This drawing represents the traffic management proposal ... · This drawing represents the traffic...

2
Wildwood The Log House Auchteraw FREE CHURCH ROAD 25 21 2 Oiseval Pine Tops 10 9 Path 4 5 6 1 8 7 6 3 1 2 1 to 5 18 16 28 Bunoich Pond 2 House Auchteraw 1 Talamh Carraig 33 Pond 9 PHASE A Ch.050 Ch.100 Ch.150 Ch.200 Ch.250 Ch.300 Ch.350 Ch.400 Ch.450 Ch.500 Ch.550 Ch.600 Ch.650 Ch.700 Ch.750 Ch.800 Ch.850 Ch.900 Ch.950 Ch.1000 Ch.1050 Ch.1100 Ch.1350 Ch.1400 Ch.1450 Ch.1500 Ch.1550 Ch.1600 Ch.1650 Ch.1700 Ch.1750 Ch.1800 Ch.1850 Ch.1900 Ch. 1950 Ch.2000 Ch.2050 Ch.2100 Ch.2150 Ch.2200 Ch.2250 Ch.2300 Ch.2350 Ch.2400 Ch.2450 Ch.2500 Ch.2550 Ch.2600 Ch.2650 Ch.2700 Ch.2750 Ch.2800 Ch.2850 Ch.2900 N PHASE B PHASE C PHASE E Phase A (Site Ch.000 - Site Ch.600) 600m of work to be undertaken using road closure and local diversion via Bunnioch Brae/Great Glen Way from the south. Daytime working only due to proximity of residences. This section will be managed as an approx. 50m long rolling road block with a team dedicated to managing the closure whereby residents either side of the works would be advised to go north or south along Great Glen Way as appropriate. Access to individual properties affected by the works will be managed by the dedicated on-site team. Phase B (Site Ch.600 - Site Ch.1150) 550m of work to be undertaken. Widening and improvement work will be undertaken from the verge/footway area allowing vehicular access, under traffic signal control, to be maintained along this section. Access to individual properties affected by the works will be managed by the dedicated on-site team. This area will be scheduled for daytime and evening working only due to proximity of residences. Evening work will only be required to complete surfacing works. PHASE F Ch.1150 Ch.1200 Ch.1250 Ch.1300 PHASE D STAGE 2 - PHASES TO BE CONSTRUCTED NOV/DEC 2019 MINOR IMPROVEMENT WORK TO BE UNDERTAKEN IN FEB/MARCH 2019. WORK WILL INCLUDE REPAIR OF POTHOLES AND PASSING PLACE UPGRADE. NO ROAD CLOSURES REQUIRED - MINOR WORK WILL BE UNDERTAKEN USING AVAILABLE ROAD WIDTH STAGE 1 - WORKS TO BE CONSTRUCTED FEB/MAR 2019 2nd Floor, Precision House, McNeil Drive Eurocentral Motherwell, ML1 4UR Telephone: 01698 730200 E-Mail: [email protected] Website: www.amey.co.uk NOTES This drawing represents the traffic management proposal for carrying out the first stage of the public road improvement (PRI) works between A82 Fort Augustus (Three Bridges) and the Auchterawe Substation. A letter drop to all affected residents will be undertaken prior to works, giving additional details on expected time scales. The first stage of works will involve working within Phase A and Phase B as described. The works will include passing place improvement, junction improvement at either end of the Phase B section (Jenkins Park road) and resurfacing of the 1100m of road from the A82 (Three Bridges) to Jenkins Park Junction. KEY Residential Properties on Route Public Car Park Phase A Diversion Route

Transcript of This drawing represents the traffic management proposal ... · This drawing represents the traffic...

Page 1: This drawing represents the traffic management proposal ... · This drawing represents the traffic management proposal for carrying out the second stage of the public road improvement

Wr T

Wildwood

T

h

e

L

o

g

H

o

u

s

e

A

u

c

h

te

r

a

w

B

u

r

n

Forestry Nurseries

Auchteraw

T

r

a

c

k

Sunny Ridge

FREE CHURCH R

OAD

Balifrishal Croft

P

W

S

t

r

a

t

h

a

i

r

d

T

h

e

The Hainyng

Tigh-na Creag

The Olde Stables

C

o

t

t

a

g

e

FB

T

k

Mountpleasant

Cottage

Burnside

Gairlochy Cottage

Whinhill

House

Whinhill

T

ra

c

k

Forest Lodge

45.1m

Hawks View

Torr

Sionnaich

51.2m

TCB

FB

Hall

P

a

th

38.7m

Ba

la

nto

ul B

urn

Rose Cottage

Culzean

Thistle Dubh

43.6m

D

r

a

i

n

Sonas

32.7m

Appin

A

8

2

24m

Cottage

Woodland

Pinecroft

Ardselma

FB

Issues

Ppg Sta

Meallan

Periwinkle

Rowanlea

39.9m

LB

TCB

2

5

2

1

P

a

t

h

Peregrine Cottage

Tor-na-Brach

D

r

a

i

n

Struan

Taransay

S

c

r

a

p

Y

a

r

d

Track

T

r

a

c

k

Pond

2

Blairconard

Rowan Cottage

Oiseval

Hill Cottage

Woodland Cottage

A

uchte

ra

w

B

urn

A

u

c

h

t

e

r

a

w

B

u

r

n

7b

Pine Tops

T

r

a

c

k

E

T

L

1

0

I

v

y

9

C

o

t

t

a

g

e

P

a

th

Skatepark

El Sub Sta

38.7m

Play Area

C

o

u

r

t

T

e

n

n

i

s

46.3m

4

5

48.5m

Applecroft

Well

Weir

Cisterns

Waterfall

6

C

r

i

a

n

l

a

r

i

c

h

C

o

t

t

a

g

e

The Shieling

P

1

Roseholm

Battery Rock

8

7

6

3

1

21.9m

Culrain

D

r

a

in

53.6m

Waterfalls

32.3m

2

Willow Bank

CRESCENT

Morags Lodge

BUNOICH

1 to 5

S

p

r

i

n

g

30.1m

Innis-Slan

27.0m

Jenkins Park

FBs

18

16

2

8

Ptarmigan

D

r

a

i

n

A

l

l

t

n

a

F

e

a

r

n

a

D

r

a

i

n

A

8

2

Battery Rock

MS

Bunoich

T

ra

c

k

Auchteraw

Auchteraw

Pond

Issues

Brackenfield

Edelweiss

The Auld Dipper

The Steadings

2

House

Auchteraw

1

E

T

L

53.3m

Auchteraw

Drain

Inchnacardoch Forest

39.3m

T

r

a

c

k

Cemetery

Forestry Nurseries

36.0m

Picnic Area

Woodside

T

r

a

c

k

Talamh Carraig

Lundie Cottage

3

3

Pond

Millcroft

37.5m

Bailem

Hulin

W

illo

w

C

o

t

t

a

g

e

9

Anzac

Tullochard

A

l

l

t

n

a

F

e

à

r

n

a

55.2m

Sheepfold

D

r

a

i

n

Electricity Distribution Site

The Old Almshouse

36.6m

Car

FB

Park

El Ps

El Ps

E

T

L

E

T

L

E

T

L

Issues

34.7m

Stronua

Broomfield

Issues

P

H

A

S

E

A

C

h

.

0

5

0

C

h

.

1

0

0

C

h

.

1

5

0

C

h

.

2

0

0

C

h

.

2

5

0

C

h

.

3

0

0

C

h

.

3

5

0

C

h

.

4

0

0

Ch.450

Ch.500

C

h

.

5

5

0

C

h

.

6

0

0

C

h

.

6

5

0

C

h

.

7

0

0

C

h

.

7

5

0

C

h

.

8

0

0

C

h

.8

5

0

C

h

.

9

0

0

C

h

.

9

5

0

C

h

.

1

0

0

0

C

h

.1

0

5

0

C

h

.

1

1

0

0

C

h

.

1

3

5

0

C

h

.

1

4

0

0

C

h

.

1

4

5

0

C

h

.

1

5

0

0

C

h

.

1

5

5

0

C

h

.

1

6

0

0

C

h

.

1

6

5

0

C

h

.

1

7

0

0

C

h.1750

Ch.1800

C

h.1850

C

h

.

1

9

0

0

C

h

.

1

9

5

0

C

h

.

2

0

0

0

C

h

.

2

0

5

0

C

h

.

2

1

0

0

C

h

.

2

1

5

0

C

h

.

2

2

0

0

C

h

.

2

2

5

0

C

h

.

2

3

0

0

C

h

.

2

3

5

0

C

h

.

2

4

0

0

C

h

.

2

4

5

0

C

h

.

2

5

0

0

C

h

.

2

5

5

0

C

h

.

2

6

0

0

C

h

.

2

6

5

0

C

h

.

2

7

0

0

C

h

.

2

7

5

0

C

h

.

2

8

0

0

C

h

.2

8

5

0

C

h.2900

N

P

H

A

S

E

B

P

H

A

S

E

C

P

H

A

S

E

E

Phase A (Site Ch.000 - Site Ch.600)600m of work to be undertaken using roadclosure and local diversion via BunniochBrae/Great Glen Way from the south. Daytime working only due to proximity ofresidences. This section will be managed asan approx. 50m long rolling road block witha team dedicated to managing the closurewhereby residents either side of the workswould be advised to go north or south alongGreat Glen Way as appropriate. Access toindividual properties affected by the workswill be managed by the dedicated on-siteteam.

Phase B (Site Ch.600 - Site Ch.1150)550m of work to be undertaken. Widening andimprovement work will be undertaken from theverge/footway area allowing vehicular access, undertraffic signal control, to be maintained along thissection. Access to individual properties affected bythe works will be managed by the dedicated on-siteteam. This area will be scheduled for daytime andevening working only due to proximity ofresidences. Evening work will only be required tocomplete surfacing works.

P

H

A

S

E

F

C

h

.

1

1

5

0

C

h

.

1

2

0

0

C

h

.

1

2

5

0

C

h

.

1

3

0

0

DRAFT

P

H

A

S

E

D

S

T

A

G

E

2

-

P

H

A

S

E

S

T

O

B

E

C

O

N

S

T

R

U

C

T

E

D

N

O

V

/

D

E

C

2

0

1

9

MINOR IMPROVEMENT WORK TO BE UNDERTAKENIN FEB/MARCH 2019.WORK WILL INCLUDE REPAIR OF POTHOLES ANDPASSING PLACE UPGRADE.NO ROAD CLOSURES REQUIRED - MINOR WORKWILL BE UNDERTAKEN USING AVAILABLE ROADWIDTH

S

T

A

G

E

1

-

W

O

R

K

S

T

O

B

E

C

O

N

S

T

R

U

C

T

E

D

F

E

B

/

M

A

R

2

0

1

9

2nd Floor, Precision House, McNeil Drive

Eurocentral

Motherwell, ML1 4UR

Telephone: 01698 730200

E-Mail: [email protected] Website: www.amey.co.uk

NOTES

This drawing represents the initial traffic management proposal for carrying out the public road improvement (PRI) works between A82 Fort Augustus and the Auchterawe Substation. We propose to carry out the works in a progressive manner from the A82 westwards towards the substation site as this means impact to the surrounding community diminishes as the work progresses. There is an opportunity for overnight working in Phases C and E without impact on any residences. Overnight working in Phases D and F would have a noise impact on asmall number of properties.

This drawing represents the traffic management proposalfor carrying out the first stage of the public road improvement (PRI) worksbetween A82 Fort Augustus (Three Bridges) and the AuchteraweSubstation. A letter drop to all affected residents will be undertaken prior toworks, giving additional details on expected time scales.

The first stage of works will involve working within Phase A and Phase B asdescribed. The works will include passing place improvement, junctionimprovement at either end of the Phase B section (Jenkins Park road) andresurfacing of the 1100m of road from the A82 (Three Bridges) to JenkinsPark Junction.

KEY

Residential Properties

on Route

Public Car Park

Phase A Diversion Route

DRAFT

DRAFT

AutoCAD SHX Text
16
AutoCAD SHX Text
15
AutoCAD SHX Text
14
AutoCAD SHX Text
13
AutoCAD SHX Text
12
AutoCAD SHX Text
11
AutoCAD SHX Text
10
AutoCAD SHX Text
9
AutoCAD SHX Text
8
AutoCAD SHX Text
7
AutoCAD SHX Text
6
AutoCAD SHX Text
5
AutoCAD SHX Text
4
AutoCAD SHX Text
3
AutoCAD SHX Text
2
AutoCAD SHX Text
1
AutoCAD SHX Text
14
AutoCAD SHX Text
13
AutoCAD SHX Text
12
AutoCAD SHX Text
11
AutoCAD SHX Text
10
AutoCAD SHX Text
9
AutoCAD SHX Text
8
AutoCAD SHX Text
7
AutoCAD SHX Text
6
AutoCAD SHX Text
5
AutoCAD SHX Text
4
AutoCAD SHX Text
3
AutoCAD SHX Text
2
AutoCAD SHX Text
1
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
F
AutoCAD SHX Text
G
AutoCAD SHX Text
H
AutoCAD SHX Text
J
AutoCAD SHX Text
K
AutoCAD SHX Text
L
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
F
AutoCAD SHX Text
G
AutoCAD SHX Text
H
AutoCAD SHX Text
J
AutoCAD SHX Text
K
AutoCAD SHX Text
L
AutoCAD SHX Text
M
AutoCAD SHX Text
M
AutoCAD SHX Text
15
AutoCAD SHX Text
16
AutoCAD SHX Text
DRAWING STATUS:
AutoCAD SHX Text
DRAWING TITLE:
AutoCAD SHX Text
DRAWING NUMBER:
AutoCAD SHX Text
SITE NAME:
AutoCAD SHX Text
PROJECT NAME:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
SHEET No.
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
REVISION:
AutoCAD SHX Text
SIZE:
AutoCAD SHX Text
REV
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
CHKD
AutoCAD SHX Text
APPD
AutoCAD SHX Text
THIS DRAWING IS THE PROPERTY OF AMEY AND MUST NOT BE COPIED OR USED FOR ANY PURPOSE OTHER THAN THAT FOR WHICH IT IS SUPPLIED WITHOUT THE WRITTEN CONSENT OF AMEY.
AutoCAD SHX Text
DRAWING TO BS 8888 UNLESS OTHERWISE STATED
AutoCAD SHX Text
SSEN DRAWING NUMBER:
AutoCAD SHX Text
CAD A1
AutoCAD SHX Text
CONTRACTOR:
AutoCAD SHX Text
EMPLOYER:
AutoCAD SHX Text
FOR DISCUSSION
AutoCAD SHX Text
08/02/19
AutoCAD SHX Text
1:5000m
AutoCAD SHX Text
MM
AutoCAD SHX Text
JT
AutoCAD SHX Text
JT
AutoCAD SHX Text
PRI WORKS
AutoCAD SHX Text
STAGE 1 WORKS
AutoCAD SHX Text
TRAFFIC MANAGEMENT PROPOSAL
AutoCAD SHX Text
FORT AUGUSTUS 400kV
AutoCAD SHX Text
& 132kV REDEVELOPMENT
AutoCAD SHX Text
FORT AUGUSTUS
AutoCAD SHX Text
CO25000314 - 0100 - 011
AutoCAD SHX Text
1 OF 1
AutoCAD SHX Text
00
AutoCAD SHX Text
SSE DWG NUMBER
AutoCAD SHX Text
%%USHE HAZARD BOX
AutoCAD SHX Text
IN ADDITION TO THE HAZARDS / RISKS NORMALLY ASSOCIATED WITH THE TYPES OF WORKS DETAILED ON THIS DRAWING, NOTE THE FOLLOWING SPECIFIC HAZARDS WHICH REQUIRE SPECIAL CONSIDERATIONS.
AutoCAD SHX Text
MAINTENANCE / CLEANING / OPERATION
AutoCAD SHX Text
CONSTRUCTION
AutoCAD SHX Text
DECOMMISSIONING / DEMOLITION
AutoCAD SHX Text
N/A
AutoCAD SHX Text
N/A
AutoCAD SHX Text
N/A
AutoCAD SHX Text
PRIMARY
AutoCAD SHX Text
CIVIL
AutoCAD SHX Text
INTERNAL DESIGN CHECK BOX
AutoCAD SHX Text
PROTECTION
AutoCAD SHX Text
ELECTRICAL
Page 2: This drawing represents the traffic management proposal ... · This drawing represents the traffic management proposal for carrying out the second stage of the public road improvement

Wr T

Wildwood

T

h

e

L

o

g

H

o

u

s

e

A

u

c

h

te

r

a

w

B

u

r

n

Forestry Nurseries

Auchteraw

T

r

a

c

k

Sunny Ridge

FREE CHURCH R

OAD

Balifrishal Croft

P

W

S

t

r

a

t

h

a

i

r

d

T

h

e

The Hainyng

Tigh-na Creag

The Olde Stables

C

o

t

t

a

g

e

FB

T

k

Mountpleasant

Cottage

Burnside

Gairlochy Cottage

Whinhill

House

Whinhill

T

ra

c

k

Forest Lodge

45.1m

Hawks View

Torr

Sionnaich

51.2m

TCB

FB

Hall

P

a

th

38.7m

Ba

la

nto

ul B

urn

Rose Cottage

Culzean

Thistle Dubh

43.6m

D

r

a

i

n

Sonas

32.7m

Appin

A

8

2

24m

Cottage

Woodland

Pinecroft

Ardselma

FB

Issues

Ppg Sta

Meallan

Periwinkle

Rowanlea

39.9m

LB

TCB

2

5

2

1

P

a

t

h

Peregrine Cottage

Tor-na-Brach

D

r

a

i

n

Struan

Taransay

S

c

r

a

p

Y

a

r

d

Track

T

r

a

c

k

Pond

2

Blairconard

Rowan Cottage

Oiseval

Hill Cottage

Woodland Cottage

A

uchte

ra

w

B

urn

A

u

c

h

t

e

r

a

w

B

u

r

n

7b

Pine Tops

T

r

a

c

k

E

T

L

1

0

I

v

y

9

C

o

t

t

a

g

e

P

a

th

Skatepark

El Sub Sta

38.7m

Play Area

C

o

u

r

t

T

e

n

n

i

s

46.3m

4

5

48.5m

Applecroft

Well

Weir

Cisterns

Waterfall

6

C

r

i

a

n

l

a

r

i

c

h

C

o

t

t

a

g

e

The Shieling

P

1

Roseholm

Battery Rock

8

7

6

3

1

21.9m

Culrain

D

r

a

in

53.6m

Waterfalls

32.3m

2

Willow Bank

CRESCENT

Morags Lodge

BUNOICH

1 to 5

S

p

r

i

n

g

30.1m

Innis-Slan

27.0m

Jenkins Park

FBs

18

16

2

8

Ptarmigan

D

r

a

i

n

A

l

l

t

n

a

F

e

a

r

n

a

D

r

a

i

n

A

8

2

Battery Rock

MS

Bunoich

T

ra

c

k

Auchteraw

Auchteraw

Pond

Issues

Brackenfield

Edelweiss

The Auld Dipper

The Steadings

2

House

Auchteraw

1

E

T

L

53.3m

Auchteraw

Drain

Inchnacardoch Forest

39.3m

T

r

a

c

k

Cemetery

Forestry Nurseries

36.0m

Picnic Area

Woodside

T

r

a

c

k

Talamh Carraig

Lundie Cottage

3

3

Pond

Millcroft

37.5m

Bailem

Hulin

W

illo

w

C

o

t

t

a

g

e

9

Anzac

Tullochard

A

l

l

t

n

a

F

e

à

r

n

a

55.2m

Sheepfold

D

r

a

i

n

Electricity Distribution Site

The Old Almshouse

36.6m

Car

FB

Park

El Ps

El Ps

E

T

L

E

T

L

E

T

L

Issues

34.7m

Stronua

Broomfield

Issues

P

H

A

S

E

A

C

h

.

0

5

0

C

h

.

1

0

0

C

h

.

1

5

0

C

h

.

2

0

0

C

h

.

2

5

0

C

h

.

3

0

0

C

h

.

3

5

0

C

h

.

4

0

0

Ch.450

Ch.500

C

h

.

5

5

0

C

h

.

6

0

0

C

h

.

6

5

0

C

h

.

7

0

0

C

h

.

7

5

0

C

h

.

8

0

0

C

h

.8

5

0

C

h

.

9

0

0

C

h

.

9

5

0

C

h

.

1

0

0

0

C

h

.1

0

5

0

C

h

.

1

1

0

0

C

h

.

1

3

5

0

C

h

.

1

4

0

0

C

h

.

1

4

5

0

C

h

.

1

5

0

0

C

h

.

1

5

5

0

C

h

.

1

6

0

0

C

h

.

1

6

5

0

C

h

.

1

7

0

0

C

h.1750

Ch.1800

C

h.1850

C

h

.

1

9

0

0

C

h

.

1

9

5

0

C

h

.

2

0

0

0

C

h

.

2

0

5

0

C

h

.

2

1

0

0

C

h

.

2

1

5

0

C

h

.

2

2

0

0

C

h

.

2

2

5

0

C

h

.

2

3

0

0

C

h

.

2

3

5

0

C

h

.

2

4

0

0

C

h

.

2

4

5

0

C

h

.

2

5

0

0

C

h

.

2

5

5

0

C

h

.

2

6

0

0

C

h

.

2

6

5

0

C

h

.

2

7

0

0

C

h

.

2

7

5

0

C

h

.

2

8

0

0

C

h

.2

8

5

0

C

h.2900

N

P

H

A

S

E

B

P

H

A

S

E

C

P

H

A

S

E

E

P

H

A

S

E

F

C

h

.

1

1

5

0

C

h

.

1

2

0

0

C

h

.

1

2

5

0

C

h

.

1

3

0

0

DRAFT

P

H

A

S

E

D

S

T

A

G

E

2

-

P

H

A

S

E

S

T

O

B

E

C

O

N

S

T

R

U

C

T

E

D

N

O

V

/

D

E

C

2

0

1

9

Phases C, D, E and FThere is insufficient corridor width for working area,safety zone and vehicular access through thesephases therefore the works will require a full roadclosure.  The closure will be managed to suit localresidents with consultation carried out in advance ofthe works.  This phase will include overnightworking. Undertaking the worksovernight will minimise the impact on local residents.

S

T

A

G

E

1

-

W

O

R

K

S

T

O

B

E

C

O

N

S

T

R

U

C

T

E

D

F

E

B

/

M

A

R

2

0

1

9

2nd Floor, Precision House, McNeil Drive

Eurocentral

Motherwell, ML1 4UR

Telephone: 01698 730200

E-Mail: [email protected] Website: www.amey.co.uk

NOTES

This drawing represents the initial traffic management proposal for carrying out the public road improvement (PRI) works between A82 Fort Augustus and the Auchterawe Substation.  We propose to carry out the works in a progressive manner from the A82 westwards towards the substation site as this means impact to the surrounding community diminishes as the work progresses.  There is an opportunity for overnight working in Phases C and E without impact on any residences.  Overnight working in Phases D and F would have a noise impact on asmall number of properties.

This drawing represents the traffic management proposalfor carrying out the second stage of the public road improvement (PRI)works between A82 Fort Augustus (Three Bridges) and the AuchteraweSubstation.  Further consultation including a letter drop to all affectedresidents will be undertaken prior to works, giving additional details onexpected time scales.

The second stage of works will involve working within Phases C, D, E and Fas described. The works will include passing place improvement,resurfacing of the road from Jenkins Park Junction to Auchteraw. Theworks will be managed to maintain access if and where possible howeverroad closures will be required. The community will be advised of thetiming of these closures with mitigation measures put in place wherepossible.

KEY

Residential Properties

on Route

Public Car Park

DRAFT

DRAFT

AutoCAD SHX Text
16
AutoCAD SHX Text
15
AutoCAD SHX Text
14
AutoCAD SHX Text
13
AutoCAD SHX Text
12
AutoCAD SHX Text
11
AutoCAD SHX Text
10
AutoCAD SHX Text
9
AutoCAD SHX Text
8
AutoCAD SHX Text
7
AutoCAD SHX Text
6
AutoCAD SHX Text
5
AutoCAD SHX Text
4
AutoCAD SHX Text
3
AutoCAD SHX Text
2
AutoCAD SHX Text
1
AutoCAD SHX Text
14
AutoCAD SHX Text
13
AutoCAD SHX Text
12
AutoCAD SHX Text
11
AutoCAD SHX Text
10
AutoCAD SHX Text
9
AutoCAD SHX Text
8
AutoCAD SHX Text
7
AutoCAD SHX Text
6
AutoCAD SHX Text
5
AutoCAD SHX Text
4
AutoCAD SHX Text
3
AutoCAD SHX Text
2
AutoCAD SHX Text
1
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
F
AutoCAD SHX Text
G
AutoCAD SHX Text
H
AutoCAD SHX Text
J
AutoCAD SHX Text
K
AutoCAD SHX Text
L
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
C
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
F
AutoCAD SHX Text
G
AutoCAD SHX Text
H
AutoCAD SHX Text
J
AutoCAD SHX Text
K
AutoCAD SHX Text
L
AutoCAD SHX Text
M
AutoCAD SHX Text
M
AutoCAD SHX Text
15
AutoCAD SHX Text
16
AutoCAD SHX Text
DRAWING STATUS:
AutoCAD SHX Text
DRAWING TITLE:
AutoCAD SHX Text
DRAWING NUMBER:
AutoCAD SHX Text
SITE NAME:
AutoCAD SHX Text
PROJECT NAME:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
SHEET No.
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
REVISION:
AutoCAD SHX Text
SIZE:
AutoCAD SHX Text
REV
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
CHKD
AutoCAD SHX Text
APPD
AutoCAD SHX Text
THIS DRAWING IS THE PROPERTY OF AMEY AND MUST NOT BE COPIED OR USED FOR ANY PURPOSE OTHER THAN THAT FOR WHICH IT IS SUPPLIED WITHOUT THE WRITTEN CONSENT OF AMEY.
AutoCAD SHX Text
DRAWING TO BS 8888 UNLESS OTHERWISE STATED
AutoCAD SHX Text
SSEN DRAWING NUMBER:
AutoCAD SHX Text
CAD A1
AutoCAD SHX Text
CONTRACTOR:
AutoCAD SHX Text
EMPLOYER:
AutoCAD SHX Text
FOR DISCUSSION
AutoCAD SHX Text
08/02/19
AutoCAD SHX Text
1:5000m
AutoCAD SHX Text
MM
AutoCAD SHX Text
JT
AutoCAD SHX Text
JT
AutoCAD SHX Text
PRI WORKS
AutoCAD SHX Text
STAGE 2 WORKS
AutoCAD SHX Text
TRAFFIC MANAGEMENT PROPOSAL
AutoCAD SHX Text
FORT AUGUSTUS 400kV
AutoCAD SHX Text
& 132kV REDEVELOPMENT
AutoCAD SHX Text
FORT AUGUSTUS
AutoCAD SHX Text
CO25000314 - 0100 - 012
AutoCAD SHX Text
1 OF 1
AutoCAD SHX Text
00
AutoCAD SHX Text
SSE DWG NUMBER
AutoCAD SHX Text
%%USHE HAZARD BOX
AutoCAD SHX Text
IN ADDITION TO THE HAZARDS / RISKS NORMALLY ASSOCIATED WITH THE TYPES OF WORKS DETAILED ON THIS DRAWING, NOTE THE FOLLOWING SPECIFIC HAZARDS WHICH REQUIRE SPECIAL CONSIDERATIONS.
AutoCAD SHX Text
MAINTENANCE / CLEANING / OPERATION
AutoCAD SHX Text
CONSTRUCTION
AutoCAD SHX Text
DECOMMISSIONING / DEMOLITION
AutoCAD SHX Text
N/A
AutoCAD SHX Text
N/A
AutoCAD SHX Text
N/A
AutoCAD SHX Text
PRIMARY
AutoCAD SHX Text
CIVIL
AutoCAD SHX Text
INTERNAL DESIGN CHECK BOX
AutoCAD SHX Text
PROTECTION
AutoCAD SHX Text
ELECTRICAL