Title of the presentation · 6 CCR –Central Control Room Title of the presentation | Date Luas...

16

Transcript of Title of the presentation · 6 CCR –Central Control Room Title of the presentation | Date Luas...

Page 1: Title of the presentation · 6 CCR –Central Control Room Title of the presentation | Date Luas CCR is based at Red Cow It is the nerve centre for the Luas network CCR is manned
Page 2: Title of the presentation · 6 CCR –Central Control Room Title of the presentation | Date Luas CCR is based at Red Cow It is the nerve centre for the Luas network CCR is manned

2

passenger journeys

2 LinesRed and Green

44 KmTrams

minsheadway

metro style

Extensionsto Date

of track is segregated

Contractawarded

2003

m

Contractretained

2014

Stops

Page 3: Title of the presentation · 6 CCR –Central Control Room Title of the presentation | Date Luas CCR is based at Red Cow It is the nerve centre for the Luas network CCR is manned

3

We are a mobility company

Page 4: Title of the presentation · 6 CCR –Central Control Room Title of the presentation | Date Luas CCR is based at Red Cow It is the nerve centre for the Luas network CCR is manned

4

The Tram- Citidas

Title of the presentation | Date

Page 5: Title of the presentation · 6 CCR –Central Control Room Title of the presentation | Date Luas CCR is based at Red Cow It is the nerve centre for the Luas network CCR is manned

5Title of the presentation | Date

Page 6: Title of the presentation · 6 CCR –Central Control Room Title of the presentation | Date Luas CCR is based at Red Cow It is the nerve centre for the Luas network CCR is manned

6

CCR – Central Control Room

Title of the presentation | Date

Luas CCR is based at Red Cow

It is the nerve centre for the Luas network

CCR is manned 24 hours a day 364 days of the year

Page 7: Title of the presentation · 6 CCR –Central Control Room Title of the presentation | Date Luas CCR is based at Red Cow It is the nerve centre for the Luas network CCR is manned

7

CCR role in Tramway Operations

Title of the presentation | Date

Management of the tramway in line with Transdev’s SMS

Timetable management –headways

Power management – OCS –Fixed equipment

Event Management

Driver – RPO – Security Management

Emergency management

Customer information – PA – PIDS

Fault reporting and rectification

Origin point for all communications

Page 8: Title of the presentation · 6 CCR –Central Control Room Title of the presentation | Date Luas CCR is based at Red Cow It is the nerve centre for the Luas network CCR is manned

8

Page 9: Title of the presentation · 6 CCR –Central Control Room Title of the presentation | Date Luas CCR is based at Red Cow It is the nerve centre for the Luas network CCR is manned

9

Overcoming

Page 10: Title of the presentation · 6 CCR –Central Control Room Title of the presentation | Date Luas CCR is based at Red Cow It is the nerve centre for the Luas network CCR is manned

10

The Challenges pre-launch

12 Platform Extensions

Substantial improvement works to the Sandyford depot

New depot at Broombridge

13 new platforms on the Cross city extension

Subsequent additional Driver and Traffic Supervisor & training requirement

All procedures and RSC approval

Winter storms – Control Room roof blew off!

Extension launched on schedule –Dec 2017

Page 11: Title of the presentation · 6 CCR –Central Control Room Title of the presentation | Date Luas CCR is based at Red Cow It is the nerve centre for the Luas network CCR is manned

11

The Challenges post-launch

Phased Delivery of new 55m trams (Jan -May)

Tram availability

Beast from the East – full network & city closure

New Timetable – additional services

Managing the headway in particular within the city centre

Skill fade

Page 12: Title of the presentation · 6 CCR –Central Control Room Title of the presentation | Date Luas CCR is based at Red Cow It is the nerve centre for the Luas network CCR is manned

12

Learnings

Success down to partnership approach: TII, Dublin Bus, Irish Rail, Dublin City Council, Local Authorities

Close collaboration to find workable solutions

Committed and innovative team

Training programme that reflected the needs of the business and customers

THE FUTURE IS INNOVATIVE

Page 13: Title of the presentation · 6 CCR –Central Control Room Title of the presentation | Date Luas CCR is based at Red Cow It is the nerve centre for the Luas network CCR is manned

13

Safety

Safety is the foundation of the Transdev Luas business

Maintained our excellent safety record.

No substantial safety issues since the opening of

Luas Cross City.

Page 14: Title of the presentation · 6 CCR –Central Control Room Title of the presentation | Date Luas CCR is based at Red Cow It is the nerve centre for the Luas network CCR is manned

14

Page 15: Title of the presentation · 6 CCR –Central Control Room Title of the presentation | Date Luas CCR is based at Red Cow It is the nerve centre for the Luas network CCR is manned

15

98% Luas Customer Satisfaction (NTA)

Safe.

Reliable.

Sustainable.

Page 16: Title of the presentation · 6 CCR –Central Control Room Title of the presentation | Date Luas CCR is based at Red Cow It is the nerve centre for the Luas network CCR is manned

Questions?