Thomas Chomer Architect

38
ARCH. PORTFOLIO THOMAS MOANA CHOMER

Transcript of Thomas Chomer Architect

  • ARCH. PORTFOLIO THOMAS MOANA CHOMER

  • PROJETS DETUDES 2009 - 2012 & 2016:

    Matraville Library, Sydney, Australia, 2009

    North Bondi Apartment, Sydney, Australia, 2010

    Woolloomooloo Boating Sales Showroom, Sydney, Australia, 2010

    Museum of Ausralian Architecture, Sydney, Australia, 2011

    Narrabeen Estuary Facility, Sydney, Australia, 2011

    Parramatta Art Centre, Sydney, Australia, 2012

    Refuge de la Grande Montagne, Seyne, France, 2015/16

    PROJETS PROFESSIONNELS 2013 - 2015:

    Extension de maison Vicorienne, Sydney, Australia, 2013

    Jelenga Lodge, Sumbawa, Indonesia, 2013

    Dulwich International College, Yangon, Myanmar, 2014

    Centre de dialyse Diaverum, Marseille, France, 2014

  • 1- Roof elements: 10mm zinc cover 100mm polyester rigid foam thermal insulation 170mm precast concrete2- Tension Cable3- Wall elements: 10mm zinc cover 100mm polyester rigid foam thermal insulation 170mm precast concrete4- Floor elements: concrete covering 200mm reinforced concrete slab5- Pilling6- Reinforced concrete column7- Frameless glass in bracket

    MATRAVILLE LIBRARY500 BUNNERONG RD, SYDNEY

  • During the 19th and 20th centuries the landscape of Sydneys southeast, the area spanning from Centennial Park to Botany Bay, changed dramatically. This change is most notably apparent in the physi-cal transformation of the wetlands and marshes to a dense urban development, regulated streets and modern buildings. Underpinning this shift in physical charac-ter, however, were broader cultural forces and intricacies that shaped and influenced the transformations within the built en-vironment. The architectural design of the Matraville Library (ML) aims to ex-plore the dramatic changes in the physi-cal landscape of the South Sydney region with specific reference to the inherent cultural issues and debates and their po-tential implication to architectural design.

    The project considers the making of architecture as a response to a broad range of cultural and po-litical issues, an approach that challenges the per-ception of architecture as autonomous object de-fined only by its formal and stylistic expressions.

  • NORTH BONDI APARTMENT P1/39-53 CAMPBELL PARADE, SYDNEY

    The project is a mixed use building: one that accommodates a range of functions, in this case commercial premises includ-ing a restaurant, with a number of apart-ments above. This is a building type that is increasingly common in developments in Sydney, as the city moves towards an urban vision that encourages higher den-sities and diverse street life through mix-ing commercial and residential functions.

  • The building design and orientation has been studied in order to offer the most suitable natural light for each appartements. The building openings receive much more sunlight during winter in order to warm up, and re-ceive less sunlight during summer to cool down.

  • WOOLLOOMOOLOO BOATING SALES SHOWROOM59 COWPER WHARF RD, SYDNEY

  • The design aims to reflect maritime archi-tecture. In this way, I created an interplay of pontoons which produced an interesting spatial arrangement. The pontoons are ori-entated by main axes draw accordingt o the site analysis. This spatial organization cre-ates a feeling of in and out, like on a boat.

    The transition from industrial use to a public creative use is part of the legacy of the mari-time and broader communities. This transition is a process of urban renewal, or public efforts to revitalize aging and decaying inner cities. The Woolloomooloo Bay Finger Wharf, designed by H D Walsh for the Sydney Harbour Trust and built between 1911 and 1915, is an icon of Austra-lian social history. The proposed project design and program aims to offer a strong connection with its surrounding environment in respect to the maritime culture of woolloomooloo.

    Material and construction technique also re-veal the maritime architecture in order to be in harmony with the surrounding environment.

  • MUSEUM OF AUSTRALIAN ARCHITECTUREFORT ST, OBSERVATORY HILL, SYDNEY CBD

    The museum provide a national focus on architecture and architectural matters, and in particular hold exhibitions on architects and their architecture, document and pub-lish monographs on a periodic basis, act as a national repository of significant drawings, images and documents on architects, host seminars and talks and in general promote discussion in the community on architec-ture and its role in the public environment.It can be stated that is also a test of our civilisation. After all, it is through our buildings and their re-mains that civilisation is represented.

    The cause is our cause, the culture is our culture, the civilisation our civilisa-tion. There are two great matters: our language and our buildings architec-ture that, together- denote civilisa-tion and act as a record for posterity. Philip Drew

    Given the role and contribution of ar-chitecture to the built environment as well as the desirability of exposing the public to excellence in design, such cen-tres provide a focus for promoting and educating the public as a whole about architecture and the contribution ar-chitecture can make to improving the overall quality of human experience.

  • The site has good views to the estuary towards both the ocean and lagoon. It is clearly visible from the surrounding waterfront areas of North Narrabeen. The design proposal fits with and com-pliments the surrounding environment both natural and built. The development minimise its physical and visual impact on the surrounding area. The design of the linkage from shore line to the proposed structure is carefully considered as an in-tegral part of the overall design.

    NARRABEEN ESTUARY FACILITY LAKE PARK RD, LAKESIDE PARK, NARRABEEN NORTH SYDNEY

  • The project offers a design proposal for a de-velopment that will provide a mixed use fa-cility on the foreshore of the Northern estu-ary of Narrabeen Lagoon. The development will provide two main activities such as a Kayak sales/rental facility and a community hall/club room space.

    The building is constructed entirely of timber except for glazing, roof cladding, and neces-sary fixings. All solid and engineered timbers are locally available species. The emphasis is put on maximising the efficient use of the selected timbers and timber products, and minimising the quantity of material used. The selection and development of the struc-tural and construction systems is made with a view to prefabrication.

  • PARRAMATTA ART CENTRE OLD KING SCHOOL PARK, PARRAMATA, SYDNEY

    The council suggested that a multi-purpose arts and cultural facility is to be developed in the Parramatta city centre to increase the profile and significance of the arts, add to the identity, character and culture of the city, contribute to the vitality and maturity of the city centre, and assist in the develop-ment of the creative and cultural industries. The centre will host temporary art and cul-tural exhibitions, reading facilities, and music representations from the Sydney institutions bringing people and cultural events into the City of Parramatta. In addition the centre will encourage commercial interest such as caf, restaurant, offices and accommodation in order to support the economic and so-cial viability of the art centre development.

  • The continuity/discontinuity between the urban elements is the essential requirement for forming a citys abundant image, which interestingly links all elements together on a morphological, social and historical level with the result that the whole urban fabric reads as a continuum. The project intends to clearly respond to that concept by con-sidering three mains aspect: the landscape (morphological), the monument (historic) and the program (social). The program refers to the combination of activities which pro-duce space and movement. The monument refers to the spectacular quality, the edifying

    aspect that is promoted by fine arts culture and through which an edifice imposes an idea such as the program. However, the problem is that an iconic effect of the existing building says nothing about either the building pur-pose or its internal functioning. Thats where the landscape takes place as a solution, by connecting the transformed landscape to the building program. by using the natural land-scape as a bond to interconnect the urban environment, it improves the monumentality appreciation of the existing building and cre-ates a more suitable public building that can host a complex program.

  • The defragmented historical built form which shape the center, is treated as one continu-ous building by reconsidering the ground floor as one big open plan and replacing the actual discontinuous roofs as a continuous-top floor level and rework on the vertical circulation. This architectural process can be considered as an urbanistic gesture that would adapt the historical build form to its contemporary context, it is a continuous pro-cess of the building evolution. The structure is revitalised through a radical interpretation of its exterior form which has incongruous qualities of being new and old, historical and contemporary, light and also heavy, continu-ous and discontinuous. By lifting the build-ing of the ground, it created a covered public plaza linking two level of urban environment

    river and city) which offers strong connection at an urban scale as transitional and static dynamic in term of pedestrian movement. This urban gesture rather than architectural improve the building access which making the building more suitable for public venue and make the building threshold is very clear and understandable by the visitors. In addi-tion, this gesture offer a better connection between the program to the landscape by creating central vertical circulation through the new structure.

  • REFUGE DE LA GRANDE MONTAGNE SEYNE, ALPES DE HAUTE PROVENCE, FRANCE

    Je vois en ce refuge un thtre, qui offre comme spectacle un magistral point de vue sur la valle. Ce somptueux paysage trs contrast, o se mlent espaces im-menses et nature proche, douceur et bru-talit, inspire la volumtrie de la btisse et guide le spectateur. Je vois galement ce refuge comme une btisse uniforme qui effleure le sol fragile et pouse la to-pographie du site. Un repre qui rvle la butte sur laquelle il sadosse.

  • La salle commune et sa terrasse offrent aux passants une exprience unique du-rant la journe. Mais ce refuge joue aussi son rle dincubateur, en permettant aux visiteurs de passer, en une nuit, du monde des alpages paisibles la rugosit de la falaise impressionnante et abrupte qui le surplombe.

    Enfin, je vois ce refuge comme un abri simple, unitaire et compact (inspir des refuges pionniers tout en un ) pour of-frir une exprience atypique au visiteur, pour mieux rpondre aux enjeux environ-nementaux, et pour rester humble face la nature grandiose.

  • EXTENSION DE MAISON VICTORIENNE 77 WATSON ST BONDI, SYDNEY, AUSTRALIA

    Le projet de rnovation et dextension dune an-cienne maison victorienne Bondi Sydney a t initi par Mr Brendan Smith en 2013. La concep-tion prcdente du btiment manquait de perspec-tives et dclairage naturel. Lespace et la circulation ntaient plus appropris pour les nouveaux occu-pants. Il a fallu de nouvelles chambres, rorganiser cuisine, salon, buanderie et salle de bains. Puis crer un amnagement paysager pour le jardin, larrire de la demeure, comprenant une structure de stock-age pour lquipement de jardinerie et autres. Nous voulions mettre en avant le contraste entre le style Victorien ornement, et une forme contemporaine mlangeant une large palette de matires premires. Mr Brendan Smith tant galement le propritaire, cela nous a permis de porter une attention particu-lire aux dtails et finitions, ainsi qu au choix des matriaux, permettant une ralisation plus raffine et bien excute. Ce projet est un bel exemple de travail de rhabilitation qui mlange diffrents styles darchitecture.

    Connaissant bien Mr Smith, il ma offert lopportunit de travailler en collaboration avec son architecte et lui mme aprs avoir obtenu mon diplme dtat aus-tralien. Ainsi, jai particip llaboration des dessins ncessaires au permis de construire laide du pro-gramme CAO Autocad, puis jai t trs impliqu au cours de la phase de construction du projet en tant quassistant contremaitre. Jai donc travaill en rela-tion avec diffrents corps de mtiers sur le chantier tel que la charpenterie, la plomberie, llectricit , ce qui ma donn loccasion dapprofondir mes con-naissances sur les diffrentes techniques de con-struction.

  • JELENGA LODGESCAR REEF, JELENGA BEACH, SUMBAWA, INDONESIA

    Le projet a dbut en Septembre 2013 au sein de lagence Tropical Pavillon Touchwood Bali, lobjectif tait de crer un complexe htelier cologique de luxe proximit dune plage isole en Indonsie sur lile de Sumbawa. Le complexe a t spcialement conu pour les amateurs de yoga et de surf grce lenvironnement naturel agrable et les vagues qui entourent la zone. La con-ception propose est inspire par la forme dune fleur. Elle permet une intgration har-monieuse dans lenvironnement et la cra-tion de btiments ouverts sur lextrieur, sadaptant au climat indonsien. Le pro-gramme propose trois types de btiments afin de convenir trois types de groupes de personnes. Le projet est ralis en bois et en bambou indonsien prfabriqu de haute qualit. De plus laccent architec-tural a t mis sur lcologie, la ventilation naturelle et limplantation sur pilotis des btiments permettant de rduire limpact sur lenvironnement. Je travaillais comme architecte indpendant pour la socit. Jai eu lopportunit de contribuer la concep-tion de lavant-projet en proposant un con-cept de btiments modulables, qui a ainsi permis le dveloppement dun master plan trs flexible.

  • INTERNATIONAL COLLEGE DULWICH INTERNATIONAL SCHOOL, THANLYIN TOWNSHIP, YANGONG REGION, MYANMAR

    Jai particip ce projet en tant quarchitecte assistant pour Les tudes davant-projet, le dossier de demande de permis de constru-ire, la conception dtaille du btiment, et les plans dexcutions. Jai contribu la planification du master plan et la concep-tion dtaille du projet, jai ensuite t par-ticulirement impliqu dans la ralisation de linternat et le travail de faade bambou (the boarding school).

  • 10 rue Virgile Marron . 13005 Marseille . T 04.91.42.91.38 . F 04.91.48.01.65 . www.tangram-architectes.comMyanmar Offices: Inya lake Hotel (ILH),Room 208- 209located at no.37, Kaba Aye Pagoda Road, Mayangone Township, Yangon, Myanmar. DULWICH COLLEGE I YANGON I

    13.46 D

    SITE/MASTERPLAN

    MAIN COURTYARD

    CLOCKTOWER

    PERFORMINGARTS CENTER

    BLACK BOXGYMNASIUM

    BOARDINGSCHOOL

    ARTS SCHOOL

    JUNIOR SCHOOL

    JS

    G

    B

    P A M

    E

    EARLY YEARSSCHOOL

    SENIOR SCHOOL

    RUGBY FIELD

    FOOTBALL FIELD

    OLYMPIC POOL

    TRAININGPOOL

    BASKETBALL COURT

    JUNIOR SCHOOL PLAYGROUND

    RESTAURANT

    RESTAURANT

    HALL

    HALL

    LOBBY

    LOBBY

    SMALL GYMMEDIUM GYM

    ARTS STREET

    DININGHALL

    PLAYROOM

    EXHIBITIONSPACE

    ADMINISTRATION PARKING BUS DROP-OFF BUS DROP-OFF SENSES GARDEN

    EARLY YEARS SCHOOLPLAYGROUND

    CRICKET PICH

    RUNNING TRACKS

    BOATHOUSE

    EARLY YEARS ENTRANCE

    SERVICEENTRANCE

    SERVICEENTRANCE

    Le projet propose de combiner quatre coles types, pour les enfants gs de 2 6 ans, les lves gs de 7 12 ans, les tudiants gs de 13 18 ans et linternat qui pourra accueillir les tudiants de 7 18 ans. En outre, le projet comprend un gymnase, une piscine olympique, des terrains de sport, une cole dart et un centre dereprsentation. Lentre principale du collge est la place principale qui est le coeur de lcole. Elle accueille des enfants tous les matins, et donne un lieu de loisirs chaque pause, un ac-cueil pour les visiteurs pour des vnements spciaux. Lcole et la place refltent la philoso-phie hautement polyvalente du projet. De la place, la rue principale permet aux tudiants et visiteurs daccder au reste de lcole. La rue est couverte en partie pour protger des rayons du soleil et de la pluie. La circulation est concentre sur les cts de la rue, avec des arbres et des zones couvertes

  • HAUT

    HAUT

    HAUTHAUT

    HAUT

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    289.9m

    Covered Area

    B.0.8.01

    CS SM

    UT

    2.33

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    289.9m

    Covered Area

    B.0.8.02

    CS SM

    UT

    2.33

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    129.6m

    StudentResidence Hall

    B.0.0.01

    CS FB GP

    AC

    2.33

    FCL:

    Air:F: W: C:

    Area:18.2 m

    W.CB.0.3.01

    TN TC SW UT

    2.33

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    30.8m

    Nursery

    B.0.0.02

    CS SM

    AC

    2.33

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    9.0m

    MEPB.0.2.03

    CS CB

    UT

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    31.0 m

    Administration

    B.0.4.02

    LN SM

    AC

    2.33

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    129.6m

    Dining Room

    B.0.0.03

    CS FB GP

    120AC

    2.475

    FCL:

    Air:F: W: C:

    Area:18.2 m

    W.CB.0.3.02

    TN TC SW UT

    2.33FCL:

    Air:F: W: C:

    Area:19.2 m

    AdministrationB.0.4.01

    LN PB SM AC

    2.33

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    46.5 m

    WarmingKitchen

    B.0.2.04

    TN TC SW

    UT

    2.33

    FCL:

    Air:F: W: C:

    Area:19.1 m

    Nurse StudioB.0.7.01

    LN PB GP AC

    2.33

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    41.1m

    Field Storage

    B.0.2.02

    CS FB

    UT

    FCL:

    Air:F: W: C:

    Area:9.0 m

    MEPB.0.2.05

    CS CB - UT

    -

    B.1

    B.1

    B.2

    B.2

    B.3

    B.3

    B.4

    B.4

    B.6

    B.6

    B.8

    B.8

    B.9

    B.9

    B.10

    B.10

    B.11

    B.11

    B.12

    B.12

    B.A B.A

    B.B B.B

    B.C B.C

    B.D B.D

    B.E B.E

    B.F B.F

    B.G B.G

    B.H B.H

    2292

    2293

    2294

    D.91

    2296

    D.12

    2297

    2298

    2299

    2300

    D.012301

    D.91

    2302

    D.012304

    D.012306

    W330850

    D.01

    2634

    D.012635

    D.012636

    D.01

    2647

    D.91

    2669

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    18.0m

    AC Technical

    B.0.2.6

    CS CB

    UT

    FCL:

    Air:F: W: C:

    Area:4.7 m

    SprinklerB.0.2.7

    CS CB - UT

    -

    FCL:

    Air:F: W: C:

    Area:4.7 m

    SprinklerB.0.2.8

    CS CB - UT

    -

    B.5

    B.5

    B.7

    B.7

    0.40 4.60 0.40 4.60 0.40 4.60 0.40 4.38 0.85 4.38 0.40 4.60 0.40 4.60 0.40 4.60 0.40 4.60 0.40

    5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

    20.00 25.00

    34.27 11.13

    45.40

    0.40

    4.78

    0.40

    2.50

    0.40

    4.78

    0.40

    15.00

    0.40

    4.78

    0.40

    2.50

    0.40

    4.78

    0.40

    5.18

    2.90

    5.18

    15.40

    5.18

    2.90

    5.18

    13.26

    15.40

    13.26

    13.66

    15.00

    13.66

    42.32

    Kitchen Exhaust FanShaft + CHW 0.6*0.6 m

    W330860

    D.02

    2274

    D.02

    2275

    D.142315

    D.01

    2628

    D.01

    2631

    Main panel board

    Main panel board

    ELV

    LV

    ELV

    LV

    1.15

    2.43

    0.41

    0.41

    2.43

    4.50 4.41

    0.43

    1.53

    0.43

    4.50

    12.70 2.461.405.134.87

    2.14 0.79 2.46 2.32 2.82 2.18 2.83 2.18 2.82 2.18 2.60 2.42 2.58 2.74 1.93 3.27 6.06

    4.23

    0.62

    1.53

    4.15

    1.91

    2.30

    1.92

    8.13

    3.21

    4.41

    0.43

    1.53

    0.43

    4.50

    2.461.405.134.87

    2.14 0.79 2.46 2.32 2.82 2.18 2.83 2.18 2.82 2.18 2.60 2.42 2.58 2.74 1.93 3.27 6.06

    4.23

    0.62

    1.53

    4.11

    1.96

    4.23

    3.62

    3.21

    9.16

    3.62 3.21

    9.16

    SD S A2 211AA

    SD S A2 211AA

    SD S A2 211BB

    SD S A2 211BB

    +5.02STR

    +5.07FFL

    +5.02STR

    +5.07FFL

    Project :

    Architects :

    Issue History :

    Engineers :

    Creation Date :

    Scale :

    Building :

    project n phase

    Drawing n :

    OtherConsultants :

    building number indice

    paper format :

    Design Arch:Adress: Unit 208 Inya Lake Hotel37 Kaba Aye Pagoda Road, MayangoneTownship Yangon, MyanmarT +959421045437

    Landscape Arch:

    Construction Architect:

    Int Designer:

    Client &Project Manager :

    Client: Project Manager:

    Structural Engineer: MEP Engineer:

    Acoustic Engineer: Bamboo Engineer:

    Consultant: Consultant:

    BuildingSurveyor:

    Building Surveyor: Site Safety Officer:

    Adresse:

    A0

    TANGRAMARCHITECTES INTERNATIONAL(Myanmar) Co., LTD.Adress: Unit 208 Inya Lake Hotel

    37 Kaba Aye Pagoda Road, MayangoneTownship Yangon, MyanmarT +959421045437

    Adress: Unit 208 Inya Lake Hotel37 Kaba Aye Pagoda Road, MayangoneTownship Yangon, MyanmarT +959421045437

    THIHA YARZARConstruction & Engineering Co., LTD.

    TANGRAM ARCHITECTES INTERNATIONAL(Myanmar) Co., LTD.

    TANGRAM ARCHITECTES INTERNATIONAL(Myanmar) Co., LTD.

    Adress : No. 24 C 2nd Fl. (R)Ma Gyi Gyi St.Sanchaung Tsp., Yangon, MyanmarT 09 73184626

    TERRELL

    Adress : 11, rue Heinrich92100 Boulogne Billancourt, France

    T +33146210746

    MARSHALL DAYAcousticsAdress : 10, rue Edith Cavell

    06400 Cannes, France

    T 0493392684

    Adress: #18 05/06101 Thompson Square (United Sq.)Singapore 307591T +6587107416

    DULWICH COLLEGE INTERNATIONAL

    Adress: Thanlynn Star CityTangon, Myanmar

    T 056 23150 3 Ext 175

    SPA MYANMAR

    Drawing title :

    RFR GROUP

    Adress : 4 rue d'Enghien75010 Paris France

    T +33 1 5324 9100

    1 : 100

    C:\U

    sers\t.ch\Doc

    umen

    ts\13.46

    Dulwich

    Boarding

    _t.ch.rvt

    08/08/20

    1400

    :16:37

    DULWICH COLLEGE YANGONBoarding School

    Thanlyn township, Yangon, Myanmar

    11/08/14

    SD13.46 B 2A 0 02

    GROUND FLOOR PLAN1 : 100

    SD 0. Boarding Ground Floor

    BOADING SCHOOL

    311.3 mUCA

    278.7 mFECA

    30.1 mFECA

    278.7 mFECA

    30.1 mFECA

    311.3 mUCA

    73.8 mFECA

    483.6 mFECA

    483.6 mFECA

    73.7 mFECA

    15.3 mUCA

    15.2 mUCA

    73.8 mFECA

    483.6 mFECA

    483.6 mFECA

    73.7 mFECA

    15.3 mUCA

    15.2 mUCA

    73.8 mFECA

    483.6 mFECA

    483.6 mFECA

    73.7 mFECA

    15.3 mUCA

    15.2 mUCA

    73.8 mFECA

    483.6 mFECA

    483.6 mFECA

    73.7 mFECA

    15.3 mUCA

    15.2 mUCA

    Project :

    Architects :

    Issue History :

    Engineers :

    Creation Date :

    Scale :

    Building :

    project n phase

    Drawing n :

    OtherConsultants :

    building number indice

    paper format :

    Design Arch:Adress: Unit 208 Inya Lake Hotel37 Kaba Aye Pagoda Road, MayangoneTownship Yangon, MyanmarT +959421045437

    Landscape Arch:

    Construction Architect:

    Int Designer:

    Client &Project Manager :

    Client: Project Manager:

    Structural Engineer: MEP Engineer:

    Acoustic Engineer: Bamboo Engineer:

    Consultant: Consultant:

    BuildingSurveyor:

    Building Surveyor: Site Safety Officer:

    Adresse:

    A0

    TANGRAMARCHITECTES INTERNATIONAL(Myanmar) Co., LTD.Adress: Unit 208 Inya Lake Hotel

    37 Kaba Aye Pagoda Road, MayangoneTownship Yangon, MyanmarT +959421045437

    Adress: Unit 208 Inya Lake Hotel37 Kaba Aye Pagoda Road, MayangoneTownship Yangon, MyanmarT +959421045437

    THIHA YARZARConstruction & Engineering Co., LTD.

    TANGRAM ARCHITECTES INTERNATIONAL(Myanmar) Co., LTD.

    TANGRAM ARCHITECTES INTERNATIONAL(Myanmar) Co., LTD.

    Adress : No. 24 C 2nd Fl. (R)Ma Gyi Gyi St.Sanchaung Tsp., Yangon, MyanmarT 09 73184626

    TERRELL

    Adress : 11, rue Heinrich92100 Boulogne Billancourt, France

    T +33146210746

    MARSHALL DAYAcousticsAdress : 10, rue Edith Cavell

    06400 Cannes, France

    T 0493392684

    Adress: #18 05/06101 Thompson Square (United Sq.)Singapore 307591T +6587107416

    DULWICH COLLEGE INTERNATIONAL

    Adress: Thanlynn Star CityTangon, Myanmar

    T 056 23150 3 Ext 175

    SPA MYANMAR

    Drawing title :

    RFR GROUP

    Adress : 4 rue d'Enghien75010 Paris France

    T +33 1 5324 9100

    1 : 500

    C:\U

    sers\r.bo\Doc

    umen

    ts\13.46

    Dulwich

    Boarding

    _r.bo.rvt

    08/08/20

    1410

    :29:13

    DULWICH COLLEGE YANGONBoarding School

    Thanlyn township, Yangon, Myanmar

    11/08/14

    SD13.46 B 5A 0 11

    GFA SURFACE AREA PLANS + 3D

    3D VIEW 1

    3 D VIEW 2

    1 : 500

    GFA L0 B1 : 500

    GFA L1 B1 : 500

    GFA L2 B

    1 : 500

    GFA L3 B1 : 500

    GFA L4 B

    GFA Boarding School

    5,820.8 m

    GFA Boarding School

    UCAL0 B

    311.3 m311.3 m622.6 m

    L1 B15.3 m15.2 m30.5 m

    L2 B15.3 m15.2 m30.5 m

    L3 B15.3 m15.2 m30.5 m

    L4 B15.3 m15.2 m30.5 m

    744.5m

    GFA Boarding School

    FECAL0 B

    278.7m30.1 m278.7 m30.1 m617.7 m

    L1 B73.8m

    483.6 m483.6 m73.7 m

    1,114.7 m

    L2 B73.8m

    483.6 m483.6 m73.7 m

    1,114.7 m

    L3 B73.8m

    483.6 m483.6 m73.7 m

    1,114.7 m

    L4 B73.8m

    483.6 m483.6 m73.7 m

    1,114.7 m5,076.4 m

    BOADING SCHOOL

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    47.5 m

    Living Room

    B.1.7.09

    LN PB GP

    AC

    2.175

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    59.2m

    Living Room

    B.1.7.01

    LN PB GP

    AC

    2.175

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    15.7 m

    Bedroom 1

    B.1.7.03

    LN PB GP

    AC

    2.175

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    16.6 m

    Bedroom 2

    B.1.7.04

    LN PB GP

    AC

    2.175

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    22.9 m

    MasterBedroom

    B.1.7.05

    LN PB GP

    AC

    2.175

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    21.7 m

    MasterBedroom

    B.1.7.13

    LN PB GP

    AC

    2.175

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    16.6 m

    Bedroom 2

    B.1.7.12

    LN PB GP

    AC

    2.175

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    15.6 m

    Bedroom 1

    B.1.7.11

    LN PB GP

    AC

    2.175

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    63.5 m

    Work Space

    B.1.0.01

    LN PB GP

    33AC

    2.175

    FCL:

    Air:F: W: C:

    Area:66.2 m

    PrivateCirculationB.1.1.01

    CS PB SA UT

    FCL:

    Air:F: W: C:

    Area:5.2 m

    BathroomB.1.7.07

    TN TC SW AC

    2.175

    FCL:

    Air:F: W: C:

    Area:2.5 m

    W.CB.1.7.08

    TN TC SW AC

    2.175

    FCL:

    Air:F: W: C:

    Area:16.5 m

    CirculationB.1.7.02

    LN - GP AC

    2.175FCL:

    Air:F: W: C:

    Area:5.4 m

    Master BathB.1.7.06

    TN PB SW AC

    2.175 FCL:

    Air:F: W: C:

    Area:5.4 m

    Master BathB.1.7.14

    TN PB SW AC

    2.175FCL:

    Air:F: W: C:

    Area:16.0 m

    CirculationB.1.7.10

    LN PB GP AC

    2.175

    FCL:

    Air:F: W: C:

    Area:2.5 m

    W.CB.1.7.16

    TN PB SW AC

    2.175

    FCL:

    Air:F: W: C:

    Area:5.2 m

    BathroomB.1.7.15

    TN PB SW AC

    2.175

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    15.8m

    CirculationB.1.8.02

    CS SA

    UT

    2.175

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    59.8m

    Living Room

    B.1.7.17

    LN PB GP

    AC

    2.175

    FCL:

    Air:F: W: C:

    Area:16.5 m

    CirculationB.1.7.18

    LN PB GP AC

    2.175

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    15.6 m

    Bedroom 1

    B.1.7.19

    LN PB GP

    AC

    2.175

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    16.6 m

    Bedroom 2

    B.1.7.20

    LN PB GP

    AC

    2.175

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    22.9m

    MasterBedroom

    B.1.7.21

    LN PB GP

    AC

    2.175

    FCL:

    Air:F: W: C:

    Area:5.4 m

    Master BathB.1.7.22

    TN PB SW AC

    2.175

    FCL:

    Air:F: W: C:

    Area:5.2 m

    BathroomB.1.7.23

    TN TC SW AC

    2.175

    FCL:

    Air:F: W: C:

    Area:2.5 m

    W.CB.1.7.24

    TN TC SW AC

    2.175

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    47.8m

    Living Room

    B.1.7.25

    LN PB GP

    AC

    2.175

    FCL:

    Air:F: W: C:

    Area:16.0 m

    CirculationB.1.7.26

    LN PB GP AC

    2.175

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    15.6 m

    Bedroom 1

    B.1.7.27

    LN PB GP

    AC

    2.175

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    16.6 m

    Bedroom 2

    B.1.7.28

    LN PB GP

    AC

    2.175

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    21.7 m

    MasterBedroom

    B.1.7.29

    LN PB GP

    AC

    2.175

    FCL:

    Air:F: W: C:

    Area:5.4 m

    Master BathB.1.7.30

    TN PB SW AC

    2.175

    FCL:

    Air:F: W: C:

    Area:5.2 m

    BathroomB.1.7.31

    TN TC SW AC

    2.175

    FCL:

    Air:F: W: C:

    Area:2.5 m

    W.CB.1.7.32

    TN TC SW AC

    2.175

    FCL:

    Air:F: W: C:

    Area:65.4 m

    PrivateCirculationB.1.7.33

    CS - SA UT

    2.175

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    15.8m

    CirculationB.1.8.34

    CS SA

    UT

    2.175

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    63.5 m

    Work Space

    B.1.0.02

    LN PB GP

    33AC

    2.175

    FCL:

    Air:F: W: C:

    Area:5.7 m

    MEPB1.2.02

    CS CB - UT

    -

    FCL:

    Air:F: W: C:

    Area:5.8 m

    MEPB1.2.01

    CS CB - UT

    -

    B.1

    B.1

    B.2

    B.2

    B.3

    B.3

    B.4

    B.4

    B.6

    B.6

    B.8

    B.8

    B.9

    B.9

    B.10

    B.10

    B.11

    B.11

    B.12

    B.12

    B.A B.A

    B.B B.B

    B.C B.C

    B.D B.D

    B.E B.E

    B.F B.F

    B.G B.G

    B.H B.H

    W402720

    W402721

    W40

    172

    2W40

    172

    3

    W40

    172

    4W40

    172

    5

    D.12

    2104

    W330744

    W330745

    W330746

    W330747

    W330748

    W330749

    W330750

    W330751

    W330752

    W332753

    W332754

    W330755

    W330756

    W330757

    F031

    758

    F031

    759

    F031 760

    F031 761

    D.12

    2108

    D.01

    2269

    D.01

    2270

    D.01

    2272

    D.12

    2277

    D.012279

    D.01

    2457

    D.01

    2458

    D.01

    2460

    W402912

    W402913

    W40

    191

    4W40

    191

    5

    W40

    191

    6W40

    191

    7

    D.12

    2464

    W330936

    W330937

    W330938

    W330939

    W330940

    W330941

    W330942

    W330943

    W330944

    W332945

    W332946

    W330947

    W330948

    W330949

    F031

    950

    F031

    951

    F031 952

    F031

    953

    D.12

    2468

    D.01

    2629

    D.01

    2630

    D.01

    2632

    D.12

    2637

    D.012639

    D.012640

    D.01

    2641

    D.01

    2642

    D.012643

    D.01

    2644

    D.012645

    D.012646

    W.71

    1008

    W.71

    1014

    D.01

    2379

    D.012380

    D.01

    2381

    D.012382

    W301E.2103.9

    W312E.2103.10

    W341E.2103.11

    W30

    0E.

    2103

    .21

    W301E.2103.22

    W312E.2103.23

    W341E.2103.24

    W301E.2103.25

    W312E.2103.26

    W341E.2103.27

    W301E.2103.28

    W312E.2103.29

    W341E.2103.30

    W30

    0E.

    2103

    .31W30

    0E.

    2103

    .32

    W30

    0E.

    2103

    .33

    B.5

    B.5

    B.7

    B.7

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    23.0 m

    Terrace

    B.1.2.10

    CS

    UT

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    23.0 m

    Terrace

    B.1.2.9

    CS

    UT

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    22.7 m

    Terrace

    B.1.2.12

    CS

    UT

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    22.7 m

    Terrace

    B.1.2.11

    CS

    UT

    0.40 4.60 0.40 4.60 0.40 4.60 0.40 4.38 0.85 4.38 0.40 4.60 0.40 4.60 0.40 4.60 0.40 4.60 0.40

    5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

    20.00 25.00

    35.40 4.60 5.40

    45.40

    0.40

    4.78

    0.40

    2.50

    0.40

    4.78

    0.40

    15.00

    0.40

    4.78

    0.40

    2.50

    0.40

    4.78

    0.40

    5.18

    2.90

    5.18

    15.40

    5.18

    2.90

    5.18

    13.26

    15.40

    13.26

    13.66

    15.00

    13.66

    42.32

    HCLC

    HCLC

    HCLC

    HCLC

    D.012303

    D.012289

    D.02

    2276

    D.02

    2280

    D.02

    2281

    D.02

    2282

    D.012283

    D.012284

    D.012285

    D.012286

    D.012287

    D.012288

    D.012290

    D.012291

    D.012295

    D.012305

    ELV

    LV

    IT cabinet general distributor

    It cabinet general distributor

    ELV

    LV

    12.54 4.96 4.96 10.04 2.50

    2.12 1.19 1.89 1.16 2.00 2.92 1.46 1.06 2.48 1.43 5.005.001.921.193.052.002.922.512.481.43

    1.92 15.58 15.58 1.92

    1.92 31.16 1.92

    5.134.871.981.892.592.182.481.471.052.482.852.501.041.472.482.182.601.881.98

    1.924.242.004.384.964.964.382.004.24

    4.24 2.00 4.38 4.96 4.96 4.38 2.00 4.24 1.98

    2.5010.114.964.9612.61

    5.38

    2.50

    5.38

    5.11

    8.15

    4.87

    1.05

    1.41

    0.55

    3.94

    1.44

    8.15

    5.11

    1.44

    3.94

    0.55

    1.40

    1.07

    4.86

    5.38

    2.50

    5.38

    7.74

    7.74

    5.17

    2.00

    2.00

    5.17

    SD S A2 211AA

    SD S A2 211AA

    SD S A2 211BB

    SD S A2 211BB

    Project :

    Architects :

    Issue History :

    Engineers :

    Creation Date :

    Scale :

    Building :

    project n phase

    Drawing n :

    OtherConsultants :

    building number indice

    paper format :

    Design Arch:Adress: Unit 208 Inya Lake Hotel37 Kaba Aye Pagoda Road, MayangoneTownship Yangon, MyanmarT +959421045437

    Landscape Arch:

    Construction Architect:

    Int Designer:

    Client &Project Manager :

    Client: Project Manager:

    Structural Engineer: MEP Engineer:

    Acoustic Engineer: Bamboo Engineer:

    Consultant: Consultant:

    BuildingSurveyor:

    Building Surveyor: Site Safety Officer:

    Adresse:

    A0

    TANGRAMARCHITECTES INTERNATIONAL(Myanmar) Co., LTD.Adress: Unit 208 Inya Lake Hotel

    37 Kaba Aye Pagoda Road, MayangoneTownship Yangon, MyanmarT +959421045437

    Adress: Unit 208 Inya Lake Hotel37 Kaba Aye Pagoda Road, MayangoneTownship Yangon, MyanmarT +959421045437

    THIHA YARZARConstruction & Engineering Co., LTD.

    TANGRAMARCHITECTES INTERNATIONAL(Myanmar) Co., LTD.

    TANGRAMARCHITECTES INTERNATIONAL(Myanmar) Co., LTD.

    Adress : No. 24 C 2nd Fl. (R)Ma Gyi Gyi St.Sanchaung Tsp., Yangon, MyanmarT 09 73184626

    TERRELL

    Adress : 11, rue Heinrich92100 Boulogne Billancourt, France

    T +33146210746

    MARSHALL DAYAcousticsAdress : 10, rue Edith Cavell

    06400 Cannes, France

    T 0493392684

    Adress: #18 05/06101 Thompson Square (United Sq.)Singapore 307591T +6587107416

    DULWICH COLLEGE INTERNATIONAL

    Adress: Thanlynn Star CityTangon, Myanmar

    T 056 23150 3 Ext 175

    SPA MYANMAR

    Drawing title :

    RFR GROUP

    Adress : 4 rue d'Enghien75010 Paris France

    T +33 1 5324 9100

    1 : 100

    C:\U

    sers\t.ch\Doc

    umen

    ts\13.46

    Dulwich

    Boarding

    _t.ch.rvt

    06/08/20

    1416

    :17:16

    DULWICH COLLEGE YANGONBoarding School

    Thanlyn township, Yangon, Myanmar

    11/08/14

    SD13.46 B 2A 0 12

    FIRST FLOOR PLAN1 : 100

    SD 1. Boarding First Floor

    BOADING SCHOOL

    FCL:

    Air:F: W: C:

    Area:25.5 m

    QuadrupleRoom

    B.2.7.01

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:25.5 m

    QuadrupleRoom

    B.2.7.02

    LN PB GP AC

    2.125 FCL:

    Air:F: W: C:

    Area:25.5 m

    QuadrupleRoom

    B.2.7.03

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:25.4 m

    QuadrupleRoom

    B.2.7.04

    LN PB GP AC

    2.125 FCL:

    Air:F: W: C:

    Area:25.4 m

    QuadrupleRoom

    B.2.7.05

    LN PB GP AC

    2.125

    FCL:

    Air:F: W: C:

    Area:25.5 m

    QuadrupleRoom

    B.2.7.07

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:25.4 m

    QuadrupleRoom

    B.2.7.08

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:25.4 m

    QuadrupleRoom

    B.2.7.09

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:25.5 m

    QuadrupleRoom

    B.2.7.10

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:25.5 m

    QuadrupleRoom

    B.2.7.11

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:25.5 m

    QuadrupleRoom

    B.2.7.12

    LN PB GP AC

    2.125

    FCL:

    Air:F: W: C:

    Area:25.5 m

    QuadrupleRoom

    B.2.7.06

    LN PB GP AC

    2.125

    FCL:

    Air:F: W: C:

    Area:14.7 m

    Single Dis.B.2.7.25

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:4.5 m

    MEPB.2.2.01

    CS CB - UT

    2.125

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    25.5 m

    Tutor StudioB.2.7.26

    LN PB GP

    1AC

    2.125

    FCL:

    Air:F: W: C:

    Area:66.9 m

    CirculationB.2.1.01

    LN PB SM AC

    2.125

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    63.5 m

    Work Space

    B.2.0.01

    LN PB GP

    33AC

    2.175

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    15.8m

    CirculationB.2.8.02

    CS SA

    UT

    2.175

    FCL:

    Air:F: W: C:

    Area:25.5 m

    QuadrupleRoom

    B.2.7.13

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:25.5 m

    QuadrupleRoom

    B.2.7.14

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:25.5 m

    QuadrupleRoom

    B.2.7.15

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:25.4 m

    QuadrupleRoom

    B.2.7.16

    LN PB GP AC

    2.125 FCL:

    Air:F: W: C:

    Area:25.4 m

    QuadrupleRoom

    B.2.7.17

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:25.5 m

    QuadrupleRoom

    B.2.7.18

    LN PB GP AC

    2.125

    FCL:

    Air:F: W: C:

    Area:25.5 m

    QuadrupleRoom

    B.2.7.19

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:25.4 m

    QuadrupleRoom

    B.2.7.20

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:25.4 m

    QuadrupleRoom

    B.2.7.21

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:25.5 m

    QuadrupleRoom

    B.2.7.22

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:25.5 m

    QuadrupleRoom

    B.2.7.23

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:25.5 m

    QuadrupleRoom

    B.2.7.24

    LN PB GP AC

    2.125

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    25.5 m

    Tutor StudioB.2.7.28

    LN PB GP

    1AC

    2.125

    FCL:

    Air:F: W: C:

    Area:14.7 m

    Single Dis.B.2.7.27

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:4.5 m

    MEPB.2.2.02

    CS CB - UT

    -

    FCL:

    Air:F: W: C:

    Area:66.9 m

    CirculationB.2.1.03

    LN PB SM AC

    2.125

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    63.5 m

    Work Space

    B.2.0.02

    LN PB GP

    33AC

    2.175

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    15.8m

    CirculationB.2.8.04

    CS SA

    UT

    2.175

    B.1

    B.1

    B.2

    B.2

    B.3

    B.3

    B.4

    B.4

    B.6

    B.6

    B.8

    B.8

    B.9

    B.9

    B.10

    B.10

    B.11

    B.11

    B.12

    B.12

    B.A B.A

    B.B B.B

    B.C B.C

    B.D B.D

    B.E B.E

    B.F B.F

    B.G B.G

    B.H B.H

    W330954

    W402727

    W40

    172

    8W40

    172

    9

    W40

    173

    1

    W330762

    W330763

    W332764

    W332765

    W330766

    W330767

    W330768

    W330769

    W330770

    W332771

    W332772

    W330773

    W330774

    W330775

    F031

    776

    F031

    777

    F031

    778

    F031

    779

    W402918

    W402919

    W40

    192

    0W40

    192

    1

    W40

    192

    2W40

    192

    3

    W330955

    W332956

    W332957

    W330958

    W330959

    W330960

    W330961

    W330962

    W332963

    W332964

    W330965

    W330966

    W330967

    F031

    968

    F031

    969

    F031

    970

    F031

    971

    W.71

    1009

    W.71

    1015

    D.12

    2105

    D.12

    2109

    D.12

    2110

    D.022215

    D.022216

    D.022217

    D.022218

    D.01

    2221

    D.022222

    D.022223

    D.022224

    D.022225

    D.022228

    D.022229

    D.022230

    D.022232

    D.022234

    D.02

    2235

    D.022236

    D.022237

    D.02

    2238

    D.022239

    D.022240

    D.02

    2241

    D.022242

    D.022246

    D.02

    2247

    D.022248

    D.01

    2252

    D.012253

    D.012254

    D.012255

    D.02

    2256

    D.02

    2257

    D.02

    2259

    D.02

    2260

    D.12

    2465

    D.12

    2469

    D.12

    2470

    D.022575

    D.022576

    D.022577

    D.022578

    D.01

    2581

    D.022582

    D.022583

    D.022584

    D.022585

    D.022588

    D.022589

    D.022590

    D.022592

    D.022594

    D.02

    2595

    D.022596

    D.022597

    D.02

    2598

    D.022599

    D.022600

    D.02

    2601

    D.022602

    D.022606

    D.02

    2607

    D.022608

    D.01

    2612

    D.012613

    D.012614

    D.012615

    D.02

    2616

    D.02

    2617

    D.02

    2619

    D.02

    2620

    B.5

    B.5

    B.7

    B.7

    0.40 4.60 0.40 4.60 0.40 4.60 0.40 4.38 0.85 4.38 0.40 4.60 0.40 4.60 0.40 4.60 0.40 4.60 0.40

    5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

    20.00 25.00

    35.40 4.60 5.40

    45.40

    0.40

    4.78

    0.40

    2.50

    0.40

    4.78

    0.40

    15.00

    0.40

    4.78

    0.40

    2.50

    0.40

    4.78

    0.40

    5.18

    2.90

    5.18

    15.40

    5.18

    2.90

    5.18

    13.26

    15.40

    13.26

    13.66

    15.00

    13.66

    42.32

    D.022219

    D.022220

    D.022226

    D.022227

    D.022231

    D.022233

    D.022243

    D.02

    2244

    D.022245

    D.022249

    D.02

    2250

    D.022251

    D.02

    2258

    D.02

    2261

    D.022579

    D.022580

    D.022586

    D.022587

    D.022591

    D.022593

    D.022603

    D.02

    2604

    D.022605

    D.022609

    D.02

    2610

    D.022611

    D.02

    2618

    D.02

    2621

    Vertical grille

    Vertical Grille

    AC

    CHWCMV

    F.A. for smoke exhauston low level

    DrainPipe

    CMV 200Fire proof acess

    Smoke exhaust duct0.8*0.4 m

    Under ceilingsmoke exhaust grilleFresh grille for smoke

    exhaust to be studied

    F.A. for smokeexhaust on low level

    Vertical grille

    Vertical Grille

    AC

    CHWCMV

    F.A. for smoke exhauston low level

    CMV 200Fire proof acess

    Smoke exhaust duct0.8*0.4 m

    Under ceilingsmoke exhaust grille

    Fresh grille for smokeexhaust to be studied

    F.A. for smokeexhaust on low level

    W40

    1E.

    2103

    .38

    W402E.2103.39

    ELV

    LV

    ELV

    LVELV

    LV

    ELV

    LV

    5.43

    0.37

    1.65

    0.37

    5.43

    0.33 1.07 2.32 2.70 2.32 2.67 2.32 2.70 2.32 2.67 2.32 2.70 2.32 3.18 3.22 4.87 5.10

    5.38

    2.50

    5.38

    5.134.873.253.152.322.702.322.672.322.702.322.672.322.702.321.070.33

    5.38

    2.50

    5.38

    5.43

    0.37

    1.65

    0.37

    5.43

    5.063.632.753.623.632.753.623.632.753.69

    2.023.043.622.753.623.632.753.623.622.753.63

    2.00

    5.17

    7.74

    7.74

    2.00

    5.17

    SD S A2 211AA

    SD S A2 211AA

    SD S A2 211BB

    SD S A2 211BB

    Project :

    Architects :

    Issue History :

    Engineers :

    Creation Date :

    Scale :

    Building :

    project n phase

    Drawing n :

    OtherConsultants :

    building number indice

    paper format :

    Design Arch:Adress: Unit 208 Inya Lake Hotel37 Kaba Aye Pagoda Road, MayangoneTownship Yangon, MyanmarT +959421045437

    Landscape Arch:

    Construction Architect:

    Int Designer:

    Client &Project Manager :

    Client: Project Manager:

    Structural Engineer: MEP Engineer:

    Acoustic Engineer: Bamboo Engineer:

    Consultant: Consultant:

    BuildingSurveyor:

    Building Surveyor: Site Safety Officer:

    Adresse:

    A0

    TANGRAMARCHITECTES INTERNATIONAL(Myanmar) Co., LTD.Adress: Unit 208 Inya Lake Hotel

    37 Kaba Aye Pagoda Road, MayangoneTownship Yangon, MyanmarT +959421045437

    Adress: Unit 208 Inya Lake Hotel37 Kaba Aye Pagoda Road, MayangoneTownship Yangon, MyanmarT +959421045437

    THIHA YARZARConstruction & Engineering Co., LTD.

    TANGRAMARCHITECTES INTERNATIONAL(Myanmar) Co., LTD.

    TANGRAMARCHITECTES INTERNATIONAL(Myanmar) Co., LTD.

    Adress : No. 24 C 2nd Fl. (R)Ma Gyi Gyi St.Sanchaung Tsp., Yangon, MyanmarT 09 73184626

    TERRELL

    Adress : 11, rue Heinrich92100 Boulogne Billancourt, France

    T +33146210746

    MARSHALL DAYAcousticsAdress : 10, rue Edith Cavell

    06400 Cannes, France

    T 0493392684

    Adress: #18 05/06101 Thompson Square (United Sq.)Singapore 307591T +6587107416

    DULWICH COLLEGE INTERNATIONAL

    Adress: Thanlynn Star CityTangon, Myanmar

    T 056 23150 3 Ext 175

    SPA MYANMAR

    Drawing title :

    RFR GROUP

    Adress : 4 rue d'Enghien75010 Paris France

    T +33 1 5324 9100

    1 : 100

    C:\U

    sers\t.ch\Doc

    umen

    ts\13.46

    Dulwich

    Boarding

    _t.ch.rvt

    06/08/20

    1416

    :17:43

    DULWICH COLLEGE YANGONBoarding School

    Thanlyn township, Yangon, Myanmar

    11/08/14

    SD13.46 B 2A 0 22

    SECOND FLOOR PLAN1 : 100SD 2. Boarding Second FloorBOADING SCHOOL

    NGFL1 B 8.10L1 B

    NGFL2 B 10.93L2 B

    NGFL3 B 13.76L3 B

    NGFL4 B 16.59L4 B

    NGFL5 B 19.42L5 B

    NGFL0 B 5.07L0 B

    B.A B.B B.C B.D B.E B.F B.G B.H

    5.18 2.90 5.18 15.40 5.18 2.90 5.18

    41.92

    Brick Wall

    Bamboo doubleskin structure

    Bamboo sunshade

    Concrete frame

    Metal deck roof on wood /bamboo structure

    3.03

    2.83

    2.83

    2.83

    2.83

    14.35

    0.79 3.99 3.36

    0.44

    2.31

    0.51

    2.33

    0.51

    2.33

    0.46

    2.38

    0.50

    2.38

    2.76

    2.83

    2.83

    2.82

    2.88

    3.36 3.99

    0.44

    2.31

    0.51

    2.33

    0.51

    2.33

    0.46

    2.38

    0.50

    2.38

    Student Hall

    Teacher apartement bed room

    Quadruple room

    2.75

    2.84

    2.83

    2.82

    2.88

    double room toilet

    Single room

    Student Hall

    Teacher apartement living room

    Quadruple room

    double room toilet

    Single room

    Circulation

    Circulation

    Circulation

    Circulation

    Circulation

    Student Hall

    Teacher apartement living room

    Quadruple room

    double room toilet

    Single room

    Student Hall

    Teacher apartement bed room

    Quadruple room

    double room toilet

    Single room

    Circulation

    Circulation

    Circulation

    Circulation

    Circulation

    Circulation

    Shaft

    NGFL1 B 8.10L1 B

    NGFL2 B 10.93L2 B

    NGFL3 B 13.76L3 B

    NGFL4 B 16.59L4 B

    NGFL5 B 19.42L5 B

    NGFL0 B 5.07L0 B

    B.A B.B B.C B.D B.E B.F B.G B.H

    5.18 2.90 5.18 15.40 5.18 2.90 5.18

    41.92

    Bamboo doubleskin structure

    Concrete frame

    Metal deck roof on wood /bamboo structure

    3.03

    2.83

    2.83

    2.83

    2.83

    14.35

    3.18 1.68 2.50 4.78 4.78 2.50 1.68 3.18

    16.65

    16.65

    3.03

    2.83

    2.83

    2.83

    2.83

    2.83

    2.83

    2.83

    2.83

    3.03

    LiftLift

    Circulation

    Circulation

    Circulation

    Circulation

    Circulation

    Circulation

    Circulation

    Circulation

    Project :

    Architects :

    Issue History :

    Engineers :

    Creation Date :

    Scale :

    Building :

    project n phase

    Drawing n :

    OtherConsultants :

    building number indice

    paper format :

    Design Arch:Adress: Unit 208 Inya Lake Hotel37 Kaba Aye Pagoda Road, MayangoneTownship Yangon, MyanmarT +959421045437

    Landscape Arch:

    Construction Architect:

    Int Designer:

    Client &Project Manager :

    Client: Project Manager:

    Structural Engineer: MEP Engineer:

    Acoustic Engineer: Bamboo Engineer:

    Consultant: Consultant:

    BuildingSurveyor:

    Building Surveyor: Site Safety Officer:

    Adresse:

    A0

    TANGRAMARCHITECTES INTERNATIONAL(Myanmar) Co., LTD.Adress: Unit 208 Inya Lake Hotel

    37 Kaba Aye Pagoda Road, MayangoneTownship Yangon, MyanmarT +959421045437

    Adress: Unit 208 Inya Lake Hotel37 Kaba Aye Pagoda Road, MayangoneTownship Yangon, MyanmarT +959421045437

    THIHA YARZARConstruction & Engineering Co., LTD.

    TANGRAM ARCHITECTES INTERNATIONAL(Myanmar) Co., LTD.

    TANGRAM ARCHITECTES INTERNATIONAL(Myanmar) Co., LTD.

    Adress : No. 24 C 2nd Fl. (R)Ma Gyi Gyi St.Sanchaung Tsp., Yangon, MyanmarT 09 73184626

    TERRELL

    Adress : 11, rue Heinrich92100 Boulogne Billancourt, France

    T +33146210746

    MARSHALL DAYAcousticsAdress : 10, rue Edith Cavell

    06400 Cannes, France

    T 0493392684

    Adress: #18 05/06101 Thompson Square (United Sq.)Singapore 307591T +6587107416

    DULWICH COLLEGE INTERNATIONAL

    Adress: Thanlynn Star CityTangon, Myanmar

    T 056 23150 3 Ext 175

    SPA MYANMAR

    Drawing title :

    RFR GROUP

    Adress : 4 rue d'Enghien75010 Paris France

    T +33 1 5324 9100

    1 : 100

    C:\U

    sers\t.ch\Doc

    umen

    ts\13.46

    Dulwich

    Boarding

    _t.ch.rvt

    01/09/20

    1412

    :07:22

    DULWICH COLLEGE YANGONBoarding School

    Thanlyn township, Yangon, Myanmar

    11/08/14

    SD13.46 B 3A 0 12

    TRANSVERSAL SECTION AA & BB

    1 : 100

    SD Boarding Tansversal Section

    1 : 100

    SD Boarding Tansversal circulation Section

    BOADING SCHOOL

    Boarding school

    Section BB

    Section AA

    NGFL1 B 8.10L1 B

    NGFL2 B 10.93L2 B

    NGFL3 B 13.76L3 B

    NGFL4 B 16.59L4 B

    NGFL5 B 19.42L5 B

    NGFL0 B 5.07L0 B

    B.A B.B B.C B.D B.E B.F B.G B.H

    5.18 2.90 5.18 15.40 5.18 2.90 5.18

    41.92

    Brick Wall

    Bamboo doubleskin structure

    Bamboo sunshade

    Concrete frame

    Metal deck roof on wood /bamboo structure

    3.03

    2.83

    2.83

    2.83

    2.83

    14.35

    0.79 3.99 3.36

    0.44

    2.31

    0.51

    2.33

    0.51

    2.33

    0.46

    2.38

    0.50

    2.38

    2.76

    2.83

    2.83

    2.82

    2.88

    3.36 3.99

    0.44

    2.31

    0.51

    2.33

    0.51

    2.33

    0.46

    2.38

    0.50

    2.38

    Student Hall

    Teacher apartement bed room

    Quadruple room

    2.75

    2.84

    2.83

    2.82

    2.88

    double room toilet

    Single room

    Student Hall

    Teacher apartement living room

    Quadruple room

    double room toilet

    Single room

    Circulation

    Circulation

    Circulation

    Circulation

    Circulation

    Student Hall

    Teacher apartement living room

    Quadruple room

    double room toilet

    Single room

    Student Hall

    Teacher apartement bed room

    Quadruple room

    double room toilet

    Single room

    Circulation

    Circulation

    Circulation

    Circulation

    Circulation

    Circulation

    Shaft

    NGFL1 B 8.10L1 B

    NGFL2 B 10.93L2 B

    NGFL3 B 13.76L3 B

    NGFL4 B 16.59L4 B

    NGFL5 B 19.42L5 B

    NGFL0 B 5.07L0 B

    B.A B.B B.C B.D B.E B.F B.G B.H

    5.18 2.90 5.18 15.40 5.18 2.90 5.18

    41.92

    Bamboo doubleskin structure

    Concrete frame

    Metal deck roof on wood /bamboo structure

    3.03

    2.83

    2.83

    2.83

    2.83

    14.35

    3.18 1.68 2.50 4.78 4.78 2.50 1.68 3.18

    16.65

    16.65

    3.03

    2.83

    2.83

    2.83

    2.83

    2.83

    2.83

    2.83

    2.83

    3.03

    LiftLift

    Circulation

    Circulation

    Circulation

    Circulation

    Circulation

    Circulation

    Circulation

    Circulation

    Project :

    Architects :

    Issue History :

    Engineers :

    Creation Date :

    Scale :

    Building :

    project n phase

    Drawing n :

    OtherConsultants :

    building number indice

    paper format :

    Design Arch:Adress: Unit 208 Inya Lake Hotel37 Kaba Aye Pagoda Road, MayangoneTownship Yangon, MyanmarT +959421045437

    Landscape Arch:

    Construction Architect:

    Int Designer:

    Client &Project Manager :

    Client: Project Manager:

    Structural Engineer: MEP Engineer:

    Acoustic Engineer: Bamboo Engineer:

    Consultant: Consultant:

    BuildingSurveyor:

    Building Surveyor: Site Safety Officer:

    Adresse:

    A0

    TANGRAMARCHITECTES INTERNATIONAL(Myanmar) Co., LTD.Adress: Unit 208 Inya Lake Hotel

    37 Kaba Aye Pagoda Road, MayangoneTownship Yangon, MyanmarT +959421045437

    Adress: Unit 208 Inya Lake Hotel37 Kaba Aye Pagoda Road, MayangoneTownship Yangon, MyanmarT +959421045437

    THIHA YARZARConstruction & Engineering Co., LTD.

    TANGRAM ARCHITECTES INTERNATIONAL(Myanmar) Co., LTD.

    TANGRAM ARCHITECTES INTERNATIONAL(Myanmar) Co., LTD.

    Adress : No. 24 C 2nd Fl. (R)Ma Gyi Gyi St.Sanchaung Tsp., Yangon, MyanmarT 09 73184626

    TERRELL

    Adress : 11, rue Heinrich92100 Boulogne Billancourt, France

    T +33146210746

    MARSHALL DAYAcousticsAdress : 10, rue Edith Cavell

    06400 Cannes, France

    T 0493392684

    Adress: #18 05/06101 Thompson Square (United Sq.)Singapore 307591T +6587107416

    DULWICH COLLEGE INTERNATIONAL

    Adress: Thanlynn Star CityTangon, Myanmar

    T 056 23150 3 Ext 175

    SPA MYANMAR

    Drawing title :

    RFR GROUP

    Adress : 4 rue d'Enghien75010 Paris France

    T +33 1 5324 9100

    1 : 100

    C:\U

    sers\t.ch\Doc

    umen

    ts\13.46

    Dulwich

    Boarding

    _t.ch.rvt

    01/09/20

    1412

    :07:22

    DULWICH COLLEGE YANGONBoarding School

    Thanlyn township, Yangon, Myanmar

    11/08/14

    SD13.46 B 3A 0 12

    TRANSVERSAL SECTION AA & BB

    1 : 100

    SD Boarding Tansversal Section

    1 : 100

    SD Boarding Tansversal circulation Section

    BOADING SCHOOL

    Ground floor plan First floor plan Second floor plan

  • 547.7 mFECA

    1415.7 mFECA

    155.3 mFECA

    41.7 mUCA

    110.4mUCA

    541.9 mUCA

    493.6 mFECA

    162.4 mFECA

    342.2 mFECA

    76.7 mFECA

    74.3 mFECA

    599.0 mUCA

    487.4mFECA

    487.1 mFECA

    487.2 mFECA

    161.6 mFECA

    342.3 mFECA

    76.7 mFECA

    76.7 mFECA

    605.4 mUCA

    145.5 mFECA

    187.6 mFECA

    162.4 mFECA

    76.8 mFECA

    284.0 mFECA

    380.0 mUCA

    Project :

    Architects :

    Issue History :

    Engineers :

    Creation Date :

    Scale :

    Building :

    project n phase

    Drawing n :

    OtherConsultants :

    building number indice

    paper format :

    Design Arch:Adress: Unit 208 Inya Lake Hotel37 Kaba Aye Pagoda Road, MayangoneTownship Yangon, MyanmarT +959421045437

    Landscape Arch:

    Construction Architect:

    Int Designer:

    Client &Project Manager :

    Client: Project Manager:

    Structural Engineer: MEP Engineer:

    Acoustic Engineer: Bamboo Engineer:

    Consultant: Consultant:

    BuildingSurveyor:

    Building Surveyor: Site Safety Officer:

    Adresse:

    A0

    TANGRAMARCHITECTES INTERNATIONAL(Myanmar) Co., LTD.Adress: Unit 208 Inya Lake Hotel

    37 Kaba Aye Pagoda Road, MayangoneTownship Yangon, MyanmarT +959421045437

    Adress: Unit 208 Inya Lake Hotel37 Kaba Aye Pagoda Road, MayangoneTownship Yangon, MyanmarT +959421045437

    THIHA YARZARConstruction & Engineering Co., LTD.

    TANGRAMARCHITECTES INTERNATIONAL(Myanmar) Co., LTD.

    TANGRAMARCHITECTES INTERNATIONAL(Myanmar) Co., LTD.

    Adress : No. 24 C 2nd Fl. (R)Ma Gyi Gyi St.Sanchaung Tsp., Yangon, MyanmarT 09 73184626

    TERRELL

    Adress : 11, rue Heinrich92100 Boulogne Billancourt, France

    T +33146210746

    MARSHALL DAYAcousticsAdress : 10, rue Edith Cavell

    06400 Cannes, France

    T 0493392684

    Adress: #18 05/06101 Thompson Square (United Sq.)Singapore 307591T +6587107416

    DULWICH COLLEGE INTERNATIONAL

    Adress: Thanlynn Star CityTangon, Myanmar

    T 056 23150 3 Ext 175

    SPA MYANMAR

    Drawing title :

    RFR GROUP

    Adress : 4 rue d'Enghien75010 Paris France

    T +33 1 5324 9100

    1 : 500

    C:\ProjetT

    S\13.46Dulwich

    Ecoles_t.sa.rvt

    07/08/20

    1416

    :14:13

    DULWICH COLLEGE YANGONInternational preschool

    Thanlyn township, Yangon, Myanmar

    JUNIOR SCHOOL

    11/08/14

    SD13.46 J 5A 0 11

    GFA SURFACE AREA + 3D VIEWSGround Floor First Floor Second Floor Third Floor

    GFA Junior School

    FECAL0

    547.7 m1,415.7 m155.3 m

    2,118.7 m

    L1487.1 m487.2m161.6 m342.3 m76.7 m76.7 m

    1,631.5 m

    L2493.6 m162.4 m342.2m76.7 m74.3 m

    487.4 m1,636.4 m

    L3145.5 m187.6 m162.4 m76.8m

    284.0m856.2 m6,242.9 m

    UCAL0

    41.7 m110.4m541.9 m

    694.0m

    L1605.4m

    605.4m

    L2599.0m

    599.0m

    L3380.0 m

    380.0 m2,278.3 m8,521.2m

    View from the South West corner

    View from the North East corner

    322.5 mFECA

    193.5 mFECA

    425.0 mFECA

    65.0 mFECA

    270.0 mFECA

    64.5 mFECA

    1179.7 mUCA

    240.0 mFECA

    195.0 mFECA

    750.0 mFECA

    195.0 mFECA

    425.0 mFECA

    65.0 mFECA

    325.0 mFECA

    195.0 mFECA

    65.0 mFECA

    766.3 mUCA

    325.0 mFECA

    65.0 mFECA 772.8 m

    UCA

    195.0 mFECA

    750.0 mFECA

    195.0 mFECA

    425.0 mFECA

    65.0 mFECA

    193.7 mFECA

    216.6 mFECA

    317.7 mUCA

    325.0 mFECA

    195.0 mFECA

    65.0 mFECA

    Project :

    Architects :

    Issue History :

    Engineers :

    Creation Date :

    Scale :

    Building :

    project n phase

    Drawing n :

    OtherConsultants :

    building number indice

    paper format :

    Design Arch:Adress: Unit 208 Inya Lake Hotel37 Kaba Aye Pagoda Road, MayangoneTownship Yangon, MyanmarT +959421045437

    Landscape Arch:

    Construction Architect:

    Int Designer:

    Client &Project Manager :

    Client: Project Manager:

    Structural Engineer: MEP Engineer:

    Acoustic Engineer: Bamboo Engineer:

    Consultant: Consultant:

    BuildingSurveyor:

    Building Surveyor: Site Safety Officer:

    Adresse:

    A0

    TANGRAMARCHITECTES INTERNATIONAL(Myanmar) Co., LTD.Adress: Unit 208 Inya Lake Hotel

    37 Kaba Aye Pagoda Road, MayangoneTownship Yangon, MyanmarT +959421045437

    Adress: Unit 208 Inya Lake Hotel37 Kaba Aye Pagoda Road, MayangoneTownship Yangon, MyanmarT +959421045437

    THIHA YARZARConstruction & Engineering Co., LTD.

    TANGRAMARCHITECTES INTERNATIONAL(Myanmar) Co., LTD.

    TANGRAMARCHITECTES INTERNATIONAL(Myanmar) Co., LTD.

    Adress : No. 24 C 2nd Fl. (R)Ma Gyi Gyi St.Sanchaung Tsp., Yangon, MyanmarT 09 73184626

    TERRELL

    Adress : 11, rue Heinrich92100 Boulogne Billancourt, France

    T +33146210746

    MARSHALL DAYAcousticsAdress : 10, rue Edith Cavell

    06400 Cannes, France

    T 0493392684

    Adress: #18 05/06101 Thompson Square (United Sq.)Singapore 307591T +6587107416

    DULWICH COLLEGE INTERNATIONAL

    Adress: Thanlynn Star CityTangon, Myanmar

    T 056 23150 3 Ext 175

    SPA MYANMAR

    Drawing title :

    RFR GROUP

    Adress : 4 rue d'Enghien75010 Paris France

    T +33 1 5324 9100

    1 : 500

    C:\ProjetT

    S\13.46Dulwich

    Ecoles_t.sa.rvt

    08/08/20

    1409

    :54:29

    DULWICH COLLEGE YANGONInternational preschool

    Thanlyn township, Yangon, Myanmar

    SENIOR SCHOOL

    11/08/2014

    SD13.46 S 6A 0 11

    SURFACE AREA PLANS GFA

    1 : 500

    Ground Floor GFA Calculation1 : 500

    First Floor GFA Calculation1 : 500

    Second Floor GFA Calculation1 : 500

    Third Floor GFA Calculation

    GFA Senior School

    9,847.4 m

    GFA Senior School

    UCAL0

    1,179.7 m1,179.7 m

    L1766.3 m

    766.3 m

    L2772.8m

    772.8m

    L3317.7 m

    317.7 m3,036.5m

    GFA Senior School

    FECAL0

    322.5 m193.5 m425.0m65.0m270.0m64.5 m

    240.0m195.0m

    1,775.5 m

    L1750.0m195.0m425.0m65.0m325.0m195.0m65.0m

    2,020.0 m

    L2750.0m195.0m425.0m195.0m325.0m65.0m65.0m

    2,020.0 m

    L3193.7 m216.6 m325.0m195.0m65.0m

    995.4 m6,810.9 m

    311.3 mUCA

    278.7 mFECA

    30.1 mFECA

    278.7 mFECA

    30.1 mFECA

    311.3 mUCA

    73.8 mFECA

    483.6 mFECA

    483.6 mFECA

    73.7 mFECA

    15.3 mUCA

    15.2 mUCA

    73.8 mFECA

    483.6 mFECA

    483.6 mFECA

    73.7 mFECA

    15.3 mUCA

    15.2 mUCA

    73.8 mFECA

    483.6 mFECA

    483.6 mFECA

    73.7 mFECA

    15.3 mUCA

    15.2 mUCA

    73.8 mFECA

    483.6 mFECA

    483.6 mFECA

    73.7 mFECA

    15.3 mUCA

    15.2 mUCA

    Project :

    Architects :

    Issue History :

    Engineers :

    Creation Date :

    Scale :

    Building :

    project n phase

    Drawing n :

    OtherConsultants :

    building number indice

    paper format :

    Design Arch:Adress: Unit 208 Inya Lake Hotel37 Kaba Aye Pagoda Road, MayangoneTownship Yangon, MyanmarT +959421045437

    Landscape Arch:

    Construction Architect:

    Int Designer:

    Client &Project Manager :

    Client: Project Manager:

    Structural Engineer: MEP Engineer:

    Acoustic Engineer: Bamboo Engineer:

    Consultant: Consultant:

    BuildingSurveyor:

    Building Surveyor: Site Safety Officer:

    Adresse:

    A0

    TANGRAMARCHITECTES INTERNATIONAL(Myanmar) Co., LTD.Adress: Unit 208 Inya Lake Hotel

    37 Kaba Aye Pagoda Road, MayangoneTownship Yangon, MyanmarT +959421045437

    Adress: Unit 208 Inya Lake Hotel37 Kaba Aye Pagoda Road, MayangoneTownship Yangon, MyanmarT +959421045437

    THIHA YARZARConstruction & Engineering Co., LTD.

    TANGRAM ARCHITECTES INTERNATIONAL(Myanmar) Co., LTD.

    TANGRAM ARCHITECTES INTERNATIONAL(Myanmar) Co., LTD.

    Adress : No. 24 C 2nd Fl. (R)Ma Gyi Gyi St.Sanchaung Tsp., Yangon, MyanmarT 09 73184626

    TERRELL

    Adress : 11, rue Heinrich92100 Boulogne Billancourt, France

    T +33146210746

    MARSHALL DAYAcousticsAdress : 10, rue Edith Cavell

    06400 Cannes, France

    T 0493392684

    Adress: #18 05/06101 Thompson Square (United Sq.)Singapore 307591T +6587107416

    DULWICH COLLEGE INTERNATIONAL

    Adress: Thanlynn Star CityTangon, Myanmar

    T 056 23150 3 Ext 175

    SPA MYANMAR

    Drawing title :

    RFR GROUP

    Adress : 4 rue d'Enghien75010 Paris France

    T +33 1 5324 9100

    1 : 500

    C:\U

    sers\r.bo\Doc

    umen

    ts\13.46

    Dulwich

    Boarding

    _r.bo.rvt

    08/08/20

    1410

    :29:13

    DULWICH COLLEGE YANGONBoarding School

    Thanlyn township, Yangon, Myanmar

    11/08/14

    SD13.46 B 5A 0 11

    GFA SURFACE AREA PLANS + 3D

    3D VIEW 1

    3 D VIEW 2

    1 : 500

    GFA L0 B1 : 500

    GFA L1 B1 : 500

    GFA L2 B

    1 : 500

    GFA L3 B1 : 500

    GFA L4 B

    GFA Boarding School

    5,820.8 m

    GFA Boarding School

    UCAL0 B

    311.3 m311.3 m622.6 m

    L1 B15.3 m15.2 m30.5 m

    L2 B15.3 m15.2 m30.5 m

    L3 B15.3 m15.2 m30.5 m

    L4 B15.3 m15.2 m30.5 m

    744.5m

    GFA Boarding School

    FECAL0 B

    278.7m30.1 m278.7 m30.1 m617.7 m

    L1 B73.8m

    483.6 m483.6 m73.7 m

    1,114.7 m

    L2 B73.8m

    483.6 m483.6 m73.7 m

    1,114.7 m

    L3 B73.8m

    483.6 m483.6 m73.7 m

    1,114.7 m

    L4 B73.8m

    483.6 m483.6 m73.7 m

    1,114.7 m5,076.4 m

    BOADING SCHOOL

    1479.7 mFECA

    487.0 mUCA

    1116.8mFECA

    84.9 mUCA

    85.9mUCA 1163.5 m

    FECA

    49.1 mUCA

    48.8 mUCA

    869.1 mFECA

    47.3 mFECA

    36.4mFECA

    5.6 mFECA

    Project :

    Architects :

    Issue History :

    Engineers :

    Creation Date :

    Scale :

    Building :

    project n phase

    Drawing n :

    OtherConsultants :

    building number indice

    paper format :

    Design Arch:Adress: Unit 208 Inya Lake Hotel37 Kaba Aye Pagoda Road, MayangoneTownship Yangon, MyanmarT +959421045437

    Landscape Arch:

    Construction Architect:

    Int Designer:

    Client &Project Manager :

    Client: Project Manager:

    Structural Engineer: MEP Engineer:

    Acoustic Engineer: Bamboo Engineer:

    Consultant: Consultant:

    BuildingSurveyor:

    Building Surveyor: Site Safety Officer:

    Adresse:

    A0

    TANGRAMARCHITECTES INTERNATIONAL(Myanmar) Co., LTD.Adress: Unit 208 Inya Lake Hotel

    37 Kaba Aye Pagoda Road, MayangoneTownship Yangon, MyanmarT +959421045437

    Adress: Unit 208 Inya Lake Hotel37 Kaba Aye Pagoda Road, MayangoneTownship Yangon, MyanmarT +959421045437

    THIHA YARZARConstruction & Engineering Co., LTD.

    TANGRAMARCHITECTES INTERNATIONAL(Myanmar) Co., LTD.

    TANGRAMARCHITECTES INTERNATIONAL(Myanmar) Co., LTD.

    Adress : No. 24 C 2nd Fl. (R)Ma Gyi Gyi St.Sanchaung Tsp., Yangon, MyanmarT 09 73184626

    TERRELL

    Adress : 11, rue Heinrich92100 Boulogne Billancourt, France

    T +33146210746

    MARSHALL DAYAcousticsAdress : 10, rue Edith Cavell

    06400 Cannes, France

    T 0493392684

    Adress: #18 05/06101 Thompson Square (United Sq.)Singapore 307591T +6587107416

    DULWICH COLLEGE INTERNATIONAL

    Adress: Thanlynn Star CityTangon, Myanmar

    T 056 23150 3 Ext 175

    SPA MYANMAR

    Drawing title :

    RFR GROUP

    Adress : 4 rue d'Enghien75010 Paris France

    T +33 1 5324 9100

    1 : 500

    C:\U

    sers\d.co\Doc

    umen

    ts\13.46

    Dulwich

    Arts_d.co

    .rvt

    08/08/20

    1400

    :04:42

    DULWICH COLLEGE YANGONInternational preschool, junior and senior schools

    Thanlyn township, Yangon, Myanmar

    11/08/2014

    SD13.46 A 5A 0 11

    SURFACE AREA PLANS GFAARTS BUILDINGS

    1 : 500Ground Floor

    1 : 500First Floor

    1 : 500Second Floor

    GFA Arts Building

    5,384.9 m

    GFA Arts Building

    UCAL0

    85.9 m84.9m487.0m

    657.8m

    L149.1 m48.8m

    97.9 m755.7 m

    GFA Arts Building

    FECAL0

    1,116.8m1,479.7 m

    2,596.5m

    L1869.1 m

    1,163.5 m2,032.6m4,629.2m

    Early years school

    Junior school

    Senior school

    Boarding school

    Performing art school

    Sports facilities

    10 rue Virgile Marron . 13005 Marseille . T 04.91.42.91.38 . F 04.91.48.01.65 . www.tangram-architectes.comMyanmar Offices: Inya lake Hotel (ILH),Room 208- 209located at no.37, Kaba Aye Pagoda Road, Mayangone Township, Yangon, Myanmar. DULWICH COLLEGE I YANGON I

    13.46 D

    BOARDING SCHOOL/FACADES

    FCL:

    Air:F: W: C:

    Area:19.5 m

    Double RoomB.3.7.01

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:18.7 m

    Double RoomB.3.7.02

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:18.7 m

    Double RoomB.3.7.03

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:19.4 m

    Double RoomB.3.7.04

    LN PB GP AC

    2.125 FCL:

    Air:F: W: C:

    Area:19.4 m

    Double RoomB.3.7.05

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:18.7 m

    Double RoomB.3.7.06

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:18.1 m

    Double RoomB.3.7.07

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:19.5 m

    Double RoomB.3.7.08

    LN PB GP AC

    2.125

    FCL:

    Air:F: W: C:

    Area:19.5 m

    Double RoomB.3.7.09

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:18.1 m

    Double RoomB.3.7.10

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:19.1 m

    Double RoomB.3.7.11

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:19.4 m

    Double RoomB.3.7.12

    LN PB GP AC

    2.475FCL:

    Air:F: W: C:

    Area:19.4 m

    Double RoomB.3.7.13

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:18.7 m

    Double RoomB.3.7.14

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:18.9 m

    Double RoomB.3.7.15

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:19.3 m

    Double RoomB.3.7.16

    LN PB GP AC

    2.125

    FCL:

    Air:F: W: C:

    Area:19.5 m

    Double RoomB.3.7.17

    LN PB GP AC

    2.125 FCL:

    Air:F: W: C:

    Area:18.7 m

    Double RoomB.3.7.18

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:18.7 m

    Double RoomB.3.7.19

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:19.4 m

    Double RoomB.3.7.20

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:19.4 m

    Double RoomB.3.7.21

    LN PB GP AC

    2.125 FCL:

    Air:F: W: C:

    Area:19.1 m

    Double RoomB.3.7.22

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:18.3 m

    Double RoomB.3.7.23

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:19.3 m

    Double RoomB.3.7.24

    LN PB GP AC

    2.125

    FCL:

    Air:F: W: C:

    Area:19.5 m

    Double RoomB.3.7.25

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:18.1 m

    Double RoomB.3.7.26

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:18.7 m

    Double RoomB.3.7.27

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:19.4 m

    Double RoomB.3.7.28

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:19.4 m

    Double RoomB.3.7.29

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:18.7 m

    Double RoomB.3.7.30

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:18.9 m

    Double RoomB.3.7.31

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:19.3 m

    Double RoomB.3.7.32

    LN PB GP AC

    2.125

    FCL:

    Air:F: W: C:

    Area:15.3 m

    Single Dis.B.3.7.33

    LN PB GP AC

    2.125

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    25.6 m

    Tutor StudioB.3.7.34

    LN PB GP

    1AC

    2.125

    FCL:

    Air:F: W: C:

    Area:15.3 m

    Single Dis.B.3.7.35

    LN PB GP AC

    2.475

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    25.6 m

    Tutor StudioB.3.7.36

    LN PB GP

    1AC

    2.475

    FCL:

    Air:F: W: C:

    Area:60.9 m

    CirculationB.3.1.01

    LN PB SM AC

    2.125

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    15.8m

    CirculationB.3.8.02

    CS SA

    AC

    2.175

    FCL:

    Air:F: W: C:

    Area:60.9 m

    CirculationB.3.1.03

    LN PB SM AC

    2.125

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    15.8m

    CirculationB.3.8.04

    CS SA

    AC

    2.175

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    63.5 m

    Work Space

    B.3.0.01

    LN PB GP

    33AC

    2.175

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    63.5 m

    Work Space

    B.3.0.02

    LN PB GP

    33AC

    2.175

    FCL:

    Air:F: W: C:

    Area:4.5 m

    MEPB.3.2.01

    CS CB - UT

    -

    FCL:

    Air:F: W: C:

    Area:4.5 m

    MEPB.3.2.02

    CS CB - UT

    2.475

    B.1

    B.1

    B.2

    B.2

    B.3

    B.3

    B.4

    B.4

    B.6

    B.6

    B.8

    B.8

    B.9

    B.9

    B.10

    B.10

    B.11

    B.11

    B.12

    B.12

    B.A B.A

    B.B B.B

    B.C B.C

    B.D B.D

    B.E B.E

    B.F B.F

    B.G B.G

    B.H B.H

    W402732

    W402733

    W40

    173

    4W40

    173

    5

    W40

    173

    6W40

    173

    7

    D.12

    2106

    W330780

    W330781

    W332782

    W332783

    W330784

    W330785

    W330786

    W330787

    W330788

    W332789

    W332790

    W330791

    W330792

    W330793

    F031

    794

    F031

    795

    F031

    796

    F031

    797

    D.12

    2111

    D.12

    2112

    D.01

    2166

    D.012167

    D.012168

    D.012169

    D.012170

    D.022171

    D.022172

    D.02

    2173

    D.02

    2174

    D.022175

    D.022176

    D.022177

    D.022178

    D.02

    2179

    2180

    D.022181

    D.022182

    D.022183

    D.02

    2184

    D.02

    2185

    D.022186

    D.022187

    D.022188

    D.022189

    D.02

    2190

    2191

    D.022192

    D.022193

    D.022194

    D.02

    2195

    D.02

    2196

    D.022197

    D.022198

    D.022199

    D.022200

    D.02

    2201

    2202

    D.022203

    D.022204

    D.022205

    D.02

    2206

    D.02

    2207

    D.022208

    D.022209

    D.022210

    D.022211

    D.02

    2212

    2213

    D.022214

    W402924

    W402925

    W40

    192

    6W40

    192

    7

    W40

    192

    8W40

    192

    9

    D.12

    2466

    W330972

    W330973

    W332974

    W332975

    W330976

    W330977

    W330978

    W330979

    W330980

    W332981

    W332982

    W330983

    W330984

    W330985

    F031

    986

    F031

    987

    F031

    988

    F031

    989

    D.12

    2471

    D.12

    2472

    D.01

    2526

    D.012527

    D.012528

    D.012529

    D.012530

    D.022531

    D.022532

    D.02

    2533

    D.02

    2534

    D.022535

    D.022536

    D.022537

    D.022538

    D.02

    2539

    2540

    D.022541

    D.022542

    D.022543

    D.02

    2544

    D.02

    2545

    D.022546

    D.022547

    D.022548

    D.022549

    D.02

    2550

    2551

    D.022552

    D.022553

    D.022554

    D.02

    2555

    D.02

    2556

    D.022557

    D.022558

    D.022559

    D.022560

    D.02

    2561

    2562

    D.022563

    D.022564

    D.022565

    D.02

    2566

    D.02

    2567

    D.022568

    D.022569

    D.022570

    D.022571

    D.02

    2572

    2573

    D.022574

    W.71

    1010

    W.71

    1016

    D.022385

    D.022264

    D.022265

    D.022266

    D.022624

    D.022625

    D.022626

    D.022627

    B.5

    B.5

    B.7

    B.7

    35.40 4.60 5.40

    45.40

    0.40

    4.78

    0.40

    2.50

    0.40

    4.78

    0.40

    15.00

    0.40

    4.78

    0.40

    2.50

    0.40

    4.78

    0.40

    5.18

    2.90

    5.18

    15.40

    5.18

    2.90

    5.18

    13.26

    15.40

    13.26

    13.66

    15.00

    13.66

    42.32

    0.40 4.60 0.40 4.60 0.40 4.60 0.40 4.38 0.85 4.38 0.40 4.60 0.40 4.60 0.40 4.60 0.40 4.60 0.40

    5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00

    20.00 25.00

    Vertical grille

    Vertical Grille

    AC

    CHWCMV

    F.A. for smoke exhauston low level

    CMV 200

    Fire proof acessUnder ceilingsmoke exhaust grille

    Fresh grille for smokeexhaust to be studied

    F.A. for smokeexhaust on low level

    DrainPipe

    Smoke exhaust duct0.8*0.4 m

    Vertical grille

    Vertical Grille

    AC

    CHWCMV

    F.A. for smoke exhauston low level

    CMV 200

    Fire proof acessUnder ceiling

    smoke exhaust grilleFresh grille for smokeexhaust to be studied

    F.A. for smokeexhaust on low level

    DrainPipe

    Smoke exhaust duct0.8*0.4 m

    DrainPipe

    DrainPipe

    ELV

    LV

    ELV

    LVELV

    LV

    ELV

    LV

    7.74

    5.43

    0.37

    1.65

    0.37

    5.43

    5.134.872.194.211.193.832.323.801.192.691.193.802.323.831.191.40

    5.062.492.272.732.732.272.502.502.272.732.732.272.56

    2.56 2.27 2.73 2.73 2.27 2.50 2.50 2.27 2.73 2.73 2.27 2.49 3.04 2.02

    1.40 1.19 3.83 2.32 3.80 1.19 2.69 1.19 3.80 2.32 3.83 1.19 3.15 3.25 4.87 5.13

    7.74

    5.17

    2.00

    SD S A2 211AA

    SD S A2 211AA

    SD S A2 211BB

    SD S A2 211BB

    5.38

    2.50

    5.38

    5.38

    2.50

    5.41

    Project :

    Architects :

    Issue History :

    Engineers :

    Creation Date :

    Scale :

    Building :

    project n phase

    Drawing n :

    OtherConsultants :

    building number indice

    paper format :

    Design Arch:Adress: Unit 208 Inya Lake Hotel37 Kaba Aye Pagoda Road, MayangoneTownship Yangon, MyanmarT +959421045437

    Landscape Arch:

    Construction Architect:

    Int Designer:

    Client &Project Manager :

    Client: Project Manager:

    Structural Engineer: MEP Engineer:

    Acoustic Engineer: Bamboo Engineer:

    Consultant: Consultant:

    BuildingSurveyor:

    Building Surveyor: Site Safety Officer:

    Adresse:

    A0

    TANGRAMARCHITECTES INTERNATIONAL(Myanmar) Co., LTD.Adress: Unit 208 Inya Lake Hotel

    37 Kaba Aye Pagoda Road, MayangoneTownship Yangon, MyanmarT +959421045437

    Adress: Unit 208 Inya Lake Hotel37 Kaba Aye Pagoda Road, MayangoneTownship Yangon, MyanmarT +959421045437

    THIHA YARZARConstruction & Engineering Co., LTD.

    TANGRAMARCHITECTES INTERNATIONAL(Myanmar) Co., LTD.

    TANGRAMARCHITECTES INTERNATIONAL(Myanmar) Co., LTD.

    Adress : No. 24 C 2nd Fl. (R)Ma Gyi Gyi St.Sanchaung Tsp., Yangon, MyanmarT 09 73184626

    TERRELL

    Adress : 11, rue Heinrich92100 Boulogne Billancourt, France

    T +33146210746

    MARSHALL DAYAcousticsAdress : 10, rue Edith Cavell

    06400 Cannes, France

    T 0493392684

    Adress: #18 05/06101 Thompson Square (United Sq.)Singapore 307591T +6587107416

    DULWICH COLLEGE INTERNATIONAL

    Adress: Thanlynn Star CityTangon, Myanmar

    T 056 23150 3 Ext 175

    SPA MYANMAR

    Drawing title :

    RFR GROUP

    Adress : 4 rue d'Enghien75010 Paris France

    T +33 1 5324 9100

    1 : 100

    C:\U

    sers\t.ch\Doc

    umen

    ts\13.46

    Dulwich

    Boarding

    _t.ch.rvt

    06/08/20

    1416

    :18:39

    DULWICH COLLEGE YANGONBoarding School

    Thanlyn township, Yangon, Myanmar

    11/08/14

    SD13.46 B 2A 0 32

    THIRD FLOOR PLAN1 : 100SD 3. Boarding Third Floor

    BOADING SCHOOL

    FCL:

    Air:F: W: C:

    Area:12.2 m

    Single R.B.4.7.01

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:12.3 m

    Single R.B.4.7.02

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:12.3 m

    Single R.B.4.7.03

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:12.3 m

    Single R.B.4.7.04

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:12.3 m

    Single R.B.4.7.05

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:12.3 m

    Single R.B.4.7.06

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:11.8 m

    Single R.B.4.7.07

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:12.6 m

    Single R.B.4.7.08

    LN PB GP AC

    2.475FCL:

    Air:F: W: C:

    Area:12.6 m

    Single R.B.4.7.09

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:11.8 m

    Single R.B.4.7.10

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:12.3 m

    Single R.B.4.7.11

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:12.3 m

    Single R.B.4.7.12

    LN PB GP AC

    2.125

    FCL:

    Air:F: W: C:

    Area:12.3 m

    Single R.B.4.7.13

    LN PB GP AC

    2.475FCL:

    Air:F: W: C:

    Area:12.3 m

    Single R.B.4.7.14

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:11.8 m

    Single R.B.4.7.15

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:12.7 m

    Single R.B.4.7.16

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:12.6 m

    Single R.B.4.7.17

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:11.8 m

    Single R.B.4.7.18

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:12.3 m

    Single R.B.4.7.19

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:12.3 m

    Single R.B.4.7.20

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:12.3 m

    Single R.B.4.7.21

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:12.3 m

    Single R.B.4.7.22

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:12.3 m

    Single R.B.4.7.23

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:12.2 m

    Single R.B.4.7.24

    LN PB GP AC

    2.125

    FCL:

    Air:F: W: C:

    Area:12.2 m

    Single R.B.4.7.25

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:12.3 m

    Single R.B.4.7.26

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:12.3 m

    Single R.B.4.7.27

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:12.3 m

    Single R.B.4.7.28

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:12.3 m

    Single R.B.4.7.29

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:12.3 m

    Single R.B.4.7.30

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:12.3 m

    Single R.B.4.7.31

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:12.2 m

    Single R.B.4.7.32

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:12.2 m

    Single R.B.4.7.33

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:12.3 m

    Single R.B.4.7.34

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:12.3 m

    Single R.B.4.7.35

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:12.3 m

    Single R.B.4.7.36

    LN PB GP AC

    2.125

    FCL:

    Air:F: W: C:

    Area:12.3 m

    Single R.B.4.7.37

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:12.3 m

    Single R.B.4.7.38

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:12.3 m

    Single R.B.4.7.39

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:12.2 m

    Single R.B.4.7.40

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:12.2 m

    Single R.B.4.7.41

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:12.3 m

    Single R.B.4.7.42

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:12.3 m

    Single R.B.4.7.43

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:12.3 m

    Single R.B.4.7.44

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:12.3 m

    Single R.B.4.7.45

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:12.3 m

    Single R.B.4.7.46

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:12.3 m

    Single R.B.4.7.47

    LN PB GP AC

    2.125FCL:

    Air:F: W: C:

    Area:12.2 m

    Single R.B.4.7.48

    LN PB GP AC

    2.125

    FCL:

    Air:F: W: C:

    Area:65.4 m

    CirculationB.4.1.01

    LN PB SM AC

    2.125

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    15.4 m

    CirculationB.4.8.02

    CS SA

    UT

    2.175

    FCL:

    Air:F: W: C:

    Area:65.4 m

    CirculationB.4.1.03

    LN PB SM ACFinishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    15.3m

    CirculationB.4.8.04

    CS SA

    UT

    2.175

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    63.5 m

    Work Space

    B.4.0.01

    LN PB GP

    33AC

    2.175

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    63.5 m

    Work Space

    B.4.0.02

    LN PB GP

    33AC

    2.175

    FCL:

    Air:F: W: C:

    Area:15.3 m

    Single Dis.B.4.7.49

    LN PB GP AC

    2.125

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    25.6 m

    Tutor StudioB.4.7.50

    LN PB GP

    AC

    2.125

    FCL:

    Air:F: W: C:

    Area:15.3 m

    Single Dis.B.4.7.51

    LN PB GP AC

    2.125

    Finishes

    FCL:

    Air Treat:

    Area:

    Occupancy:F: W: C:

    25.6 m

    Tutor StudioB.4.7.52

    LN PB GP

    AC

    2.125

    FCL:

    Air:F: W: C:

    Area:4.5 m

    MEPB.4.2.01

    CS CB - UT

    -

    FCL:

    Air:F: W: C:

    Area:4.5 m

    MEPB.4.2.02

    CS CB - UT

    -

    B.1

    B.1

    B.2

    B.2

    B.3

    B.3

    B.4

    B.4

    B.6

    B.6

    B.8

    B.8

    B.9

    B.9

    B.10

    B.10

    B.11

    B.11

    B.12

    B.12

    B.A B.A

    B.B B.B

    B.C B.C

    B.D B.D

    B.E B.E

    B.F B.F

    B.G B.G

    B.H B.H

    W402738

    W402739

    W40

    174

    0W40

    174

    1

    W40

    174

    2W40

    174

    3

    D.12

    2107

    W330798

    W330799

    W332800

    W332801

    W330802

    W330803

    W330804

    W330805

    W330806

    W332807

    W332808

    W330809

    W3308