Time cost-quality model

3
QUALITY

Transcript of Time cost-quality model

Page 1: Time cost-quality model

QUALITY

Page 2: Time cost-quality model

Choose only 2

1. Quality + Cost = Impact** on Time

2. Cost + Time = Impact** on Quality

3. Time + Quality = Impact** on Cost

**Impact could be Positive or Negative- Discussed in the forthcoming Scenarios

Page 3: Time cost-quality model

Scenario

1. I require something of best quality and costisn't an issue then I could get that in ashorter timeframe

2. I require something that is very good qualitybut I have a very limited budget then Itwould take longer time to procure that

3. I require some thing in a very shorttimeframe and of the best quality then Iwould need to shell out additional cost