Document of The World Bank FOR OFFICIAL USE ONLY Report No: 62569-BD RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF BANGLADESH DISABILITY AND CHILDREN AT RISK PROJECT IDA CREDIT NO: 4481-BD IN THE AMOUNT OF SDR 21.9 MILLION (US$35 MILLION EQUIVALENT) TO THE THE PEOPLE‘S REPUBLIC OF BANGLADESH May 26, 2011 This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Transcript of The World Bank...2012 5.91 7.80 2013 9.00 16.80 2014 10.20 27.00 2015 8.00 35.00 Total 35.00 6....

  • Document of

    The World Bank

    FOR OFFICIAL USE ONLY

    Report No: 62569-BD

    RESTRUCTURING PAPER

    ON A

    PROPOSED PROJECT RESTRUCTURING

    OF

    BANGLADESH DISABILITY AND CHILDREN AT RISK PROJECT

    IDA CREDIT NO: 4481-BD

    IN THE AMOUNT OF

    SDR 21.9 MILLION

    (US$35 MILLION EQUIVALENT)

    TO THE

    THE PEOPLE‘S REPUBLIC OF BANGLADESH

    May 26, 2011

    This document has a restricted distribution and may be used by recipients only in the performance of their

    official duties. Its contents may not otherwise be disclosed without World Bank authorization.

    Pub

    lic D

    iscl

    osur

    e A

    utho

    rized

    Pub

    lic D

    iscl

    osur

    e A

    utho

    rized

    Pub

    lic D

    iscl

    osur

    e A

    utho

    rized

    Pub

    lic D

    iscl

    osur

    e A

    utho

    rized

    Pub

    lic D

    iscl

    osur

    e A

    utho

    rized

    Pub

    lic D

    iscl

    osur

    e A

    utho

    rized

    Pub

    lic D

    iscl

    osur

    e A

    utho

    rized

    Pub

    lic D

    iscl

    osur

    e A

    utho

    rized

  • ABBREVIATIONS AND ACRONYMS

    CBR Community-Based Rehabilitation

    DCAR Disability and Children-at-Risk Project

    DG Director General

    DPOs Disabled People‘s Organizations

    DSS Department of Social Services

    FM Financial Management

    GoB Government of Bangladesh

    IA Implementing Agency

    ICB International Competitive Bidding

    IDA International Development Association

    IEC Information, Education and Communication

    ILO International Labor Organization

    IUFR Interim Unaudited Financial Report

    JPUF Jatiyo Protibondhi Unnayan Foundation

    M&E Monitoring and Evaluation

    MIS Management Information System

    MoSW Ministry of Social Welfare

    NFOWD National Federation of Organizations Working for the Disabled

    NGOs Non-governmental organizations

    NSC National Steering Committee

    NSSA National Social Service Academy

    PAD Project Appraisal Document

    PCAR Protection of Children-at-Risk Project

    PDO Project Development Objective

    PIC Project Implementation Committee

    PIU Project Implementation Unit

    PPA Public Procurement Act

    PPR Public Procurement Rules

    PRSP Poverty Reduction Strategy Paper

    PSC Project Selection Committee

    PWD Persons with Disabilities

    SBD Standard Bidding Documents

    SILs Specific Investment Loans

    UN United Nations

    UNICEF United Nations Children‘s Fund

    Regional Vice President: Isabel M Guerrero

    Country Director: Ellen Goldstein

    Sector Director:

    Sector Manager:

    Michal Rutkowski

    Mansoora Rashid

    Task Team Leader: Jessica Leino

  • BANGLADESH BANGLADESH DISABILITY AND CHILDREN AT RISK

    P106332 CONTENTS

    Page

    A. SUMMARY ............................................................................................................................ 1

    B. PROJECT STATUS ................................................................................................................ 1

    C. PROPOSED CHANGES......................................................................................................... 3

    D. APPRAISAL SUMMARY ..................................................................................................... 7

    ANNEX 1: RESULTS FRAMEWORK AND MONITORING ...................................................... 9

    ANNEX 2: REALLOCATION OF PROCEEDS .......................................................................... 15

    ANNEX 3: DETAILED PROJECT DESCRIPTION .................................................................... 16

    ANNEX 4: PROCUREMENT PLANS ......................................................................................... 24

  • i

    Restructuring Status: Submitted to SECPO Restructuring Type: Level one Last modified on date : 05/26/2011

    1. Basic Information Project ID & Name P106332: Disability and Children at Risk

    Country Bangladesh

    Task Team Leader Jessica Leigh Leino

    Sector Manager/Director Mansoora Rashid

    Country Director Ellen A. Goldstein

    Original Board Approval Date 07/01/2008

    Original Closing Date: 12/31/2014

    Current Closing Date 12/31/2014

    Proposed Closing Date [if applicable]

    EA Category C-Not Required

    Revised EA Category C-Not Required-Not Required

    EA Completion Date

    Revised EA Completion Date

    2. Revised Financing Plan (US$m) Source Original Revised

    BORR 0.00 0.00

    IDA 35.00 35.00

    Total 35.00 35.00

    3. Borrower Organization Department Location

    Economic Relations Division,

    Ministry of Finance

    Bangladesh

    4. Implementing Agency Organization Department Location

    Department of Social Services Department of Social Services Bangladesh

    Jatiyo Protibondhi Unnayan

    Foundation

  • ii

    5. Disbursement Estimates (US$m) Actual amount disbursed as of 06/14/2011 1.89

    Fiscal Year Annual Cumulative

    2011 0.00 1.89

    2012 5.91 7.80

    2013 9.00 16.80

    2014 10.20 27.00

    2015 8.00 35.00

    Total 35.00

    6. Policy Exceptions and Safeguard Policies Does the restructured project require any exceptions to Bank policies? N

    Does the restructured projects trigger any new safeguard policies? If yes, please select

    from the checklist below and update ISDS accordingly before submitting the package.

    N

    7a. Project Development Objectives/Outcomes Original/Current Project Development Objectives/Outcomes

    The objective of the proposed Project is to expand the coverage, use, and quality of social care services for

    persons with disabilities and vulnerable children as a means of promoting equity and social inclusion.

    7b. Revised Project Development Objectives/Outcomes [if applicable]

    To expand coverage and improve quality of services for persons with disabilities and children at risk by

    strengthening and scaling up government service delivery systems.

  • 1

    BANGLADESH DISABILITY AND CHILDREN AT RISK

    RESTRUCTURING PAPER

    A. SUMMARY

    This Restructuring Paper seeks the approval of the Executive Directors to introduce the following

    proposed changes to the Bangladesh Disability and Children at Risk (DCAR) Project:

    (a) Revision to the Project Development Objective (PDO) to provide a more precise and measurable reflection of the project activities and also better reflect the strengthening and expansion of the

    government safety net system and service provision in the revised project activities;

    (b) Revisions to the project activities to reflect a shift from an arrangement where exclusively non-government organizations are funded on a grant basis to provide services (under Components 1

    and 2) to one where the government safety net system and services are strengthened and

    expanded to ensure sustainability, while NGOs are contracted where necessary and viable;

    (c) Revisions to the results framework to better reflect the revised project design and the revised PDO;

    (d) Revisions to the implementation arrangements for all components to foster ownership and sustainability of project activities; and

    (e) Reallocation of Credit proceeds.

    B. PROJECT BACKGROUND AND STATUS 1. The Disability and Children at Risk (DCAR) Project was approved on July 1, 2008 and declared

    effective on January 22, 2009. The project Closing Date is December 31, 2014. The PDO is ―to

    expand the coverage, use, and quality of social care services for persons with disabilities and children

    at risk as a means of promoting equity and social inclusion‖. The project includes three components,

    as follows:

    Component 1 (total baseline estimated costs US$21.60 million): The objective is to expand

    disability services, improve awareness and build capacity of NGOs and government agencies

    serving the disabled. Sub-component 1(a) supports the restructuring, scaling up and capacity

    building of the Jatiyo Protibondhi Unnayan Foundation (JPUF) to make it a center of excellence

    for contracting disability services, promote awareness building, research, monitoring and

    evaluation, and establishing good practices. Sub-component 1(b) finances disability services

    including community-based rehabilitation, early detection and intervention, prevention,

    counseling, communication and awareness, provided by NGOs or Disabled Peoples

    Organizations (DPOs) through grants managed by JPUF.

    Component 2 (total baseline estimated costs US$9.14 million): The objective is to strengthen

    and expand the network of services for children-at-risk. Activities under sub-component 2(a)

    focus on supporting institutional strengthening, training and capacity building of Department of

    Social Services (DSS) staff and service providers to enhance the quality of services for children-

    at-risk through development of minimum standards of care and case management tools,

    monitoring compliance of standards, enhance skills in specialized areas such as mentoring,

    volunteerism, social work, care, counseling, etc. Sub-component 2(b) provides rehabilitation and

    integration services for street children by supporting NGO-run centers for street children in

    eleven locations. Sub-component 2(c) supports the design, development and piloting of

  • 2

    alternative approaches to institutional care for orphans by contracting NGOs as service providers.

    Sub-component 2(d) supports the management and operational costs of the project.

    Component 3 (total baseline estimated costs US$2.75 million): The objective is the

    institutional strengthening, training and capacity building of the Ministry of Social Welfare

    (MoSW) and DSS for policy formulation, program planning, implementation, monitoring and

    evaluation by supporting the (i) revision of the associated legal framework for persons with

    disabilities, child protection and other socially disadvantaged populations to bring local laws and

    regulations in conformity with the UN conventions on Disability and Child Rights; (ii)

    streamlining the organizational structure and procedures of DSS; (iii) training DSS personnel and

    other service providers on proactive social services; (iv) technical assistance and provision of

    required hardware and software for monitoring and evaluation of MoSW and DSS services and

    programs.

    2. Under the original design, Component 1 was to be implemented by the JPUF with 42 project staff and a number of national and international consultants. Components 2 and 3 were to be implemented by

    the DSS within the MoSW through a PIU set up for implementation of the UNICEF-sponsored

    Protection of Children-at-Risk (PCAR) Project for street children.

    3. Since project approval, there has been a major change in the Government‘s social welfare policy

    which has led to the decision to restructure the project. Specifically, in early 2009, the Ministry of

    Social Welfare took a decision to significantly strengthen public social welfare institutions and

    service delivery systems and scale up publicly provided services. The government remains

    committed to partnering with non-government providers where necessary to complement publicly

    provided services in order to improve equity in access, improve quality, and extend coverage of

    services. The new Government also reassessed the original project design and had concerns

    regarding the implementation arrangements as envisaged through a restructured JPUF. As a result of

    this assessment, the institutional status of the implementing agency for Component 1 - the JPUF –

    began the process of reverting to a Government agency with the appointment of a civil servant

    deputed from the Ministry of Social Welfare as the Managing Director. Due to the structural issues

    surrounding the JPUF, it took time to develop a revised and agreed project design.

    4. Project implementation has been very slow since effectiveness, reflecting delays created by the institutional changes described above. The project has also suffered from weak initial fiduciary

    capacity and generally weak project management. Given the very limited progress made in terms of

    procurement of planned goods and services, no progress has yet been made in implementing the

    original project activities. A total of US$0.20 million is expected to be disbursed by the end of FY

    2011. Financial management capacity was also slow to develop for both implementing agencies, as

    evidenced particularly in JPUF by a delayed entity audit report and audit reports and in several

    delayed Interim Unaudited Financial Reports (IUFRs). Consequently, project ratings (including for

    outcome, implementation progress, project management, financial management, procurement and

    monitoring and evaluation) were downgraded to Unsatisfactory in March 2010.

    5. In recent months, there has been increasing progress in improving procurement and financial management (FM) capacity that will help improve project implementation. The DSS has now

    recruited both a FM Specialist and a Procurement Specialist. Both of these specialist positions will

    also be shared with the JPUF until the JPUF can recruit its own FM and Procurement Specialists.

    JPUF has submitted its first withdrawal application since the initial advance in April 2009, and the

    Designated Account is no longer flagged as inactive. DSS is now current on reporting requirements

    and has been submitting withdrawal applications regularly. All overdue audits have been conducted

    and finalized audit reports are in the process of being submitted to the Bank. DSS and JPUF have

  • 3

    begun the process of hiring project staff, pending the approval of the restructured project. The

    implementing agencies, the JPUF and the DSS, have prepared Revised Development Project

    Proposals (RDPPs) - the Government's implementation documents - and are currently obtaining GoB

    clearances for the RDPPs.

    C. PROPOSED CHANGES

    Project’s Development Objectives 6. The proposed revised PDO is: “To expand coverage and improve quality of services for persons with

    disabilities and children at risk by strengthening and scaling up government service delivery

    systems.” The revised PDO provides a more precise and measurable reflection of the revised project

    activities and also better reflects the restructured project‘s emphasis on significantly expanding the

    coverage of services by strengthening government service delivery systems and complementing the

    main delivery mechanism with services provided by private and not for profit service providers.

    Results/Indicators 7. The Results Framework has been revised in order to reflect the proposed changes in the project

    activities and institutional arrangements under the restructured project. The Results Framework now

    focuses more closely on measuring increases in service coverage, the quality of services, and the

    institutional capacity of DSS and JPUF. The revised Results Framework is provided in Annex 1.

    Components 8. The general objectives of each component in the restructured project are the same as in the original

    project, but the activities within the components have been modified to reflect the Government‘s new

    policy focus: strengthening government institutions and programs and scaling up the provision of

    services, while still partnering with non-government providers in underserved areas and for services

    not provided through government programs. As a result: 1) The services financed by the project will

    now cover significantly more beneficiaries across the entire country than originally envisaged; 2)

    Long-term systems for service delivery will be established and institutionalized to help ensure

    continuation of services after the project funding ends; 3) The scope and coverage of training and

    capacity building activities have been expanded to enhance the institutional capacity of the nodal

    government agencies for disability and children at risk, and now both (a) cover a larger number of

    officials at the central and local levels and (b) focus on a broader set of issues; and 4) New activities

    related to assessing the socioeconomic situation and needs of persons with disability and children at

    risk have been introduced to promote a culture of ‗evidence based policy making‘ within government.

    9. The activities under the restructured project, together with details on the nature and rationale for changes, are discussed below. For a detailed description of the restructured project activities, see

    Annex 3.

    Component 1: Institutional Strengthening, Expanding Disability Services, Improving Awareness,

    and Building Capacity (total estimated cost US$22 million):

    The objective of this component is to strengthen the capacity of JPUF to formulate and implement

    disability policies and programs, increase the coverage and quality of disability services and programs,

    and build public awareness on the rights of persons with disability in Bangladesh. The restructured

    activities, which have been agreed with government, are as follows:

    Sub-component 1(a): Expansion of Integrated Services and Support for Inclusion of Persons with Disability: This sub-component would support the following activities: (i) Strengthen and

    scale up the existing network of government programs and interventions through the addition of 20

  • 4

    new Protibondhi Sheba-O Sahjjo Kendra (Care and Assistance Center for Persons with Disabilities)

    to the 15 existing centers and the provision of 20 fully-equipped mobile vans for outreach services;

    (ii) Contract services from non-governmental service providers to reach persons with disability

    specifically in under-served geographical/service areas in order to complement government service

    delivery; (iii) Design a national disability certification and determination process through the

    development of relevant guidelines and tools; (iv) Provide schooling materials such as Braille

    textbooks, assistive devices such as spectacles and hearing aids, and mobile ramps for cyclone

    shelters; and (v) Design and implement public education and information campaigns on disability

    issues, including the development of awareness materials.

    Sub-component 1(b): Institutional Strengthening of the JPUF: This sub-component would support the following activities: (i) Conduct a socioeconomic situation assessment of persons with

    disability and carry out a needs assessment to inform program development and action plan

    formulation for disability services and programs; (ii) Develop detailed operational guidelines and

    instructions as well as develop standards of service for persons with disabilities; (iii) Introduce a

    system to monitor and assess JPUF progress and performance with an integrated MIS (including

    hardware, software, training, and communication technology); (iv) Provide training to disability

    service providers such as therapists, health workers, and school teachers; (v) Train and build

    capacity of JPUF and MoSW staff at union, upazilla, district and national levels on disability issues;

    (vi); Conduct an evaluation to assess performance of JPUF programs and services; and (vii)

    Finance fiduciary and technical staff to support project implementation and associated operating

    costs.

    Component 2: Strengthening and Expanding the Network of Services for Children at Risk and

    Strengthening Department of Social Services (DSS) (total estimated cost US$10.5 million):

    The objective of this component is to improve and expand the network of services for children at risk and

    strengthen the institutional capacity of DSS. The specific activities in each sub-component of the

    restructured project, which have been agreed with government, are as follows:

    Sub-component 2(a): Strengthening Services for Children at Risk: This sub-component would support the following activities: (i) Support Integrated Child Protection Service (ICPS) Centers in

    7 divisional cities, including 24-hour crisis management services such as a telephone helpline,

    referral services, psychosocial counseling, skills training and development, reintegration services,

    case management, and health and education; (ii) Contract service provision from non-government

    service providers to expand services specifically in under-served geographical or service areas for

    children at risk to complement government service delivery; (iii) Conduct a socioeconomic

    situation assessment of children-at-risk and conduct a needs assessment to inform program

    development and action plans for children-at-risk services and programs; (iv) Develop detailed

    operational guidelines, instructions, and standards of services for children-at-risk; and (v) Design

    and implement public education and information campaigns on child protection issues including

    the development of awareness materials.

    Sub-component 2(b): Project Implementation Support: This sub-component would support the following activities: (i) Design and implement a system to monitor and assess DSS progress and

    performance, including an MIS; (ii) Conduct an evaluation to assess performance of programs and

    services for children at risk; and (iii) Finance fiduciary and technical staff to support project

    implementation and associated operating costs.

    Component 3: Institutional Strengthening of Ministry of Social Welfare (MoSW) to Mainstream

    Disability and Children at Risk Issues (total estimated cost US$2.5 million):

  • 5

    The objective of this component is to strengthen the institutional capacity of MoSW and enhance project

    impacts by promoting and mainstreaming disability and children at risk issues within the institutions that

    deal with social welfare concerns more broadly. This component will build on and consolidate the gains

    made through project activities under Components 1 and 2, which focus on providing services and raising

    awareness about two vulnerable groups: persons with disabilities and children at risk.

    This component would support the following activities: (i) Strengthen the National Social Service

    Academy (NSSA) on disability and child protection issues; (ii) Build capacity of MoSW personnel

    through training and exposure through group study tours; (iii) Train and build capacity of staff at the local

    levels (i.e. union, upazilla and district social workers); (iv) Develop and implement an MIS for MoSW

    integrated with the DSS and JPUF MIS systems (including hardware, software, training, communication

    technology); and (v) Conduct an evaluation to assess overall project performance and impact.

    Institutional Arrangements 10. JPUF will continue to be the implementing agency for the Component 1 of the project. JPUF will be

    responsible for overseeing the expansion of Disability Service Centers, contracting non-government

    service providers to expand services in under-served geographical areas through a competitive

    selection process detailed in the JPUF Operational Manual, setting up the national disability

    certification system in coordination with MoSW, and other project activities. For more details, see

    Annex 3. The Government has taken steps towards transforming the JPUF into the nodal public body

    responsible for disability policy and programs, and has appointed a full-time Managing Director at the

    level of Joint Secretary. The original project design had a provision for hiring 42 project personnel

    and a number of international consultants. Under the restructured project, there would now be 11

    staff as well as 7 national technical consultants, based on the actual need for the effective

    implementation of the project. The proposed changes in staffing would also provide a better balance

    between administrative/managerial and technical positions. The Government and the IDA team have

    agreed that national consultants would be hired rather than international consultants as the necessary

    skills can be found locally. Finally, project staff will now be paid salaries and other allowances as per

    the existing National Pay Scale rather than a significantly higher private sector scale to ensure

    sustainability after the project period. For staff and consultant positions in the JPUF central office that

    are not currently filled, TORs have been prepared and arrangements are being made to fill the

    positions immediately after approval of the restructured project. Field-level positions for the

    Disability Service Centers will be filled as the centers become operational (ten centers in the first year

    after restructuring and an additional ten centers in the second year).

    11. The implementation of Components 2 and 3 of the project would be carried out by DSS supported by a Project Implementation Unit (PIU). DSS will be responsible for establishing and running the ICPS

    Centers, contracting non-government service providers to expand services in under-served

    geographical areas through a competitive selection process detailed in the Children at Risk

    Operational Manual, working to mainstream children at risk issues through the MoSW and other

    Ministries, and other project activities. For more details, see Annex 3. The PIU would be headed by

    a National Project Director (NPD) at the level of Deputy/Senior Deputy Secretary. The PIU will act

    under the supervision and guidance of the DSS. The GoB has already appointed a Deputy Secretary

    level officer as the full time NPD within the DSS. For staff and consultant positions within the PIU

    that are not currently filled, TORs have been prepared and arrangements are being made to fill the

    positions immediately after approval of the restructured project. Field-level positions for the ICPS

    Centers will be filled as the centers become operational over the first year of implementation after

    restructuring. This arrangement replaces the original implementation arrangements, which relied on

    the PIU set up by the UNICEF-sponsored PCAR Project for street children. This change reflects the

    Government‘s commitment to oversee project implementation and will facilitate strengthening the

    Government‘s own child protection mechanisms.

  • 6

    Financing

    (a) Project Costs

    Project Costs (US$m.)

    Components / Activities Original Proposed

    Component 1: Institutional Strengthening, Expanding Disability

    Services, Improving Awareness, and Building Capacity 21,602.00 22,000.00

    Component 2: Strengthening and Expanding the Network of

    Services for Children at Risk and Strengthening DSS 9,138.60 10,500.00

    Component 3: Institutional Strengthening of MoSW to

    Mainstream Disability and Children at Risk Issues 2,748.00 2,500.00

    Total Baseline Cost 33,488.60

    35,000.000

    Contingencies 1,511.40 0.00

    Total Project Costs 35,000.00 35,000.000

    (b) Financing Plan

    Estimated Disbursement (US$ millions)

    FY09-11 FY12 FY13 FY14 FY15

    IDA - annual 1.89 5.91 9.00 10.20 8.00

    IDA - cumulative 1.89 7.80 16.80 27.00 35.00

    (c) Reallocations

    The proposed reallocation envisages the establishment of a new consolidated disbursement category

    (Category 6), which would enable more efficient processing of payments. See Annex 2 for the

    reallocation table.

    Financial Management 12. The broad arrangements for financial management, as envisaged in the Project Appraisal Document

    (PAD) would largely remain the same. The activities under the restructured project will continue to

    be carried out by the two implementing agencies, namely, the JPUF and DSS.

    13. In order to strengthen financial management capacity, the DSS has recruited an Accounts/Financial Management Specialist to ensure compliance with fiduciary requirements pertaining to financial

    management. JPUF is also in the process of recruiting an FM Specialist, but in the meantime will

    arrange to share the services of the FM Specialist that is supporting the DSS PIU. It is anticipated

    that the delays with audit reports and submission of IUFRs for both implementing agencies will be

    improved with the increased FM capacity.

  • 7

    14. The other financial management arrangements pertaining to budgeting, fund flow, disbursement, accounting and reporting and supervision plan would remain the same as envisaged in the PAD.

    Procurement 15. The procurement arrangements, as envisaged in the Project Appraisal Document (PAD), are not

    changed significantly. The procurement activities under the project will continue to be carried out by

    the two implementing agencies, namely, the JPUF and DSS.

    16. The Project Implementation Support Unit (PIU) within DSS, has appointed an experienced Procurement Specialist who has a good understanding of the IDA procedures. It has been agreed

    between the Government and IDA Team that the services of the same Procurement Specialist would

    be utilized by both the implementing agencies until JPUF recruits is own Procurement Specialist.

    17. The volume of procurement will increase in the restructured project due to some of the new project activities such as: Protibondhi Sheba-O Sahjjo Kendra (Care and Assistance Center for Persons with

    Disabilities); provision of fully-equipped mobile vans for outreach services; provision of assistive

    devices for PWDs and other education materials; provision of mobile ramps for shelters in disaster

    prone areas; and provision of Integrated Child Protection Service (ICPS) Centers. The revised

    procurement plans for the restructured project have been discussed and agreed with the Government

    and are included in Annex 4.

    D. APPRAISAL SUMMARY

    Economic and financial analysis 18. The proposed changes in project activities are expected to improve the scope, nature and

    sustainability of services for persons with disabilities and children at risk, and the services will reach

    several times the number of beneficiaries as originally envisaged with the same cost envelope. The

    Government has also decided to expand the range of services by strengthening its own interventions

    and has planned the budget and staff costs accordingly, fostering the fiscal sustainability of the

    services provided. The proposed changes in the project activities would ensure that the services are

    designed well with improved capacity to deliver them effectively.

    19. Supporting these vulnerable populations provides a number of economic and non-economic benefits. Persons with disabilities and children at risk suffer from a lack of access to adequate educational

    services, health services and safety nets. This lack of access has led to exclusion from social and

    economic activities. The increased availability and accessibility of care and support services for

    persons with disabilities under the revised project will continue to: i) ease constraints to labor force

    participation by persons with disabilities and their caretakers; ii) ease constraints to schooling for

    disabled children and child helpers of disabled family members; iii) increase socialization; and iv)

    reduce discrimination. The increased availability and accessibility of child protection services

    provided through this project to children as risk will: i) ease constraints to schooling by providing

    non-formal education and life-skills to children at risk; ii) improve the health of children at risk; iii)

    reduce petty crime by providing alternatives for children at risk; and iv) improve socialization and

    facilitate reintegration of children into society.

    Technical 20. The proposed changes in the project activities are technically sound. The revised project activities

    involve strengthening and scaling up government institutions, programs and/or services, while

    supporting needs based interventions through non-government providers, where necessary. This will

  • 8

    enhance the coverage of service provision, on a much larger scale than previously possible through a

    reliance on non-government providers alone, with a financially sustainable budget. Assessments have

    been conducted of the existing government services for the disabled and children at risk, and have

    found that in general the delivery system is functioning well and is able to deliver a range of care and

    support services. However, these assessments have identified some challenges in reaching all

    beneficiaries in the center‘s catchment areas and in recruiting some technical staff positions in the

    field. The proposed project activities are designed to address the difficulties found in the assessments

    by focusing on capacity building and outreach.

    Risk

    21. Several of the critical risks identified in the PAD still remain risks for the restructured project, such as weak capacity and weak coordination among ministries. The capacity risks under the restructured

    project are mitigated by several factors: a) improvements in the FM and procurement capacity of

    JPUF and DSS that have already occurred; b) the recruitment process for key project staff and

    consultants has already been started so that these positions can be filled as soon as the restructuring is

    completed; and c) increased government ownership for the project given the changes in the

    institutional arrangements and policy decisions undertaken by the government. In addition, the risks

    identified in the PAD arising from low NGO capacity to administer sub-grants are no longer as great,

    as these risks are now largely transferred the implementing entities. As there was no public launch of

    grant-making activities to NGOs, the risk that NGOs might complain about the restructured project

    design is minimal.

    22. There is a challenge of developing new government service centers and meeting institutional strengthening objectives of the restructured project given the relatively short implementation period

    remaining under the project. However, the restructured activities and implementation plans have

    been designed keeping in mind the remaining implementation period, and although ambitious are

    achievable. Finally, although past experience with disbursement under the project is not encouraging,

    accelerated disbursement is expected with the revised project design due to the improvements in FM

    and procurement capacity.

  • 9

    ANNEX 1:

    Results Framework and Monitoring

    BANGLADESH: BANGLADESH DISABILITY AND CHILDREN AT RISK

    Project Development Objective (PDO): To expand the coverage, use, and quality of social care services for persons with disabilities and children at risk as a means of promoting equity and social

    inclusion.

    Revised Project Development Objective: To expand coverage and improve quality of services for persons with disabilities and children at risk by strengthening and scaling up government service

    delivery systems

    PDO Level Results

    Indicators* Co

    re

    D=Dropped

    C=Continu

    e

    N= New

    R=Revised

    Unit of

    Measure Baseline

    Cumulative Target Values**

    Frequency Data Source/

    Methodology

    Responsibility

    for Data

    Collection

    YR 1

    YR 2 YR 3 YR4 YR5

    Increased number of

    persons with disability

    receiving services.

    N Person 15,000

    served

    by 5 new

    disability

    service

    centers

    in 2009

    Initiate

    process

    25,000 50,000 750,000 100,000 Annual/

    Baseline,

    mid-year,

    endline

    Administrative

    records/Household

    survey based

    independent

    evaluation

    Government /

    Third Party

    Evaluation

    Increased percentage of

    beneficiaries report

    satisfaction with services

    received at disability

    service centers.

    N Percent

    age

    Not

    currently

    available

    Initiate

    process

    50% 60% 70% 80% Annual/

    Baseline,

    mid-year,

    endline

    Household survey

    based independent

    evaluation

    Government /

    Third Party

    Evaluation

    Increased number of

    children at risk receiving

    child protection services.

    N Person Not

    currently

    available

    Determine

    baseline

    - - - Double the

    baseline

    Annual/

    Baseline,

    mid-year,

    endline

    Administrative

    records/

    Household survey

    based independent

    evaluation

    Government /

    Third Party

    Evaluation

    Performance of disability

    and children at risk

    programs regularly

    monitored and reviewed.

    N N.A1 Not

    currently

    done

    Annual

    conference

    held where

    monitoring

    reports and

    program

    results

    discussed

    Annual

    conference

    held where

    monitoring

    reports and

    program

    results

    discussed

    Annual

    conference

    held where

    monitoring

    reports and

    program

    results

    discussed

    Periodically

    (monthly/

    quarterly/

    annual)

    Quarterly and

    annual reports,

    annual conference

    Government

    1 N.A – Not applicable

  • 10

    Increased awareness and

    positive change in attitude

    towards persons with

    disability and children at

    risk in communities where

    services provided.

    N

    Person

    To be

    determin

    ed

    Determine

    baseline

    - 10%

    increase

    - 20%

    increase

    Baseline,

    mid-year,

    end line

    Independent

    evaluation

    Third Party

    Evaluation

    10% increase in the coverage

    of disabled population by JPUF

    D 24,185

    None (JPUF

    launch sub-

    projects)

    None

    (implement

    ation underway)

    None (mid-year

    assessment

    period)

    3-5% 5-10%

    First year of effectiveness

    to set the

    baseline, mid-year

    assessment

    and at the end

    of project

    impact

    assessment

    (i) Specialized survey

    of 15,000 household;

    (ii) Census & (iii) HIES

    Bangladesh Bureau of Statistics in

    coordination with

    JPUF and partner organizations in

    sub-project

    locations

    30% increase in early detection of disabilities and

    impairments

    D

    Currently

    only 2% are

    detected

    early

    None

    Training and

    Capacity

    Building

    5-15% Training

    and

    capacity building

    continues

    10-25% 25-40% 40-50% Once a year

    Beneficiary database, household survey,

    spot surveys,

    beneficiary assessment, progress

    reports

    BBS and JPUF

    10% increase of PWD in the

    workforce; D 769,000 None None 1-3% 3-6% 6-10%

    Mid-year

    review + end of project

    impact

    assessment

    Household survey,

    labor market surveys,

    beneficiary assessments

    BBS in coordination with

    JPUF/beneficiaries

    30% of the participating

    street children attend formal

    or non formal education, or training.

    D 8080 None

    10%

    10-20%

    30% 30%

    Once a year

    during last

    three years of project

    Beneficiary database,

    reports from referral agencies, school

    reports, Evaluation

    report

    PCAR-DSS in coordination with

    implementing

    NGOs and independent

    evaluation experts

    INTERMEDIATE RESULTS

    Component One: Institutional Strengthening, Expanding Disability Services, Improving Awareness, and Building Capacity

    20 additional Disability

    Service Centers

    established and functional.

    N District 0 Initiate

    process

    5 10 15 20 Annual Administrative

    records

    Government

    Guidelines and tools for

    disability certification

    developed

    N N.A None

    currently

    available

    Initiate

    preparatio

    n

    - Complete - - Once Administrative

    records

    Government

  • 11

    Concerned government

    officials and service

    providers at union,

    upazilla and district levels

    trained on rights of

    persons with disabilities

    and available services

    N Person Not

    currently

    available

    Finalize

    training

    design

    and

    materials

    20% of

    governme

    nt

    officials

    and

    service

    providers

    30% of

    government

    officials and

    service

    providers

    40% of

    governmen

    t officials

    and service

    providers

    50% of

    governm

    ent

    officials

    and

    service

    provider

    s

    Annual Administrative records

    Government

    10% increase in PWDs using the services provided by

    NGOs contracted by JPUF.

    D 35,000

    NGO identified,

    links

    established

    , services

    defined

    Sub-project

    selected

    and services

    delivery

    resumes

    0-5% increase

    in the PWDs receiving

    services from

    JPUF

    5-8% increase

    8-10%

    increase +

    assessment to

    verify the

    performance

    Annual Progress reports from the sub-projects + beneficiary

    database

    JPUF + sub-project teams +

    beneficiaries

    Percentage increase in the

    number of NGOs, DPOs and community groups capable of

    developing and implementing

    rehabilitation and other disability programs

    D 521

    None

    Training

    and capacity

    building

    phase

    100-150

    NGOs and community

    groups

    collectively providing

    primary

    rehabilitation

    150-300 300-500 500-600 Annual

    Progress reports from the

    sub-projects + reports from

    JPUF + beneficiary assessment + independent

    expert assessment

    JPUF + sub project teams

    Percentage increased in the number of NGOs, DPOs

    capable of providing

    specialized services on specific issues (such as early

    detection of disabilities and

    impairments)

    D 89

    None

    Training

    and capacity

    building

    phase

    None

    Training

    and

    capacity building

    phase

    25-50

    NGOs

    secondary/tert

    iary rehabilitation

    50-75 75-100 Annual

    Progress reports from the

    sub-projects + reports from

    JPUF + beneficiary assessment + independent

    expert assessment

    JPUF + sub project teams

    At least 10 spot surveys over

    a period of 5 years conducted

    to assess awareness on specific disability issues and

    need of relevant care

    D Not

    applicable

    Designing

    survey and selecting

    survey

    group and location

    First spot

    survey 1-2 surveys 1-2 surveys

    2-3

    surveys Annual Results of spot surveys

    JPUF in

    coordination with independent experts

  • 12

    JPUF capable of delivering

    disability services nationwide D

    JPUF

    restructur

    ed to be an

    autonomo

    us organizati

    on

    No

    Adjusting the

    functions

    and sensitizati

    on

    campaigns

    JPUF

    receiving proposals

    from all 6

    divisional cities

    No

    Planning, selecting,

    training

    partners in all 6

    divisional

    cities

    Yes

    Sub-projects

    beginning to

    deliver primary

    rehabilitation

    services in 6 divisional

    cities

    Yes

    Sub-projects beginning to

    deliver

    primary+ specialized

    rehabilitatio

    n services in 6 divisional

    cities

    Yes

    Feasibilit

    y and performa

    nce

    assessment

    Semi-annual Semi-annual progress

    reports

    JPUF policy and

    planning staff + independent experts

    in all 6 divisional

    cities + sub project teams

    Component Two: Strengthening and Expanding the Network of Services for Children at Risk and Strengthening Department of Social Services (DSS)

    Intermediate Result

    indicator One: ICPS

    centers established and

    functional in 7 divisional

    cities

    N Divisional City

    0 Initiate

    and

    Finalize

    strategy

    and

    design

    1 3 5 7 Annual Administrative records

    Government

    Intermediate Result

    indicator Two: Standards

    for children at risk

    developed

    N N.A None currently

    available

    Initiate

    preparati

    on

    - Complete - - Once Administrative records

    Government

    Intermediate Result

    indicator Three:

    Concerned government

    officials and service

    providers at union,

    upazilla and district levels

    trained on child protection

    issues and available

    services

    N Person Not

    currently

    available

    Finalize

    training

    design

    and

    materials

    20% of

    concerned

    governme

    nt officials

    and

    service

    providers

    30% of

    concerned

    government

    officials and

    service

    providers

    40% of

    concerned

    governmen

    t officials

    and service

    providers

    50% of

    concerne

    d

    governm

    ent

    officials

    and

    service

    providers

    Annual Administrative records

    Government

  • 13

    1. Minimum standards of care for working with

    street children are developed and applied

    across implementing

    NGOs.

    D

    Not

    applicable

    Assessme

    nt of missing

    and

    available standards

    Missing standards

    developed

    and synchroni

    zed with

    the existing

    ones to

    develop into one

    common

    package for

    planning

    and training

    the

    partner organizati

    ons

    Standard manuals

    distributed,

    partner organizatio

    ns trained

    At least 10-

    15%

    participating NGOs

    apply

    common Standards

    At least 20%

    participating

    NGOs apply common

    Standards

    At least 30% of

    participating

    NGOs apply common

    Standards

    properly

    At least

    50%

    participating NGOs

    apply

    common Standards

    properly

    Semi-annual

    Semi-annual progress

    reports from the partner NGOs + independent

    assessment

    Project implementation team

    (DSS) in

    coordination with participating NGOs

    2. Alternative care model for orphans developed

    and piloted;

    D None

    Planning

    and preparatio

    n

    Planning

    and

    preparation

    Pilot

    operational

    Pilot

    evaluated

    Decision taken by

    MoSW/D

    SS whether to

    continue

    alternative care

    model

    Semi-annual

    Semi annual progress

    reports from NGOs + the

    bank supervision reports + project progress reports

    MOSW/DSS in coordination with

    NGOs and families

    3. MIS established and used to monitor service

    delivery to street

    children

    D None

    0%

    25% ready

    50% ready

    Fully operational

    Fully

    operationa

    l

    Semi-Annual

    Semi-Annual progress

    reports + reports generated by MIS on the

    performance of the

    PCAR-DSS programs and

    project implementation

    PCAR-DSS

    (MIS/M&E unit) +

    project management team

  • 14

    Component Three: Institutional Strengthening of Ministry of Social Welfare (MoSW) to Mainstream Disability and Children at Risk Issues

    NSSA staff trained to

    provide training on

    disability and child

    protection issues and

    available services

    N N.A Not currently

    done

    Finalize

    training

    design

    and

    materials

    20% of

    NSSA

    staff

    30% of

    NSSA staff 40% of

    NSSA staff

    50% of

    NSSA

    staff

    Annual Administrative records

    Government

    Concerned policy makers

    and government officials

    at MoSW central level

    trained on disability and

    child protection related

    issues and available

    services

    N Person Not

    currently

    available

    Finalize

    training

    design

    and

    materials

    20% of

    concerned

    governme

    nt officials

    30% of

    concerned

    government

    officials

    40% of

    concerned

    governmen

    t officials

    50% of

    concerne

    d

    governm

    ent

    officials

    Annual Administrative records

    Government

    Evidence of MOSW-DSS

    taking lead in planning &

    formulating policies and programs consistent with its

    institutional mandate.

    D None

    None

    Adjusting the

    functions

    None

    Planning

    and training

    Partial

    Training and

    capacity building

    Partial

    Beginning to

    take pro-

    active role in reviewing

    policies/pro

    grams vis-à-vis the

    institutional

    development plan

    Partial

    Feasibility and

    performan

    ce assessmen

    t

    Semi-annual Semi-annual progress

    reports None

    MIS developed and able to

    produce relevant reports to

    assess the performance of programs

    D None 0% 10% ready 25% ready 75% ready

    100%

    ready and

    operational

    Semi-Annual Semi-Annual progress

    reports None

    *Please indicate whether the indicator is a Core Sector Indicator (see further http://coreindicators)

    **Target values should be entered for the years data will be available, not necessarily annually.

  • 15

    ANNEX 2:

    Reallocation of Proceeds

    BANGLADESH —DISABILITY AND CHILDREN AT RISK

    1. Credit proceeds will be reallocated as follows:

    Category of Expenditure Allocation (SDR) % of Financing

    Current (SDR) Revised (SDR) Current Revised (1) Goods, consultants, services,

    training, studies and workshops:

    (a) Component 1

    (b) Components 2&3

    1,120,000

    1,910,000

    0

    96,973

    100%

    100%

    (2) Sub grants for sub projects:

    (a) Component 1

    (b) Components 2&3

    11,250,000

    4,530,000

    0

    0

    100%

    0%

    (3) Incremental operating costs:

    (a) Component 1

    (b) Components 2&3

    840,000

    950,000

    4,539

    20,304

    100%

    100%

    (4) Refund of Project Preparation

    Advance

    350,000

    247,740 100%

    100%

    (5) Unallocated 950,000

    0

    (6) Goods, Consultants’ Services,

    Training, Studies and Workshops,

    Sub-grants for Sub-projects, and

    Incremental Operating Costs:

    (a) Component 1

    (b) Components 2&3

    0

    0

    13,513,435

    8,017,009

    - 100%

    TOTAL AMOUNT 21,900,000 21,900,000

  • 16

    ANNEX 3:

    Detailed Project Description

    Component 1: Institutional Strengthening, Expanding Disability Services, Improving

    Awareness, and Building Capacity (total estimated cost US$22 million):

    The broad objective of this component is to strengthen the capacity of JPUF to formulate and

    implement disability policies and programs, increase the coverage and quality of disability

    services and programs and build public awareness on the rights of persons with disability in

    Bangladesh. The component would comprise of the following two sub-components:

    Sub-component 1(a): Expansion of Integrated Services and Support for Inclusion of Persons

    with Disability

    This sub-component would support activities that strengthen and expand the network and quality

    of services and programs and build public awareness on the rights of persons with disability in

    Bangladesh. This would be achieved through the following activities:

    Integrated Disability Service Centers: The majority of project funds will be used to support the geographical expansion of Protibondhi Sheba-O Sahjjo Kendra (Care and Assistance

    Center for Persons with Disabilities) in 20 districts that are currently uncovered by such

    services. Throughout the country, 15 districts are currently served by existing government-

    run centers. An assessment of the operations of existing government-run Integrated

    Disability Service Centers was carried out during the preparation of the restructured project.2

    The objective of these integrated disability service centers is to act as “One Stop Service

    Centers” for PWDs to provide them a wide range of care and support services including

    2 According to the findings of the Assessment, the five centers established in early 2010 in Mymensingh, Manikganj,

    Dhaka, Kishoreganj and Jamalpur are functioning well and have been able to deliver a range of care and support

    services to persons with disabilities. However, these centers are also faced with some difficulties including non-

    availability of the suitable candidates for the positions of Speech Therapist and Occupational Therapist (two of the 13

    sanctioned staff positions of the centers) and problems relating to outreach because the centers are meant to cover a

    large geographical area with a significant population of persons with disabilities. On increasing the outreach and

    geographical coverage of the Disability Service Centers, a tangible suggestion that emerged during the assessment of

    these centers was to provide fully equipped mobile vans (with basic therapy equipment and a team of therapists). These

    mobile vans could be used to focus on specific geographical locations within the districts by visiting and camping for a

    week at the pre-identified locations to provide basic therapy services as well as link local PWD to other specialized

    services either by referring them to the respective Disability Service Center or to another service provider based on

    client need and a pre-identified referral network.

    The ten centers established in early 2011 located in Barisal, Comilla, Gopalgunj, Munshiganj, Netrokona, Bagerghat,

    Rajshahi, Sirajgunj, Kurigram and Habibgunj districts are still in the process of setting up and as of April 2011 were

    not yet fully functional. The staffs for these new centers (except Speech and Occupational Therapists) are in place in

    almost all new centers and JPUF is currently in the process of procuring equipments and assistive devices for these

    centers, which is essential for making them fully functional. In the meantime, these new centers currently engaged in

    preparatory work, including public announcements about the opening of the center and the services and facilities it

    offers. A few centers have also started basic physiotherapy sessions that do not require specialized equipment. It is

    anticipated that by June 2011 the newest centers will also be fully functional and delivering essential services to

    persons with disabilities in their coverage areas.

    Other major findings of the assessment include: (i) Need for strengthening the linkages between the Disability Service

    Centers and the disability determination and certification process being carried out by the DSS as well as linking those

    PWDs who are currently registered through the DSS in each district with the service of the centers; (ii) Need for a

    psychologist / counselor in every center; (iii) Need for regular training and skill building of staff members of the

    centers; (iv) Need for strengthening the data management and monitoring system by developing relevant tools and

    guidelines; (v) Need for identification and utilization of a referral network for connecting PWDs with essential

    services; (vi) Need for harmonizing the District Committee for the Welfare of PWDs set up under the provisions of the

    Bangladesh Persons with Disability Welfare Act 2001 with the District Steering Committee of the Disability Service

    Centers.

  • 17

    assessment, treatment and rehabilitation services either directly through the center or through

    a pre-identified referral network. The services to be provided include identification and

    assessment of disability; repair and distribution of assistive devices (e.g., wheel chairs,

    standing frames, crutches, hearing aids, white canes) and educational aids for children with

    disability (e.g., Braille text books); referral services; physiotherapy, occupational and

    language therapy; and information, awareness and knowledge dissemination. The service

    delivery of these Integrated Centers is broadly based on the following conceptual model:

    Chart 1: Conceptual Model for Protibondhi Sheba-O Sahjjo Kendra

    * Under the Bangladesh Persons with Disability Welfare Act 2001 there is a provision to set up a District Committee for Welfare of

    Persons with Disability headed by the Deputy Commissioner of the concerned district. This committee is mainly responsible for

    registration of PWD and issuance of identity cards.

    The final project districts will be selected in consultation with JPUF. The structure (including

    staffing, equipment, etc.) and mode of operation of the project centers will be similar to

    existing centers currently operating in 15 districts of the country. The staff at the centers

    (indicative and based on existing government norms) would include a District Disability

    Officer, Physiotherapy Consultant, Clinical Physiotherapist, Clinical Occupational Therapist,

    Clinical Speech and Language Therapist, Therapy Assistants, Technicians, Office Assistant,

    Support Staff, and a Guard.

    In addition to the centers in each of these 20 districts, 20 mobile vans fully equipped with

    diagnostic and therapeutic equipment will also be procured under the project. These vans

    USW/MSW prepares a list of PWDs in consultation with ward members &

    community

    Union-wise/Ward-wise list of PWDs is compiled & sent to Upazila/Dist.

    Steering Committee

    Upazila Committee reviews, approves & sends a Upazila level list to the

    concerned Disability Affairs Officer (DAO)

    DAO prepares a dist. level list & places it before the Dist. Steering Committee

    with details appropriate service requirements

    Dist. Steering Committee of Integrated Center reviews & approves the list and

    directs the DAO to ensure appropriate services

    A PWD approaches the center directly / or

    children with disabilities brought by an

    adult

    Integrated

    Center

    Case assessment & preparation of an Individual Care Plan / Treatment Plan

    Services at the Center based on

    the Individual Care Plan Information & Knowledge

    dissemination

    Referral services to PWDs based on the

    Individual Care Plan

    District Committee for the Welfare of

    PWDs* refers an individual for initial

    assessment of his / her disability

    Deputy Director DSS issues

    Identity Cards to registered

    PWDs & refers him/her for

    required service provision

    New

    cas

    es (

    PW

    Ds)

    ref

    erre

    d f

    or

    reg

    istr

    atio

    n

  • 18

    will provide mobile outreach services to those who are unable to access center-based services

    in these project districts.

    Standard operating procedures to guide implementation of center-based and mobile services

    will also be prepared under the project.

    Support need based/innovative initiatives in under-served geographical/service areas through non government service providers: Project funds will also be used to contract non-

    government organizations in order to reach persons with disability in under-served

    geographical areas and/or provide complementary services not rendered through existing

    disability centers. The non-government organizations that could be contracted for such

    purposes include community based organizations, disabled persons organizations and private

    entities. The situation and needs assessment (discussed below), undertaken in the early stages

    of project implementation, will be an important source of information to help identify the

    geographical and/or service areas that need support. The process of application, selection and

    disbursement of funds to non-government agencies will be managed by JPUF, through

    transparent processes and guidelines laid down in the Operations Manual of the project.

    Design and pilot national disability certification and determination process: Currently, there is no well established, comprehensive and transparent system to assess and certify persons

    with disability. The project seeks to address this important policy gap by supporting the

    design of a national disability certification and determination process, including the

    development of guidelines and tools and a detailed operational plan to guide implementation.

    The process will include a pilot launch in select areas to test the design, implementation and

    roll-out strategy.

    Improve education of children with disabilities: Project funds will be used for activities such as providing schooling materials (such as Braille textbooks) and assistive devices (such as

    spectacles and hearing aids) to disabled students. The educational activities would be

    planned centrally, but the distribution of materials would be done in part through the network

    of disability service centers.

    Make existing cyclone shelters accessible to persons with disability: Mobile ramps and other necessary devises will be procured and distributed to make existing cyclone shelters

    accessible to persons with disability, as per the requirements of the district administration in

    cyclone-prone coastal areas.

    Design and pilot public information, education and communication (IEC) campaigns on disability issues: Misconceptions about the causes and impact of disability and lack of

    information about the rights and entitlements of persons with disability can prevent their

    meaningful inclusion and participation in society. The project seeks to address such

    information gaps by supporting activities that build awareness and disseminate information to

    the public on disability related issues, including information on the causes and types of

    disability as well as the interventions, programs and services available to persons with

    disability. The target audience for all IEC activities will include persons with and without

    disability, as well as government and non-government entities working on disability related

    issues. The activities supported involve: (i) development of a comprehensive IEC strategy on

    disability related issues with program specific inputs for key interventions like the disability

    service centers, based on situation assessments and consultative meetings with stakeholders;

    (ii) development of a detailed IEC implementation plan clearly identifying activities, methods

    of implementation, institutional arrangements, indicators for assessment, budgetary

  • 19

    requirements, timelines and responsibility assignment; (iii) development of audio-visual

    awareness and dissemination materials; and (iv) pilot in select areas to test implementation of

    the newly designed IEC strategy.

    Sub-component 1(b): Institutional Strengthening of the JPUF

    This sub-component would support activities that enhance JPUF‘s strategic role and strengthen its

    institutional capacity, to make it the nodal agency responsible for framing and implementing

    disability policy in Bangladesh. This vision for JPUF will be achieved by supporting activities

    that focus on:

    Better informed and evidence based policy formulation: To assist the JPUF in fulfilling its strategic role in a more informed way and to help introduce and promote a culture of

    ‗evidence based policy making‘ within government, the project will support technical

    assistance services for the design and preparation of: (a) a situation analysis of persons with

    disability to assess the socio-economic situation of persons with disability, including their

    current access to services and programs and employment opportunities; (b) a needs analysis

    to assess the nature, coverage, financial and human resource related (including staffing,

    training, etc.) requirements of services/programs for persons with disability; (c) and an

    impact evaluation to assess performance of disability related programs and services. These

    assessments (together with routinely generated MIS reports) will be used to formulate action

    plans for JPUF and inform the future design and implementation of disability services and

    programs managed by JPUF. Existing sources of information including the Census (2011)

    and HIES (2010) will be used to the extent possible, but new analytical tools including

    sample household surveys may also be undertaken where required.

    Strengthening institutional capacity to implement programs and services: The project will: (a) finance technical assistance services for the development of relevant guidelines and tools,

    including a comprehensive operational manual for JPUF, implementation guidelines and

    standards of care for the Integrated Disability Service Centers, Mobile Services, Disability

    Certification System, and service provision through NGOs (all discussed in Component 1(a))

    and other programs and services for persons with disabilities; (b) finance the design and

    development of an integrated MIS including hardware, software, training, and

    communication technology for more effective monitoring by JPUF; and (c) finance additional

    staff including specialists to manage Procurement, Finances and Accounts, Training,

    Monitoring and Evaluation, Policy Analysis and Development, Community Based

    Rehabilitation and specific disability(ies) related activities. In addition, a total of 260 field

    based personnel (13 personnel for each of 20 centers) will be also be recruited to provide

    disability related services through the Integrated Disability Service Centers supported by the

    Project. Certain operating costs will also be financed under this sub-component to ensure

    effective implementation of project activities.

    Training and capacity building: The project will finance training and capacity building activities for JPUF and other MoSW officials at union, upazilla, district and national levels.

    It will also provide training to disability service providers such as therapists, health workers,

    and school teachers. The activities will support the development of a training strategy based

    on the needs assessment and the development of curriculum and materials in addition to

    actual training on disability related issues. Several methods will be used including on the job

    training as well as international study tours to learn from experiences about disability-related

    best practices abroad.

  • 20

    Component 2: Strengthening and Expanding the Network of Services for Children at Risk

    and Strengthening Department of Social Services (DSS) (total estimated cost US$10.5

    million):

    The objective of this component is to improve and expand the network of services for children at

    risk and strengthen the institutional capacity of DSS. The focus of this component is on

    strengthening and scaling up the government‘s child protection programs/services, complemented

    by interventions through non-government organizations in underserved geographic locations and

    service areas. This component would support the following major activities:

    Sub-component 2(a): Strengthening Services for Children at Risk: This sub-component aims to

    enhance the coverage and quality of services for children at risk in both urban and rural locations

    through the following activities:

    Support seven Integrated Child Protection Service (ICPS) Centers, as ―One Stop Service Centers‖ in each of the seven divisional cities of the country with the overall aim of

    improving access to services for children-at-risk, as well as enhancing the quality and

    relevance of services provided. Based on the results of needs assessments, the ICPS Centers

    will provide some of the following child protection services for children-at-risk: 24-hour

    crisis management services, psychosocial support, skills training and development,

    reintegration services, case management, daycare, shelter, food, educational and recreational

    opportunities, healthcare, assistive devices for children with disabilities (through JPUF)

    either directly through the center or through a pre-identified referral network. Children-at-

    risk will be linked to an appropriate service in accordance with their needs and resource

    availability. ICPS Centers will include a 24- hour crisis management center equipped with

    telephone helpline service, two shelter homes / drop-in-centers (one for girls and one for

    boys), and outreach and other support services. The service delivery of these ICPS Centers

    would be broadly based on the following conceptual model:

  • 21

    Chart 2: Conceptual Model for Integrated Child Protection Service (ICPS) Centers

    The ICPS Centers are an essential element of a long term strategy of strengthening the

    government‘s program on child protection. The Department of Social Services (DSS) has

    been running a range of child care institutions across the country and the ICPS Centers will

    serve as the divisional level hub for strengthening child protection services in Bangladesh. On

    the basis of lessons learnt during the project period, the MoSW-DSS would consider

    expanding the outreach of these service centers throughout the country, especially at the

    district levels.

    Support need based initiatives in under-served geographical/service areas through non government service providers: Project funds will also be used to contract non-government

    organizations to reach children at risk in under-served geographical areas and/or provide

    certain services not rendered through existing government facilities. The non-government

    organizations that could be contracted for such purposes include community based

    organizations, children‘s organizations and private entities. The situation and needs

    assessment undertaken in the early stages of project implementation will be an important

    source of information to help identify the geographical and/or service areas that need support.

    The process of application, selection and disbursement of funds to non-government agencies

    will be managed by DSS, through transparent processes and guidelines laid down in the

    Operations Manual of the project.

    Conduct a socio-economic situation assessment and a needs assessment of children-at-risk with the aim to introduce and promote a culture of ‗evidence based policy making‘ within

    USW/MSW prepares a list of children-at-risk in consultation with

    ward members & community

    Union-wise/Ward-wise list of children-at-risk is compiled & sent to

    Upazila/Dist. Steering Committee

    Upazila Committee reviews & sends a Upazila level list to the

    Deputy Project Director (DPD)

    DPD prepares a dist. level list of children-at-risk & places it before

    the Dist. Steering Committee with appropriate service requirements

    Dist. Steering Committee reviews the list and decides on placing the most vulnerable children to appropriate services

    A child-at-risk is rescued by

    police / brought by an adult /

    approaches the center directly

    ICPS

    Center

    Case Manager assesses the case and prepares an Individual Care Plan

    Services at the Center based on

    the Individual Care Plan Family reintegration &

    rehabilitation

    Referral services to children based on

    the Individual Care Plan

  • 22

    government. The socio-economic situation assessment of children-at-risk in Bangladesh

    would be conducted to understand the current circumstances of children-at-risk in

    Bangladesh. The needs assessment would identify critical gaps in service delivery and inform

    the development of policies, action plans and programs for children-at-risk. It would also

    facilitate better targeting and informed actions on the expansion of child protection services

    across the country.

    Develop detailed operational guidelines, instructions, and standards of services for children-at-risk: This activity would facilitate the development of guidelines on the standards of care

    for all child protection programs / services across the country implemented both by the

    government and by non-government agencies. The development of other relevant guidelines /

    tools pertaining to case management, rehabilitation and reintegration, and family based non-

    institutional care would also be supported in order to strengthen child protection services in

    Bangladesh.

    Design and implement public education and information campaigns on child protection: The project would support the design and implementation of a comprehensive public information

    and education campaign (IEC) on child rights and protection to enhance understanding and

    demand for child protection services. The IEC would utilize mass media, for instance

    television, newspapers, periodicals, magazines, hoardings, bus panels, cinema halls, radio,

    street plays, and discussion forums for disseminating information. The activities may also

    include the development and dissemination of awareness and education materials and

    consultations and advocacy workshops with non-governmental organizations, communities

    and local bodies.

    Sub-component 2(b): Project Implementation Support: This sub-component would focus on

    activities to support and strengthen DSS capacity to implement the project, including:

    Design and implement a system to monitor and assess project progress and performance: The project would develop an overall framework for a monitoring and evaluation (M&E)

    system for the DSS. This would include the development of an MIS along with a detailed

    M&E plan with a particular focus on results as well as a framework for identifying,

    analyzing, documenting and disseminating project outcomes and lessons learned. It would

    also include a set of monitoring indicators, tools, mechanisms for data / information

    management and dissemination from the grassroots levels to the divisional (ICPS Centers)

    and DSS headquarters.

    Conduct an evaluation to assess performance of programs and services for children at risk: The project would support process and impact evaluations of existing programs and services

    for children-at-risk implemented by DSS to improve their coverage and quality. DSS would

    engage a reputable local survey firm to undertake an evaluation of existing programs and

    services for children-at-risk. The studies would examine whether the programs and services

    were implemented as per the relevant guidelines and operational procedures and whether the

    intended outcomes were achieved. It would also document and disseminate lessons learned

    during the course of implementation.

    Finance project management and associated operating costs: A Project Implementation Unit (PIU) would be set up under the Department of Social Services (DSS) for ensuring day-to-

    day management, supervision and monitoring as well as adherence to Bank fiduciary

    requirements, particularly with respect to procurement, and financial management. Day-to-

  • 23

    day management and operational costs including the salaries of project staff would be

    financed to support the effective implementation of the project.

    Component 3: Institutional Strengthening of Ministry of Social Welfare (MoSW) to

    Mainstream Disability and Children at Risk Issues (total estimated cost US$2.5 million):

    The objective of this component is to strengthen the institutional capacity of MoSW and enhance

    project impacts by promoting and mainstreaming disability and children at risk issues within the

    nodal ministry and training institute that deal with social welfare concerns more broadly. This

    component would focus on improving the broader institutional capacity of the MoSW for

    training, monitoring and evaluation on child protection and disability issues and would support

    the following activities:

    Strengthen the National Social Service Academy (NSSA) on disability and child protection issues: The NSSA is the focal point for training and capacity building of the personnel of

    MoSW through its headquarters in Dhaka and six divisional centers located in the Divisional

    headquarters. The project would strengthen the institutional and technical capacity of the

    NSSA as the nodal training center on disability and child protection issues through activities

    that may include: rejuvenating the six regional centers, obtaining required training equipment,

    reviewing and strengthening existing course curricula / syllabi, developing new training and

    learning materials, and enhancing capacities of existing Academy staff.

    Train and build capacities of MoSW personnel: The project would support training and building capacity of MoSW staff at all levels, with an emphasis on building capacities of

    personnel at the local levels (i.e. union, upazilla and district social workers) on child

    protection issues. This would be achieved by organizing trainings and workshops for three

    groups: (a) GoB officials; (b) NGOs and other stakeholders; and (c) children at risk and their

    families and service providers. International study tours / exchange visits would also be

    organized for MoSW personnel to familiarize them with the evidence based good practices.

    Develop and implement an MIS integrated with the DSS and JPUF MIS systems: With the overall aim of putting in place a system for collecting, processing, storing and disseminating

    information to facilitate management functions, a comprehensive Management Information

    System (MIS) for the overall implementing Ministry would be developed and implemented.

    The MIS would have clear linkages to both the DSS and JPUF MIS. A reputed local

    consultant would be hired to develop a framework for the development of the MIS, outlining

    the necessary steps, timelines, required financial and human resources, hardware, software,

    training, and communication technology.

    Conduct an evaluation to assess project performance and impact: With the overall aim to assess the impact of the project activities on targeted beneficiaries, a reputable local survey

    firm would be engaged to undertake a third party evaluation of programs and services. Such

    an independent third party evaluation would examine whether the programs and services of

    the project were implemented as per the relevant guidelines and operational procedures and

    whether the intended outcomes of related programs and services were achieved. It would also

    document and disseminate lessons learned during the course of implementation.

  • 24

    ANNEX 4:

    Procurement Plans

    Indicative Procurement by JPUF (Component 1):

    GOODS

    Sl. Contract Description Selection

    Method Prior Review

    Estimated

    Cost (USD)

    1 Computers & Accessories (for H/O) NCB No 14,700

    2 Furniture & Accessories (for H/O) NCB No 9,100

    3 Office Equipment (photocopiers, fax

    machine, etc. for H/O) NCB No 4,200

    4 Vehicles (2 4WDs and 1 microbus for H/O) ICB / NCB Yes (varies by

    specific contract) 364,600

    5 MIS Hardware NCB No 98,100

    6 Computers & Accessories (for 20

    Disability Service Centers) NCB No 39,300

    7 Furniture and Accessories (for 20

    Disability Service Centers) NCB No 91,100

    8 Mobile Vans (for 20 Disability Service

    Centers) ICB Yes 1,682,600

    9 Therapy Equipment (for 20 Disability

    Service Centers) ICB Yes 981,500

    10 ^ Assistive Devices ICB / NCB

    Yes (varies by

    specific contract) 2,103,200

    11 ^ *

    Subsidies for Education Aids (Braille

    books, etc.) ICB / NCB

    Yes (varies by

    specific contract) 560,900

    12 ^ *

    Strengthening Disaster Management

    (mobile ramps, etc.) NCB No 105,200

    SERVICES

    Sl. Contract Description Selection

    Method Prior Review

    Estimated

    Cost (USD)

    1 Procurement Specialist SIC Yes 105,200

    2 Financial Management Specialist SIC Yes 105,200

    3 Policy Analysis & Development Specialist SIC Yes 105,200

  • 25

    4 Community-Based Rehabilitation Specialist SIC Yes 105,200

    5 Disability Specialist SIC Yes 105,200

    6 Monitoring & Evaluation Specialist SIC Yes 105,200

    7 Training Specialist SIC Yes 105,200

    8 Socio-Economic Assessment of PWDs FBS No 42,100

    9 Needs Assessment to Inform Policy and

    Program Development FBS No 42,100

    10 Third-Party Evaluation to Assess

    Performance of Programs & Services FBS No 56,100

    11 ^ #

    Need-based / Innovative Initiatives through

    Non-Government Service Providers QCBS

    Yes (varies by

    specific contract) 1,822,800

    12 ^ #

    Awareness & Public Education Campaigns

    (design, implementation, materials, etc.) FBS

    Yes (varies by

    specific contract) 287,400

    13 MIS Development & MIS-related Training QCBS Yes 168,300

    14 Design / Piloting of National Disability

    Certification & Determination System QCBS No 114,900

    15 * Training (National & International) ICB / NCB

    Yes (varies by

    specific contract) 1,892,900

    ^ packages to be determined and quantified

    * non-consulting service / minor service component

    # procurement completed

    Indicative Procurement by DSS (Components 2 & 3):

    GOODS

    Sl. Contract Description Selection

    Method Prior Review

    Estimated

    Cost (USD)

    1.a # Furniture NCB No 7,500

    1.b ^ Furniture & Accessories (other) (for H/O) NCB / RFQ No 12,500

    2.a # Computer & Accessories RFQ No 2,700

    2.b ^ Computers & Accessories (other) (for H/O) NCB / RFQ No 17,300

    3.a # Photocopier / Fax Machine / IPS RFQ No 2,500

  • 26

    3.b ^ Office Equipment (other) (for H/O) NCB / RFQ No 92,500

    4 MIS Hardware NCB No 100,000

    5.a # Vehicle (4-wheel-drive) NCB Yes 34,000

    5.b # Vehicles (microbus) NCB No 46,000

    5.c Vehicle (4-wheel-drive) NCB No 116,300

    6 Furniture & Accessories (for Integrated Child

    Protection Service Centers) NCB No 196,300

    7 Computers & Accessories (for Integrated

    Child Protection Service Centers) NCB No 29,400

    8 Televisions & Refrigerators (for Integrated

    Child Protection Service Centers) NCB No 29,400

    9 Telecommunications Equipment (for

    Integrated Child Protection Service Centers) NCB No 29,400

    10 ^

    Miscellaneous Goods (for Integrated Child

    Protection Service Centers) NCB / RFQ No 58,900

    SERVICES

    Sl. Contract Description Selection

    Method Prior Review

    Estimated

    Cost (USD)

    1 Child Protection Specialist (Institutional

    Care) SIC Yes 105,200

    2 Child Protection Specialist (Non-

    Institutional/Alternative Care) SIC Yes 105,200

    3 Monitoring & Evaluation Specialist SIC Yes 105,200

    4 Community-Based Rehabilitation Specialist SIC Yes 105,200

    5 Training Specialist SIC Yes 105,200

    6 # Accounts Specialist SIC Yes 105,200

    7 # Procurement Specialist SIC Yes 105,200

    8 Child Protection Policy Specialist SIC Yes 105,200

    9 Outreach & Awareness Building Specialist SIC Yes 105,200

  • 27

    10 Institutional Development Specialist SIC Yes 105,200

    11 Socio-Economic Assessment of Children-At-

    Risk FBS No 42,100

    12 Needs Assessment to Inform Policy and

    Program Development FBS No 42,100

    13 Third-Party Evaluation to Assess

    Performance of Programs & Services FBS No 56,100

    14 ^

    Need-based / Innovative Initiatives through

    Non-Government Service Providers QCBS

    Yes (varies by

    specific contract) 280,400

    15 ^

    Awareness & Public Education Campaigns

    (incl. design, implementation, materials, etc.) FBS

    Yes (varies