CHE 400 Thesis I & II
Suman Sarkar0802019
1
STUDY OF DIFFERENT TYPES OF ETP PROCESSES AND TO
DEVELOP A THEORETICAL COST EFFECTIVE MODEL OF
EFFLUENT TREATMENT PLANT (ETP) FOR TANNERIES OF
HAZARIBAGH
![Page 2: Thesis & design presentation](https://reader036.fdocuments.us/reader036/viewer/2022081515/587bf42a1a28ab765a8b798d/html5/thumbnails/2.jpg)
Supervisor
Dr. Easir Arafat Khan
Assistant Professor
Department of Chemical Engineering, BUET
2
![Page 3: Thesis & design presentation](https://reader036.fdocuments.us/reader036/viewer/2022081515/587bf42a1a28ab765a8b798d/html5/thumbnails/3.jpg)
Outline
• Background
• Objective
• Methodology (Experimental/ Simulation Principle-
Procedure)
• Results and Discussion
• Conclusion & Recommendation
3
![Page 4: Thesis & design presentation](https://reader036.fdocuments.us/reader036/viewer/2022081515/587bf42a1a28ab765a8b798d/html5/thumbnails/4.jpg)
Background:
4
In developing countries like Bangladesh water pollution
due to industrial wastewater is a serious concern. Most
of the industries in Bangladesh do not treat their
wastewater properly and let it go to the river which
cause the pollution of river water. These untreated
wastewater has very bad effect on agriculture, aquatic
plant, fish and human health.
Tanneries in Hazaribagh cause massive pollution to
Buriganga and nearby areas of Hazaribagh.
![Page 5: Thesis & design presentation](https://reader036.fdocuments.us/reader036/viewer/2022081515/587bf42a1a28ab765a8b798d/html5/thumbnails/5.jpg)
Objectives
5
To study the wastewater quality of several industries
and compare with national standards
To study installation & operating cost and efficiency of
different ETP
Compare the ETPs based on installation & operating
cost and efficiency and develop a theoretical cost
effective model of ETP for Tanneries of Hazaribag
![Page 6: Thesis & design presentation](https://reader036.fdocuments.us/reader036/viewer/2022081515/587bf42a1a28ab765a8b798d/html5/thumbnails/6.jpg)
Methodology
6
Laboratory experiment (BOD, COD, DO, TDS, pH
measurement)
Industrial data analysis (cost analysis)
![Page 7: Thesis & design presentation](https://reader036.fdocuments.us/reader036/viewer/2022081515/587bf42a1a28ab765a8b798d/html5/thumbnails/7.jpg)
7
Lab Experiment
BOD5 measurement:
Chemical procedure
BOD5 = DO5 – DO1
COD measurement:
Chemical procedure
Heating and instrumental measurement
Microsoft Office Word Document
![Page 8: Thesis & design presentation](https://reader036.fdocuments.us/reader036/viewer/2022081515/587bf42a1a28ab765a8b798d/html5/thumbnails/8.jpg)
8
Lab Experiment cont’d
Direct instrumental measurement:
DO
TDS
pH
![Page 9: Thesis & design presentation](https://reader036.fdocuments.us/reader036/viewer/2022081515/587bf42a1a28ab765a8b798d/html5/thumbnails/9.jpg)
Lab Experiment cont’d
9
Aeration(BOD5 )
HeatingCOD
![Page 10: Thesis & design presentation](https://reader036.fdocuments.us/reader036/viewer/2022081515/587bf42a1a28ab765a8b798d/html5/thumbnails/10.jpg)
10
Lab Experiment cont’d
DO pH
TDS
![Page 11: Thesis & design presentation](https://reader036.fdocuments.us/reader036/viewer/2022081515/587bf42a1a28ab765a8b798d/html5/thumbnails/11.jpg)
Lab Experiment cont’d
Parameters
Chemicals
Industry Paint Industry DOE
Waste water
Treated water
Waste Water
Treated water
pH 3 7.3 6.93 7.03 6 - 9
BOD5 450 ppm 38 ppm 250 ppm 16 ppm 50 ppm
COD 1200 ppm 172 ppm 670 ppm 46 ppm 200 ppm
TDS 4288 ppm 1900 ppm 1130 ppm 870 ppm 2100 ppm
DO 0 5.35 ppm 0 6.1 4.5 - 8
11
![Page 12: Thesis & design presentation](https://reader036.fdocuments.us/reader036/viewer/2022081515/587bf42a1a28ab765a8b798d/html5/thumbnails/12.jpg)
Parameter Tannery Effluent Department of Environment
(DOE)pH 3.88 6 - 9
BOD5(mg/l) 1454 50
COD(mg/l) 3386 200
TDS(mg/l) 14572 2100
DO(mg/l) 0.0 4.5 - 8
Cr(ppm) 987 0.5 (0.1 for Cr6+)
12
Lab Experiment cont’d
![Page 13: Thesis & design presentation](https://reader036.fdocuments.us/reader036/viewer/2022081515/587bf42a1a28ab765a8b798d/html5/thumbnails/13.jpg)
Industry of Chemicals
Paint Industry
No. of Employee 4 6
Working Shifts 1 3
Working Hours 8 24
Liquid effluent discharge (m3/d)
8 120
Point of discharge Unused open land Pond
13
Industrial data analysis
![Page 14: Thesis & design presentation](https://reader036.fdocuments.us/reader036/viewer/2022081515/587bf42a1a28ab765a8b798d/html5/thumbnails/14.jpg)
Fixed Cost Annual variable cost
Chemicals Tk. 1300000 Tk. 800000
Paint Tk. 3050000 Tk. 6200000
14
Cost analysis
![Page 15: Thesis & design presentation](https://reader036.fdocuments.us/reader036/viewer/2022081515/587bf42a1a28ab765a8b798d/html5/thumbnails/15.jpg)
Chemicals
Industry Paint Industry
Chemical Process
Biological Process
Chemical Process
Biological Process
Operating Cost
Tk. 121000
Tk. 78000 Tk. 3550000
Tk. 1252000
Installation Cost
Tk. 410000
Tk. 740000
Tk. 1150000
Tk. 1650000
15
Cost analysis cont’d
![Page 16: Thesis & design presentation](https://reader036.fdocuments.us/reader036/viewer/2022081515/587bf42a1a28ab765a8b798d/html5/thumbnails/16.jpg)
16
Cost analysis cont’d
![Page 17: Thesis & design presentation](https://reader036.fdocuments.us/reader036/viewer/2022081515/587bf42a1a28ab765a8b798d/html5/thumbnails/17.jpg)
Cost analysis cont’d
17
![Page 18: Thesis & design presentation](https://reader036.fdocuments.us/reader036/viewer/2022081515/587bf42a1a28ab765a8b798d/html5/thumbnails/18.jpg)
Cost analysis cont’d
18
Installation cost of Biological treatment process
units were larger than Chemical treatment process
units
Operation cost of chemical treatment process was
larger than biological treatment process
![Page 19: Thesis & design presentation](https://reader036.fdocuments.us/reader036/viewer/2022081515/587bf42a1a28ab765a8b798d/html5/thumbnails/19.jpg)
Cost analysis cont’d
19
![Page 20: Thesis & design presentation](https://reader036.fdocuments.us/reader036/viewer/2022081515/587bf42a1a28ab765a8b798d/html5/thumbnails/20.jpg)
Cost analysis cont’d
20
Paint Industry produces 10 times more effluent
than Chemicals Production Industry
The ratio of cost of
Material supply = 1.78:1
Consultancy-commissioning-supervision = 1.67:1
Civil work = 4.8:1
Total fixed cost = 2.346:1
![Page 21: Thesis & design presentation](https://reader036.fdocuments.us/reader036/viewer/2022081515/587bf42a1a28ab765a8b798d/html5/thumbnails/21.jpg)
21
ETP Model
Presence of Cr
Cr neutralization methods
Adsorption
Sawdust
![Page 22: Thesis & design presentation](https://reader036.fdocuments.us/reader036/viewer/2022081515/587bf42a1a28ab765a8b798d/html5/thumbnails/22.jpg)
22
ETP Model cont’d
![Page 23: Thesis & design presentation](https://reader036.fdocuments.us/reader036/viewer/2022081515/587bf42a1a28ab765a8b798d/html5/thumbnails/23.jpg)
Conclusion & Recommendation
23
BOD, COD, TDS, DO, pH of treated water will
reach DOE specification
Cr removal will not reach DOE specification
Conclusion
![Page 24: Thesis & design presentation](https://reader036.fdocuments.us/reader036/viewer/2022081515/587bf42a1a28ab765a8b798d/html5/thumbnails/24.jpg)
24
Conclusion & Recommendation cont’d
Lab experiment
Low cost adsorbent having optimum pH 2.5 – 3.5
Presence of alkalinity, chloride, oil and grease,
phenol compounds, sulfide etc.
Sludge management
Recommendation
![Page 25: Thesis & design presentation](https://reader036.fdocuments.us/reader036/viewer/2022081515/587bf42a1a28ab765a8b798d/html5/thumbnails/25.jpg)
25
END of
Thesis I & II
![Page 26: Thesis & design presentation](https://reader036.fdocuments.us/reader036/viewer/2022081515/587bf42a1a28ab765a8b798d/html5/thumbnails/26.jpg)
CHE 408 Process Design Sessional I & II
Suman Sarkar0802019
26
Design of Natural Gas Processing with Hysis
simulation
![Page 27: Thesis & design presentation](https://reader036.fdocuments.us/reader036/viewer/2022081515/587bf42a1a28ab765a8b798d/html5/thumbnails/27.jpg)
Supervisor
Dr. Dil Afroza Begum
Professor
Department of Chemical Engineering, BUET
27
![Page 28: Thesis & design presentation](https://reader036.fdocuments.us/reader036/viewer/2022081515/587bf42a1a28ab765a8b798d/html5/thumbnails/28.jpg)
28
Outline
• Objectives
• Project definition
• Available Process
• Design Basis
• Process Block Diagram
• Process Flow Diagram (PFD)
![Page 29: Thesis & design presentation](https://reader036.fdocuments.us/reader036/viewer/2022081515/587bf42a1a28ab765a8b798d/html5/thumbnails/29.jpg)
29
Outline cont’d
• Comparison between raw & products gas
• List of Major Equipments
• Individual Major Equipment Design
• Mechanical Design
• P&I Diagram
• Overall Economic Analysis
![Page 30: Thesis & design presentation](https://reader036.fdocuments.us/reader036/viewer/2022081515/587bf42a1a28ab765a8b798d/html5/thumbnails/30.jpg)
30
Objectives
Ensuring more efficient and profitability Design
Improving plant control, operability
Reducing human error and time requirement
Eliminating process bottle necks and minimizing
process network
By hysis simulation:
![Page 31: Thesis & design presentation](https://reader036.fdocuments.us/reader036/viewer/2022081515/587bf42a1a28ab765a8b798d/html5/thumbnails/31.jpg)
Project definition:
31
![Page 32: Thesis & design presentation](https://reader036.fdocuments.us/reader036/viewer/2022081515/587bf42a1a28ab765a8b798d/html5/thumbnails/32.jpg)
32
Project definition cont’d
• Location- Golapgonj, Sylhet
• Capacity-550 MMSCFD
• Raw materials-Raw Natural Gas From 3
Producing Gas Wells, DEAmine Solution, TEG.
• Utility- Cooling water, Electricity (2 MW Capacity),
Natural Gas.
![Page 33: Thesis & design presentation](https://reader036.fdocuments.us/reader036/viewer/2022081515/587bf42a1a28ab765a8b798d/html5/thumbnails/33.jpg)
33
Available Process
• Gas Sweetening
Solid Bed Sweetening Process: Molucular Sieves
Aquasorption Process (Wash Water Process)
Selexol Process
Chemical Absorption Process(MEA,DEA,TEA
Processes)
The Holmes-Stretford Process
![Page 34: Thesis & design presentation](https://reader036.fdocuments.us/reader036/viewer/2022081515/587bf42a1a28ab765a8b798d/html5/thumbnails/34.jpg)
34
Available Process cont’d
• Gas Dehydration
Absorption Process(Methanol, Glycol Process)
Adsorption Process (Solid Dessicants, Alumina,
Silica Gel, Molecular Sieves)
![Page 35: Thesis & design presentation](https://reader036.fdocuments.us/reader036/viewer/2022081515/587bf42a1a28ab765a8b798d/html5/thumbnails/35.jpg)
Design Basis
35
Climate Condition:
Ambient Temperature-
Max- 35oC Min-12oC
Design max temp- 40oC Min temp-5oC
Annual Avg. Atmospheric pressure-0.11 MPa
Annual Avg. relative Humidity- 80%
Wind Velocity-52 miles/hr
Rain- Annual avg Rainfall- 2850 mm
![Page 36: Thesis & design presentation](https://reader036.fdocuments.us/reader036/viewer/2022081515/587bf42a1a28ab765a8b798d/html5/thumbnails/36.jpg)
Process Block Diagram
36
![Page 37: Thesis & design presentation](https://reader036.fdocuments.us/reader036/viewer/2022081515/587bf42a1a28ab765a8b798d/html5/thumbnails/37.jpg)
37
PFD (Hysis Simulation):
![Page 38: Thesis & design presentation](https://reader036.fdocuments.us/reader036/viewer/2022081515/587bf42a1a28ab765a8b798d/html5/thumbnails/38.jpg)
38
Comparison Between Raw Natural gas & Product gas
Raw Natural GasComponents CompositionMethane 0.8634
Ethane 0.0574
Propane 0.0088
i-Butane 0.0007
i-Butane 0.0005
n-Pentane 0.0005
n-Hexane 0.0003
H2O 0.0467
Nitrogen 0.0018
CO2 0.0204
Components Composition
Methane 0.930973
Ethane 0.053632
Propane 0.000658
i-Butane 0.000022
i-Butane 0.000014
n-Pentane 0.000007
n-Hexane 0.000002
H2O 0.000101
Nitrogen 0.002029
CO2 0.012562
Product Gas
![Page 39: Thesis & design presentation](https://reader036.fdocuments.us/reader036/viewer/2022081515/587bf42a1a28ab765a8b798d/html5/thumbnails/39.jpg)
List of Major Equipments
39
Equipment Name QuantityDesignation in the
HYSYS Simulation
Compressor 1 K-100
Heat Exchanger 2 E-100, E-102
Absorber 2 T-100, T-102
Separator 3 V-100, V-101, V-104
Pump 2 P-100, P-101
Storage Tank 1 V-106
Stripper Column 2 V-102, V-103
Stabilizer Column 1 V-105
![Page 40: Thesis & design presentation](https://reader036.fdocuments.us/reader036/viewer/2022081515/587bf42a1a28ab765a8b798d/html5/thumbnails/40.jpg)
40
Design Parameter
Separator Diameter: 8.12 ft
Minimum Separator height: 40.6
Thickness of the Separator: 3.3 ft
Microsoft Office Word Document
Gas-Liquid Separator
![Page 41: Thesis & design presentation](https://reader036.fdocuments.us/reader036/viewer/2022081515/587bf42a1a28ab765a8b798d/html5/thumbnails/41.jpg)
41
Design Parameter cont’d Microsoft Office Word Document
Pump (P-100) of Dehydration plant
Total frictional loss:
2.44 ft
Total head: 43.11 ft
Power requirement:
17.1hp
Material: cast iron
RPM: 1750
Flow capacity: 770GPM
(max)
Impeller size: 11-3/4”
Weight: 255 lbs
Price: $ 4662.00
Specification of pump:
![Page 42: Thesis & design presentation](https://reader036.fdocuments.us/reader036/viewer/2022081515/587bf42a1a28ab765a8b798d/html5/thumbnails/42.jpg)
Mechanical Design of Separator
42
![Page 43: Thesis & design presentation](https://reader036.fdocuments.us/reader036/viewer/2022081515/587bf42a1a28ab765a8b798d/html5/thumbnails/43.jpg)
43
P & ID Diagram
Figure: P & I diagram for gas liquid separator
![Page 44: Thesis & design presentation](https://reader036.fdocuments.us/reader036/viewer/2022081515/587bf42a1a28ab765a8b798d/html5/thumbnails/44.jpg)
P & ID Diagram cont’d
44
![Page 45: Thesis & design presentation](https://reader036.fdocuments.us/reader036/viewer/2022081515/587bf42a1a28ab765a8b798d/html5/thumbnails/45.jpg)
45
Overall Economic Analysis
Equipment Cost at Present(2014)- $1.088 million
Total Capital Investment - $ 6.12 million
Total Annual Expenses- $ 13.24 million
Net Profit After Tax(15%)- $ 15.4 million
Pay back period – 3 year 11 month
Salvage value- $ 0.532 million
Depreciation- $0.765 million/year
IRR i% = 24.58 %
ERR i% = 19.67%
Project life – 20 years