This project will investigate the following sedimentation sources : Stream Bank Erosion
1
This project will investigate the following sedimentation sources: •Stream Bank Erosion •Gravel Roads •Construction •Other Land Clearing Activities Assessing Nonpoint Source Pollution Sources for a Priority Subwatershed of the Upper Saline River October 2005 to January 2008 After tonight’s meeting, there will be: • 2 more Public Meetings • 1 Field Tour in the Spring of 2007 Stream surveys will be taken in 2006 and 2007 to evaluate stream bank erosion rate and amount of sediment deposited in the
-
Upload
miriam-stark -
Category
Documents
-
view
15 -
download
0
description
Assessing Nonpoint Source Pollution Sources for a Priority Subwatershed of the Upper Saline River. October 2005 to January 2008. After tonight’s meeting, there will be: 2 more Public Meetings 1 Field Tour in the Spring of 2007. - PowerPoint PPT Presentation
Transcript of This project will investigate the following sedimentation sources : Stream Bank Erosion
![Page 1: This project will investigate the following sedimentation sources : Stream Bank Erosion](https://reader038.fdocuments.us/reader038/viewer/2022110403/56812c81550346895d9132ed/html5/thumbnails/1.jpg)
This project will investigate the following sedimentation sources:•Stream Bank Erosion •Gravel Roads •Construction •Other Land Clearing Activities
Assessing Nonpoint Source Pollution Sources for a Priority Subwatershed of the Upper Saline River
October 2005 to January 2008
After tonight’s meeting, there will be:• 2 more Public Meetings• 1 Field Tour in the Spring of 2007
Stream surveys will be taken in 2006 and
2007 to evaluate stream bank erosion rate and amount of sediment deposited in the stream bed.