QUALITY
Choose only 2
1. Quality + Cost = Impact** on Time
2. Cost + Time = Impact** on Quality
3. Time + Quality = Impact** on Cost
**Impact could be Positive or Negative- Discussed in the forthcoming Scenarios
Scenario
1. I require something of best quality and costisn't an issue then I could get that in ashorter timeframe
2. I require something that is very good qualitybut I have a very limited budget then Itwould take longer time to procure that
3. I require some thing in a very shorttimeframe and of the best quality then Iwould need to shell out additional cost