TIMELINE - I I TIMELINE · Proper excavation is the essential first step in the proper installation...

2
Contact us for a free onsite consultation of: • Propane System Design • Mechanicals Coordination • Underground/Aboveground Tank Installations • Temporary Construction Heat • Community or Metered Systems • High Effciency Appliances 800.523.5237 www.eastern.com TIMELINE While the timing on projects is rarely exactly the same, here's where propane would typically ft into your overall build schedule. Noles (1) Regardlessoritssize.anyASMEcontainerfilledonsitemustbelocatedsothat thefillingconnectionandfixedmaximumliquid levelgaugeareatleast 10ftfromanyexternalsourceolignition(e.g.,openflame,windowAC,compressor),intaketodirect-vented gasapplianc,orintaketoamechanicalventilationsystem.Reierlo6.3.4.4 (2) Reierlo 6.3.4.3 (3)This distancecanbereducedtonolessthan10fllorasinglecontainerof1200gal(4.5m3)walercapacityorless.providedsuch containerisalleast25flfromanyotherLP-Gascontainerofmorethan125gal(0.5m3)walercapacity_Referto6.3.1.3 Aboveground ASME* / 10flmin) 2��:r (Nole1) (Note2) window, oreilaustfan (sourcof1gnr1 on) ,----.: :l N Ofl(min) _,,,/ : gaf --. (Note 2 _, •�O.i! ___ �-c _ - _ - ./ _ -, -: r neofadjoiningproperty that can be ForSIunits.1fl=0.3048m Noles (1)Thereliefvalve,fillingconnection,andfixed maximumliquid lvelgauge vent connection al thecontainer mustbealleast10flfrom anyexterior sourceofignition, openingsinto direct-vent appliancs,ormechanicalventilationairintakes. Reierlo6.3.4.4 (2)Nopartofanunderground containercanbelessthan10flfrom an important building orlineofadjoiningpropertythatcanbebuilt upon.Reierlo6.3.2.3 Underground ASME* compressor (sourceofignition) ForSI units. 1fl=0.3048m Notes: Crawl spacopening, windows,or exhaust fan (1)5flmini mumfrom relief valveinanydirection away fromanyexterior source of ignition, openings intodirect-vent appliances,ormechanical ventilationairintakes.RefertoTable6.3.4.3. (2)Ifthecylinderisfilledonsiteatthepointofusefromabulktruck,thefillingconnectionandventvalvemustbeatleast 10flfromany exteriorsourceof ignition,openings intodirect-ventappliances,ormechanicalventilationairintakes. Refer to6.3.4.4. (3)Referto6.3.4.3. Cylinders* - ",: . " "� 0 u ,-.o, o "v 0 ."< C < " u t- .2 8 L L "" -� �: "" LC t-w E " 0 I V z 0 _ : c z C v w 0 We're In Your Neighborhood

Transcript of TIMELINE - I I TIMELINE · Proper excavation is the essential first step in the proper installation...

Page 1: TIMELINE - I I TIMELINE · Proper excavation is the essential first step in the proper installation of an underground tank. Improper excavation can jeopardize the installation and

Contact us for a free onsite consultation of:

• Propane System Design• Mechanicals Coordination• Underground/Aboveground

Tank Installations• Temporary Construction Heat• Community or Metered Systems• High Efficiency Appliances

800.523.5237 www.eastern.com

TIMELINE While the timing on projects is rarely exactly the same, here's where propane would typically fit into your overall build schedule.

Noles (1) Regardless or its size. any ASME container filled on site must be located so that the filling connection and fixed maximum liquid level gauge are at least 10 ft from any external source ol ignition (e.g., open flame, window AC, compressor), intake to direct-vented gas appliance, or intake to a mechanical ventilation system. Reier lo 6.3.4.4 (2) Reier lo 6.3.4.3 (3) This distance can be reduced to no less than 10 fl lor a single container of 1200 gal (4.5 m3) waler capacity or less. provided such container is al least 25 fl from any other LP-Gas container of more than 125 gal (0.5 m3) waler capacity_ Refer to 6.3.1.3

Aboveground ASME*

/ 10flmin) 2:::��:':;r (Nole 1) (Note 2) window, or eidlaust fan (sourceof1gnrt1on) ,----.: :l NOfl(min) _,,,,/ : ¾gaf ·--. (Note 2�_,.......-· •�Of'.i<J!}!J ___ �--c) _........-_........-

./ _........-,.......--- ��:r��neofadjoining property that can be

For SI units. 1 fl= 0.3048 m Noles (1) The relief valve, filling connection, and fixed maximum liquid level gauge vent connection al the container must be al least 10 fl from any exterior source of ignition, openings into direct-vent appliances, or mechanical ventilation air intakes. Reier lo 6.3.4.4 (2) No part of an underground container can be less than 10 fl from an important building or line of adjoining property that can be built upon. Reier lo 6.3.2.3

Underground ASME*

compressor (source of ignition) For SI units. 1 fl= 0.3048 m

Notes:

Crawl space opening, windows,or exhaust fan

(1) 5 fl minimum from relief valve in any direction away from any exterior source of ignition, openings into direct-vent appliances, or mechanical ventilation air intakes. Refer to Table 6.3.4.3. (2) If the cylinder is filled on site at the point of use from a bulk truck, the filling connection and vent valve must be at least 10 fl from any exterior source of ignition, openings into direct-vent appliances, or mechanical ventilation air intakes. Refer to6.3.4.4. (3) Refer to 6.3.4.3.

Cylinders*

-g "',::, . ""� 0. u ,-.o, � oi ��

"vi 0 ..::,t_"<J C <C "' u

t- .2

8 L L"" - ��:::, "'"L C

t-w

E " 0..

I Vl z

0 _J

::J co

z CJ vi w 0

I I

I I

Contact us for a free onsite consultation of:

• Propane System Design• Mechanicals Coordination• Underground/Aboveground

Tank Installations• Temporary Construction Heat• Community or Metered Systems• High Efficiency Appliances

800.523.5237 www.eastern.com

TIMELINE While the timing on projects is rarely exactly the same, here's where propane would typically fit into your overall build schedule.

Noles (1) Regardless ol its size. any ASME container filled on site must be localed so that the filling connection and fixed maximum liquid level gauge are al least 10 fl from any external source ol ignition (e.g., open flame, window AC, compressor), intake lo direct-vented gas appliance, or intake lo a mechanical ventilation system. Reier lo 6.3.4.4 (2)Reler lo6.3.4.3 (3) This distance can be reduced to no less than 10 fl lor a single container of 1200 gal (4.5 m3) waler capacity or less. provided such container is al least 25 fl from any other LP-Gas container of more than 125 gal (0.5 m3) waler capacity_ Refer to 6.3.1.3

Aboveground ASME*

For SI units. 1 fl= 0.3048 m Noles

./ _/ __ Nearestlineofadjoining propertythatcanbe / bu11tupon

(1) The relief valve, filling connection, and fixed maximum liquid level gauge vent connection al the container must be al least 10 fl from any exterior source of ignition, openings into direct-vent appliances, or mechanical ventilation air intakes. Reier lo 6.3.4.4 (2) No part of an underground container can be less than 10 fl from an important building or line of adjoining property that can be built upon. Reier lo 6.3.2.3

Underground ASME*

compressor (source of ignition) For SI units. 1 fl= 0.3048 m

Notes:

Crawl space opening, windows,or exhaust fan

(1) 5 fl minimum from relief valve in any direction away from any exterior source of ignition, openings into direct-vent appliances, or mechanical ventilation air intakes. Refer to Table 6.3.4.3. (2) If the cylinder is filled on site at the point of use from a bulk truck, the filling connection and vent valve must be at least 10 fl from any exterior source of ignition, openings into direct-vent appliances, or mechanical ventilation air intakes. Refer to6.3.4.4. (3) Refer to 6.3.4.3.

Cylinders*

C >-sQ L� "'u L � OL a.� E :<' �8

8 L L"" - ��:::, "',::, L C

t-w

E " 0..

I Vl z

0 _J

::J co

z CJ vi w 0

We're In Your Neighborhood We're In Your Neighborhood

Page 2: TIMELINE - I I TIMELINE · Proper excavation is the essential first step in the proper installation of an underground tank. Improper excavation can jeopardize the installation and

Ho

le D

ime

nsio

ns *

* **T

ou

ch

up

an

y s

cra

tch

es o

r m

ark

s o

n t

an

ks o

r lif

tin

g lu

gs w

ith

pro

pe

r co

atin

g m

ate

ria

ls b

efo

re b

ack-f

illin

g.

Ta

nk S

ize

Ta

nk D

ime

nsio

ns

We

igh

t (a

pp

rox.)

Be

low

th

e T

an

k-a

ll siz

es

Be

su

reto

ke

ep

atle

asth

alf

ofrise

r(d

om

e)

ab

ove

gro

un

dM

ark

ing

the

ha

lfw

ay

po

intb

efo

reb

ack-f

illin

gis

he

lpfu

le

sp

ecia

llyif

fin

ish

ing

with

top

so

ilF

illin

g

Pro

pe

r e

xca

va

tio

n is t

he

esse

ntia

l firs

t ste

p in

th

e p

rop

er

insta

llatio

n o

f a

n u

nd

erg

rou

nd

ta

nk.

Imp

rop

er

exca

va

tio

n c

an

je

op

ard

ize

th

e in

sta

llatio

n a

nd

ca

n p

ote

ntia

lly le

ad

to

a h

aza

rdo

us g

as le

ak.

14

' L

x 5

' W

x 4

' 6

" D

eep

20

' L

x 5

' 6

" W

x 4

' 6

" D

eep

Six

in

ch

es o

f sa

nd

in

th

e b

ott

om

of

the

ho

le .

On

e 1

7 lb

. A

no

de

ba

g c

on

nte

cte

d t

o t

an

k.

Pla

ce

at

lea

st

2' a

wa

y f

rom

ta

nk a

nd

lo

w in

th

e h

ole

. P

ou

r 1

ga

llon

of

wa

ter

on

ba

g a

nd

im

me

dia

tely

co

ve

r w

ith

sa

nd

.

Sa

me

pro

ce

du

re -

usin

g 2

An

od

e b

ag

s.

320 G

al.

9' 6

" L x

4' W

x 4

4"

Deep

13

' L

x 4

' 6"

W x

52

" D

eep

Wa

rnin

g:

Th

e in

sta

llatio

n o

f u

nd

erg

rou

nd

LP

ga

s t

an

ks is g

ove

rne

d b

y t

he

LP

Ga

s C

od

e (

NF

PA

58

) a

nd

mu

st

alw

ays b

e d

on

e b

y a

qu

alif

ied

pro

fessio

na

l.

Insta

llatio

n o

f ta

nks b

y u

nq

ua

lifie

d p

ers

on

s c

an

po

ten

tia

lly le

ad

to

a h

aza

rdo

us g

as le

ak.

Be

su

re t

o c

all

Dig

sa

fe b

efo

re d

igg

ing

: 8

88

-DIG

-SA

FE

(3

34

-72

33

).

500 G

al.

10

' x 3

8"

dia

me

ter

16

' x 4

1"

dia

me

ter

120 G

al.

17

31

lb

.

On

ce

ta

nk is p

lace

an

d in

sp

ecte

d b

y t

he

lo

ca

l A

HJ,

if r

eq

uire

d,

ba

ck-f

ill t

he

en

tire

ho

le w

ith

sa

nd

. G

rad

e d

ow

nw

ard

an

d a

wa

y f

rom

h

ou

sin

g d

om

e.

Th

is p

reve

nts

wa

ter

fro

m c

olle

ctin

g a

nd

ru

nn

ing

in

to o

r sta

nd

ing

aro

un

d t

he

ho

usin

g d

om

e.

Ba

ck-f

ill *

*

If a

co

ncre

te p

ad

is r

equired, depth

of hole

must be 6

" deeper

to a

ccom

modate

a 6

" concre

te p

ad in the d

imensio

ns o

f th

e tank w

ith 4

anchor

eye b

olts (

one in e

ach c

orn

er

of th

e p

ad).

Attach s

tain

less s

teel or

sim

ilar

str

appin

g fro

m lifitin

g lugs d

ow

n to e

ye b

olts. M

ultip

le u

nder

grou

nd ta

nks

need

to b

e se

para

ted

by a

min

imum

of 3

feet

. Mea

surin

g fr

om th

e ta

nk s

urfa

ce.

1000 G

al.

5' 6

" x 2

4"

dia

me

ter

9' x

32

" d

iam

ete

r

Prio

r to

Ba

ck-f

illin

g

.bl

12

9.

bl 8

85

.bl

25

2

Ga

s L

ine

Tre

nc

h S

pe

cif

ica

tio

ns

: T

he tre

nch

fo

r buried c

oate

d c

opper

tubin

g o

r poly

eth

yle

ne p

ipe a

nd tubin

g s

hall

be insta

lled w

ith

a m

inim

um

12 in. o

f cle

an fill

or

sand. D

o n

ot backfill

until in

specte

d b

y the local A

HJ, if r

equired. T

he m

inim

um

cover

shall

be incre

ased to 1

8 in

. if

exte

rnal dam

age to

the p

ipe o

r

tubin

g fro

m v

ehic

les is lik

ely

to r

esult. T

race

r w

ire

(re

quired fo

r P

E p

ipe &

tubin

g o

nly

) alo

ng w

ith y

ello

w c

aution tape (

Caution G

as L

ine B

uried B

elo

w)

shall

be

pro

perl

y in

sta

lled b

y a

qualif

ied s

erv

ice

technic

ian.

Be

sure

tokeep

atle

asthalf

of

riser

(dom

e)

above

gro

und.

Mark

ing

the

halfw

ay

poin

tbefo

reback-f

illin

gis

help

ful ,

especia

llyif

finis

hin

gw

ith

top

soil .

Fill

ing

in m

ore

than h

alfw

ay c

an c

ause f

utu

re w

ate

r/fr

eezin

g p

roble

ms a

nd m

ust be a

void

ed.

Tan

k D

om

e -

Half o

f th

e d

om

e m

ust be a

bove t

he g

round.

G

rade d

ow

nw

ard

and a

way f

rom

dom

e.

28"

hig

h d

om

eM

ulti-valv

e &

re

gula

tor

insid

e d

om

e

A 6

-inch b

ase o

f sand in r

equir

ed o

n a

ll underg

round t

ank insta

llations.

fig

. A

. D

eta

il o

f dom

e

Copyright©

202

0, E

aste

rn P

ropane G

as, In

c.

Fin

ish G

rade

28"

Excavati

on

Gu

ide

lin

es

for U

nd

erg

rou

nd

Pro

pan

e T

an

ks

10”

9”

8”

7”

6”

5”

4”

3”

2”

1”

Pro

pan

e &

Oil

Since

1932

Mul

tiple

und

ergr

ound

tank

s ne

ed to

be

sepa

rate

d by

a m

inim

um o

f 3 fe

et. M

easu

ring

from

the

tank

sur

face

.

i

020