The Working Smarter Programme
Paul Milmore Programme Manager4th November 2010
![Page 2: The Working Smarter Programme Paul Milmore Programme Manager 4 th November 2010.](https://reader036.fdocuments.us/reader036/viewer/2022081008/56649e7e5503460f94b81daf/html5/thumbnails/2.jpg)
Contents
• History of the Programme• The 5 projects and ‘fit for the future’• Achievements to date• Systems Thinking at Walsall Council• How we are moving forward
![Page 3: The Working Smarter Programme Paul Milmore Programme Manager 4 th November 2010.](https://reader036.fdocuments.us/reader036/viewer/2022081008/56649e7e5503460f94b81daf/html5/thumbnails/3.jpg)
History of Working Smarter
• October 09 – concept borne with CMT and Cabinet
• January to May 10 – council level systems thinking with top leadership group
• May 10 – formal programme established• Oct 10 – completed Phase 1 successfully• Nov 10 – Phase 2 launched = delivery of the
benefits
![Page 4: The Working Smarter Programme Paul Milmore Programme Manager 4 th November 2010.](https://reader036.fdocuments.us/reader036/viewer/2022081008/56649e7e5503460f94b81daf/html5/thumbnails/4.jpg)
Objectives of Working Smarter
• Reduce the council’s cost base by at least £68 million by April 2015
• Increase customer satisfaction with the council from 32% now to 75% by April 2015
• Radically change the way in which we do our business
• Plus 9 Working Smarter Principles that are currently being implemented across council
![Page 5: The Working Smarter Programme Paul Milmore Programme Manager 4 th November 2010.](https://reader036.fdocuments.us/reader036/viewer/2022081008/56649e7e5503460f94b81daf/html5/thumbnails/5.jpg)
The 5 Working Smarter Projects
• Area Partnerships Implementation• Resource Allocation Process & Model• Service Redesign• Asset Management 2010• Council System Design• ……’Fit for the Future’ strand • All work as a single programme
![Page 6: The Working Smarter Programme Paul Milmore Programme Manager 4 th November 2010.](https://reader036.fdocuments.us/reader036/viewer/2022081008/56649e7e5503460f94b81daf/html5/thumbnails/6.jpg)
Achievements to date
• Commenced 7 service redesign projects – Identified £4.391million efficiencies for 2011/12
• Area Planning frameworks in place for all 6 areas priorities identified and being delivered
• Outline new council system design and operating model
• Initial Working Smarter business case and benchmarked service cost model
![Page 7: The Working Smarter Programme Paul Milmore Programme Manager 4 th November 2010.](https://reader036.fdocuments.us/reader036/viewer/2022081008/56649e7e5503460f94b81daf/html5/thumbnails/7.jpg)
The method is… Systems ThinkingThe method is… Systems Thinking
• Taking a customer’s perspective• Clarity of purpose in customer terms• Measuring what matters to your customers• Considering the whole system – end to end• Understanding demand – value / failure• Understanding flow – value / waste• Designing against the value demand• Seeking continuous improvement using the right
measures
![Page 8: The Working Smarter Programme Paul Milmore Programme Manager 4 th November 2010.](https://reader036.fdocuments.us/reader036/viewer/2022081008/56649e7e5503460f94b81daf/html5/thumbnails/8.jpg)
Introducing the approachIntroducing the approach
Weekly as required
Sustain
Strategic Team – Portfolio Holder; ED; AD; HoS
Prep & Set up Assess
Vision & Redesign Experiment Implement
Internal Team
Ope
ratio
nal t
eam
–
end
to
end
Model for CHECKValue Steps Measures
Design and run experiments Establish new measures Take one, do oneLearn
Back to the garageNew operating principles Paper design
5 weeks Scale up 1 day 5 weeks 2 weeks Make normal
![Page 9: The Working Smarter Programme Paul Milmore Programme Manager 4 th November 2010.](https://reader036.fdocuments.us/reader036/viewer/2022081008/56649e7e5503460f94b81daf/html5/thumbnails/9.jpg)
Service Redesign Activity• Children’s Services (Specialist Services)• Neighbourhoods - Public Realm • Neighbourhoods - Highways• Adult Services• Regeneration and Economic Development• Asset Management – non-property savings• Support Services• Council-wide Customer Demand
![Page 10: The Working Smarter Programme Paul Milmore Programme Manager 4 th November 2010.](https://reader036.fdocuments.us/reader036/viewer/2022081008/56649e7e5503460f94b81daf/html5/thumbnails/10.jpg)
What we have found so far
• Adult Social Care – 2 assessments per week to >10 per worker (£200k unnecessary care)
• Pothole repairs – 84% return rate, now 0%• 50% Failure demand in FSS/Contact Centre• Housing Options – Prevent homelessness?• School Meals – predictable fluctuations in
demand; spend per child on meals
![Page 11: The Working Smarter Programme Paul Milmore Programme Manager 4 th November 2010.](https://reader036.fdocuments.us/reader036/viewer/2022081008/56649e7e5503460f94b81daf/html5/thumbnails/11.jpg)
Working Smarter – Next Steps• Phase 2 requires a step change in approach• Dedicated Executive Director – removed
from the day job• Roll out systems thinking across council• Right balance of external support, central
change team and service level capacity• Programme of Service Reviews combined
with supporting change activity at all levels• Ensure the 6 Area Plans are linked to service
redesign programme