To: PLANNING & DEVELOPMENT COMMITTEE Meeting Date: 02/12/2019 Subject: Public Meeting Report – 215 Allendale Road and 245 Riverbank Drive Industrial Draft Plan of Subdivision – Intermarket CAM Limited From: Kathy Padgett, Senior Planner - Environment Report No.: 19-016(CD) File No.: 30T-18102 Recommendation(s) THAT application 30T-18102, report No. 19-016(CD), 215 Allendale Road and 245 Riverbank Drive industrial draft plan of subdivision be referred back to staff for a subsequent report and recommendation. Executive Summary Purpose The applicant is requesting permission for an industrial plan of subdivision consisting of seven industrial blocks and one future development block on a future public road. This report is for a statutory public meeting required by the Planning Act for the requested application at 215 Allendale Road and 245 Riverbank Drive. Key Findings The Plan of Subdivision is requested to prepare the lands for future industrial development. These lands were already pre-designated in the City’s Official Plan and pre- zoned through City-initiated amendments. Financial Implications City costs associated with the future North-South Collector Road.

Transcript of To: PLANNING & DEVELOPMENT COMMITTEE Drive Industrial ... · Recommendation(s) THAT application 30T...

Page 1: To: PLANNING & DEVELOPMENT COMMITTEE Drive Industrial ... · Recommendation(s) THAT application 30T -18102, report No. 19-016(CD), 215 Allendale Road and 245 Riverbank Drive industrial

To: PLANNING & DEVELOPMENT COMMITTEE

Meeting Date: 02/12/2019

Subject: Public Meeting Report – 215 Allendale Road and 245 Riverbank Drive Industrial Draft Plan of Subdivision – Intermarket CAM Limited

From: Kathy Padgett, Senior Planner - Environment

Report No.: 19-016(CD)

File No.: 30T-18102

Recommendation(s)

THAT application 30T-18102, report No. 19-016(CD), 215 Allendale Road and 245 Riverbank Drive industrial draft plan of subdivision be referred back to staff for a subsequent report and recommendation.

Executive Summary

Purpose• The applicant is requesting permission for an industrial plan of subdivision

consisting of seven industrial blocks and one future development block on a future public road.

• This report is for a statutory public meeting required by the Planning Act for the requested application at 215 Allendale Road and 245 Riverbank Drive.

Key Findings• The Plan of Subdivision is requested to prepare the lands for future industrial

development. • These lands were already pre-designated in the City’s Official Plan and pre-

zoned through City-initiated amendments.

Financial Implications• City costs associated with the future North-South Collector Road.

Page 2: To: PLANNING & DEVELOPMENT COMMITTEE Drive Industrial ... · Recommendation(s) THAT application 30T -18102, report No. 19-016(CD), 215 Allendale Road and 245 Riverbank Drive industrial

Background

The applicant proposes to develop the properties as an industrial plan of subdivision consisting of seven industrial blocks and one future development block on a future public road.

In accordance with the Planning Act, the City must hold a public meeting in order to formally consider the requested Draft Plan of Subdivision and receive public comments.

Detailed analysis of Provincial, Regional and City Policies and regulations, supporting documents, agency comments and any public submissions will be the subject of a future recommendation report.

Location

The subject lands are legally described as Part of Lot 14, Beasley’s Broken Front Concession, City of Cambridge, Regional Municipality of Waterloo. The subject lands are municipally known as 215 Allendale Road and 245 Riverbank Drive and are located on the south side of Allendale Road, east of Riverbank Drive.

Page 3: To: PLANNING & DEVELOPMENT COMMITTEE Drive Industrial ... · Recommendation(s) THAT application 30T -18102, report No. 19-016(CD), 215 Allendale Road and 245 Riverbank Drive industrial

The properties subject to the Draft Plan of Subdivision (outlined in red above) are approximately 21 hectares (51 acres) in size.

Existing/surrounding land uses

The subject lands are currently used as agricultural lands. The subject lands are surrounded by agricultural lands, farms and natural features to the north; agricultural lands and industrial uses to the east; agricultural lands, Freeport Creek, a large stormwater pond and a draft approved industrial/business park known as Intermarket/Creekside Phase 1A and 1B to the south; and single detached dwellings on Riverbank Drive (one fronting on Allendale Road) and the Grand River to the west.

Proposal

The applicant is requesting to develop the property with an industrial plan of subdivision containing seven industrial blocks and one future development block on a public North-South Collector Road, with the following blocks identified:

• Block 1 is approximately 2.2 hectares (5.4 acres) • Block 2 is approximately 2.1 hectares (5.1 acres) • Block 3 is approximately 2.2 hectares (5.4 acres) • Block 4 is approximately 3.4 hectares (8.4 acres) • Block 5 is approximately 3.2 hectares (7.9 acres) • Block 6 is approximately 2.9 hectares (7.1 acres) • Block 7 is approximately 2.9 hectares (7.1 acres) • Block 8 is approximately 0.57 hectares (1.4 acres)

Attachment No. 1 contains the applicants’ proposed Draft Plan of Subdivision. The additional lands owned by the applicant directly west of the subject lands are not being considered as part of this Plan of Subdivision.

Analysis:

Strategic Alignment: PEOPLE To actively engage, inform and create opportunities for people to participate in community building – making Cambridge a better place to live, work, play and learn for all.

Goal #2 - Governance and Leadership

Objective 2.1 Provide a wide range of ways that people can become involved in city decision making.

A statutory public meeting is required by the Planning Act to provide an opportunity for the public to give input on the proposal.

Page 4: To: PLANNING & DEVELOPMENT COMMITTEE Drive Industrial ... · Recommendation(s) THAT application 30T -18102, report No. 19-016(CD), 215 Allendale Road and 245 Riverbank Drive industrial

Comments:

City-initiated Official Plan and Zoning By-law Amendments came into effect for these lands in July 2018 which permit a range of business industrial uses, office buildings and associated complementary uses. The eight blocks of the proposed Draft Plan of Subdivision do not have proposed operations yet and will be further reviewed for conformity to the City’s Official Plan and Zoning By-law at the Site Plan review stage.

The subject lands are adjacent to Freeport Creek, Upper Freeport Creek Provincially Significant Wetland Complex, and a significant woodland. An Environmental Impact Statement has been provided to determine setbacks from these environmental features.

Existing Policy/By-Law:

Regional Official Plan (2015)

The subject lands are currently designated Prime Industrial Strategic Reserve (Serviced). The main purpose of this designation is to ensure an adequate supply of industrial lands are available within the region for new large-lot manufacturing or business park land uses in the vicinity of the Region of Waterloo International Airport and Provincial Highways.

City of Cambridge Official Plan (2012)

The subject lands are currently designated Business Industrial and Natural Open Space System (see Attachment No. 2). Site Specific Policies 8.10.66 and 8.10.70 apply to the subject lands which permit a range of business industrial uses, office buildings and associated complementary uses. These site specific policies came into effect in July 2018.

City of Cambridge Zoning By-law No. 150-85, as amended

The subject lands are currently zoned Industrial (M3) and Open Space (OS1) (see Attachment No. 3). Site specific zoning by-law amendments S.4.1.341.1, S.4.1.341.2 and S.4.1.342.1 came into effect in July 2018 and permit a range of industrial uses, office building and associated complementary uses.

Page 5: To: PLANNING & DEVELOPMENT COMMITTEE Drive Industrial ... · Recommendation(s) THAT application 30T -18102, report No. 19-016(CD), 215 Allendale Road and 245 Riverbank Drive industrial

Financial Impact:

The North-South Collector Road will be funded from two sources, the City’s development charge funds and Intermarket CAM Limited who own the land. The City will be responsible for paying for the road, watermain and sanitary trunk sewer. The road component includes multi-use trail(s), curbs, asphalt road surface, street lighting, boulevard landscaping/street furniture, creek crossing, Freeport Creek Stormwater Management Facility outlet structure reconstruction and part of the cost of the storm sewer based on the quantity of runoff contribution from the road alone. The developer will be responsible for the remainder of the cost of the storm sewer, utilities, and a local sanitary sewer.

Public Input:

The statutory public meeting being held under the Planning Act is being held on February 12, 2019. Official notification of the public meeting and complete application for a proposed Draft Plan of Subdivision was provided in the Cambridge Times on December 6, 2018. In addition, notice was provided to all assessed property owners within a 120 metres (393.7 feet) radius of the site. Any interested parties and members of the public will be provided with the opportunity to speak to this proposal at the February 12, 2019 public meeting.

Internal/External Consultation:

The application and supporting information has been circulated to the departments and agencies listed in Attachment No. 4.

Conclusion

Staff will provide further comments and analysis regarding this application as part of a future recommendation report to the Planning and Development Committee.

Considerations for the review of this application include (but are not limited to) the following:

• Conformity to the site-specific official plan and zoning by-law amendments • Future North-South Collector Road • Servicing • Environmental impacts • Planning Act provisions regarding the subdivision of land • Comments received from the public

Page 6: To: PLANNING & DEVELOPMENT COMMITTEE Drive Industrial ... · Recommendation(s) THAT application 30T -18102, report No. 19-016(CD), 215 Allendale Road and 245 Riverbank Drive industrial

Signature

Prepared by:

Name: Kathy Padgett Title: Senior Planner - Environment

Departmental Approval:

Name: Hardy Bromberg

Title: Deputy City Manager, Community Development

ATTACHMENTS

• Attachment No. 1 – Proposed Draft Plan of Subdivision

• Attachment No. 2 – Existing Official Plan Map

• Attachment No. 3 – Existing Zoning Map

• Attachment No. 4 – Internal/External Consultation and List of Supporting Studies

Page 7: To: PLANNING & DEVELOPMENT COMMITTEE Drive Industrial ... · Recommendation(s) THAT application 30T -18102, report No. 19-016(CD), 215 Allendale Road and 245 Riverbank Drive industrial

Attachment No. 1 Proposed Draft Plan of Subdivision

Creekside Phase I

Page 8: To: PLANNING & DEVELOPMENT COMMITTEE Drive Industrial ... · Recommendation(s) THAT application 30T -18102, report No. 19-016(CD), 215 Allendale Road and 245 Riverbank Drive industrial

Attachment No. 2 Existing Official Plan Map

Page 9: To: PLANNING & DEVELOPMENT COMMITTEE Drive Industrial ... · Recommendation(s) THAT application 30T -18102, report No. 19-016(CD), 215 Allendale Road and 245 Riverbank Drive industrial

Attachment No. 3 Existing Zoning Map

Page 10: To: PLANNING & DEVELOPMENT COMMITTEE Drive Industrial ... · Recommendation(s) THAT application 30T -18102, report No. 19-016(CD), 215 Allendale Road and 245 Riverbank Drive industrial

Attachment No. 4 Internal/External Consultation and List of Supporting Studies These applications have been circulated to the departments and agencies listed below. Their comments will be included in a future staff report to the Planning & Development Committee for consideration.

• Energy + Inc.

• Hydro One

• Telecommunication Companies

• Public and Catholic School Boards

• Ministry of Transportation • Regional Municipality of Waterloo

• Grand River Conservation Authority

• City of Cambridge Engineering and Transportation Services Division • City of Cambridge Planning Services Division

• City of Cambridge Parks, Recreation & Culture Division

• City of Cambridge Fire Department

List of Supporting Studies:

• Subdivision Plan

• Planning Justification Report

• Urban Design Brief

• Preliminary Grading Plan and Drainage Plan

• Preliminary Stormwater Management Report

• Functional Servicing Report

• Hydrogeological Assessment

• Transportation Impact Study

• Environmental Impact Study

• Tree Management Plan

• Archaeological Assessment

• Chloride Impact Study/Salt Impact Assessment