Timelines for Water Extracon Licence / Pastoral Land Clearing / Non-Pastoral Use Applicaons Water Extracon Licence (WEL) Pre-lodgement meeng (Oponal) Pastoral Land Clearing (PLC) Non-Pastoral Use (NPU) Pre-lodgement meeng Decision Accept Public Exhibion 4 weeks Service Authories Applicaon circulated to Service Authories. 6 weeks Technical Assessment report prepared. Collaon of all comments. Report and comments sent to applicant. 2 weeks 7 weeks Nave Title Applicaon circulated to Nave Title holders. 12 weeks (90 days) Refuse Pre-lodgement meeng 24 weeks + Applicant addional me for preparaon 12 weeks 1 week 10 days 2 weeks Applicaon received and verified. Decision Accept Inial Assessment 2 weeks 14 weeks 2 weeks (10 days) Refuse Public Comment Noce of Intenon published. Adjacent landholders advised. 4 weeks (30 days) Controller of Water Resources makes a determinaon. Decision Approve / Refuse Noce of Decision Controller of Water Resources publishes a Noce of Decision. 4 weeks 4 weeks (30 days) 16 weeks 24 weeks + Applicant addional me for preparaon 1 week Decision Accept Public Exhibion 4 weeks Service Authories Applicaon circulated to Service Authories. DENR undertakes field inspecon. 6 weeks Applicaon lodged and verified. 6 weeks Report prepared for Nave Vegetaon Assessment Panel (NVAP). 1 week 3 weeks 1 week Pastoral Land Board (PLB Report) prepared. PLB makes a determinaon. 3 weeks 2 weeks Determinaon Approve / Refuse 17 weeks + Applicant me for preparaon Noce of Decision If approved - permit, endorsed drawings and Noce of Consent issued. 2 weeks Refuse 2 weeks + addional me for applicant if required NVAP meeng 4 weeks Noce of Decision of WEL Technical Assessment report prepared. Collaon of all comments. Report and comments sent to applicant. When applicaons can run concurrently: Simple Proposals (applicaons can occur concurrently) - Seeking less than 500ML outside a water allocaon plan area. - Seeking less than 10% of the general consumpve pool in a water allocaon plan area. - Not within 1km of a groundwater dependent ecosystem protecon zone or a wetland. - Not within a groundwater discharge protecon area All other applicaons: - Water Extracon Licence is required first Simple Proposals - Concurrent Applicaons 4 weeks NPU Report prepared. PLB makes a determinaon. 3 weeks Noce of Decision If approved - permit, endorsed drawings and Noce of Consent issued. 2 weeks 2 weeks Determinaon Applicant Acon Applicant provided with minimum two weeks to respond to Technical Assessment report and comments. Applicant Acon Applicant provided with minimum two weeks to respond to Technical Assessment report and comments. Report prepared for Controller of Water Resources. Approve / Refuse 2 weeks + addional me for Applicant if required PAUSE Unl aer NVAP meeng for PLC 1 week Applicaon lodged and verified. LEGEND DENR consideraon and acon Exhibion / comment Determinaon Noce of Decision

Transcript of Tim el ines fo r Water Extra c o n L icence / Pa s to ra l ...€¦ · Tim el ines fo r Water Extra...

Page 1: Tim el ines fo r Water Extra c o n L icence / Pa s to ra l ...€¦ · Tim el ines fo r Water Extra c o n L icence / Pa s to ra l L a nd C l ea ring / No n-Pa s to ra l Us e Appl

TimelinesforWaterExtrac�onLicence/PastoralLandClearing/Non-PastoralUseApplica�ons

WaterExtrac�onLicence(WEL)

Pre-lodgementmee�ng(Op�onal)

PastoralLandClearing(PLC) Non-PastoralUse(NPU)

Pre-lodgementmee�ng

Decision

Accept

PublicExhibi�on

4weeks

ServiceAuthori�esApplica�oncirculatedtoServiceAuthori�es. 6

weeks

TechnicalAssessmentreportprepared.Colla�onofallcomments.Reportand

commentssenttoapplicant.

2weeks

7weeks

Na�veTitleApplica�oncirculatedtoNa�veTitleholders. 12

weeks

(90days)

Refuse

Pre-lodgementmee�ng

24weeks+Applicantaddi�onal�meforprepara�on

12weeks

1week

10days

2weeks

Applica�onreceivedandverified.

Decision

Accept

Ini�alAssessment

2weeks

14weeks

2weeks(10days)

Refuse

PublicComment

No�ceofInten�onpublished.Adjacentlandholdersadvised. 4

weeks

(30days)

ControllerofWaterResourcesmakesadetermina�on.

Decision

Approve/Refuse

No�ceofDecision

ControllerofWaterResourcespublishesaNo�ce

ofDecision.

4weeks

4weeks

(30days)

16weeks

24weeks+Applicantaddi�onal�meforprepara�on

1week

Decision

Accept

PublicExhibi�on4weeks

ServiceAuthori�es

Applica�oncirculatedtoServiceAuthori�es.DENRundertakesfieldinspec�on.

6weeks

Applica�onlodgedandverified.

6weeks

ReportpreparedforNa�veVegeta�onAssessmentPanel

(NVAP).

1week

3weeks

1week

PastoralLandBoard(PLBReport)prepared.

PLBmakesadetermina�on.

3weeks

2weeks

Determina�on

Approve/Refuse

17weeks+Applicant�meforprepara�on

No�ceofDecision

Ifapproved-permit,endorseddrawingsandNo�ceofConsentissued.

2weeks

Refuse

2weeks+addi�onal

�meforapplicantif

required

NVAPmee�ng

4weeks

No�ceofDecisionofWEL

TechnicalAssessmentreportprepared.Colla�onofallcomments.Reportand

commentssenttoapplicant.

Whenapplica�onscanrunconcurrently:

SimpleProposals(applica�onscanoccurconcurrently)-Seekinglessthan500MLoutsideawateralloca�onplanarea.-Seekinglessthan10%ofthegeneralconsump�vepoolinawateralloca�onplanarea.-Notwithin1kmofagroundwaterdependentecosystemprotec�onzoneorawetland.-Notwithinagroundwaterdischargeprotec�onarea

Allotherapplica�ons:-WaterExtrac�onLicenceisrequiredfirst

SimpleProposals-ConcurrentApplica�ons

4weeks

NPUReportprepared.

PLBmakesadetermina�on.

3weeks

No�ceofDecision

Ifapproved-permit,endorseddrawingsandNo�ceofConsentissued.

2weeks

2weeks

Determina�on

ApplicantAc�on

ApplicantprovidedwithminimumtwoweekstorespondtoTechnicalAssessmentreportand

comments.

ApplicantAc�on

ApplicantprovidedwithminimumtwoweekstorespondtoTechnicalAssessmentreportand

comments.

ReportpreparedforControllerofWater

Resources.

Approve/Refuse

2weeks+addi�onal

�meforApplicantif

required

PAUSE

Un�la�erNVAPmee�ngforPLC

1week

Applica�onlodgedandverified.

LEGEND

DENRconsidera�onandac�on

Exhibi�on/comment

Determina�on

No�ceofDecision

Page 2: Tim el ines fo r Water Extra c o n L icence / Pa s to ra l ...€¦ · Tim el ines fo r Water Extra c o n L icence / Pa s to ra l L a nd C l ea ring / No n-Pa s to ra l Us e Appl

WaterExtrac�onLicence(WEL)

Pre-lodgementmee�ng

STAGE1

StartatNo�ceofDecisionofWEL

Pre-lodgementmee�ng Pre-lodgementmee�ng

StartatNo�ceofDecisionofWEL

24weeks+applicantaddi�onal�meforprepara�on

STAGE2*

PastoralLandClearing(PLC)

1week

Decision

Accept

PublicExhibi�on

TechnicalAssessmentreportprepared.Colla�onofallcomments.Reportand

commentssenttoapplicant.

4weeks

1week

1week

Approve/Refuse

No�ceofDecision

Ifapproved-permit,endorseddrawingsandNo�ceofConsentissued.

2weeks

Refuse

24weeks+applicantaddi�onal�meforprepara�on

Non-PastoralUse(NPU)

Decision

Accept

PublicExhibi�on 4weeks

ServiceAuthori�es

Applica�oncirculatedtoServiceAuthori�es. 6

weeks

TechnicalAssessmentreportprepared.Colla�onofallcomments.Reportand

commentssenttoapplicant.

2weeks

1week

Na�veTitleApplica�oncirculatedtoNa�veTitleholders. 12weeks

(90days)

ReportpreparedforNa�veVegeta�onAssessmentPanel

(NVAP).

PastoralLandBoard(PLB)Reportprepared.

PastoralLandBoard(PLB)Reportprepared.

3weeks

3weeks

11weeks

1week

7weeks

12weeks

*Cancommencewhenproponentisno�fiedofWELdecision(approx.week20)

NPUReportprepared.

PLBmakesadetermina�on.

10days

2weeks

Applica�onreceivedandverified.

Decision

Accept

2weeks(10days)

Refuse

Decision

Approve/Refuse

10weeks

4weeks

(30days)

24weeks

22weeks

Determina�on

Approve/Refuse

No�ceofDecision

Ifapproved-permit,endorseddrawingsandNo�ceofConsentissued.

Determina�on

2weeks

3weeks

2weeks

Ini�alAssessment

4weeks

PublicComment

No�ceofInten�onpublished.Adjacentlandholdersadvised. 4

weeks

(30days)

ApplicantAc�on

ApplicantprovidedwithminimumtwoweekstorespondtoTechnicalAssessmentreportand

comments.4weeks

No�ceofDecision

ControllerofWaterResourcespublishesaNo�ce

ofDecision.

ProceedtoStage2

NVAPmee�ng

PAUSE

Un�la�erNVAPmee�ngforPLC

2weeks

ControllerofWaterResourcesmakesadetermina�on.

ReportpreparedforControllerofWater

Resources.

Allotherapplica�ons-WaterExtrac�onLicenceisrequiredfirst

2weeks+addi�onal

�meforapplicantif

required

2weeks+addi�onal

�meforApplicantif

required

Refuse

ServiceAuthori�es

Applica�oncirculatedtoServiceAuthori�es.DENRundertakesfieldinspec�on.

4weeks

4weeks

ApplicantAc�on

ApplicantprovidedwithminimumtwoweekstorespondtoTechnicalAssessmentreportand

comments.

Applica�onreceivedandverified.

Applica�onreceivedandverified.

PLBmakesadetermina�on.

6weeks

6weeks

LEGEND

DENRconsidera�onandac�on

Exhibi�on/comment

Determina�on

No�ceofDecision

Whenapplica�onscanrunconcurrently:

SimpleProposals(applica�onscanoccurconcurrently)-Seekinglessthan500MLoutsideawateralloca�onplanarea.-Seekinglessthan10%ofthegeneralconsump�vepoolinawateralloca�onplanarea.-Notwithin1kmofagroundwaterdependentecosystemprotec�onzoneorawetland.-Notwithinagroundwaterdischargeprotec�onarea

Allotherapplica�ons:-WaterExtrac�onLicenceisrequiredfirst