OIL & GAS DEVELOPMENT COMPANY LIMITED PROCUREMENT DEPARTMENT, ISLAMABAD FOREIGN SECTION E Material Tender Enquiry No Due Date Evaluation Criteria .$ERVO HYDRAULIC VIBRATORS WlTH ELECTRONICS PROC-FElCBIEXPL-1 959120 I 6 FULL rNoI>escrfption Seismic Servo Hydraulic Vibrators (Peak force Minimum 60,000) fitted with latest Vibrator Control Electronics (Details Attached in attachment Number 5 (To be completed, filled in, signed and stamped by the principal) ANNEXURE 'A' Unit Pri~' Total Price C&FBYSEA: C &F BY SEA DeViated ~ront Tender Spec. If Any Note: (I) PURSUANT TO TENDER CLAUSE # 2,2, IIA, 13 & 353,2, BID BOND AMOUNTING TO US$ 66,000/- (US DOLLAR SIXTY SIX THOUSAND ONLY) SHOULD BE SUBMITTED WITH THE TECHNICAL BID (2) EVALUATION CRITERIA: FULL CONSIGNMENT WISE ON C&F BY SEA, KARACHL COST OF THE RECOMMENDED SPARES WILL NOT BE PART OF THE FINANCIAL EV ALUA TION (3) SIX (06) PAGES TECHNICAL SPECIFICATION AND T &Cs ATTACHED HEREWITH, :tIT ~f>JI' Page J

Transcript of :tIT ~f>JI'

OIL & GAS DEVELOPMENT COMPANY LIMITEDPROCUREMENT DEPARTMENT, ISLAMABAD

FOREIGN SECTION E

Material

Tender Enquiry No

Due Date

Evaluation Criteria

.$ERVO HYDRAULIC VIBRATORS WlTH ELECTRONICS

PROC-FElCBIEXPL-1 959120 I6

FULL

rNoI>escrfption

Seismic Servo Hydraulic Vibrators (Peak force Minimum 60,000) fitted withlatest Vibrator Control Electronics (Details Attached in attachment

Number 5

(To be completed, filled in, signedand stamped by the principal)

ANNEXURE 'A'

Unit Pri~' Total PriceC&FBYSEA: C &F BY SEA

DeViated ~rontTender Spec. If Any

Note: (I) PURSUANT TO TENDER CLAUSE # 2,2, IIA, 13 & 353,2, BID BOND AMOUNTING TO US$ 66,000/- (US DOLLAR SIXTY SIX THOUSAND ONLY) SHOULD BE SUBMITTED WITH THETECHNICAL BID (2) EVALUATION CRITERIA: FULL CONSIGNMENT WISE ON C&F BY SEA, KARACHL COST OF THE RECOMMENDED SPARES WILL NOT BE PART OF THE FINANCIALEV ALUA TION (3) SIX (06) PAGES TECHNICAL SPECIFICATION AND T &Cs ATTACHED HEREWITH,

:tIT ~f>JI'

Page J

•.. Oracle attachment for the requisition NO. ECMP (GS) F-68/2016,"

iSeismic Servo Hydraulic Vibrators (Peak force Minimum 60,000) With Vibrator control Electronics

Following are the main parts of annexure

A. Brand New Servo-Hydraulic VibratorsB. Latest new Vibrator control electronics of Mis INOV AI Mis SercelC. Terms and conditions.

Page 1 of 6

)

05

A-2

II

AA-I

Brand New Servo-Hydraulic VibratorsGENERAL

1. Latest design for simplified operation and easy access for maintenance. Low centre of gravity suitable for high sand dunes and high hillyareas. Enhanced visibility to meet all the safety requirements.

2. Power take off I engine and pump drive with flexible coupling, reliability should be of high level and heavy duty.3. Simplified hydraulic hose installation to avoid the complications of the piping system with no compromise in the overall performance.4. Operator cabin leather insulated be facilitated with camera to keep an eye on the Front, back and Massi Base plate of vibrator during operation.5. Reduced Noise level in the vibrator cabin and around the vibrator at HSEQ standards.

VIBRATOR1. Peak Force Minimum 60,000 Ibf2. Rated Frequency Minimum I to 250 HZ3. Balancing Technique Air Bagsl Air Spring4. Isolation Method Air Baas/ Air Snrinz

I A-31. Filtration Minimum 3 Micron2. Accumulators Minimum 02 for smooth operation3. Heat Exchanger Heavy Duty Core with Hydraulic driven Motor Multi wing fan with temperature control unit

! 4. Air Pressure System Clean dry air at Minimum 90 PSI for pneumatic components with moisture control unitr A-4 BASE PLATEI 1. Type Rectangular, reinforced P wave type.

2. Isolation Air bagsl Air Spring3. Lift System Minimum 2 Guide Rods and 2 Lift cylinders.4. Ground Clearance Minimum 18 inch.

I A-S!i

I

HYDRAULIC SYSTEMI PNEUMATIC

ENGINE1. Engine2. BHP3. RPM4. Cooling5. OnlOff

:Water cooled 4 stroke Diesel: Minimum 400 HP: Maximum 2200.: Heavy Duty water cooled radiator to work in very high temperature Areas (i-e +50 degree C).:Internal and external start! stop switch with emergency shutdown safety

A-6 MISCELANEOUS1. Fuel Tank2. Axle3. Brake4. Frame

: VIin imurn for 16 hour operation.: Inboard/outboard planetary axle with operator control differential lock.: Hydraulic actuated Internal Wet Disc, spring actuated wet Disc Parking.: High Strength frame for maximum strength and reliability.

(III

I

~)~

" ">\"•.' Oracle attachment for the requisition NO. ECMP (GS) F -68/20) 6 Page 2 of 6'.

5. Steering : Articulated assembly with hydraulic power steering6. Bumper : Front & rear bumper7. Mud Guards : Tire front rear Mud Guards

A-7 CABIN

Steel Construction. Fully Insulated, Tinted Glass, Carpeted, Two Doors. Cooling and Heating system, Adjustable driver and passenger seats withsafety Belt. fitted with rollover protection, Engine and hydraulic/ pneumatic circuit monitoring display, outside rear view mirror, Fire extinguisher tobe provided inside the driver cabins, Defroster, wiper, dome light. AC sunroof Cover (Incase AC is on Roof), centralize greasing system, camera tokeep an eye on the Front, back and Mass/ Base plate of vibrator during operation etc

A-8 BUGGYI. Length : Maximum 11.5 Meters.2. Width : Maximum 3.75 Meters with central air inflating system3. Height : Maximum 3.75 Meters with all vehicle accessories ,4. Grade ability : Minimum 60 % (3 I degree)

I

5. Gross Vehicle Weight: Maximum 70,000 Lbs6. Electrical : 24V/ 12 V start I

7. Winch Capacity : 30,000 Ibs minimum hydraulically operated.8. Tires Type : All Weather /terrain size 67x34x25/ 66x44x25 minimum 20 pr or equivalent with central tire air inflating system

1'4(With one spare tire complete(with bar and spanner) with rim for each vibrator)9. Paint : Anti Rust Prime Plus white enamel.

A-9 TEST BENCH AND TOOLS 02TEST BENCH

I. Hydraulic system maintenance tool with different size quick coupler fittings/ gauge to check different pressure.2. Engine diagnostic tool (With Life time License) if deem necessary.

I

TOOLSAll the standard tools for the repair and maintenance of the equipment must be provided (List must be provided 'with the bid with literature inEnglish language). \

I A-10 SPARES 01

I MECHA:\ICAL SPARESI ! II. Adequate Mechanical spares for all the equipment must be quoted for the repair and maintenance for a oeriod of? ) ear operation in the remote I

area's after commissioning including engine top overhauling kit. I

2. Item \\ ise list of all spares would be provided with technical literature (but prices must be mentioned in financial bid only ).I 3. The price of spares would not be part of financial evaluation at the time of financial bid opening.I 4. Selection of spares from list would be finalized according to the requirement by indenting department.

~

~J

I

r" ,,

Oracle attachment for the requisition NO. ECMP (GS) F-68/2016," Dage30f6

i A-1I I SET OF DOCUMENTATION.

Set of manuals for vibrators and all associated equipment in English. Complete operation/workshop manuals and part catalogues for all themanufacturer's units fitted on vibrators in soft and hard form.

03

A-12 01PROFESSIONAL DEVELOPMENT PROGRAM:

Bidder will arrange Two weeks training free of charge for 02 professionals from indenting department at manufacturer's works for operation, repairand maintenance of; Vibrator engine, Vibrator Hydraulics, etc

II

i Note: - All expenses including travel, living, boarding and per diem etc. will be paid by the bidder for each trainee for whole training period.

Ir A-13I

I Two weeks for Vibrators onsite equipment commissioning by the bidder/ manufacturer's engineer free ofcharge. including travel and living I Ii Ii expenses at seller's account OGDCL will provide in land transportation from Hotel to Commissioning site as per term and condition at Serial No.2., ', ~ I !

I ' I~It',A-14 'WARRANTY I I

I All the equipment must be warranted for a minimum period of two years for all components of main equipment. which will start after completion of I Icommissioning and defective items will be replaced free of charge including freight and other during warranty period by bidder and OEM. I IOEM"rt;fi"" ofw",""nty m"'t b, pco,;d,d w;thth, b;d. , U

~)¥?I

COMMISSIONING AND START UP ON SITE. 01 1

" ,~\•.. \

...... ,'

Real time Quality Control & data monitoring• Ensuring that the vibrator generates the proper sweep without any risk of polarity inversion.

I· · A complete QC data base is generated for real time/post processing analysis including, Phase, Distortion, Fundamental ground force.

• Vibrator signature cross-correlation wavelet, Earth ground model characteristics. All the QC data from Vibrator's Control Electronics canI be saved and displayed (at Recording Truck) in detailed Line & Bar graphs for each vibrator current values and average values for a sum ofi sweeps. Provides comprehensive data analysis and data storage. Also alarms reporting of out of tolerance vibrator.I • QC database format APS mos. COG. VP attr;butes. Other QC files may also be geoorated by system. I WI

B-3 DIFFERENTIAL GLOBAL POSITIONING SYSTEM ¥The system be capable of, to be worked with all Sercel4?8XL and onward and INOVA G31 HD and onward_Sesimic Data Acquisition Systems. It Iwill be utilize~ to record/display corrected vibrosies source positioning .during seismic data acquisition in single or multi-fleet vibrosies have I Icapability of vibrosies source tracking. The DGPS IS to be integrated With above described Vibrator Digital Control System. I'" .FEATURE AND SPECIFACATIONS

• A sub-meter G PS reference station capable of sending corrections in standard format with 35 Wan UHF Radio allow to operate mobilereceivers in differential mode

• Sub-meter accuracy: - Less than 0 I meter, EQUIPMENT DESCRIPTIOl\

Sub-meter GPS reference station system (35 Watt).Complete with receiver configured 10 operate in reference station mode, system interface. radio set, cables, antenna & accessories.

Oracle attachment for the requisition NO. ECMP (GS) F-68/2016

fB

Pilot generator with digital! TDMA radio with guidance system/ software• Capable to work all Sercel 428XL and onward and INOV A G3! HD and onward Sesimic Data Acquisition Systems with quality parameter

and Quality files and ifany Hardware/Software are required to work with any of the said system OEM will be responsible to provide necessarysoftware or any other hardware.

• Having capability of both radio & wire line similarity ofvibs (to check vibs. performance).• It enables the use of advanced vibrosies techniques such as: Random, linear, non-linear sweeps & Pulse etc. Simultaneous or slip-mode

capable combination of sweep segments with no dead time multiple simultaneous source application fully compatible with most satelliteDGPS for recording and display of vibrators GPS positioning and navigation and guidance system/ software.

LATEST NEW VIBRATOR DIGITAL CONTROL SYSTEM OF INOVAI SERCEL (INOVA VibproHD I ~ERCEL VE464 OR LATEST)(DIGITAL! TDMA RADIO WITH VIBRATOR GUIDANCE SYSTEM OR LATEST)

B-1 Servo control hydraulic Vibrator Electronics with digital! TDMA radio with guidance system• Latest Vibrator digital control electronics installed on each vibrator with guidance system installed in each vibrator.• Wifi Wireless for inter vibrator communication to calculate COG.• Performs real time control of the vibrator ground force, computes & transmits complete attribute set for quality control data base to Recording

Truck.• Provides an optimal control which minimizes distortion & maximizes the fundamental output force & phase locking while controlling

ground force amplitude.• Performs continuous tests to check the reliability & integrity of the accelerometers.

B-2

I

I .~

Page4of6

08

02

02

'#..Oracle attachment for the requisition NO. ECMP (GS) F-68/2016 Page 5 of 6, ,,.

~

Not" - A" expenses indud; fig travel liv ing, boardi ng and pee d iern etc will be P'; d by the bidder for each trainee for who" traini ng period. I I ~i I

B-8 SETOFDOCUME'iTATIO'i. ' .I Set of manuals for vibrators and all associated equipment in English ..Complete operation/workshop manuals and part catalogues for all the

manufacturer's units fitted on vibrators in soft and hard form.

.r Sub-meter vib. GPS system for vibrators

Complete with receiver configured to operate in DGPS mode, interface system, radio set, antenna, cables & accessories. 08

B-4 Recording truck equipment for interfacing with data acquisition system 02Complete with computer, Software, recording system interface, radio set, antenna, cables & accessories to completely interface with DataAcquisition system and Capable to work with Sercel428XL and INOV A G31 HD Sesimic Data Acquisition Svstems.

B-S VHF Radio 08For Vibrator and recording truck cabin voice communication.Description General

VHF mobile two ways radio (transceiver),

frequency range 136 to 174 MHzoutput power 40 to 45 watts ,

input voltage DC 12V II

B-6 TEST BENCH AND TOOLS rTEST BENCH .02

I

Test bench for Vibrator electronics and pilot generator if deem necessary. JIj I

TOOLSAll the standard tools for the repair and maintenance of the equipment must be provided (List must be provided with the bid with literature in English

language).I B-6 SPARES I III "

ELECTRONIC SPARES 011. Servo control hydraulic Vibrator Electronics2. Pilot Generator I

I 3. Sub-meter G PS reference station system (35 Watt)I 4. Sub-meter vib, GPS system 1

III B-7 PROFESSIONAL DEVELOPMENT PROGRAM: • 01I

I Bidder will arrange Two weeks training free of charge for 02 professionals from indenting department at manufacturer's works for operation, repair

I.. ...

I

jib

03

~ I I ;

Oracle attachment for the requisition NO. ECMP (GS) F-68/2016

B-9 COMMISSIONING AND START UP ON SITE. ,01

Two weeks for Vibrator Electronics onsite equipment commissioning by the manufacturer's engineer free of charge, including travel and livingexpenses at seller's account. OGDCL will only provide in land transportation from Hotel to Commissioning site.

B-IO WARRANTYAll the equipment must be warranted for a minimum period of two years for all components of main equipment, which will start after completion ofcommissioning and defective items will be replaced free of charge including Freight and other charges during warranty period by bidder and OEM.OEM certificate must be provided with the bid.

e TERMS AND CONDITIONS.

1. The Manufacturer or its authorized agent may participate in bid, copy of authorization certificate should be provided on OEM letter headpad

2. Bidder will ensure and give certificate that OEM of Vibrator will be responsible to give all necessary interface or cables/ boxes like lift boxbreak out box or any other panels to hook up with VE464 and Vibpro HD systems or their latest models.

3. Bidder will ensure and give certificate from OEM to provide necessary cables/software/ protocol or any other hardware required to hook upelectronics in vibrator and work with Sercel428XL and INOVA G3! Seismic Data Acquisition Systems and their onward Seismic Data ~Acquisition Systems. I

4. The manufacturer/ Bidder must have sold Minimum 100 Nos of seismic vibrators to well renowned intelnational geophysical companiesacquiring Seismic Data with Address, telephone No. and email must be provided for cross confirmation. \

5. The manufacturer / Bidder must provide the 05 satisfactory performance certificates of Vibrators from world renowned different E & P \

I

geophysical companies (Certificate must possess date, address, e-mail, year of purchase etc with authentic sale record for confirmation).6. Complete technical bid should be submitted in all respects, with detailed technical English literature and provide compliance sheet with bid.7. Manufacturer must have minimum 10 years' experience of manufacturing the Vibrators (experience will be considered from first sale of

Ivibrators for which bidder must provide evidence of sale contract along with the bid).

8. Bidder will ensure and give certificate from OEM for Technical support and supply of spare parts and Service for minimum 10 years forboth vibrators and vibrator control electronics. Local OEM representative will also be responsible in this regard (please provide certificatefrom bidder on original letter head pad)

9. Third party Pre- shipment inspection will be conducted as per OGDCL procedure at manufacturer's works (at customer's account). 02 No.professionals from indenting department will witness the inspection at bidder's cost.

10. Cost / Price of Mechanical Spares will not be considered in financial evaluation of main equipment and it must not exceed 10% of total. price of main equipment.

11. Delivery Period 120 Days maximum.

Page 6 of 6 .