Throughput Analysis and Debottlenecking of...

6
28 BioPharm AUGUST 2002 Process Development provide a common reference and an evaluation framework that facilitates process development. A model shows the effects of process changes, and allows those changes to be readily evaluated and systematically documented. A reliable model can pinpoint the most cost-sensitive areas — the economic hot spots — of a complex process. Those spots are usually capital intensive, with high operating cost or with low yields and production throughputs. The findings from such analyses can focus additional lab or pilot-plant studies to optimize those process steps. Experimenting on the computer with alternative process setups and operating conditions allows a company to reduce costly and time-consuming laboratory and pilot-plant efforts. The environmental effect of a process can readily be evaluated with computer models. Material balances calculated for projected large-scale manufacturing reveal environmental “hot spots.” Those are usually process steps that require solvents or regulated materials with high disposal costs. Environmental issues not addressed during process development can lead to serious headaches during manufacturing because after a process is approved by regulatory agencies, it is costly and time-consuming to make process changes. That is particularly true for biopharmaceutical production, about which it is commonly said the process makes the product. Facility design and selection. When process development nears completion at the pilot level, simulation tools are used to systematically design and optimize the large-scale process for commercial production. Good computer models can aid in the transfer of process technology and facility design. If a new facility needs to be built, process simulators can be used to size Throughput Analysis and Debottlenecking of Biomanufacturing Facilities A Job for Process Simulators Bottlenecks are everywhere, from the freeway overpass during the morning commute to the long lines at the supermarket. But bottlenecks in a manufacturing process are bad for business. Computer models can help you eliminate those conditions or situations that retard your progress. Whether the goal is strategic planning, evaluating alternatives, purchasing equipment, appraising a facility, or optimizing production processes, simulation tools can improve your analysis. P rocess simulators and other modeling tools are gaining acceptance and popularity in the biotech industry. Such tools are mainly used to evaluate “what-if” scenarios and to optimize integrated processes. Tasks handled by process simulators include material and energy balances of integrated processes, equipment sizing, cost analyses, scheduling of batch operations, environmental impact assessments, throughput analyses, and debottlenecking (removing a condition or situation that limits process throughput). Process simulation tools can be used throughout the life cycle of process development and product commercialization (Figure 1). Using Process Simulation Tools Simulation tools can be used at many stages during the commercialization process. Idea generation. When product and process ideas are first conceived, process simulators can be used for project screening and selection and for strategic planning based on preliminary economic analyses. Process development. During preclinical and clinical testing of a drug candidate compound, a company’s process development group looks into the options available for manufacturing, purifying, and characterizing the drug substance and for formulating it as a drug product. At this stage, the process undergoes many changes. New synthetic routes are investigated: New recovery and purification options are evaluated, and alternative formulations are explored. Typically, many scientists and engineers are involved in improving and optimizing individual processing steps. Simulation tools used at this stage can introduce a common communication language and facilitate team interaction. A computer model of the entire process can Demetri Petrides, Alexandros Koulouris, and Charles Siletti Demetri Petrides is president, Alexandros Koulouris is managing director of Intelligen Europe, and Charles Siletti is director of scheduling and planning applications at Intelligen, Inc., 2326 Morse Avenue, Scotch Plains, NJ 07076, 908.654.0088, fax 908.654.3866, [email protected], www.intelligen.com.

Transcript of Throughput Analysis and Debottlenecking of...

28 BioPharm AUGUST 2002

Process Development

provide a common reference and anevaluation framework that facilitates processdevelopment. A model shows the effects ofprocess changes, and allows those changesto be readily evaluated and systematicallydocumented.

A reliable model can pinpoint the mostcost-sensitive areas — the economic hotspots — of a complex process. Those spotsare usually capital intensive, with highoperating cost or with low yields andproduction throughputs. The findings fromsuch analyses can focus additional lab orpilot-plant studies to optimize those processsteps. Experimenting on the computer withalternative process setups and operatingconditions allows a company to reducecostly and time-consuming laboratory andpilot-plant efforts.

The environmental effect of a process canreadily be evaluated with computer models.Material balances calculated for projectedlarge-scale manufacturing revealenvironmental “hot spots.” Those areusually process steps that require solvents orregulated materials with high disposal costs.Environmental issues not addressed duringprocess development can lead to seriousheadaches during manufacturing becauseafter a process is approved by regulatoryagencies, it is costly and time-consuming tomake process changes. That is particularlytrue for biopharmaceutical production, aboutwhich it is commonly said the processmakes the product.

Facility design and selection. When processdevelopment nears completion at the pilotlevel, simulation tools are used tosystematically design and optimize thelarge-scale process for commercialproduction. Good computer models can aidin the transfer of process technology andfacility design. If a new facility needs to bebuilt, process simulators can be used to size

Throughput Analysisand Debottleneckingof Biomanufacturing FacilitiesA Job for Process Simulators

Bottlenecks are everywhere, fromthe freeway overpass during themorning commute to the longlines at the supermarket. Butbottlenecks in a manufacturingprocess are bad for business.Computer models can help youeliminate those conditions orsituations that retard yourprogress. Whether the goal isstrategic planning, evaluatingalternatives, purchasingequipment, appraising a facility, oroptimizing production processes,simulation tools can improve youranalysis.

Process simulators and other modelingtools are gaining acceptance andpopularity in the biotech industry.Such tools are mainly used to evaluate“what-if” scenarios and to optimize

integrated processes. Tasks handled byprocess simulators include material andenergy balances of integrated processes,equipment sizing, cost analyses, schedulingof batch operations, environmental impactassessments, throughput analyses, anddebottlenecking (removing a condition orsituation that limits process throughput).Process simulation tools can be usedthroughout the life cycle of processdevelopment and product commercialization(Figure 1).

Using Process Simulation ToolsSimulation tools can be used at many stagesduring the commercialization process.

Idea generation. When product and processideas are first conceived, process simulatorscan be used for project screening andselection and for strategic planning based onpreliminary economic analyses.

Process development. During preclinical andclinical testing of a drug candidatecompound, a company’s processdevelopment group looks into the optionsavailable for manufacturing, purifying, andcharacterizing the drug substance and forformulating it as a drug product. At thisstage, the process undergoes many changes.New synthetic routes are investigated: Newrecovery and purification options areevaluated, and alternative formulations areexplored. Typically, many scientists andengineers are involved in improving andoptimizing individual processing steps.

Simulation tools used at this stage canintroduce a common communicationlanguage and facilitate team interaction. Acomputer model of the entire process can

Demetri Petrides, Alexandros Koulouris, andCharles Siletti

Demetri Petrides is president, AlexandrosKoulouris is managing director of IntelligenEurope, and Charles Siletti is director ofscheduling and planning applications at Intelligen,Inc., 2326 Morse Avenue, Scotch Plains, NJ 07076,908.654.0088, fax 908.654.3866,[email protected], www.intelligen.com.

BioPharm AUGUST 2002 29

process equipment and supporting utilitiesand to estimate the required capitalinvestment. Production transfer to existingmanufacturing sites can use processsimulators to evaluate various sites forcapacity and cost and to select the mostappropriate facility. The same type of modelcan be applied to outsourcing ofmanufacturing or to selecting a contractmanufacturer.

Manufacturing. In large-scale manufacturing,simulation tools are primarily used forprocess scheduling, debottlenecking, andongoing process optimization. Simulationtools capable of tracking equipment used foroverlapping batches can identify bottleneckcandidates and guide the user through thedebottlenecking effort.

Several publications address the use ofsimulation for evaluating and optimizingintegrated biochemical processes (1-4). Wefocus here on the use of such tools foridentifying bottlenecks, reducing cycletimes, and increasing the throughput ofexisting biomanufacturing facilities.

Using Debottlenecking TheoryThe total throughput of a batch plant withina given time period is equal to the batch size(the amount of product produced per batch)multiplied by the number of batchesexecuted during that period (Equation 1).

Furthermore, because the number ofbatches is inversely proportional to the plant— or recipe — cycle time, which representsthe interval between the start of twoconsecutive batches, the plant throughputbecomes proportional to the batch sizedivided by the plant cycle time (Equation 2).

To increase plant throughput, an increasecan be made in either the batch size or thenumber of batches or both. Increasing thoseparameters, however, increases thelikelihood of running into bottlenecks

(process limitations) from either theequipment or the resources. Resourcesinclude the demand for various utilities,labor, and raw materials, among others. Thebottlenecks that limit the number of batches(or the plant cycle time) are known as time(or scheduling) bottlenecks. Those that limitthe batch size are known as size bottlenecks.

Equipment-related time (or scheduling)bottlenecks are identified by tracking theuses of the various equipment over time andcalculating the equipment cycle time. Figure2 shows how such information can begraphically displayed using “Equipment UseGantt Charts.” The equipment with thelongest cycle time (V-101 in Figure 2) is thetime bottleneck that determines themaximum number of batches and the plantcycle time. Auxiliary equipment, such asclean-in-place (CIP) and steam-in-place(SIP) skids, can also create time bottlenecks.

Finding the size bottleneck. Similar to plantthroughput (Equation 1), maximum batchsize (or maximum batch throughput) of acyclical processing step can be determinedas shown in Equation 3.

Batch size of a semicontinuousprocessing step (such as high-pressurehomogenization or disk-stackcentrifugation) is determined using Equation 4.

The step that yields the lowest maximumbatch size is the size bottleneck, whichdetermines the maximum batch size of theentire recipe. An alternative way ofidentifying size bottlenecks is by calculatingthe capacity used, the uptime, and thecombined use of the various processing steps.

Finding the scheduling bottleneck. Thescheduling bottleneck is that step that hasthe longest duration or step cycle time. Thestep duration can be estimated as shown inEquation 5.

Finding equipment use bottlenecks. Each type ofequipment is characterized by a uniquecapacity measurement (such as a reactor’svessel volume), which determines themaximum load that the equipment canhandle per cycle. Capacity used is defined asthe fraction of an equipment’s capacity usedduring an operation. For instance, if acertain vessel operates with a maximumliquid level of 1,000 L, but the vessel canoperate at a volume of 500 L, the capacityused is 0.5, or 50%. For equipment thatoperates in continuous or semicontinuousmode, the capacity used is the operating

Figure 1. Benefits from the use of bioprocess simulation tools

Idea Generationproject screening, strategic planning

Process Developmentevaluation of alternatives

common communication language

Facility Design and Selectionequipment, utility sizing, and design

Manufacturingongoing optimization, debottlenecking,

process scheduling, production planning

Development groups

Development groupsProcess engineeringCorporate environmentalManufacturing

Manufacturing

Equation 3

Equation 2

Equation 1

30 BioPharm AUGUST 2002

Process Development

expenditures. The flowsheet we generated isbased on information available in patent andtechnical literature. We used the SuperProDesigner simulator in our example. (Readerscan obtain an evaluation copy of thesoftware at the company website, www.intelligen.com).

Process description. Our example analyzesthe production of a therapeutic monoclonalantibody that is required in large doses. TheFigure 3 flowchart shows howapproximately 70 kg of purified product isproduced each year in 29 batches beforedebottlenecking strategies are applied. Tosimplify the flowsheet, the media, buffer,and inoculum preparation steps wereremoved from the recipe.

The volume of bioreactor broth generatedduring each batch is about 4,000 L andcontains four kg of product (the product titer is1 g/L). Total volume of the bioreactor vessel(V-101) is 6,500 L. A cycle time of 255 hours(240 hours for fermentation and 15 hours forthe turnaround) was estimated for thebioreactor. Because the bioreactor is the timebottleneck, a new batch can begin every 264 hours (11 days). Figure 2 shows theequipment use during two consecutivebatches.

Biomass and other suspended compoundsgenerated are removed using a 0.65-�mmembrane diafilter (DF-101). Productrecovery at this step is 95%. The filtration steptakes about 12 hours using a filter with amembrane area of 30 m2. Clarified solution isconcentrated 15-fold using a 50,000 MW cut-off diafilter (DF-102). Recovery yield at thisstep is 95% and takes 6.35 hours using a filterwith an 80-m2 membrane.

Concentrated product is stored in anagitated tank (V-103) with a total volume of1,200 L. The bulk of the contaminant proteinsare removed using protein A affinitychromatography (C-101). The column handlesthe material from each batch in two cycleslasting 8.8 hours each. The column has aheight of 0.25 m and a diameter of 0.9 m. Thebinding capacity of the resin is 15 mg ofproduct per mL of resin, and product recoveryis 90%. The protein A elution buffer isexchanged with phosphate buffer (P-7) usingthe same diafilter (DF-102) as in theconcentration step (P-4). The multiplerectangles on the Gantt chart at DF-102(Figure 2) show that the same equipment isused by two different unit procedures. Productrecovery at this step is 95%.

Because of time constraints in most plants,we recommend that two approaches (thestep batch size and the combined use) beused in conjunction to identify the true batchsize bottleneck. We recommend the stepsoutlined in the “Debottlenecking Strategy”sidebar for biomanufacturing facilities.

An Example of DebottleneckingA cell culture plant that produces atherapeutic monoclonal antibody (MAb) canbe used to illustrate throughput analysismethodology. MAbs are used in diagnostictests as well as for therapeutics. Worlddemand for approved MAbs is now a fewkilograms per year. However, with newtherapeutic MAbs that require dosesbetween several hundred milligrams and agram during the course of a therapy, globaldemand for MAbs is expected to rise tohundreds of kilograms per year (5).

This example illustrates how to increaseplant throughput with only modest capital

throughput divided by the maximumpossible throughput for that particularprocess material or equipment.

A measure of how effectively a piece ofequipment is used is given by the equipmentuptime, defined as the ratio of thatequipment’s occupancy time over the plantcycle time. For example, if the cycle time is100 hours, and a certain vessel is only usedfor 20 hours during a batch, its uptime is 0.2, or 20%. The equipment occupancy timeis the sum of the time that particularequipment takes to execute the tasks hostedin that equipment.

Combined use is the product of thecapacity used and the uptime, which is aclear indicator of how much of the time andcapacity of particular equipment is actuallybeing used.

Using these equations as indicators, theprocessing step with the highest combineduse is most likely the batch size bottleneck.

To increase plant throughput, changes that increasethe batch size or reduce the plant cycle time can beeffective. In general, we recommend the followingstrategy.

• Increase batch size until at least onecyclical step operates at 100% usecapacity.

• If equipment uptime is low, tryincreasing the number of cycles perbatch for that equipment. This maycreate opportunities for additionalincreases in batch size. A side benefit ofincreased batch size is the reduced costfor quality control (QC) and qualityassurance (QA), which depend on thenumber, not the size, of the batches.

• If a process operates at its maximumbatch size, work to reduce plant cycletime by eliminating time bottlenecks.Long process steps and equipmentsharing cause time bottlenecks.

• If bottlenecks are created by equipmentsharing, install extra equipment thatreduces the sharing. The size of thenew equipment should be chosen tocreate opportunities for batch sizeincreases (basing the equipment size onthe most demanding step). Rearrangingthe order in which equipment is used

(for shared equipment) can createopportunities for reducing cycle time andsometimes for batch size increases.

• If the time bottleneck is caused by astep that has a very long cycle time,new equipment should be operated in astaggered mode based on the cycletime of the next time bottleneck.

• If the time bottleneck is caused byequipment, it can sometimes beeliminated by moving secondaryoperations from bottlenecked tononbottlenecked equipment (1). Forinstance, instead of heating material in avessel, heating can be done using anexternal heat exchanger during thecharge and transfer of material into thevessel.

• If bottleneck analysis suggests buyingnew equipment, the final purchasedecision should be based on anevaluation of overall project economiccriteria, not simply on throughputconsiderations.

Reference(1) Minnich, T.M., “Use Process Integrationfor Plant Modernization,” Chem. Eng., 70–76,(August 2000).

Debottlenecking Strategy

32 BioPharm AUGUST 2002

Process Development

Purification continues, using a cation-exchange column (C-102), operated for twocycles lasting 8.95 hours each. The column’sheight is 0.25 m, and its diameter is 0.8 m.The binding capacity of the resin is 20 mg ofproduct per mL of resin, and the productyield is 90%. Using an agitated tank (V-103), ammonium sulfate is then added toa concentration of 2.0 M, increasing theionic strength of the solution and preparingit for hydrophobic interactionchromatography (HIC). The HIC column(C-103) handles the batch material in twocycles that each last 20.6 hours. The columnhas a height of 0.25 m and a diameter of 0.7 m, with a binding capacity of 20 mg ofproduct per mL of resin.

Sodium chloride and acetic acid areadded to inactivate any virus particles (P-11/V-104), and the solution is pushedthrough a 0.1-µm membrane diafilter (DF-103) that captures viral and othersuspended particles. As a final diafiltrationstep (P-13), reusing an existing diafilter(DF-102), the HIC and virus inactivationchemicals are replaced with PBS buffer.Final product solution is about 9.5 g/L, andthe final amount of product is 2.3 kg, whichcorresponds to an overall recovery yield of 56%.

Options for increased throughput. Assumingthat the market demand for the product inour example is rising, options need to beconsidered for increasing the plant’sthroughput. Figure 4 shows the capacity,time, and combined use for allprocedure–equipment pairs as our processnow stands. The bioreactor (V-101) has thehighest combined use (62.6%) and isidentified as the first throughput bottleneckcandidate. However, the bioreactor capacityused is only 65.3% because the maximumworking volume is 6,175 L (0.95 � 6,500),whereas the broth volume is only 4,000 L,

This provides an opportunity forincreasing the batch size by 54.4%. Such amove is in agreement with thedebottlenecking strategy that recommendsan “increase in batch size until a batch sizebottleneck is reached.” When that is done,however, all three chromatography columnsbecome unable to handle the amount ofmaterial using only the two cycles that wereassumed at the beginning (the software weare using displays error messages to warnthe user about such a discrepancy).

To accommodate the new batch size, thenumber of cycles per batch for all columnshas to increase from two to three.Fortunately, that increase has no negativeaffect on plant cycle time or the annualnumber of batches (which remains at 29)because of idle time in downstreamprocessing.

The bioreactor remains the time bottleneck. Thenew plant throughput is 3.5 kg of productper batch, which translates to 102.8 kg ofproduct per year. This first debottleneckingstep clearly shows that oversized equipmentoffers opportunities for increased plantthroughput without capital expenditures.Although the diafilters (DF-101, DF-102,and DF-103) are shown (Figure 4) to be at

100% use capacity, they are not the batchsize bottlenecks because their uptimes arerather low, and increasing their batch sizesimply increases their uptime.

After increasing the batch size, thebioreactor (P1/V-101) is fully used both insize (capacity) and in time. At this point, thebioreactor constitutes the batch size as wellas the plant throughput bottleneck. The onlyway to increase plant throughput beyond thecurrent level is by installing extra capacityfor procedure P-1 (that is, by installing anadditional bioreactor) and by staggering theoperation of the second bioreactor so that itstarts during the middle of the firstbioreactor’s cycle time.

Making those changes is not yet feasiblebecause the DF-102, which is the new timebottleneck, has a cycle time (196 hours) thatis more than half the cycle time of the P-1

Figure 2. Equipment use chart

Figure 4. Capacity, time, and combined usechart

Figure 3. Monoclonal antibody production flowsheet (s � stream, p � procedure, v � vessel, df � diafilter, and c � column)

34 BioPharm AUGUST 2002

Process Development

Floor space. In the previous analysis, weassumed that floor space was available forinstalling a second and third bioreactor andadditional recovery equipment. If that is notthe case, then a new building may need to beconstructed, and our best throughputscenario may not necessarily be the mosteconomically attractive.

Resource bottlenecks. Another characteristicof batch processing is the variable demandfor resources (labor, utilities, and rawmaterials) as a function of time. Forinstance, Figure 7 shows the labor demand(expressed in number of operators) for sixconsecutive batches. As shown, for shortperiods, up to 17 operators are needed. Ifthat labor is unavailable, then certainoperations need to be delayed to distributethe demand for operators more evenly. Insuch a case, labor can be the timebottleneck.

Labor demand analyses (such as that inFigure 7) are also useful in staffing afacility. If the facility is dedicated tomanufacturing a single product, then thenumber of operators in each shift should bebased on the peak demand during that shift.In multiproduct facilities, each productionsuite can employ a dedicated number ofoperators and use floating operators duringperiods of peak demand.

bottleneck and increases the number ofbatches to 44 and the annual production to156 kg. At that point, V-103 becomes thenew time bottleneck with a plant cycle timeof 171 hours. Adding an extra storage vesselto replace V-103 in P-9 increases thenumber of batches to 58 and the annualthroughput to 205.7 kg. With those changes,the bioreactors (V-101 and STG01>>V-101)again become the time and throughputbottleneck, and the new cycle time has beenlowered to 130 hours.

Plant throughput can be increased furtherwith the addition of a new bioreactor and anew diafilter (to replace DF-102 in P-7).Under those conditions, the number of batchesbecomes 84, and the annual throughput goesup to 298 kg (Figure 6). At this point all stepsnow use dedicated equipment (no equipmentsharing), and V-105 (a storage tank added toreplace V-103 in P-9) becomes the new timebottleneck. However, the bioreactors are againapproaching 100% uptime. The same is truefor one of the diafilters (DF-105).Furthermore, the chromatography columnsare approaching a combined use of 70%.Further throughput increase modifications areprobably impractical at this point. If additionalplant throughput is required, a new productionline should be designed and built.

(260 hours). Consequently, the startingtimes of the two bioreactors are staggered196 hours apart, and this is the new plantcycle time. Figure 5 shows an equipment usechart for the new scenario. Under theseconditions, the annual number of batchesincreases from 29 to 39 and the annualthroughput rises from 102.8 to 138.3 kg.

Figure 5 also shows how the twostaggered bioreactors alternate in handlingconsecutive batches. The first line (V-101)represents the first bioreactor (handling thefirst and third batches and all subsequentodd-numbered batches), and the second line(STG01>>V-101) represents the secondbioreactor (handling the second and fourthbatches and all subsequent even-numberedbatches). In other words, we use the samerecovery train to handle both bioreactors.That is possible because all recovery stepshad cycle times considerably lower than thecycle time of the bioreactor.

Removing time bottlenecks. Because theprocess now operates at its maximum batchsize, all additional debottlenecking actionsshould focus on the elimination of timebottlenecks. Figure 5 clearly shows that thediafilter DF-102 is the current timebottleneck. Addition of a new diafilter toreplace DF-102 in P-13 removes that time

Figure 5. Equipment use chart with twobioreactors operating in staggered mode

Figure 6. Equipment use chart with threebioreactors and no equipment sharing

Equation 4

Equation 5

Equation 6

Figure 7. Labor demand as a function oftime (six consecutive batches)

Figure 8. Water-for-injection consumptionrate and storage tank levels (sixconsecutive batches)

Continued on page 64

64 BioPharm AUGUST 2002

Figure 8 shows the water-for-injection (WFI) demand for sixconsecutive batches. The blue lines represent the demand for WFI(averaged over an eight-hour period) and correspond with the y-axison the left side. The red lines represent the liquid level in the WFIstorage tank and correspond with the y-axis on the right side. WFIdemand is a frequent bottleneck in biopharmaceuticalmanufacturing. It is commonly used during multiple processingsteps to simultaneously prepare fermentation media and purificationbuffers and to make equipment cleaning solutions.

If the WFI storage tank runs dry at a certain point (because oflow capacity in the still or the tank), one or more process steps willbe delayed, and the WFI can become the time bottleneck. The redlines in Figure 8 (showing the liquid level in the storage tank) staywithin certain limits because the WFI still, which has a capacity of1,000 L/h, was programmed to turn on when the level drops below35% and to turn off when the level exceeds 85% of the vesselvolume of 45,000 L. During retrofit projects, such as the onedescribed in this example, design engineers should consider newutility profiles to make sure adequate production and storagecapacity is available to meet new demands. Process simulators canplay an important role in retrofit projects by enabling engineers tocalculate new profiles and optimize the size of new equipment.

Tooling Up to Maximum EfficiencyUse of computer-aided tools for process design and simulation isincreasing in the biotech industry and affecting engineeringactivities at all stages of commercialization, from initial ideascreening to process development and manufacturing.

Simulators that are capable of tracking and displaying thecapacity and the time of equipment and resource use can beindispensable in identifying and eliminating bottlenecks. Inrevamping existing facilities, such tools enable management tovisualize the plant operating at maximum practical capacity and toevaluate process modifications required to reach that goal. Indesigning new facilities, simulation tools can be used to judiciouslyintroduce overcapacity for certain steps and the ability to expandeasily for others, so that increased future market demand can bereadily accommodated.

Having access to a simulator that quickly performs the repetitivecalculations allows facility engineers to focus more of their time oncreative aspects of design and to achieve optimized solutions thatwould be impossible otherwise.

References(1) Petrides, D.P., Calandranis, J., and Cooney, C.L., “Bioprocess

Optimization Via CAPD and Simulation for Product Commercialization,”Genet. Eng. News, 16(16), 24–40 (1996).

(2) Hwang, F., “Batch Pharmaceutical Process Design and Simulation,”Pharma. Eng., 28–43 (January–February 1997).

(3) Petrides,D.P. et al., “Introduction to Bioprocess Simulation,” Manual ofIndustrial Microbiology and Biotechnology, A.L. Demain and J.E. Davies,Eds. (ASM Press, Washington, DC, 1999), pp. 289–299.

(4) Harrison, R.G. et al., Bioseparations Science and Engineering (OxfordUniversity Press, New York), in press. The chapter “BioProcess Designand Economics,” is available at www.intelligen.com/literature.htm.

(5) Seaver, S.S., “Monoclonal Antibodies: Using New Techniques to ReduceDevelopment Time,” Genet. Eng. News 17(1), 13–28 (1997). BP

Info #31

Debottlenecking continued from page 34