of the proposed building
design features to help meet with the regulatory
energy design benchmarks stipulated in the ECBC
guidelines. The estimated energy consumption from
the proposed design is compared with the estimated
energy consumption using ECB Benchmark design
standard in the proposed design layouts. As the
project construction is done is different phases, this
leads to a split mechanism to explore the intent of
this study. The method to highlight ECBC compliance
is by highlighting the difference in estimated annual
energy by the overall project.
The graph above highlight the energy consumption
difference achieved by virtue of envelope measures
and savings from efficient lighting fixtures.
To address and attain higher performance from the
residential buildings, insulated roof and high
performing glazing are proposed for the project
keeping in mind the current stage of the project and
the design specifications of the constructed buildings.
The proposed design is estimated to use 1.1% of less
energy than energy use estimated using ECBC
benchmark design standards.
-
L&T Emerald Isle, Powai ECBC Compliance Report
Confidential and Proprietary: Any use of this material without specific permission of TRANSVEN is strictly prohibited 5
METHODOLOGY
The scope of this study is to examine the influence of
the proposed building design features to help meet
with the regulatory energy design benchmarks
stipulated in the ECBC guidelines. The study examines
the influence of features incorporated in building
design to help achieve energy efficiency. The
estimated energy consumption from the proposed
design is compared with the estimated energy
consumption using ECB Benchmark design standard in
the proposed design layouts.
The former part of the report shares the Benchmark
compliance codes and specifications stipulated by
ECBC whereas the latter section compares presents
the proposed design specification continued by the
energy use estimations and comparative. The design
features of the proposed building design are referred
as PROPOSED CASE. ECBC stipulated baseline design
is termed as BENCHMARK CASE in the report.
The performance achieved by virtue of design from
the proposed building is compared with benchmark
performance observed using envelope specifications
as per ECBC standards. The performance is further
enhanced with additional energy trade-offs, such that
the expected energy consumed by the project is less
than the energy expected to be consumed using
absolute design standards by ECBC.
The project buildings is divided into three categories.
This differntiation is because the design properties
and function of the three segments are different.
However the compliance is highlighted for the overall
project and not as three segregated stratigies.
Segment 1 Construted
residential buildings
Tower 1 to
tower 8
Segment 2 To be constructed
buildings
Tower 9 to
Tower 16
Segment 3 Commerical and healthcare buildings
CLIMATE ANALYSIS for Mumbai,
India
It is important to identify key external climatic
conditions for this site which have influence on the
solar heat gain and solar insolation findings.
LOCATION: Powai, Mumbai, Maharashtra, India
CLIMATE ZONE: ECBC type: Warm and Humid
Building 1
Building 2
-
L&T Emerald Isle, Powai ECBC Compliance Report
Confidential and Proprietary: Any use of this material without specific permission of TRANSVEN is strictly prohibited 6
Solar Radiation Chart
Monthly diurnal averages for available and direct
solar radiation.
The site by virtue of its location has abundance of
solar exposure and can benefit from it in the winter
periods. Solar exposure from summer periods can be
avoided.
Psychrometric Chart
The psychrometic chart offers insights into strategies
that can be adopted to meet thermal comfort while
being energy efficient. A combination of active and
passive strategies can be induced in design that can
collectively perform to induce conservation.
Best design fit strategy.
Sun Path
Mumbai region located 18 degree above the equator
receives direct sunlight predominantly from the
southern façade. Northern facade receives direct
incident solar radiation for two months (summer) of
the year.
Sun path for the development (with focus on open
areas)
BENCHMARK - ECBC Performance
The energy performance of proposed case is
compared with performance achieved using design
standards of ECBC. The baseline/ benchmarks for the
buildings were established after calculating the WWR
(Annexure 2)
ECBC benchmarks for Residential Buildings
Parameters of Design
features
ECBC
Parameters
Day time building
Exterior Wall Construction-
U Value: W/m2K 0.44 (max)
Roof Construction-
U Value: - W/m2K 0.409 (max)
Roof Finish- Reflectivity 0.30
Fenestration type Vertical
Fenestration SHGC
Coefficient (rated) 0.25 (max)
Fenestration
U-value : W/m2K 3.30 (max)
-
L&T Emerald Isle, Powai ECBC Compliance Report
Confidential and Proprietary: Any use of this material without specific permission of TRANSVEN is strictly prohibited 7
ECBC benchmarks for Commercial and Health
care Building
Parameters of Design
features
ECBC
Parameters
12 hour use building
Exterior Wall Construction-
U Value: W/m2K 0.44 (max)
Roof Construction-
U Value: - W/m2K 0.409 (max)
Roof Finish- Reflectivity 0.30
Fenestration type Vertical
Fenestration SHGC
Coefficient (rated) 0.25 (max)
Fenestration
U-value : W/m2K 3.30 (max)
Energy Use Estimation of Project Using ECBC
Benchmark Design Features
Energy performance (MWh)
Ene
rgy
con
sum
pti
on
est
imat
ion
Segm
en
t 1
Tower 1 2072.2
Tower 2 1880.0
Tower 3 2061.7
Tower 4 2061.7
Tower 5 2061.7
Tower 6 1879.8
Tower 7 2539.1
Tower 8 2530.9
Segm
en
t 2
Tower 9 2322.5
Tower 10 2932.3
Tower 11 2324.2
Tower 12 2932.3
Tower 13 2335.0
Tower 14 2932.3
Tower 15 3147.6
Tower 16 3349.7
Segm
en
t 3
TC III 1561.0
TC IV 1847.8
Health
Centre 954.3
Overall 43726.1
Proposed Building – Design
performance
The construction technology, envelope parameters,
and design specifications for all the types of buildings
namely Residential, Commercial and Healthcare are
given below. Their design specifications are compared
with the corresponding ECBC standards.
As it can be observed from the table in the following
pages only few design specifications in the proposed
design comply with the ECBC design standards.
Thereby a prescriptive approach to highlight
compliance cannot be adopted. The detail of
envelope design is further shared.
-
L&T Emerald Isle, Powai ECBC Compliance Report
Confidential and Proprietary: Any use of this material without specific permission of TRANSVEN is strictly prohibited 8
Design Comparative for with ECBC Standards
Parameters of
Design features
Segment 1
Residential buildings- T1 to T8
Segment 2
Residential buildings- T9 to T16
Design Details ECBC
Compliance check Design Details
ECBC
Compliance check
Exterior Wall Construction-
U Value: W/m2K 2.51
NO (MAX 0.44)
2.51 NO
(MAX 0.44)
Roof Construction-
U Value: - W/m2K 0.33
YES (MAX 0.409)
0.33 YES
(MAX 0.409)
Roof Finish- Reflectance
coefficient. 0.45
YES (MIN 0.30)
0.45 YES
(MIN 0.30)
Fenestration type
Vertical Single NA Single NA
Fenestration SHGC
Coefficient (rated) 0.82
NO (MAX 0.25)
0.29 NO
(MAX 0.25)
Fenestration
U-value : W/m2K 5.7
NO (MAX 3.30)
3.8 NO
(MAX 3.30)
Fenestration VLT
Coefficient 0.88
YES (MIN 0.27)
0.28 YES
(MIN 0.27)
Overhangs/ Shading All windows NA All windows NA
Parameters of
Design features
Segment 3
Commercial Buildings Segment 3
Healthcare building
Design Details ECBC
Compliance check Design Details
ECBC
Compliance check
Exterior Wall Construction-
U Value: W/m2K 0.654
NO (MAX 0.44)
0.654 NO
(MAX 0.44)
Roof Construction-
U Value: - W/m2K 0.47
NO (MAX 0.409)
0.68 NO
(MAX 0.409)
Roof Finish- Reflectance
coefficient. 0.45
YES (MIN 0.30)
0.45 YES
(MIN 0.30)
Fenestration type
Vertical Double NA Single NA
Fenestration SHGC
Coefficient (rated) 0.24
YES (MAX 0.25)
0.24 YES
(MAX 0.25)
Fenestration
U-value : W/m2K 2.72
YES (MAX 3.3)
2.72 YES
(MAX 3.3)
Fenestration VLT
Coefficient 0.22
YES (MIN 0.16)
0.22 YES
(MIN 0.16)
Overhangs/ Shading All windows NA All windows NA
-
L&T Emerald Isle, Powai ECBC Compliance Report
Confidential and Proprietary: Any use of this material without specific permission of TRANSVEN is strictly prohibited 9
Buildings Wall type Roof type Glazing type
Segm
en
t 1
Tower T1 W1 R1 G1
Tower T2 W1 R1 G1
Tower T3 W1 R1 G1
Tower T4 W1 R1 G1
Tower T5 W1 R1 G1
Tower T6 W1 R1 G1
Tower T7 W1 R1 G1
Tower T8 W1 R1 G1
Segm
en
t 2
Tower T9 W1 R1 G2
Tower T10 W1 R1 G2
Tower T11 W1 R1 G2
Tower T12 W1 R1 G2
Tower T13 W1 R1 G2
Tower T14 W1 R1 G2
Tower T15 W1 R1 G2
Tower T16 W1 R1 G2
Segm
en
t 3
TC III W2 R2 G3
TC IV W2 R2 G3
Health Centre W2 R3 G3
Wall Construction
Details of the two existing wall construction
assemblies are shared herein.
W1: Wall Assembly Type 1: Wall assembly for the
residential buildings.
W2: Wall Assembly Type 2: Wall assembly for the
Commercial and Healthcare building.
Wall assembly details ‘U’ Value
W1 2.51
W2 0.66
Wall Assembly W1 – Residential
Wall W1 –The proposed building wall assembly is of
RCC Wall with Gypsum plaster.
Wall Assembly Details - W1
Material
Layer
Thickness
Thermal
Conductivity,
K
Thermal
resistance, R
(ft) (Btu/h·ft·°F) (h·ft2·°F/Btu)
Exterior Air
Resistance - - 0.250
Exterior
POP plaster 0.039 0.12 0.328
RCC Wall 0.755 1.12 0.674
Interior POP
plaster 0.039 0.12 0.328
Interior Air
Resistance - - 0.680
Total R Value 2.260
Overall U Value (1/R) (btu/ft2-F) 0.442
Total U Value (1/R) (W/m2-K) 2.512
-
L&T Emerald Isle, Powai ECBC Compliance Report
Confidential and Proprietary: Any use of this material without specific permission of TRANSVEN is strictly prohibited 10
Wall Assembly W2 – Commercial and
Healthcare
Wall W2–The proposed building wall assembly is of
AAC Wall with Gypsum plaster.
Wall Assembly Details - W2
Material
Layer
Thickness
Thermal
Conductivity,
K
Thermal
resistance, R
(ft) (Btu/h·ft·°F) (h·ft2·°F/Btu)
Exterior Air
Resistance - - 0.250
Exterior
POP plaster 0.039 0.12 0.328
AAC Block
Wall 0.656 0.09 7.098
Interior POP
plaster 0.039 0.12 0.328
Interior Air
Resistance - - 0.680
Total R Value 8.684
Overall U Value (1/R) (btu/ft2-F) 0.115
Total U Value (1/R) (W/m2-K) 0.654
Roof Construction
Following are the three different roof assemblies
for the project.
R1: Roof Assembly Type 1: Roof assembly for the
residential buildings.
R2: Roof Assembly Type 2: Roof assembly for the
commercial buildings.
R3: Roof Assembly Type 3: Roof assembly for the
healthcare building.
Roof assembly details ‘U’ Value
R1 0.33
R2 0.47
R3 0.68
Roof Assembly R1– Residential
Roof R1 –The proposed roof assembly is with over
deck insulation.
Roof Assembly Details
Material
Layer
Thickness
Thermal
Conductivity
Thermal
resistance
(ft) (Btu/h·ft·°F) (h·ft2·°F/Btu)
Exterior Air
Resistance - - 0.250
Tiles 0.059 0.64 0.093
Cement
Screed 0.115 0.81 0.142
Insulation 0.246 0.02 15.209
Bitumen 0.039 0.12 0.341
Cement
Screed 0.115 0.81 0.142
Concrete 0.492 1.33 0.370
Interior Air
Resistance - - 0.680
Total R Value 17.227
Overall U Value (1/R) (btu/ft2-F) 0.058
Total U Value (1/R) (W/m2-K) 0.330
-
L&T Emerald Isle, Powai ECBC Compliance Report
Confidential and Proprietary: Any use of this material without specific permission of TRANSVEN is strictly prohibited 11
Roof Assembly R2– Commercial
Roof R2 –The proposed roof assembly is with under
deck insulation.
Roof Assembly Details
Material
Layer
Thickness
Thermal
Conductivity
Thermal
resistance
(ft) (Btu/h·ft·°F) (h·ft2·°F/Btu)
Tiles 0.059 0.64 0.09
Cement
Screed 0.115 0.81 0.14
Brick bat
coba 0.361 0.35 1.04
Concrete
slab 0.656 1.1 0.7
Nitrile
rubber
insulation
0.164 0.02 9.8
Total R Value 11.78
Overall U Value (1/R) (btu/ft2-F) 0.08
Total U Value (1/R) (W/m2-K) 0.47
Roof Assembly R3– Health Care
Roof R3 –The proposed roof assembly is with under
deck insulation.
Roof Assembly Details
Material
Layer
Thickness
Thermal
Conductivity
Thermal
resistance
(ft) (Btu/h·ft·°F) (h·ft2·°F/Btu)
Tiles 0.059 0.64 0.09
Cement
Screed 0.115 0.81 0.14
Brick bat
coba 0.361 0.35 1.04
Concrete
slab 0.656 1.1 0.7
Nitrile
rubber
insulation
0.125 0.02 6.5
Total R Value 8.48
Overall U Value (1/R) (btu/ft2-F) 0.12
Total U Value (1/R) (W/m2-K) 0.68
-
L&T Emerald Isle, Powai ECBC Compliance Report
Confidential and Proprietary: Any use of this material without specific permission of TRANSVEN is strictly prohibited 12
Glazing
Details of the three types of Glazing are:
G1: Glazing Type 1: Glazing used for constructed
Residential buildings.
G2: Glazing Type 2: Glazing used for to be
constructed Residential building.
G3: Glazing Type 3: Glazing for Commercial and
Healthcare buildings.
Glazing Type
G1
Saint Gobain SGG Planilux Single
G2
Saint Gobain Evo ET 125 Single
G3
Saint Gobain Cool Lite ST 736 Double
Glazing G1 & G2– Residential
Glazing G1 – The glass proposed for the project is
a SGU - Saint Gobain SGG Planilux.
Glazing specifications – G1
Type SHGC ‘U’ Value VLT
Single 0.82 5.7 0.88
Glazing G2 – The glass proposed for the project is
a SGU - Saint Gobain Evo ET 125.
Glazing specifications – G2
Type SHGC ‘U’ Value VLT
Single 0.29 3.8 0.28
Glazing G3 – Commercial & HealthCare
Glazing G3 – The glass proposed for the project is
a Saint Gobain Cool Lite ST 736
Glazing specifications – G2
Type SHGC ‘U’ Value VLT
Double 0.24 2.72 0.22
-
L&T Emerald Isle, Powai ECBC Compliance Report
Confidential and Proprietary: Any use of this material without specific permission of TRANSVEN is strictly prohibited 13
Additional Trade off’s
In addition to building envelop the project saves from
reduced lighting load. This reduction in lighting is
from public areas – corridor lighting, staircase lighting.
This is achieved from use of LED light source.
Reduction in lighting load – Lighting power density.
Space
Description
Base Case
Wattage
(W/m2)
Base Case
Wattage
(W/ ft2)
Proposed
Case
Wattage
(W/ft2)
Dwelling Units 11.8 1.10 1.10
Corridor/
Transition 5.4 0.50 0.35
Stairs Active 6.5 0.60 0.42
Restrooms 9.7 0.90 0.90
Food Prep/
Kitchen 12.9 1.20 1.20
Office 11.8 1.10 1.10
Electrical Room 16.1 1.5 1.5
Hospital 12.9 1.2 1.2
Store Room 8.6 0.84 0.84
Energy Model
Tower 1
Tower 2 and 6
-
L&T Emerald Isle, Powai ECBC Compliance Report
Confidential and Proprietary: Any use of this material without specific permission of TRANSVEN is strictly prohibited 14
Tower 3, 4 and 5
Tower 7 and 8
Tower 9, 11 and13
-
L&T Emerald Isle, Powai ECBC Compliance Report
Confidential and Proprietary: Any use of this material without specific permission of TRANSVEN is strictly prohibited 15
Tower 10, 12 and 14
Tower 15
Tower 16
-
L&T Emerald Isle, Powai ECBC Compliance Report
Confidential and Proprietary: Any use of this material without specific permission of TRANSVEN is strictly prohibited 16
TC III
TC IV
Health care center
-
L&T Emerald Isle, Powai ECBC Compliance Report
Confidential and Proprietary: Any use of this material without specific permission of TRANSVEN is strictly prohibited 17
Results and Comparative
The energy performance of the proposed case with
two variations is compared with Benchmark
performance observed using ECBC standards. The
comparative between the two are shared below for
the complete project.
ECBC -
Benchmark
case
Proposed
case
Energy Consumption
Estimation 43726 43200
Please refer to Annexure 1
The proposed design is estimated to use 1.1% of less
energy than energy use estimated using ECBC
benchmark design standards.
Building Number Benchmark case (ECBC Case)
Proposed Project Performance
comparative
Segm
en
t 1
Tower 1 2072.2 2177 -5%
Tower 2 1880.0 1976.1 -5%
Tower 3 2061.7 2235.7 -8%
Tower 4 2061.7 2235.7 -8%
Tower 5 2061.7 2235.7 -8%
Tower 6 1879.8 2020.3 -7%
Tower 7 2539.1 2468.0 3%
Tower 8 2530.9 2469.4 2%
Segm
en
t 2
Tower 9 2322.5 2201.7 5%
Tower 10 2932.3 2761.2 6%
Tower 11 2324.2 2202.4 5%
Tower 12 2932.3 2761.2 6%
Tower 13 2335.0 2200.8 6%
Tower 14 2932.3 2761.2 6%
Tower 15 3147.6 2958.4 6%
Tower 16 3349.7 3203.3 4%
Segm
en
t 3
TC III 1561.0 1551.2 1%
TC IV 1847.8 1836.5 1%
Health Centre 954.3 944.7 1%
Overall 43726.1 43,259.2 1.1%
-
L&T Emerald Isle, Powai ECBC Compliance Report
Confidential and Proprietary: Any use of this material without specific permission of TRANSVEN is strictly prohibited 18
The energy performance segment wise is shared further.
-
L&T Emerald Isle, Powai ECBC Compliance Report
Confidential and Proprietary: Any use of this material without specific permission of TRANSVEN is strictly prohibited 19
Segment 1 - Residential Buildings – Tower 1 to Tower 8
ECBC - Benchmark case Proposed case
Energy Consumption Estimation 17087 17,818
Segment 2 - Residential Buildings – Tower 9 to Tower 16
ECBC - Benchmark case Proposed case
Energy Consumption Estimation 22,276 21,050
-
L&T Emerald Isle, Powai ECBC Compliance Report
Confidential and Proprietary: Any use of this material without specific permission of TRANSVEN is strictly prohibited 20
Segment 3 – Commercial and Healthcare building
ECBC - Benchmark case Proposed case
Energy Consumption Estimation 22,276 21,050
-
L&T Emerald Isle, Powai ECBC Compliance Report
Confidential and Proprietary: Any use of this material without specific permission of TRANSVEN is strictly prohibited 21
ANNEXURE 1 – Simulation Results Tower 1
Electricity
MWh
0 degrees 90 degrees 180 degrees 270 degrees Average Base Case Proposed case
Space Cool 746.1 758.4 693.6 766 741.025 854.2
Heat Reject. 0 0 0 0 0 0
Refrigeration 0 0 0 0 0 0
Space Heat 0 0 0 0 0 0
HP Supp. 0 0 0 0 0 0
Hot Water 0 0 0 0 0 0
Vent. Fans 33.9 37.3 39.3 35.3 36.45 54.8
Pumps & Aux. 0 0 0 0 0 0
Ext. Usage 0 0 0 0 0 0
Misc. Equip. 562 562 562 562 562 562
Task Lights 0 0 0 0 0 0
Area Lights 732.7 732.7 732.7 732.7 732.7 706.1
Total 2074.7 2090.5 2027.7 2096 2072.225 2177.1
Tower 2
Electricity
MWh
0 degrees 90 degrees 180 degrees 270 degrees Average Base Case Proposed case
Space Cool 733.6 732.4 733.7 733.6 733.325 888.6
Heat Reject. 0 0 0 0 0 0
Refrigeration 0 0 0 0 0 0
Space Heat 0 0 0 0 0 0
HP Supp. 0 0 0 0 0 0
Hot Water 0 0 0 0 0 0
Vent. Fans 40.3 40.6 41.1 40.6 40.65 71.2
Pumps & Aux. 0 0 0 0 0 0
Ext. Usage 0 0 0 0 0 0
Misc. Equip. 470.8 470.8 470.8 470.8 470.8 442.6
Task Lights 0 0 0 0 0 0
Area Lights 635.2 635.2 635.2 635.2 635.2 573.8
Total 1879.9 1878.9 1880.8 1880.2 1879.95 1976.1
Tower 3
Electricity
MWh
0 degrees 90 degrees 180 degrees 270 degrees Average Base Case Proposed case
Space Cool 756.1 721.4 775.2 691.1 735.95 923.3
Heat Reject. 0 0 0 0 0 0
Refrigeration 0 0 0 0 0 0
Space Heat 0 0 0 0 0 0
HP Supp. 0 0 0 0 0 0
Hot Water 0 0 0 0 0 0
Vent. Fans 115.6 105.1 124.4 113.3 114.6 203.9
Pumps & Aux. 0 0 0 0 0 0
Ext. Usage 0 0 0 0 0 0
Misc. Equip. 472.6 472.6 472.6 472.6 472.6 444.2
Task Lights 0 0 0 0 0 0
Area Lights 738.6 738.6 738.6 738.6 738.6 706.6
Total 2082.9 2037.7 2110.8 2015.5 2061.725 2235.6
-
L&T Emerald Isle, Powai ECBC Compliance Report
Confidential and Proprietary: Any use of this material without specific permission of TRANSVEN is strictly prohibited 22
Tower 4
Electricity
MWh
0 degrees 90 degrees 180 degrees 270 degrees Average Base Case Proposed case
Space Cool 756.1 721.4 775.2 691.1 735.95 923.3
Heat Reject. 0 0 0 0 0 0
Refrigeration 0 0 0 0 0 0
Space Heat 0 0 0 0 0 0
HP Supp. 0 0 0 0 0 0
Hot Water 0 0 0 0 0 0
Vent. Fans 115.6 105.1 124.4 113.3 114.6 203.9
Pumps & Aux. 0 0 0 0 0 0
Ext. Usage 0 0 0 0 0 0
Misc. Equip. 472.6 472.6 472.6 472.6 472.6 444.2
Task Lights 0 0 0 0 0 0
Area Lights 738.6 738.6 738.6 738.6 738.6 706.6
Total 2082.9 2037.7 2110.8 2015.5 2061.725 2235.6
Tower 5
Electricity
MWh
0 degrees 90 degrees 180 degrees 270 degrees Average Base Case Proposed case
Space Cool 756.1 721.4 775.2 691.1 735.95 923.3
Heat Reject. 0 0 0 0 0 0
Refrigeration 0 0 0 0 0 0
Space Heat 0 0 0 0 0 0
HP Supp. 0 0 0 0 0 0
Hot Water 0 0 0 0 0 0
Vent. Fans 115.6 105.1 124.4 113.3 114.6 203.9
Pumps & Aux. 0 0 0 0 0 0
Ext. Usage 0 0 0 0 0 0
Misc. Equip. 472.6 472.6 472.6 472.6 472.6 444.2
Task Lights 0 0 0 0 0 0
Area Lights 738.6 738.6 738.6 738.6 738.6 706.6
Total 2082.9 2037.7 2110.8 2015.5 2061.725 2235.6
Tower 6
Electricity
MWh
0 degrees 90 degrees 180 degrees 270 degrees Average Base Case Proposed case
Space Cool 733.7 732.8 732.7 733.2 733.1 909.3
Heat Reject. 0 0 0 0 0 0
Refrigeration 0 0 0 0 0 0
Space Heat 0 0 0 0 0 0
HP Supp. 0 0 0 0 0 0
Hot Water 0 0 0 0 0 0
Vent. Fans 40.3 40.9 40.9 40.5 40.65 73
Pumps & Aux. 0 0 0 0 0 0
Ext. Usage 0 0 0 0 0 0
Misc. Equip. 470.8 470.8 470.8 470.8 470.8 452.2
Task Lights 0 0 0 0 0 0
Area Lights 635.2 635.2 635.2 635.2 635.2 586
Total 1880 1879.7 1879.7 1879.8 1879.8 2020.2
-
L&T Emerald Isle, Powai ECBC Compliance Report
Confidential and Proprietary: Any use of this material without specific permission of TRANSVEN is strictly prohibited 23
Tower 7
Electricity
MWh
0 degrees 90 degrees 180 degrees 270 degrees Average Base Case Proposed case
Space Cool 750.9 738.3 809.7 810.1 777.25 788.9
Heat Reject. 0 0 0 0 0 0
Refrigeration 0 0 0 0 0 0
Space Heat 0 0 0 0 0 0
HP Supp. 0 0 0 0 0 0
Hot Water 0 0 0 0 0 0
Vent. Fans 42.8 39.9 35.1 35.6 38.35 61.9
Pumps & Aux. 0 0 0 0 0 0
Ext. Usage 0 0 0 0 0 0
Misc. Equip. 921.8 921.8 921.8 921.8 921.8 884.9
Task Lights 0 0 0 0 0 0
Area Lights 801.7 801.7 801.7 801.7 801.7 732.2
Total 2517.2 2501.8 2568.3 2569.2 2539.125 2468.0
Tower 8
Electricity
MWh
0 degrees 90 degrees 180 degrees 270 degrees Average Base Case Proposed case
Space Cool 752.7 717.4 804 800.9 768.75 789.5
Heat Reject. 0 0 0 0 0 0
Refrigeration 0 0 0 0 0 0
Space Heat 0 0 0 0 0 0
HP Supp. 0 0 0 0 0 0
Hot Water 0 0 0 0 0 0
Vent. Fans 43 40.9 35.9 34.5 38.575 62.7
Pumps & Aux. 0 0 0 0 0 0
Ext. Usage 0 0 0 0 0 0
Misc. Equip. 921.8 921.8 921.8 921.8 921.8 884.9
Task Lights 0 0 0 0 0 0
Area Lights 801.7 801.7 801.7 801.7 801.7 732.2
Total 2519.2 2481.9 2563.4 2559 2530.875 2469.4
Tower 9
Electricity
MWh
0 degrees 90 degrees 180 degrees 270 degrees Average Base Case Proposed case
Space Cool 870.5 797.7 869.4 846.1 845.925 753.7
Heat Reject. 0 0 0 0 0 0
Refrigeration 0 0 0 0 0 0
Space Heat 0 0 0 0 0 0
HP Supp. 0 0 0 0 0 0
Hot Water 0 0 0 0 0 0
Vent. Fans 49.5 51.1 47.3 45.4 48.325 58.1
Pumps & Aux. 0 0 0 0 0 0
Ext. Usage 0 0 0 0 0 0
Misc. Equip. 597.4 597.4 597.4 597.4 597.4 597.4
Task Lights 0 0 0 0 0 0
Area Lights 830.8 830.8 830.8 830.8 830.8 792.5
Total 2348.3 2277 2344.9 2319.8 2322.5 2201.70
-
L&T Emerald Isle, Powai ECBC Compliance Report
Confidential and Proprietary: Any use of this material without specific permission of TRANSVEN is strictly prohibited 24
Tower 10
Electricity
MWh
0 degrees 90 degrees 180 degrees 270 degrees Average Base Case Proposed case
Space Cool 1252.2 1230.9 1253.1 1228.3 1241.125 1096.10
Heat Reject. 0 0 0 0 0 0
Refrigeration 0 0 0 0 0 0
Space Heat 0 0 0 0 0 0
HP Supp. 0 0 0 0 0 0
Hot Water 0 0 0 0 0 0
Vent. Fans 64.8 62.9 64.7 62.5 63.725 74.9
Pumps & Aux. 0 0 0 0 0 0
Ext. Usage 0 0 0 0 0 0
Misc. Equip. 641.6 641.6 641.6 641.6 641.6 641.6
Task Lights 0 0 0 0 0 0
Area Lights 985.8 985.8 985.8 985.8 985.8 948.5
Total 2944.4 2921.2 2945.2 2918.3 2932.275 2761.20
Tower 11
Electricity
MWh
0 degrees 90 degrees 180 degrees 270 degrees Average Base Case Proposed case
Space Cool 867.6 851.3 864 807 847.475 756.4
Heat Reject. 0 0 0 0 0 0
Refrigeration 0 0 0 0 0 0
Space Heat 0 0 0 0 0 0
HP Supp. 0 0 0 0 0 0
Hot Water 0 0 0 0 0 0
Vent. Fans 47.2 45.8 49 52 48.5 56.1
Pumps & Aux. 0 0 0 0 0 0
Ext. Usage 0 0 0 0 0 0
Misc. Equip. 597.4 597.4 597.4 597.4 597.4 597.4
Task Lights 0 0 0 0 0 0
Area Lights 830.8 830.8 830.8 830.8 830.8 792.5
Total 2343 2325.4 2341.3 2287.2 2324.225 2202.40
Tower 12
Electricity
MWh
0 degrees 90 degrees 180 degrees 270 degrees Average Base Case Proposed case
Space Cool 1230.9 1253.1 1228.3 1252.2 1241.125 1,096.10
Heat Reject. 0 0 0 0 0 0
Refrigeration 0 0 0 0 0 0
Space Heat 0 0 0 0 0 0
HP Supp. 0 0 0 0 0 0
Hot Water 0 0 0 0 0 0
Vent. Fans 62.9 64.7 62.5 64.8 63.725 74.9
Pumps & Aux. 0 0 0 0 0 0
Ext. Usage 0 0 0 0 0 0
Misc. Equip. 641.6 641.6 641.6 641.6 641.6 641.6
Task Lights 0 0 0 0 0 0
Area Lights 985.8 985.8 985.8 985.8 985.8 948.5
Total 2921.2 2945.2 2918.3 2944.4 2932.275 2761.20
-
L&T Emerald Isle, Powai ECBC Compliance Report
Confidential and Proprietary: Any use of this material without specific permission of TRANSVEN is strictly prohibited 25
Tower 13
Electricity
MWh
0 degrees 90 degrees 180 degrees 270 degrees Average Base Case Proposed case
Space Cool 870.3 852.9 868.3 847.3 859.7 752.9
Heat Reject. 0 0 0 0 0 0
Refrigeration 0 0 0 0 0 0
Space Heat 0 0 0 0 0 0
HP Supp. 0 0 0 0 0 0
Hot Water 0 0 0 0 0 0
Vent. Fans 49.5 46.1 47.2 45.4 47.05 58
Pumps & Aux. 0 0 0 0 0 0
Ext. Usage 0 0 0 0 0 0
Misc. Equip. 597.4 597.4 597.4 597.4 597.4 597.4
Task Lights 0 0 0 0 0 0
Area Lights 830.8 830.8 830.8 830.8 830.8 792.5
Total 2348 2327.3 2343.8 2321 2335.025 2200.80
Tower 14
Electricity
MWh
0 degrees 90 degrees 180 degrees 270 degrees Average Base Case Proposed case
Space Cool 1252.2 1230.9 1253.1 1228.3 1241.125 1096.10
Heat Reject. 0 0 0 0 0 0
Refrigeration 0 0 0 0 0 0
Space Heat 0 0 0 0 0 0
HP Supp. 0 0 0 0 0 0
Hot Water 0 0 0 0 0 0
Vent. Fans 64.8 62.9 64.7 62.5 63.725 74.9
Pumps & Aux. 0 0 0 0 0 0
Ext. Usage 0 0 0 0 0 0
Misc. Equip. 641.6 641.6 641.6 641.6 641.6 641.6
Task Lights 0 0 0 0 0 0
Area Lights 985.8 985.8 985.8 985.8 985.8 948.5
Total 2944.4 2921.2 2945.2 2918.3 2932.275 2761.20
Tower 15
Electricity
MWh
0 degrees 90 degrees 180 degrees 270 degrees Average Base Case Proposed case
Space Cool 1147.6 1146.8 1143.7 1146.6 1146.175 991.4
Heat Reject. 0 0 0 0 0 0
Refrigeration 0 0 0 0 0 0
Space Heat 0 0 0 0 0 0
HP Supp. 0 0 0 0 0 0
Hot Water 0 0 0 0 0 0
Vent. Fans 61.3 61.6 64.1 61.7 62.175 76.8
Pumps & Aux. 0 0 0 0 0 0
Ext. Usage 0 0 0 0 0 0
Misc. Equip. 812.2 812.2 812.2 812.2 812.2 812.2
Task Lights 0 0 0 0 0 0
Area Lights 1127 1127 1127 1127 1127 1,077.90
Total 3148.2 3147.6 3147 3147.5 3147.575 2958.40
-
L&T Emerald Isle, Powai ECBC Compliance Report
Confidential and Proprietary: Any use of this material without specific permission of TRANSVEN is strictly prohibited 26
Tower 16
Electricity
MWh
0 degrees 90 degrees 180 degrees 270 degrees Average Base Case Proposed case
Space Cool 1138.4 1240.2 1215.2 1234.2 1207 1,093.60
Heat Reject. 0 0 0 0 0 0
Refrigeration 0 0 0 0 0 0
Space Heat 0 0 0 0 0 0
HP Supp. 0 0 0 0 0 0
Hot Water 0 0 0 0 0 0
Vent. Fans 68.2 62.1 59.6 64.5 63.6 73.2
Pumps & Aux. 0 0 0 0 0 0
Ext. Usage 0 0 0 0 0 0
Misc. Equip. 882.6 882.6 882.6 882.6 882.6 882.6
Task Lights 0 0 0 0 0 0
Area Lights 1196.5 1196.5 1196.5 1196.5 1196.5 1,153.90
Total 3285.7 3381.4 3353.9 3377.8 3349.7 3203.30
TC III
Electricity
MWh
0 degrees 90 degrees 180 degrees 270 degrees Average Base Case Proposed case
Space Cool 488 489.8 487.1 478.7 485.9 487.4
Heat Reject. 26.6 26.7 26.5 25.8 26.4 26.6
Refrigeration 0 0 0 0 0 0
Space Heat 0 0 0 0 0 0
HP Supp. 0 0 0 0 0 0
Hot Water 0 0 0 0 0 0
Vent. Fans 128 126.3 138.6 144.7 134.4 126.7
Pumps & Aux. 64.2 65.5 62.8 58.3 62.7 64.3
Ext. Usage 0 0 0 0 0 0
Misc. Equip. 456.8 456.8 456.8 456.8 456.8 456.8
Task Lights 0 0 0 0 0 0
Area Lights 394.9 394.9 394.9 394.9 394.9 389.3
Total 1558.4 1559.8 1566.7 1559.1 1561 15,51.2
TC IV
Electricity
MWh
0 degrees 90 degrees 180 degrees 270 degrees Average Base Case Proposed case
Space Cool 561.1 544.1 549.8 546.2 550.3 559.2
Heat Reject. 30.6 29.5 29.6 29.5 29.8 30.5
Refrigeration 0 0 0 0 0 0
Space Heat 0 0 0 0 0 0
HP Supp. 0 0 0 0 0 0
Hot Water 0 0 0 0 0 0
Vent. Fans 179.5 183.2 202.5 194.7 189.975 179.1
Pumps & Aux. 67.5 63.3 61.8 61.8 63.6 67.2
Ext. Usage 0 0 0 0 0 0
Misc. Equip. 519.6 519.6 519.6 519.6 519.6 519.6
Task Lights 0 0 0 0 0 0
Area Lights 494.5 494.5 494.5 494.5 494.5 481
Total 1852.8 1834.2 1857.8 1846.4 1847.8 1836.5
-
L&T Emerald Isle, Powai ECBC Compliance Report
Confidential and Proprietary: Any use of this material without specific permission of TRANSVEN is strictly prohibited 27
Healthcare
Electricity
MWh
0 degrees 90 degrees 180 degrees 270 degrees Average Base Case Proposed case
Space Cool 472.27 462.93 483.61 467.66 471.6175 466.9
Heat Reject. 0 0 0 0 0 0
Refrigeration 0 0 0 0 0 0
Space Heat 37.98 36.73 41.59 42.82 39.78 39.4
HP Supp. 0 0 0 0 0 0
Hot Water 0 0 0 0 0 0
Vent. Fans 117.66 112.92 120.5 123.26 118.585 117.4
Pumps & Aux. 0 0 0 0 0 0
Ext. Usage 0 0 0 0 0 0
Misc. Equip. 181.06 181.06 181.06 181.06 181.06 179.2
Task Lights 0 0 0 0 0 0
Area Lights 143.21 143.21 143.21 143.21 143.21 141.8
Total 952.17 936.85 969.97 958.01 954.25 944.7
ANNEXURE 2 – WWR
Tower Wall Dimensions (m2)
Wall Area Window area WWR (%) Length Height
Tower T1 221 3.6 796 172 21.6%
Tower T2 215 3.1 666 134 20.1%
Tower T3 225 3.1 697 148 21.3%
Tower T4 225 3.1 697 148 21.3%
Tower T5 225 3.1 697 148 21.3%
Tower T6 215 3.1 666 134 20.1%
Tower T7 200 3.1 621 134 21.6%
Tower T8 200 3.1 621 134 21.6%
Tower T9 228 3 685 124 18.2%
Tower T10 323 3 970 188 19.4%
Tower T11 228 3 685 124 18.2%
Tower T12 323 3 970 188 19.4%
Tower T13 228 3 685 124 18.2%
Tower T14 323 3 970 188 19.4%
Tower T15 355 3 1066 207 19.4%
Tower T16 319 3 957 188 19.7%
TC III 158 4.2 662 186 28.0%
TC IV 170 4.2 714 136 19.0%
Health Centre 119 3.9 462 92 20.0%
-
PMR- RO Certicication
-
PROCESS FLOW DIAGRAMMMBR PROCESS90 KLD PLANT
EMERALD ISLE RESIDENTIALTOWER 1/2
POWAI EAST- MUMBAI
WPS Consultants Pvt. Ltd.
L&T Realty Limited
PRABHU ENVIROTEC PRIVATE LIMITED.
FOR TENDER
STP SCHEMATIC LAYOUT FOR T1/2
NTS
06 JAN 2017 PV
DP
12231223-00-P-STP-SC-305
T1
A1
-
Emerald Isle - Sewage Treatment Plant Capacity-90 KLD
-
[Type text]
19/12/2016
19/12/2016
19/12/2016
14/12/2016
-39/12/2016
282.4
12.2
12.9
0.3
-
[Type text]
19/12/2016
14/12/2016
09/12/2016
-40/12/2016
186.9
13.2
12.5
0.3
-
[Type text]
19/12/2016
09/12/2016
-26/12/2016
68.4
64.5
66.4
67.1 67.5 67.4
74.2
66.4
75.2
73.4 68.4
81.2
61.4
58.4
73.4
67.1
62.4
63.4
59.2
74.2
&
-
[Type text]
19/12/2016
09/12/2016
14/12/2016
- 41/12/2016
-
[Type text]
19/12/2016
09/12/2016
14/12/2016
-22/12/2016
-
COMMERCIAL TOWER-TC IVMumbai, India
HAS FULFILLED THE REQUIREMENTS OF
UNDER LEADERSHIP IN ENERGY AND ENVIRONMENTAL DESIGN (LEED®) FOR CORE & SHELL DEVELOPMENT LEVEL:
DOCUMENTATION HAS BEEN SUBMITTED FOR THIS PROJECT, WHICH DEMONSTRATESAN INTENT TO DESIGN AND BUILD A HIGH-PERFORMANCE LEED GREEN BUILDING.
PRE-CERTIFICATION
GOLD
DECEMBER 2015
-
5690 GI/2016 (1)
.
jftLVªh laö Mhö ,yö&33004@99 REGD. NO. D. L.-33004/99
vlk/kj.k
EXTRAORDINARY
Hkkx II— [k.M 3—mi&[k.M (ii) PART II—Section 3—Sub-section (ii)
izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY
la- 2910] ubZ fnYyh] 'kqØokj] fnlEcj 9] 2016@vxzgk;.k 18] 1938 No. 2910] NEW DELHI, FRIDAY, DECEMBER 9, 2016/AGRAHAYANA 18, 1938
पयावरण, वन और जलवाय ुप रवतन मं ालय अिधसचूना
नई द ली, 9 दस बर, 2016 का.आ. 3999(अ).—के ीय सरकार ने भारत सरकार के त कालीन पयावरण और वन मं ालय ारा पयावरण (संर ण)
िनयम, 1986 के िनयम 5 के उपिनयम (3) के खंड (घ) के साथ प ठत पयावरण (संर ण) िनयम, 1986 क धारा 3 क उपधारा (1) और उपधारा (2) के खंड (v) के अधीन जारी क गई अिधसूचना सं यांक का.आ. 1533(अ), तारीख 14 िसतंबर, 2006 ारा यह िनदशे दया था क इस अिधसूचना के काशन क तारीख से ही नवीन प रयोजना या याकलाप के अपेि त संिनमाण या उ अिधसूचना क अनुसूची म सूचीब िव मान प रयोजना या याकलाप के िव तारण या आधुिनक करण के काय को, िजसम या या तकनीक और/या उ पाद िम ण म प रवतन सिहत मता म वृि कया जाना सि मिलत ह,ै भारत के कसी भाग म केवल, यथाि थित, के ीय सरकार या के ीय सरकार ारा उ अिधिनयम क धारा 3 क उपधारा (3) के अधीन स यक् प से ग ठत रा य तरीय पयावरण समाघात िनधारण ािधकरण से, उसम िविन द या के अनुसार, पूव पयावरणीय अनापि लेने के प ात् ही आरंभ कया जाएगा ;
के ीय सरकार उ रदायी कारबार करने क सुगमता सुिनि त करने के िलए काय कर रही है और भवन तथा संिनमाण से टर, जो आवास क व था करने के िलए मह वपूण ह,ै के िलए अनु ा को सरल बना रही ह ैतथा इस योजन के िलए शहरी े म कमजोर वग स ता आवास उपल ध कराने के ल य के साथ वष 2022 तक सभी के िलए आवास क क म म मह वाकां ी ल य रखा गया ह ै;
और उ पयावरण (संर ण) िनयम, 1986 के िनयम 5 के उपिनयम (3) के खंड (क) म यह उपबंिधत ह ै क जब कभी के ीय सरकार यह िवचार करती ह ै क कसी उ ोग पर ितषेध या िनब धन अिधरोिपत कए जाने चािहए, तो वह अपने ऐसा करने के आशय क सूचना दगेी ;
और पयावरण (संर ण) िनयम, 1986 के िनयम 5 के उपिनयम (3) के खंड (घ) के साथ प ठत पयावरण (संर ण) िनयम, 1986 क धारा 3 क उपधारा (1) और उपधारा (2) के खंड (च) ारा द शि य का योग करते ए पयावरण समाघात िनधारण अिधसूचना, 2006 म संशोधन करने के िलए एक ा प अिधसूचना का.आ.1595(अ) तारीख 29 अ ैल, 2016 ारा कािशत क गई थी, म संशोधन करने के िलए ा प अिधसूचना पर आ ेप और सुझाव ऐसे सभी ि य से िजनके उससे भािवत होने क संभावना ह,ै से उ अिधसूचना के भारत के राजप म काशन क तारीख से साठ दन म आमंि त कए जाते ह ै;
और के ीय सरकार ारा उपरो िन द ा प अिधसूचना के संबंध म ा सभी आ ेप और सुझाव पर स यक् प से िवचार कया जाएगा ;
-
2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)] अतः, अब, के ीय सरकार, उ पयावरण (संर ण) िनयम, 1986 के िनयम 5 के उपिनयम (3) के खंड (घ) के साथ प ठत पयावरण (संर ण) िनयम, 1986 (1986 का 29) क धारा 3 क उपधारा (1) और उपधारा (2) म खंड (च) ारा द शि य का
योग करते ए पयावरण समाघात िनधारण अिधसूचना, 2006 म िन िलिखत और संशोधन करती है, अथात् :--(I) उ त अिधसूचना म,--
(1) पैरा 13 के प ात्, िन िलिखत पैरा अंतः थािपत कया जाएगा, अथात् :-
“14. िनमाण उप िनयम म पयावरणीय शत का समाकलन :-
(1) थानीय ािधका रय ारा िनमाण अनुमित सिहत समाकिलत पयावरणीय दशा दान क जाएगी और आकार के अनुसार इमारत का िनमाण प रिश XIV म दए गए ल य और िनगरानी यो य पयावरणीय दशा के अनुसार कया जाएगा ।
(2) रा य जो अपनी भवन उपिविधय तथा सुसंगत रा य िविधय म उप पैरा (1) म िन द इन ल य तथा िनगरानी यो य पयावरणीय शत को अपना रह ेह और भवन संिनमाण के िलए दए गए अनुमोदन से उन शत को समािव कर रह ेह िजससे इसे िविधक प से वतनीय बनाया जा सके, ि क इमारत के िलए पयावरण, वन और जलवायु प रवतन मं ालय से अनापि क अपे ा नह होगी ।
(3) रा य पयावरण, वन और जलवायु प रवतन मं ालय को अपनी उपिविधय और िनयम म ऐसे तािवत प रवतन भेजगे जो ा प क समी ा करेगा और सहमित देगा ।
(4) जब रा य सरकार , वन और जलवायु प रवतन मं ालय ारा सहमित दए गए उपिविधय और िनयम को अिधसूिचत कर दतेी ह तो के ीय सरकार यह आदशे जारी करेगी क उन रा य या थानीय ािधकारी े म कोई पृथक् पयावरणीय अनापि अपेि त नह है ।
(5) थानीय ािधका रय जैसे िवकास ािधकरण, नगरपािलकाएं थानीय िनकाय म ग ठत पयावरण को ठ क िसफा रश पर क ही भवन के िलए िनयत अपे ा के अनुसार यथा लागू कए गए समापन माणप के जारी कए जाने से पूव इन पयावरणीय शत का अनुपालन मािणत करगे ।
(6) रा य सरकार जहां उपिविध या िनयम िवरिचत नह है, इस अिधसूचना म अिधकिथत उपबंध के अनुसार, ि क प रयोजना के मू यांकन क िव मान या तथा इमारत और संिनमाण के िलए पयावरण अनापि क मंजूरी का पालन करते रहगे ।”
(7) भवन म पयावरण के समावेशन के संबंध म माणीकरण के योजन के िलए पयावरण, वन और जलवायु प रवतन मं ालय स म अिभकरण के मा यम से अ हत िनमाण पयावरणीय संपरी क से इस अिधसूचना क अपे ा के मा यम से िनमाण प रयोजना का मू यांकन और मािणत करेगी तथा अ हत िनमाण पयावरणीय संपरी क का
यानन के िलए या और उनक भूिमका प रिश XV पर दी गई है ।
(8) िनमाण उपिविध म पयावरण शत के समामेलन के अनुपालन म रा य सरकार या थानीय ािधकारी पयावरण को (िजसे इसम इसके प ात् को कहा गया ह)ै, गठन करेगी तथा अपने े ािधकार म पयावरण योजना को
सुिनि त करेगा ।
(9) को इमारत के िनमाण के िलए पयावरण शत के समाकिलत करने के िलए बनाए गई उपिविध और िनयम के अनुपालन क िनगरानी करेगा और को कसी असावधानी, य द कोई ह,ै के िलए तृतीय प कार संपरी ा या क भी अनुमित दगेा ।
(10) को थानीय ािधकरण के शासिनक िनयं ण के अधीन काय करेगा ।
(11) को का गठन और कृ य प रिश xvi म दया आ ह ै।
(12) थानीय ािधकारी िनमाण उपिविध म पयावरण के संबंध म समाकलन करते समय प रयोजना म उनक सरकार के अनुसार नीचे दी गई या का पालन करेगी :-
भवन वग ‘1’ (5000 से < 20,000 वग मीटर)
पयावरणीय शत (प रिश xiv) के अनुपालन के िलए व घोषणा प और अ हत भवन पयावरण संपरी क ारा माणन ा प 1क के साथ प रयोजना तावक ारा थीय ािधकारी से िनमाण के िलए अनुमित हतेु आवेदन के अलावा
पृथक् खाते म िविन द फ स सिहत आनलाइन तुत करेगा । उसके प ात् थानीय ािधकारी इसम पयावरणीय शत के
-
¹Hkkx IIµ[k.M 3(ii)º Hkkjr dk jkti=k % vlk/kj.k 3
समावेशन के िलए िनमाण अनुमित जारी करेगा तथा आवेदन के साथ व घोषणा और माणन के आधार पर प रयोजना आरंभ करने के िलए अनुमित दगेा । भवन के िनमाऩ के समापन के प ात् प रयोजना तावक अ हत भवन पयावरण संपरी क ारा क गई संपरी ा के आधार पर आनलाइन आधा रत प 1क को अ तन करेगा तथा पुनरीि त अनुपालन प रवचन थानीय ािधकारी को दगेा । 20,000 वग मीटर से कम के भवन के अननुपालन संबंधी कोई मु ा िव मान यांि क के दौरान थानीय ािधकारी और रा य तर पर िवचार कया जाएगा ।
अ य भवन वग (>20,000 वग मीटर)
प रयोजना तावक पयावरण मू यांकन के िलए िविन द फ स सिहत प 1क म आनलाइन आवेदन तथा िनमाण अनुमित के िलए अित र फ स तुत करेगा । पयावरण मू यांकन के िलए फ स पृथक् खाते म जमा क जाएगी । पयावरण
को आवेदन पर कायवाही करेगा और उस थानीय ािधकारी म िनमाण अनुमित दनेे के िलए स म ािधकारी के नेतृ व वाली बैठक म तुत करेगा । सिमित प रयोजना का मू यांकन करेगी और पयावरण शत को िनमाण अनुमित म समावेशन के िलए शत रखेगा । सिमित क िसफा रश के प ता िनमाण अनुमित और पयावरण अनापि थानीय ािधकारी ारा समे कत आ प म जारी करेगा ।
प रयोजना तावक अ हत िनमाण पयावरण संपरी क से संिनमाण के समापन के प ात् लागू पयावरणीय शत मानक के िलए प रयोजना म सतत् अनुपालन के माणप और अनुपालन आंकड़ येक पांच वष म पयावरण को को िन िलिखत मानक पर िवशेष केि त करते ए तुत करेगा :-
(क) ऊजा योग (सभी ऊजा ोत सिहत) (ख) साइट पर पुन योग ऊजा ोत से साइट पर उ पन क ऊजा (ग) साइट जल योग और अपिश जल उ प , उपचा रत और पुuZçयु (घ) साइट पर पृथक कृत और उपचा रत अपिश (ङ) पौधारोपण और रखरखाव । परयोजना के पूण होने पर, को पांच वष य संपरी ा रपोट सिहत प रयोजना अनुपालन ाि थित क अचावक
जांच करेगा । रा य सरकार पयावरणीय शत और मानक के अननुपालन के िलए शाि तयां लगाने के िलए समुिचत िविध अिधिनयिमत करेगी । को थानीय ािधकारी शत या मानक के अननुपालन के िलए सुसंगत रा य िविध के अधीन यथा लागू िव ीय शाि तय क िसफा रश करेगा । को क िसफा रश के आधार पर थानीय ािधकारी सुसंगत रा य िविध के अधीन शाि तयां अिधरोिपत करेगा । अस य घोषणा या काशन क दशा म यानन िनकाय को रपोट करेगा और थानीय िनकाय अ हत भवन पयावरण संपरी क को काली सूची म डाल दगेा तथा मािलक और अ हत िनमाण पयावरण संपरी क पर िव ीय शाि त लगाएगा ।
जल ( दषूण िनवारण तथा िनयं ण) अf/िनयम, 1974 और वायु ( दषूण िनवारक तथा िनयं ण) अिधिनयम, 1981 के अधीन थापन तथा चालन क सहमित रा य दषूण िनयं ण बोड से सहमित 1,50,000 वग मीटर के िलए रहायशी िनमाण हतेु अपेि त नह होगी,'';
(II) अनुसूची म मद 8 और उससे संबंिधत िवि टय के िलए िन निलिखत मद और िवि टयां रखी जाएंगी, अथात्:--
(1) (2) (3) (4) (5)
“8. भवन/योजना संिनमाण/िवकास योजना और नगरीय
8(क) भवन िनमाण और संिनमाण प रयोजना
िन मत े का > 20,000 वग मीटर और < 1,50,000 वग मीटर
इस अिधसूचना के योजन के िलए “िन मत े ” पद, सभी तल को एक साथ िमलाकर िन मत या आ छा दत े िजसके अंतगत उसका बेसमट भी ह,ै जो भवन िनमाण तथा संिनमाण प रयोजना म तािवत है ।
ट पण 1- प रयोजना या याकलाप के अंतगत औ ोिगक शेड, िव विव ालय ,
-
4 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
महािव ालय , शै िणक सं था के िलए छा ावास,
कतु ऐसे भवन पोषणीय पयावरणीय बंधन, ठोस और तरल तथा प रिश ट 14
म दी गई शत को सुिनि चत करेगी ।
ट पण 2: साधारण शत लागू नह ह गी ।
ट पण 3: ट पण 1 म द त छूट थानीय ािधकारी के तर पर भवन
अनुमित सिहत पयावरणीय मानक के समाकलन के प चात् औ ोिगक शेड के िलए ही उपल ध होगी ।
8(ख) नगरी और े िवकास योजनाएं
िन मत े का > 3,00000 वग मीटर या आ छा दत े का > 150 हे टेयर
िन मत े का >1,50000 वग मीटर और < 3,00000 वग मीटर या आ छा दत
े का > 50 हे टेयर और
-
¹Hkkx IIµ[k.M 3(ii)º Hkkjr dk jkti=k % vlk/kj.k 5
वषा जल संचयन क एक योजना बनाए जाने क आव यकता ह ैिजसम रचाज बोर ( येक 5,000 वग मीटर िन मत े पर यूनतम एक रचाज) क िसफा रश क जाती ह ै। संिचत वषा जल के भ डारण तथा पुन: योग को बढ़ावा दया जाना चािहए । ऐसे े म जहां भू-जल तर को बढ़ाना यवहाय न हो, वषा जल का भ डारण और पुन: योग कया जाना चािहए । स म ािधकारी क अनुमित के िबना भू-जल नह िनकाला जाएगा । सभी रचाज को उथले जलभृत तक सीिमत रखा जाना चािहए ।
2 (क) थानीय भवन उपिनयम म यथा अपेि त कम से कम 20% खुला थान भावनीय होगा । कम से कम 50% ओप नग के साथ पेवर, पेवर लॉक , लड केप इ या द को भावनीय तल समझा जाएगा ।
अपिश ट बंधन 3 ठोस अपिश ट: अपिश ट के पृथ करण को सुिवधाजनक बनाने के िलए येक इकाई म तथा भू-तल पर अलग-अलग नम और शु क िबन क यव था क जानी चािहए । सीवेज: ऐसे े म जहां नगरीय सीवेज नेटवक नह ह,ै वहां ऑनसाइट शोधन णािलयां सं थािपत क जानी चािहए । लड केप से एक कृत होने वाली ाकृितक शोधन णािलय को बढ़ावा दया जाएगा । जहां तक संभव हो शोिधत बिह: ाव का पुन: योग कया जाना चािहए । अित र त शोिधत बिह: ाव को सीपीसीबी ितमान के अनुपालन म िन ता रत कया जाएगा । सेि टक टक सिहत ऑनसाइट सीवेज शोधन से िनकले गाद को शहरी िवकास
मं ालय, के ीय लोक वा य और पयावरण अिभयांि क संगठन (सीपीएचईईओ) के सीवरेज तथा सीवेज शोधन णाली मैनुअल, 2013 के अनुसार एकि त, भेजना और िन ता रत कया जाएगा । ठोस अपिश ट ( बंधन) िनयम, 2016 तथा ई-अपिश ट ( बंधन) िनयम, 2016 और लाि टक अपिश ट ( बंधन) िनयम, 2016 का अनुपालन कया जाएगा ।
ऊजा 4 ऊजा द ता यूरो के ऊजा संर ण भवन कोड (ईसीबीसी) का अनुपालन सुिनि त कया जाएगा । रा य म ऐसे भवन िजनम उनके अपने ईसीबीसी अिधसूिचत ह, उनम रा य ईसीबीसी का अनुपालन कया जाएगा । आउटडोर तथा साझा े क काश यव था म लाईट एिम टग डायोड (एलइडी) का योग होगा । िडमांड लोड के 1% समतु य अथवा रा य तरीय/ थानीय भवन उपिनयम क अपे ा अनुसार िबजली उ पादन क पू त करने हेतु सौर, पवन अथवा नवीकरणीय ऊजा, जो भी अिधक हो, क सं थापना क जाएगी । वािणि यक तथा सं थागत भवन क गम जल क मांग को पूरा करने के िलए अथवा थानीय भवन उपिनयम क आव यकतानसुार, जो भी अिधक हो, सोलर वाटर ही टग क यव था क जाएगी । आवासीय भवन के िलए भी यथासंभव अपनी गम जल मांग क पू त हतेु सोलर वाटर हीटर क िसफा रश क जाती ह ै। भवन िडजायन म पैिसव सोलर िडजायन क संक पना शािमल क जाएगी िजसम िडजायन के त व जैसे भवन अिभमुखीकरण, लड के पग, द भवन ए वेलप, समुिचत िखड़ कय क यव था, दन म अिधक काश करने क यव था म सुधार और थमल मास इ या द का योग करके भवन म ऊजा खपत को यूनतम कया जाता ह ै। दीवार, िखड़ कयां और छत के
यू-वॉ व ईसीबीसी िविशि य के अनुसार ह गे। वायु गुणव ता तथा शोर 5 भवन और साथ ही थल के िलए धूल, धुंआ एवं अ य वायु दषूण िनवारण के उपाय कए
जाएंगे। इन उपाय म िनमाणाधीन भवन, थल के चार ओर धूल/धूल रोकने वाली दीवार का िनमाण (कम से कम 3 मीटर क ऊंचाई तक) के िलए आवरण म शािमल हो सकगे। ला टक/तारपोिलन थल से कचरा उठाने के साथ-साथ बालू, सीमट, मुरम म चलती ई
गाि़डयां तथा अ य िनमाण सामि यां धूल दषूण का कारण हो सकती है। साइट पर बालू, मूरम, िबखरी िम ी, सीमट भंडार को उिचत तरीके से ढक कर रखा जाएगा िजससे क धूल दषूण को रोका जा सके। िपसाई तथा प थर कटाई के िलए वेट जेट का बंध कया जाएगा। धूल को दबाने के िलए
-
6 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]
िबना पटरी िबछा आ धरातल तथा िबखरी िम ी पर उिचत तरीके से पानी का िछड़काव कया जाएगा।
िनमाण तथा िव वंस सारे मलबे को उिचत तरीके से िनपटान से पहले साइट के पास इक ा कया जाएगा (तथा सड़के के कनारे ढेर या बाहर खुली जगह म इक ा नह ) सभी िव वंस
तथा िनमाण अपिश ट को िनमाण तथा िव वंस अपिश ट िनयम, 2016 के उपबंध के अनुसार बंिधत होगा। िनमाण थल पर काय करने वाले सभी कामगार तथा िनमाण साम ी क लो डग अनलो डग म शािमल, िनमाण साम ी क ढुलाई तथा िनमाण के कचरे या धूल दषूण के कसी भी े म काय कर रहे यि को ड ट मा क उपल ध कराया जाएगा। आंत रक वायु गुणव ता के िलए भारत के रा ीय भवन कोड के अनुसार वातायन के ावधान तैयार कए जाएंगे।
5(क) डीजी सेट का थान िनधारण तथा िनकास पाइप क ऊंचाई सीपीसीबी मानदंड के ावधान के अनुसार होगा।
ह रत े 6 ित80 वग मीटर क भूिम के िलए कम से कम एक पेड़ लगाकर उसक दखेभाल क जानी चािहए। इस उ े य के िलए िव मान पेड़ क िगनती क जाएगी। दशेीय जाित के पौध को
ाथिमकता दी जानी चािहए। 6(क) जहां पेड़ क कटाई आव यक हो, 1:3 के अनुपात म ितपूरक वृ ारोपण अथात येक एक
पेड़ क कटाई के िलए 3 पौध को लगाना तथा उनका रख-रखाव करना होगा।
( ेणी ‘2’ : 20,000 वग मीटर से लेकर 50,000 से कम)
मा यम म.सं. पयावरणीय शत
थलाकृित तथा ाकृितक जल
िनकास
1 जल क अबािधत धारा सुिनि त करने के िलए ाकृितक जल िनकास णाली का बंध होना चािहए। साइट के मा यम से ाकृितक जल िनकास को अवरोध करने के िलए िनमाण क अनुमित नह होगी। नमभूिम और जल िनकाय पर िनमाण क अनुमित नह होगी। जल िनकास पैटन तथा वषा जल संचयन के िलए चेक डैम, बायो- वा स, लड केप तथा अ य धारणीय शहरी जल िनकास
णािलय (एसयूडीएस) क अनमुित होगी।
जहां तक संभव हो सके, भवन क िडजाइन म ाकृितक थलाकृित का पालन कया जाएगा। कम से कम कटाई तथा भराई होनी चािहए।
जल संर ण, वषा जल सचाई तथा भूिम जल को रचाज करना
2 जल संचयन, जल मता और संर ण के िलए एक पूण योजना तैयार क जाए।
यून फ चर या ससर वाले जल मता वाले उपकरण के उपयोग को बढ़ावा दया जाना चािहए।
वषा संचयन के संबंध म थानीय उप िनयम, उपबंध का पालन कया जाएगा। अगर थानीय उप िनयम उपल ध नह है तो शहरी िवकास मं ालय का मॉडल भवन उप िनयम, 2016 के अनुसार भंडारण तथा रचाज के िलए पया त ावधान का पालन कया जाना चािहए।
वषा जल संचयन योजना का िडजाइन बनाने क आव यकता है जहां 5000 वग मीटर के िन मत े म कम से कम एक रचाज बोर हो तथा कम से कम कुल एक दन के शु जल के बंधन क भंडारण
मता क आव यकता होगी। उन े , जहां भूिमगत जल को रचाज करना संभव नह ह,ै म वषा जल संचयन चािहए तथा पुन: उपयोग के िलए भंडारण कया जाएगा। भूिमगत जल को स म
ािधकारी के अनुमोदन के िबना नह िनकाला जाएगा।
सभी रचाज सीिमत उथले जलभृत तक सीिमत होनी चािहए।
2 (क) थानीय भवन उप-िनयम ारा यथाअपेि त खुले थान का कम से कम 20% भाग भे होगा। यूनतम 50% खाली जगह, भूदृ य आ द सिहत ह रत खंड़ज , खंडज खंड के उपयोग सिहत यथा वे य धरातल के प म िवचार कया जाएगा।
अपिश ट बंधन 3 ठोस अपिश ट: येक इकाई म और भू तल पर पृथक-पृथक गीले और सूखे कचरे के िड ब,े अपिश ट के पृथ करण को सुिवधाजनक बनाने के िलए दान कए जाएंगे।
मलजल: अपिश ट 100% अपिश ट जल के शोधन क थल पर मलजल शोधन मता सं थािपत क
-
¹Hkkx IIµ[k.M 3(ii)º Hkkjr dk jkti=k % vlk/kj.k 7
जानी ह।ै शोिधत अपिश ट जल को थल पर भूदृ य, फल शग, कू लग टावर और अ य योजनाथ पुन: योग कया जाएगा। अित र त शोिधत जल को सीपीसीबी मानक के अनुसार छोड़ा जाएगा।
ाकृितक शोधन णािलय को बढ़ावा दया जाएगा।
सेि टक टको सिहत थल पर (ऑन साईट) शोधन से अवमल का मल-िनयास और मलजल शोधन णाली, 2013 पर शहरी िवकास मं ालय, के ी�